Parliament Question: Modernization of FCI Godowns

Issued by Ministry of Consumer Affairs, Food and Public Distribution · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF CONSUMER AFFAIRS, FOOD & PUBLIC DISTRIBUTION DEPARTMENT OF FOOD AND PUBLIC DISTRIBUTION LOK SABHA UNSTARRED QUESTION NO. 3998 TO BE ANSWERED ON j2TH AUGUST, 2026 MODERNIZATION OF FCI (,ODOWNS 3998 SHRI ATUL GAR(,: SMT. SHAMBHAVI: DR. LATA WANKHEDE: SHRI RAJESH VERMA: SHRI ARUN BHARTI: Will the Minister of CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION be pleased to state: (a) the details of the progress of infrastructure projects sanctioned for the modernization of Food Corporation of India (FCI) godowns during 2025-2026 in the States of Bihar and Madhya Pradesh; (b) the total number of modern steel silos constructed under the Public-Private Partnership (PPP) model to minimize storage losses in Bihar and Nladhya Pradesh during the last one year; (c) the total capital expenditure allocated and utilized for implementing the Depot Online System in the food storage facilities across Bihar and Madhya Pradesh; (d) whether any delays in land acquisition or environmental clearances have hindered the timely completion of the proposed silo projects in the said States; and (e) the details of the measures being taken by the Government to integrate modern moisture control and automated weighing systems in all State-managed godowns in Bihar and Madhya Pradesh? ANSWER MINISTER OF STATE FOR MINISTRY OF CONSUMER AFFAIRS, FOOD & PUBLIC DISTRIBUTION (SHRIMATI NIMUBEN JAYANTIBHAI BAMBHANIYA) (a) : in the state of Bihar, Construction ofGodown of 4590 MT at FSDNarayanpur Anant, Muzaffarpur, was sanctioned during FY 2024-2025 under Asset Monetization Scheme. After completion of construction, the godown was taken over by FCI in May-2026.Further, under the Asset monetization scheme, PSD Phulwarisharif (8,120 MT), FSD Mol<ama (2,240 MT) depots have been selected for Asset Monetization and are currently under consideration. In the state oflVladhya Pradesh, no proposal for the construction of SILOs was undertaken during FY 2025–26. In order to improve the infrastructure of the godowns, several works have been undertaken by FCI which includes replacement of old damaged Bituminous (BT) roads by Cement Concrete (CC) roads,replacement of old damaged Asbestos Cement (AC) sheet roof with pre color coated GI profile roof sheet, upgradation of illumination system and installation of DG Set as power backup at all Food Storage Godowns. The details of the progress of such works sanctioned for the modernization of Food Corporation of India (FCI) godowns during 2025-26 in the state of Bihar and Madhya Pradesh is placed at Annexure-A & Annexure-B respectively. (b): in the state of Bihar, SILOs at 06 locations with capacity 03 LMT are completed and tender awarded for 05 locations with capacity 1.75 LMT during the FY. 2025-26. (Annexure –C) Further, the details of modern steel SILOs constructed under the Public-Private Partnership (PPP) mode in Madhya Pradesh is as under: 1. Damoh (50000MT) 2. (luna (5000C)MT) 3 . Ujjain (75000MT) 4. Dhar (50000MT) (c): The Depot Online System (DOS) was implemented as a Pan-India project in FCI. Hence, the capital expenditure for the project was allocated and utilized at the national level, and no State-wise bifurcation of the allocated or utilized expenditure, including for Bihar and Madhya Pradesh, is available. (d) & (e): Land is acquired by private entities for the construction of Silo as per the tender terms. Under Asset Monetization, FC:1’s owned land parcel is also offered. Data/ information regarding the measures being taken to integrate modern moisture control and automated weighing systems in all state-managed godowns in the States of Bihar and Madhya Pradesh is not compiled/maintained at Central Government level. &####Annexure-A referred to in the reply to Part (a) ofUnstarred Question No. 3998 in the Lok Sabha on 12.08.2026. Annexu re-A Details of the works undertaken under MCW (Equity) head during FY 2025-26 in the State of 13il lal AA&ES Amount Tendered Amount SI. No. 1Name of Depot FName of the work (Rs. In Lakh) (Rs. In Lakh) Status of work % Completion Civil 1 Mu[ zaffarpur R Roe ’p al da c we itm he Pn Qt o Cf c Ro om ap al e at te Fly S Dda Nm Rag Pe Ad b Mit uu zm ai fn faou rps u a rnd CC 1162.36 1033.71 Work in Progress 95% 2 IFSD Jaynagar Replacement ofcompletely damaged Bituminous Road 530.21 570.68 Work completed 100% and CC Road with POC Road at FSD Javnagar m> =TiiTialllagedmGus Roacmmm 3 IFSD Chanpatia Co-ncrete Road at FSD Chanpatia 372.21 319.09 Work completed 1009/a Conversion of valley gutter Godown No.- 12, 13, 14 &15 4 IFSD Mokama into Single Span along-with replacement of AC Sheet 386.56 295.55 Work in Progress 75% Roofing ofGodown no 1 1 with Profile Sheet Roofing at FSD Mokama. Conversion of Valley Gutter Godown No. 1 & 2 (wooden truss) into Single Span by tubular steel truss along with 5 IFSD Darbhanga replacement of GI/Asbestos Sheet Roofing with Profile 1230.08 176,34 Work in Progress 65% Sheet Roofing ofGodown no. 1. 2, mini shed, Isolation shed at FSD Darbhanga Conversion of Valley Gutter Godown No. 1 into single 6 IFSD Jaynagar span along with replacement of sheet by profile sheet 213.38 139.74 Work completed 100% roofing of odow-n no. 1.2 & 3 at FSD Jaynagar. Electrical SITC of 30 & 40 KVA DG Set (AS PER CPCB- IV FSD Katihar I with NORMS) 122 91 17.41 Work completed 100% ] FSD Belouri AMF PANEL including providing eaIThing, foundation, I'--'' ' and providing roofing with profile sheet at FCI FSD's under DO Purnea.Annexure-B referred to in the reply to Part (a) ofUnstarred Question No. 3998 in the Lok Sabha on 12.08.2026. Annexure-B aims (#the worMu ntFditMeliilkliFTlt\MEHI iM HmI t :III nfl mM; MmmFsTITili / (70 (in Rs.Lakh) Completion iI. L,kh) FaTMl a ng 388. 17 100% Cement IConcrete Road at FSD Harpalpur. iBn'–It;a-e= r2 FSD Shahdol MCW works at FSD Shahdol for the year 2025-26. SH: Providing B3 100% cement oncrete road at FSD Shahdol 3 L Fa [26m 24 1 .48 Completed loo(E Cement 'oncrete Road at FSD Sura+gan i e Meghnagar for the year 2025-26. SH. Providing T22n 114.22 Completed 100 Po Cement IConcrete Road at FSD Meghnagar bI BSC' Itarsi \ a 1 228,32 Work in pr&T= 60% FConcrete FRoad at BSC Itarsi-2nd call m 6 I o 179.23 Completed 10 0% Cement oncrete Road at FSD SheoDur kalan- 3rd call 7 1 6.28 259.44 Work in progress 2% cement :oncrete road 8 FSD Datia l 156.15 Work FR) imr :%' concrete oad V I1 6.77 won:lGaii; 90% xisting wal] and its reconstruction along with retaining wall at FSD IChhola (Bhopal) yeRF––BT 10 c works at PSD Meghnagar thr the 1 o o ) Completed 1 00% Reconstruction of Idamaged and tilted compound wall by demolishing existing tilted wall at IFSD Meghnagar t r t.le year - . : econstructlon o] mma nc '- ' jdamaged/9ollqpse.d_„'_ „ . .12 1 FSD Seoni IMCW work at FSD Seoni for the Year 2025-26. SH: Providing bore\veII, 24.74 15.26 Work in progress 195% IRaising boundary wall, Main gate repair and providing PVC water jstorage tank 13 FSD Datia & FSD [MCW work at k-SD Datia and FSD Gwalior for the vear 2025-26, Sl-I 11 .69 8.18 Completed 1 00% G walior IPr9viding Mild steal weld mesh for top ventilator ofgodo\yn 14 Ti;ii Ujjain \ r 2025-26. SH: I)roviding Mild Mr 3.85 CcTim I o( )',’.t, lsteel weld mesh for top ventilator ofROdown T :ampur \ ) ii:iTTmmc- T) m( mpleted Mo t eel weld Imesh for tOD ventilator ofgodown Kg a MC'W work at BSC ltarsi for the year 2025-26. SH: Providing Mild 32.28 Completed 100% steel \veld mesh for top ventilator of godo\yn e ii SD isllOkllag;It' t I1 .54 8.09 CombI :ype fully 'nclosed DG set complete on Turnkey basis (including fully mr :omprehensive guarantee for 2 years) at FSD Ashoknagar 2 mt ply, Installation, Testing and Commissioning of 30 KVA outdoor n3 D3 Complete ype fu]ly enclosed DG set comp]ete on Turnkey basis (including fully corn prchensive guarantee for 2 years) at FSD Balaghat(N 3 FSD Betul ;upply, Installation. Testing and Commissioning of 25 KVA outdoor I1 .54 8.09 Complete ype ful]y enclosed DG set complete on Turnkey basis (including fully comprehensive Igudrantee for 2 years) at FSD Betul T FSD Sura}ganj L 1 1 .54 8.3 Complete hype fully enclosed DG set complete on Turnkey basis (including fully comprehensive Iguarantee for 2 years) at FSD Surajgan 5 PSD Vidisha L g and Commissioning of 25 KVA outdoor 11 .54 8 .09 Complete hype fully enclosed DG set complete on Turnkey basis (including fully comprehensive Iguarantee for 2 years) at FSD Vidisha6 FSDBalaghat (K) ISupply, Installation. Testing and Commissioning of 25 KVA outdoor 11.54 8.03 Complete ype fully enclosed DG set complete on Turnkey basis (including lfully comprehensive guarantee for 2 years) at FSD Balaghat ( K 7 FSD Rampur Supply. Installation, Testing and Commissioning of 25 KVA outdoor 11.54 8.65 Complete .ype fully enclosed DG set complete on Turnkey basis (including lfully comprehensive guarantee for 2 years) at FSD RamDur 8 FSD Waraseoni Supply, Installation. Testing and Commissioning of 25 KVA outdoor 1 1 .54 8.03 Complete .ype fully enclosed DG set complete on Turnkey basis (including fully comprehensive jquarantee for 2 vears) at FSD Waraseoni [; FSDSeoni t 11 .54 8.03 Complete jtype fully enclosed DG set complete on Turnkey basis (including fully jcomprehensive guarantee for 2 years) at FSD Seoni m m 10 FgD-(-iTvaITaF L IIation. Testing and Commissioning of 25 KV A outdoor Complete jtype fully 'nclosed DG set complete on Turnkey basis (inc]uding fully jcomprehensive guarantee for 2 years) at FSD Gwdlior rl -Kf5131ia m( 11 L i Comm issioning of 25 KV A outdoor Comple= Itype fully enclosed DG set complete on Turnkey basis (including fully comprehensive Iguarantee for 2 vears) at FSD Bina ansimmmZG-LiZI 12 FSD Satna [Supply, Installation. Testing 11.54 8.13 Complete :ype fully enclosed DG set complete on Turnkey basis (including lfully comprehensive .guarantee for 2 years) at FSDSatna 13 Fgfi-ghahdol L 11.54 8.13 Complete )'pe fully enclosed DG set complete on Turnkey basis (including fu]ly :omprehensive guarantee for 2 years) at FSD Shahdol r4 ) ;upply. Installation. Testing and Commissioning of 30 KVA outdoor n3 Complete ype fully enclosed DG set complete on Turnkey basis (including fully conrprehensive I.guarantee for 2 years) at FSD HarDaIDur CimlmMgBin 15 FSD 'Fikamgarl; TSuppnimIIation. Testing and 13.12 9.12 Comp-m pe fully enclosed DG set complete on Turnkey basis (including fully IComDrehensive guarantee for 2 years) at FSD TikamgarhAnnexure-C referred to in the reply to Part (b) of Unstarred Question No. 3998 in the Lok Sabha on 12.08.2026. Annexu re-C S. No. 1 State Location Capacity (in Mode / Type Year/Date of LM of Silo Completion Bihar BUXAR r5d VGF 23.04.2025 Bihar 0.50 Non-VGF 02.06.2025 < Bihar KATIHAR (II 0.50 SPOKE 18.06.2025 Bihar rrlur 0.50 VGF 15.12.2025 Bihar Purnea 0.50 Spoke 26. 12 .2025 Bihar :usara 0.50 Spoke 12.03.2026 Bihar 0.50 Hub Tender Awarded ) Bihar Vaishal 0.25 Spoke Tender Awarded Bihar Saran 0.25 Spoke Tender Awarded Bihar Motihar 0.50 Hub Tender Awarded Bihar Siwan 0.25 SDOke Tender Awarded

Continue your research