## Policy Analysis Report: Special Railway Project Notification
**1. Executive Summary:**
This report analyzes a notification (S.O. 1247(E)) issued by the Ministry of Railways, South Central Railway, Government of India, on March 18, 2025. The notification declares the "Guntur: Guntur-Nadikudi: Construction of 2-lane ROB in lieu of LC No. 06 at KM 91314 between Nallapadu-Bandarupalli stations" project as a Special Railway Project. This designation facilitates land acquisition in the Guntur district of Andhra Pradesh for this public infrastructure project. The key finding is the focus on expediting land acquisition to enable timely construction of the railway overbridge (ROB).
**2. Introduction:**
This report provides an overview and analysis of the South Central Railway's notification regarding the declaration of a specific railway project as a "Special Railway Project" for land acquisition purposes, based solely on the provided policy text.
**3. Policy Overview:**
* This is a new policy notification.
* **Core Objective:** Based on the provided text, the core objective is to facilitate the construction of a 2-lane Railway Over Bridge (ROB) at KM 91314 between Nallapadu-Bandarupalli stations in the Guntur district by expediting the land acquisition process.
**4. Background and Rationale:**
The policy addresses the need to replace Level Crossing (LC) No. 06 with a Railway Over Bridge (ROB). The notification suggests that the current level crossing is inadequate for current or projected traffic, necessitating the construction of the ROB to improve safety and traffic flow. Designating it as a Special Railway Project likely aims to overcome potential delays in land acquisition, which is a common obstacle for infrastructure projects.
**5. Key Provisions / Changes:**
* The notification declares the "Guntur: Guntur-Nadikudi: Construction of 2-lane ROB in lieu of LC No. 06 at KM 91314 between Nallapadu-Bandarupalli stations" project as a Special Railway Project.
* This designation invokes the powers conferred by clause 37A of Section 2 of the Railways Act, 1989.
* The notification authorizes the acquisition of land in the Guntur district of Andhra Pradesh for the project.
* The project is explicitly identified as providing "National Infrastructure for a public purpose."
* The notification takes effect from the date of its publication in the Official Gazette (March 18, 2025).
**6. Target Audience and Stakeholders:**
The primary target audience and stakeholders include:
* Landowners in the Guntur district whose land is required for the project.
* Residents and commuters in the Guntur-Nadikudi region who will benefit from improved railway infrastructure.
* The South Central Railway and its contractors responsible for the project's construction.
* The Andhra Pradesh state government, involved in land acquisition processes.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency:** The South Central Railway, specifically the Chief Project Manager-Gati Shakti, is responsible for overseeing the project.
* **Procedures:** While the notification itself doesn't detail specific procedures, it triggers the process of land acquisition under the Railways Act, 1989, and related regulations. It can be inferred that the relevant authorities will initiate procedures for land valuation, compensation, and transfer.
* **Timelines:** No specific timelines are provided in the notification. However, the designation as a Special Railway Project implies an intention to expedite the process.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcomes include:
* Faster land acquisition for the ROB construction.
* Timely completion of the ROB project.
* Improved safety and reduced traffic congestion by eliminating the level crossing.
* Enhanced railway infrastructure in the Guntur-Nadikudi region.
* Contribution to national infrastructure development.
**9. Conclusion:**
The South Central Railway's notification designating the Guntur-Nadikudi ROB project as a Special Railway Project is a crucial step towards facilitating its construction. The designation is intended to streamline land acquisition, which is critical for the timely completion of this infrastructure project. The successful implementation of this notification will likely lead to improved transportation infrastructure and safety in the region. The industry can anticipate a focus on expedited land acquisition processes within the Guntur district for the specified railway project.
Key Entities Referenced
Railways Act, 1989: A law that confers powers to the Central Government regarding railway projects.
Central Government: The governing body that is exercising powers conferred by the Railways Act, 1989.
South Central Railway: The specific railway zone under the Ministry of Railways issuing the notification.
Guntur, Andhra Pradesh: District in the State of Andhra Pradesh where land acquisition will occur for the railway project.
Guntur-Nadikudi: A railway line section for which a 2-lane Road Over Bridge (ROB) is to be constructed.
Special Railway Project: The designated status of the Guntur-Nadikudi construction project, facilitating land acquisition.
Andhra Pradesh: The State where the land acquisition for the railway project is taking place.
National Infrastructure: The category under which the railway project is classified, highlighting its importance.
Nallapadu-Bandarupalli: The railway stations between which the LC No. 06 is located.
D. MANOHAR REDDY: Chief Project ManagerGati Shakti who is responsible for the upload of document
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-ए.पी.-अ.-19032025-261706
CG-AxPx-xEG-I1D9H0x3x2x0 25-261706
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 1234] नई कदल्ली मगं लवार, माच च18, 2025/फाल्ग न 27, 1946
No. 1234] NEW DELHI, TUESDAY, MARCH 18, 2025/PHALGUNA 27, 1946
रेल मत्रं ालय
(दजिण मध्य रेलव)े
अजधसचू ना
ग ंटूर, 18 माच,च 2025
का.आ. 1247(अ).—केंद्र सरकार, रेलवे अजधजनयम 1989 की धारा 2 के खंड (37क) द्वारा प्रदत्त िजियों का
प्रयोग करते हुए, एतद्वारा, "ग ंटूर: ग ंटूर- नजडक जड: नल्लापाड – बंडारूपल्ली स्ट्टेिनों के बीच ककमी 9/13-14 पर समपार
संख्या-06 के स्ट्थान पर 2-लने आरओबी का जनमाचण" को िन प्रयोिन हते राष्ट्रीय अवसंरचना प्रदान करन े के जलए आध्रं
प्रदेि राज्य के ग ंटूर जिले में एक जविेष रेल पररयोिना के रूप म ें भूजम अजधग्रहण हते आजधकाररक रािपत्र म ें इस
अजधसूचना के प्रकािन की तारीख स े अजधसूजचत करती ह.ै
[फा.स.ं GS/GNT/ROBs/2025/LC.06]
डी.मनोहर रेड्डी, म ख्य पररयोिना प्रबंधक/गजत िजि
1808 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
MINISTRY OF RAILWAYS
(South Central Railway)
NOTIFICATION
Guntur, the 18th March, 2025
S.O. 1247(E).— In exercise of the powers conferred by clause (37A) of Section 2 of the Railways Act, 1989
the Central Government hereby notifies "Guntur: Guntur-Nadikudi: Construction of 2-lane ROB in lieu of LC No. 06
at KM 9/13-14 between Nallapadu-Bandarupalli stations" as a Special Railway Project for acquisition of land in the
State of Andhra Pradesh in the District of Guntur for providing National Infrastructure for a public purpose with effect
from the date of publication of this notification in the Official Gazette.
[F. No. GS/GNT/ROBs/2025/LC.06]
D. MANOHAR REDDY, Chief Project Manager/Gati Shakti
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.