Home India Ministry of Railways GNT: GNT_NDKD: Construction of 2_lane ROB in lieu of LC No.8...
Date: 2025-03-18 Category: Extra Ordinary State: Union Government Country: India

GNT: GNT_NDKD: Construction of 2_lane ROB in lieu of LC No.81 at km 93/16_17 between Tummalacheruvu_Nadikudi stations

Issued by Ministry of Railways · South Central Railway

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: Special Railway Project - Guntur-Nadikudi ROB Construction **1. Executive Summary:** This report analyzes a notification from the Ministry of Railways, South Central Railway, designating the "Guntur: GunturNadikudi: Construction of 2lane ROB in lieu of LC No.81 at KM 931617 between Tummalacheruvu Nadikudi stations" as a Special Railway Project. This designation facilitates land acquisition in the Palnadu District of Andhra Pradesh for this infrastructure project, which aims to improve railway infrastructure and public transportation. The key finding is that the project aims to replace an existing level crossing with a road overbridge (ROB), enhancing safety and efficiency. **2. Introduction:** This report aims to provide a comprehensive overview of the Ministry of Railways' notification concerning the "Guntur: GunturNadikudi: Construction of 2lane ROB in lieu of LC No.81 at KM 931617 between Tummalacheruvu Nadikudi stations" project. The analysis is based solely on the provided text of the notification published in the Gazette of India. **3. Policy Overview:** * This is a **New Policy** designation, establishing a "Special Railway Project." * **Core Objective:** The core objective, as inferred from the text, is to facilitate the construction of a 2-lane Road Over Bridge (ROB) between Tummalacheruvu and Nadikudi stations in place of Level Crossing (LC) No. 81. **4. Background and Rationale:** As a new policy designation, the notification suggests a need to improve railway infrastructure. The replacement of a level crossing (LC) with a road overbridge (ROB) typically addresses issues such as: * **Safety:** ROBs eliminate the risk of collisions between trains and road vehicles at level crossings. * **Efficiency:** ROBs improve traffic flow by separating road and rail traffic, reducing delays for both. * **Infrastructure Improvement:** Enhancing the overall railway network. **5. Key Provisions:** The main provision of this notification is the designation of the construction project as a "Special Railway Project." This designation, authorized under clause 37A of Section 2 of the Railways Act, 1989, triggers specific powers related to land acquisition. Specifically: * **Land Acquisition:** The designation enables the Central Government to acquire land in the Palnadu District of Andhra Pradesh for the project. * **Public Purpose:** The project is declared as providing National Infrastructure for a public purpose, justifying the land acquisition process. * **Effective Date:** The designation takes effect from the date of publication of the notification in the Official Gazette (March 18, 2025). **6. Target Audience and Stakeholders:** Based on the text, the directly affected stakeholders include: * **Residents and landowners** in the Palnadu District of Andhra Pradesh, who may be affected by land acquisition. * **Commuters and businesses** that use the railway line and the road network in the Guntur-Nadikudi area, who will benefit from improved safety and efficiency. * **The Railway authorities** responsible for the construction and maintenance of the railway infrastructure. * **Construction companies** involved in the project. **7. Implementation Aspects (Inferred):** * **Responsible Agency:** The Ministry of Railways, South Central Railway, is the responsible agency. D. Manohar Reddy, Chief Project ManagerGati Shakti, is mentioned as a contact. * **Timeline:** The project commences from the date of the notification (March 18, 2025). * **Procedure:** Land acquisition will follow the procedures outlined in the Railways Act, 1989, and related regulations for Special Railway Projects. **8. Expected Outcomes / Impact of Changes:** The likely intended outcomes of designating this project as a Special Railway Project are: * **Expedited Land Acquisition:** The designation will facilitate a faster land acquisition process, enabling the project to proceed without significant delays. * **Improved Safety:** The construction of the ROB will eliminate the safety risks associated with the existing level crossing. * **Enhanced Efficiency:** The separation of road and rail traffic will improve traffic flow and reduce congestion in the Guntur-Nadikudi area. * **Boost to National Infrastructure:** The project will contribute to the development of national infrastructure by improving the railway network. **9. Conclusion:** The Ministry of Railways' notification designating the "Guntur: GunturNadikudi: Construction of 2lane ROB in lieu of LC No.81 at KM 931617 between Tummalacheruvu Nadikudi stations" as a Special Railway Project marks a significant step towards improving railway infrastructure and public safety in the Andhra Pradesh region. By streamlining land acquisition and prioritizing this project, the government aims to enhance transportation efficiency and contribute to national infrastructure development. This project is significant as it addresses safety concerns and improves traffic flow by replacing a level crossing with a more modern and safer Road Over Bridge.

Key Entities Referenced

Railways Act, 1989: The Act under which powers are conferred for the notification. Central Government: The governing body issuing the notification. Special Railway Project: The designation assigned to the railway construction project for land acquisition purposes. Guntur-Nadikudi: The railway section where the ROB construction is planned. Andhra Pradesh: The state where the land acquisition for the railway project is taking place. Palnadu: The district in Andhra Pradesh where land acquisition for the project is occurring. D. MANOHAR REDDY: Chief Project Manager of Gati Shakti. Gati Shakti: Name of the project manager's organisation. South Central Railway: The specific zone of Indian Railways involved. Tummalacheruvu Nadikudi stations: Railway stations between which the construction will occur
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-ए.पी.-अ.-19032025-261707 CG-AxPx-xEG-I1D9H0x3x2x0 25-261707 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण् ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 1237] नई कदल्ली मगं लवार, माच च18, 2025/फाल्ग न 27, 1946 No. 1237] NEW DELHI, TUESDAY, MARCH 18, 2025/PHALGUNA 27, 1946 रेल मत्रं ालय (दजिण मध्य रेलव)े अजधसचू ना ग ंटूर, 18 माच,च 2025 का.आ. 1250(अ).—केंद्र सरकार, रेलवे अजधजनयम 1989 की धारा 2 के खंड (37क) द्वारा प्रदत्त िजियों का प्रयोग करते हुए, एतद्वारा, "ग ंटूर: ग ंटूर- नजडक जड: त म्मलचेरूव – नजडक जड स्ट्टेिनों के बीच ककमी 93 /16-17 पर समपार संख्या - 81 के स्ट्थान पर 2-लने आरओबी का जनमाचण" को िन प्रयोिन हते राष्ट्रीय अवसंरचना प्रदान करन े के जलए आध्रं प्रदेि राज्य के पलनाड जिल े में एक जविेष रेल पररयोिना के रूप म ें भूजम अजधग्रहण हते आजधकाररक रािपत्र म ें इस अजधसूचना के प्रकािन की तारीख स े अजधसूजचत करती ह.ै [फा.स.ं GS/GNT/ROBs/2025/LC.81] डी.मनोहर रेड्डी, म ख्य पररयोिना प्रबंधक/गजत िजि 1811 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] MINISTRY OF RAILWAYS (South Central Railway) NOTIFICATION Guntur, the 18th March, 2025 S.O. 1250(E).—In exercise of the powers conferred by clause (37A) of Section 2 of the Railways Act, 1989 the Central Government hereby notifies "Guntur: Guntur-Nadikudi: Construction of 2-lane ROB in lieu of LC No.81 at KM 93/16-17 between Tummalacheruvu - Nadikudi stations" as a Special Railway Project for acquisition of land in the State of Andhra Pradesh in the District of Palnadu for providing National Infrastructure for a public purpose with effect from the date of publication of this notification in the Official Gazette. . [F. No. GS/GNT/ROBs/2025/LC.81] D. MANOHAR REDDY, Chief Project Manager/Gati Shakti Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research