## Policy Analysis Report: Land Acquisition for NH92 Rehabilitation and Upgradation in Uttar Pradesh
**1. Executive Summary:**
This report analyzes a notification from the Ministry of Road Transport and Highways, Government of India, regarding land acquisition for the rehabilitation and upgradation of National Highway 92 (NH92) in Uttar Pradesh. The core purpose, as inferred from the text, is to facilitate the improvement of the Bewar to Karri village section of NH92, specifically upgrading it to a 2-lane configuration with paved shoulders or a 4-lane configuration. Key findings indicate the assignment of a Competent Authority for land acquisition and identifies the specific stretch of land, districts, taluks/mandals, and villages affected by this project.
**2. Introduction:**
This report provides an overview and analysis of the notification S.O. 395(E), published in the Gazette of India on January 27, 2021, concerning land acquisition for the rehabilitation and upgradation of a section of National Highway 92 (NH92) in the state of Uttar Pradesh. The analysis is based solely on the provided text of the notification.
**3. Policy Overview:**
* This is a new policy regarding land acquisition for a specific infrastructure project.
* **Core Objective(s):** As inferred from the text, the primary objective is to facilitate the rehabilitation and upgradation of the Bewar to Karri village section (Km 0.000 to Km 28.900) of NH92. This includes upgrading the highway to a 2-lane configuration with paved shoulders or a 4-lane configuration. The project falls under the Green National Highways Corridor Project (GNHCP).
**4. Background and Rationale:**
This new policy addresses the need for infrastructure development and improvement along National Highway 92 (NH92) in Uttar Pradesh. The policy text suggests that the existing road infrastructure between Bewar and Karri village (Km 0.000 to Km 28.900) requires rehabilitation and upgrading. The reference to "2-lane with paved shoulder/4-lane configuration" implies a need to increase the road capacity and improve safety standards, likely driven by increasing traffic volume and the goals of the Green National Highways Corridor Project (GNHCP).
**5. Key Provisions / Changes:**
* **Competent Authority Designation:** The core provision of this policy is the authorization of a "Competent Authority" to perform functions under the National Highways Act, 1956, specifically related to land acquisition for the NH92 project. The officer designated as the Competent Authority is mentioned in column 2 of the Schedule annexed to the notification.
* **Land Acquisition Parameters:** The policy details the specific stretch of land required for the project, defining it as the Bewar to Karri village section (Km 0.000 to Km 28.900) of NH92 in Uttar Pradesh.
* **Geographical Scope:** The policy explicitly identifies the affected state (Uttar Pradesh), districts (Mainpuri), taluks/mandals (Bhogaon, Mainpuri, Kusmra, Kishni), and villages (Bajhera, Bhawalpur, Fatehpur Gani, Saraichak Govindpur, Chilaunsa, Paraunkha, Majhola, Dharmangadpur, Kundhi, Bara, Maheshpur, Kusmra Dehat, Arsara, Saunasee, Kishni, Jatpura, Khijarpur, Pharaijee, Dadaus).
**6. Target Audience and Stakeholders:**
The target audience and stakeholders directly affected by this policy include:
* **Landowners:** Individuals and entities owning land within the specified stretch of NH92.
* **Residents:** Individuals residing in the listed villages.
* **Businesses:** Businesses operating within the affected area.
* **Construction Companies:** Entities likely to be involved in the road rehabilitation and upgradation project.
* **Local Government:** Officials and departments in the Mainpuri district.
* **National Highways Authority of India (NHAI):** While not explicitly mentioned, NHAI is likely a key stakeholder due to its role in national highway development.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency/Bodies:** The Ministry of Road Transport and Highways is the issuing authority. The notification designates a "Competent Authority" (CALA) to oversee the land acquisition process. The Additional District Magistrate is named as the CALA.
* **Timelines/Procedures:** The policy takes effect from the date of its publication in the Official Gazette (January 27, 2021). The policy mandates the CALA to execute land aquisition. Further timelines are not specified in the given text.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcomes of this policy are:
* **Efficient Land Acquisition:** Streamlined land acquisition process through the designated Competent Authority, leading to reduced delays in the project.
* **Highway Improvement:** Facilitation of the rehabilitation and upgradation of the Bewar to Karri village section of NH92, resulting in improved road infrastructure, increased capacity, and enhanced safety.
* **Economic Benefits:** Potential economic benefits for the region through improved connectivity and transportation infrastructure.
* **Green National Highways Corridor Project advancement**: Contribution to the achievement of the goals under the GNHCP.
**9. Conclusion:**
The notification S.O. 395(E) represents a crucial step towards the rehabilitation and upgradation of the Bewar to Karri village section of National Highway 92 in Uttar Pradesh. The designation of a Competent Authority and the clear definition of the affected land provide a framework for efficient land acquisition, paving the way for the timely completion of this important infrastructure project under the Green National Highways Corridor Project. The implementation of this policy is expected to have a significant impact on the region's transportation network and economic development.
Key Entities Referenced
Majhola: Village in Uttar Pradesh
National Highways Act, 1956: Act of Indian Parliament empowering Central Government to declare certain highways as national highways and to provide measures for their administration.
Central Government: The Union Government of India.
NH92: National Highway 92, stretch of land from km 0.000 to Km 28.900
UTTAR PRADESH: State in India where the land acquisition is taking place.
Green National Highways Corridor Project GNHCP: Project under which rehabilitation and upgradation of NH92 is being carried out.
MAINPURI: District in Uttar Pradesh where part of the land acquisition is taking place.
Bewar to Karri village: Section of NH92 being upgraded.
New Delhi: Location of Ministry of Road Transport and Highways
Ministry of Road Transport and Highways: Indian Government Ministry responsible for the development of road infrastructure.
Bajhera: Village in Uttar Pradesh
Bhawalpur: Village in Uttar Pradesh
Fatehpur Gani: Village in Uttar Pradesh
Bhogaon: TalukMandal in Uttar Pradesh
Saraichak Govindpur: Village in Uttar Pradesh
Chilaunsa: Village in Uttar Pradesh
Paraunkha: Village in Uttar Pradesh
Dharmangadpur: Village in Uttar Pradesh
Kundhi: Village in Uttar Pradesh
Bara: Village in Uttar Pradesh
Maheshpur: Village in Uttar Pradesh
Kusmra: Village in Uttar Pradesh
kusmra Dehat: Village in Uttar Pradesh
Kishni: TalukMandal in Uttar Pradesh
Arsara: Village in Uttar Pradesh
Saunasee: Village in Uttar Pradesh
jatpura: Village in Uttar Pradesh
Khijarpur: Village in Uttar Pradesh
Pharaijee: Village in Uttar Pradesh
Dadaus: Village in Uttar Pradesh
RAJESH GUPTA: Director
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
xxxGIDHxxx
सी.जी.-डी.एलxx.x-GअID.-E2x8x0x 12021-224732
CG-DL-E-28012021-224732
ऄसाधारण
EXTRAORDINARY
भाग II—खण् ड 3—ईप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 363] नइ ददल्ली, बुधवार, िनवरी 27, 2021/माघ 7, 1942
No. 363] NEW DELHI, WEDNESDAY, JANUARY 27, 2021/MAGHA 7, 1942
सड़क पररवहन और रािमाग गमत्रं ालय
ऄजधसचू ना
नइ ददल्ली, 27 िनवरी, 2021
का.अ. 395(ऄ).— केन्द्रीय सरकार, राष्ट्रीय रािमाग ग ऄजधजनयम, 1956 (1956 का 48) की धारा 3 के खंड (क)
द्वारा प्रदत्त िजियों का प्रयोग करत े हुए ईत्तर प्रदेि म े राष्ट्रीय रािमाग ग NH-92 के बेवर-करी खण्ड (दकमी0 0.000 स े
दकमी0 28.900) को ग्रीन राष्ट्रीय रािमाग ग कॉरीडोर पररयोिना (िीएनएचसीपी) के ऄतं गतग जनमागण/चौड़ीकरण (दो लने
पटरी सजहत/चार लेन) के जलए ईि ऄनुसूची के स्ट्तम्भ (4), (5), (6) और (7) म ें क्रमिः ईजल्लजखत राज्य, जिलों, तालुकों
और गांवों स े सम्बजन्द्धत ईि ऄनुसूची के स्ट्तम्भ (3) की तद्त्सस्ट्थानी प्रजवजि म ें जवजनर्ददि भ-ू खण्ड के सम्बन्द्ध म ें आस
ऄजधसूचना के सरकारी रािपत्र म ें प्रकािन की तारीख स े ऄनुसूची के स्ट्तम्भ (2) म ें ईजल्लजखत ऄजधकारी को ईि
ऄजधजनयम के ऄन्द्तगतग ऐसे प्राजधकारी के कृसयों का जनष्पादन करने के जलए सक्षम प्राजधकारी के रूप म ें प्राजधकृत करती ह।ै
531 GI/2021 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
ऄनसु चू ी
ईत्तर प्रदेि राज्य म ेंराष्ट्रीय रािमाग ग सख्ं या NH-92 के बवे र-करी खण्ड (दकमी. 0.000 स ेदकमी. 28.900) के
जनमाणग /चौड़ीकरण (दो लने पटरी सजहत/चार लने ) हते ुभजू म ऄिनग ।
क्रजमक सक्षम प्राजधकारी भूजम का राज्य जिल ेका तालकु का नाम गावं का नाम
सख्ं या जववरण नाम
1 2 3 4 5 6 7
1 बझेडा
2 भावलपुर
3 फतेहपुर गनी
भोगााँव 4 सरायचक गोजवन्द्देपुर
5 जचलौसा
6 परौखा
7 मझोला
राष्ट्रीय 1 धरमंगदपुर
ऄपर
रािमागग
2 कूडी
जिलाजधकारी
संख्या
(जव०/रा०) NH92 के ईत्तर 3 बरा
1 मैनपुरी
मैनपुरी प्रदेि
दक.मी. 0 4 महिे पुर
से 28.9
5 कुसमरा
तक
6 कुसमरा देहात
दकिनी 7 ऄरसारा
8 सौनासी
9 दकिनी
10 िटपुरा
11 जखिरपुर
12 फरैिी
13 ददौस
[फा. सं. PIU/MoRTH/FRK/NH-92-I/LA/2020-21]
रािेि गुप् ता, जनदेिक[भाग II—खण् ड 3(ii)] भारत का रािपत्र : ऄसाधारण 3
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 27th January, 2021
S.O. 395(E).— In exercise of powers conferred by clause (a) of section 3 of the National Highways
Act, 1956(48 of 1956), the Central Government hereby authorizes the officer mentioned in column (2) of
the Schedule annexed here to as the Competent Authority to perform the functions of such authority under
the said Act with effect from the date of publication of this notification in the Official Gazette, in respect of
the stretch of land specified in the corresponding entry in column (3) of the said Schedule relating to state,
districts, taluk and villages mentioned in column (4), (5), (6) and (7) respectively of the said Schedule for
Rehabilitation and upgradation to 2 lane with paved shoulder/4-lane configuration of Bewar to Karri village
section (km 0.000 to Km 28.900) of NH-92 in the State of UTTAR PRADESH under Green National
Highways Corridor Project (GNHCP).
SCHEDULE
Land acquisition for Rehabilitation and up-gradation to 2 lane with paved shoulder/4-lane
configuration of Bewar to Karri village section (Km. 0.000 to Km. 28.900) of National Highway No.
NH-92 in the State of UTTAR PRADESH.
Sl. CALA Stretch State District Taluk/Mandal Name of the Village
No.
1 2 3 4 5 6 7
1 Bajhera
2 Bhawalpur
3 Fatehpur Gani
Bhogaon 4 Saraichak Govindpur
5 Chilaunsa
6 Paraunkha
7 Majhola
Additional 1 Dharmangadpur
District
2 Kundhi
Magistrate
0KM To UTTAR
1 (F/R) MAINPURI 3 Bara
28.9KM PRADESH
Mainpuri 4 Maheshpur
5 Kusmra
6 kusmra Dehat
Kishni 7 Arsara
8 Saunasee
9 Kishni
10 jatpura
11 Khijarpur
12 Pharaijee
13 Dadaus
[F. No. PIU/MoRTH/FRK/NH-92-I/LA/2020-21]
RAJESH GUPTA, Director
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.