Executive Summary & Key Takeaways

Executive Summary: These notifications, under Section 20A of the Railways Act, 1989, declare the Central Government's intention to acquire land for the Anuppur Katni 3rd line project in Madhya Pradesh. The notifications outline the process for interested persons to raise objections to the land acquisition within 30 days of publication in the official Gazette. The Competent Authority will hear and decide on these objections. Key Points / Main Content: Land Acquisition for Railway Project: * The Central Government intends to acquire land for the Anuppur Katni 3rd line project (165.52 Kms). * The project is a Special Railway Project of Madhya Pradesh. * This action is taken under Section 20A, subsection 1 of the Railways Act, 1989. Objection Process: * Persons interested in the land can raise objections within 30 days of the notification's publication. * Objections must be in writing and submitted to the Sub Divisional Officer (Competent Authority) of either Shahdol or Anuppur, Madhya Pradesh, depending on the land in question. * Objections must state the grounds for the objection. * The Competent Authority will provide an opportunity for the objector to be heard, either in person or through a legal practitioner. * The Competent Authority's decision on the objections is final. Land Details and Inspection: * Land plans and details are available for inspection at the office of the Competent Authority. * The notification includes schedules with brief descriptions of the land to be acquired in Village Chhata, Tahsil Sohagpur, District Shahdol and Villages Parswar and Devhara, Tahsil Anuppur, District Anuppur including Khasra numbers and area (in Hectares). Impact Analysis: Landowners/Interested Persons: * Impact: Potential loss of land due to acquisition for the railway project. * Action Required: If desired, submit written objections to the Sub Divisional Officer (Competent Authority) of the corresponding district within 30 days of the notification's publication, including the grounds for objection. Competent Authority (Sub Divisional Officer, Shahdol and Anuppur, Madhya Pradesh): * Impact: Responsible for receiving, reviewing, and addressing objections to the land acquisition. * Action Required: Provide objectors an opportunity to be heard, conduct inquiries, and issue orders either allowing or disallowing the objections. Central Government/Ministry of Railways: * Impact: Facilitating the Anuppur Katni 3rd line project through land acquisition. * Action Required: Proceed with land acquisition as per the Railways Act, 1989, considering the objections received and the Competent Authority's decisions.

Key Entities Referenced

Railways Act, 1989: A law referenced in the notification, specifically sections 20A and 20D, related to land acquisition for railway projects. Anuppur Katni 3rd line project: A Special Railway Project in Madhya Pradesh for which land is being acquired. Madhya Pradesh: The state in India where the Anuppur Katni 3rd line project is located and where land acquisition is taking place. Central Government: The governing body responsible for authorizing the land acquisition for the railway project. Sub Divisional Officer, Shahdol, Madhya Pradesh: The Competent Authority to whom objections regarding land acquisition can be raised for the land being acquired in Shahdol district. Sub Divisional Officer, Anuppur, Madhya Pradesh: The Competent Authority to whom objections regarding land acquisition can be raised for the land being acquired in Anuppur district. Anuppur District, Madhya Pradesh: A district in Madhya Pradesh where land acquisition is taking place for the Anuppur Katni 3rd line project. Shahdol District, Madhya Pradesh: A district in Madhya Pradesh where land acquisition is taking place for the Anuppur Katni 3rd line project.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. NO. D. L.-33004/99 xxxGIDHxxx सी.जी.-सी.जी.-अ.-23012020-215652 xxxGIDExxx CG-CG-E-23012020-215652 असाधारण EXTRAORDINARY भाग II—खण्ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 286] नई कदल्ली, िधु वार, िनवरी 22, 2020/माघ 2, 1941 No. 286] NEW DELHI, WEDNESDAY, JANUARY 22, 2020/MAGHA 2, 1941 रेल मत्रं ालय (द.प.ूम. रेलव,े जिलासपरु ) अजधसचू ना जिलासपुर, 9 िनवरी, 2020 रेल अजधजनयम 1989 की धारा 20A के अतं गतग अजधसचू ना का.आ. 297(अ).—केंद्रीय सरकार रेल अजधजनयम, 1989 (1989 का 24) (जिसे इसम ें इसके पश्चात ् उक्त अजधजनयम कहा गया ह)ै की धारा २०क की उपधारा (1) द्वारा प्रदत्त िजक्तयों का प्रयोग करते हुए यह समाधान होन े के पश्चात ् कक लोक प्रयोिन के जलय,े वह भूजम, जिसका संजिप्त जववरण इससे उपािद्ध अनुसूची में कदया गया ह,ै मध्य प्रदेि राज्य के िहडोल जिल े म ें जविेष रेल पररयोिना, अर्ागत,् द.पू.म. रेलवे के अंतगगत अनुपपरु -कटनी तीसरी लाइन पररयोिना (165.52 कक.मी.), के जनष्पादन के जलय े अपेजित ह,ै ऐसी भूजम का अिगन करन े के जलय े अपन े आिय की घोषणा करती हIै उक्त भूजम म ें जहतिद्ध कोई व्यजक्त, रािपत्र म ें इस अजधसूचना के प्रकािन की तारीख स े तीस कदन के भीतर, उक्त अजधजनयम की धारा 20घ की उपधारा (1) के अधीन उपयुगक्त प्रयोिन के जलय े ऐसी भूजम के अिगन और उपयोग के संिंध म ेंआिेप कर सकेगा I प्रत्येक ऐसा आिपे सिम प्राजधकारी अर्ागत, अनुजवभागीय अजधकारी (रािस्ट्व), िहडोल, मध्य प्रदिे को जलजखत म ें ककया िायेगा और उसमें उसके आधार उपवर्णणत करेगा और सिम प्राजधकारी आिेपकता ग को व्यजक्तगत रूप स े या जवजध व्यवसायी के माध्यम स े सुनवाई का अवसर प्रदान करेगा और सभी ऐस े आिेपों की सुनवाई करन े तर्ा ऐसी अजतररक्त िााँच, यकद कोई हो तो, करन े के पश्चात, िो सिम प्राजधकारी आवश्यक समझ,े आदिे द्वारा, आिेपों को या तो अनुज्ञात या अन अनुज्ञात कर सकेगा I उक्त अजधजनयम की धारा 20घ की उपधारा (2) के अधीन सिम प्राजधकारी द्वारा ककया गया कोई आदेि अंजतम होगा I 414 GI/2020 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] इस अजधसूचना के अधीन आन े वाली भूजम का रेखांकन और भूजम के अन्य ब्यौरे उपलब्ध ह ैं और जहतिद्ध व्यजक्त द्वारा उनका जनररिण सिम प्राजधकारी के उपरोक्त कायागलय म ें ककया िा सकता ह ैI अनसु चू ी (A) ग्राम – छाता, तहसील - सोहागपरु , जिला - िहडोल (म. प्र.) क्र जिले का तहसील ग्राम का खसरा अर्णित की िाने वाला जिस वास्ट्ते िमीन ली िा रही ह ै नाम का नाम नाम संख्या. िेत्रफल (हे टेयर में) .1 िहडोल सोहागपुर छाता 172/1 0.494 अनुपपुर – कटनी तीसरी रेल लाइन 2. िहडोल सोहागपुर छाता 172/2 0.040 अनुपपुर – कटनी तीसरी रेल लाइन 3. िहडोल सोहागपुर छाता 174 0.396 अनुपपुर – कटनी तीसरी रेल लाइन 4. िहडोल सोहागपुर छाता 175/1 0.271 (Map not अनुपपुर – कटनी तीसरी रेल लाइन 5. िहडोल सोहागपुर छाता 175/2/1 revised) अनुपपुर – कटनी तीसरी रेल लाइन 6. िहडोल सोहागपुर छाता 175/2/2 अनुपपुर – कटनी तीसरी रेल लाइन 7. िहडोल सोहागपुर छाता 175/2/3 अनुपपुर – कटनी तीसरी रेल लाइन 8. िहडोल सोहागपुर छाता 175/3/1 अनुपपुर – कटनी तीसरी रेल लाइन 9. िहडोल सोहागपुर छाता 175/2/4 अनुपपुर – कटनी तीसरी रेल लाइन 10 िहडोल सोहागपुर छाता 175/3/2 अनुपपुर – कटनी तीसरी रेल लाइन .11 िहडोल सोहागपुर छाता 175/3/3 अनुपपुर – कटनी तीसरी रेल लाइन .11 िहडोल सोहागपुर छाता 175/3/4 अनुपपुर – कटनी तीसरी रेल लाइन .13 िहडोल सोहागपुर छाता 175/5 अनुपपुर – कटनी तीसरी रेल लाइन 14. िहडोल सोहागपुर छाता 176 0.040 अनुपपुर – कटनी तीसरी रेल लाइन Total 1.141 कुल जनिी भजू म : 1.241 ह े टेयर [फा. स.ं CAO/C/BSP/APR-KTE 3rd Line/Land Acquisition] सोनवीर ससह, मुख्य प्रिासजनक अजधकारी (जनमागण) MINISTRY OF RAILWAYS (S.E.C. Railway, Bilaspur) NOTIFICATION Bilaspur, the 9th January, 2020 Notification under Section 20A of the Railways Act, 1989 S.O. 297(E).—In In exercise of powers conferred by sub-section (1) of section 20A of the Railways Act, 1989 (24 of 89) (hereinafter referred as the said Act), the Central Government after being satisfied that for the public purpose, the land, brief description of which is given in the schedule annexed hereto, is required for the execution of Anuppur – Katni 3rd line project (165.52 Kms), Special Railway Project of Madhya Pradesh, hereby declares its intention to acquire such land; Any persons interested in the said land may Within a period of 30 days from the date of publication of this notification in the official Gazette, raise objection to the acquisition of such land for the aforesaid purpose under sub-section (1) of Section 20D of the said Act. Every objection shall be made to the competent Authority, namely Sub Divisional Officer, Shahdol, Madhya Pradesh in writing and shall set out grounds thereof and the competent authorityभाग II खण् ड (ii) भारत का रािपत्र : असाधारण 3 shall give the objector an opportunity of being heard, either in person or through a legal practitioner, and may, after hearing all such objections and after making such further enquiry, if any as the competent Authority thinks necessary, by order, either allow or disallow the objections; Any order made by the Competent Authority under sub-section (2) of section 20D of the said Act shall be final. The land plans and other defaults of the land covered under this notification are available and can be inspected by the interested person at the aforesaid office of the Competent Authority. SCHEDULE Brief Description of the land to be acquired, with or without structure, for the Special Railway Project, namely Anuppur – Katni 3rd line (165.52 Km) of Anuppur – Shahdol- Umaria – Katni, District in the State of Madhya Pradesh. (A) Village – Chhata, Tahsil - Sohagpur, District- Shahdol (M.P.) Sl.No. Name of Name of Name of Khasra/Plot Area to be Reason for land acquisition District Tahsil village No. acquired (In Hect.) .1 Shahdol Sohagpur Chhata 172/1 0.494 Anuppur – Katni 3rd line 2. Shahdol Sohagpur Chhata 172/2 0.040 Anuppur – Katni 3rd line 3. Shahdol Sohagpur Chhata 174 0.396 Anuppur – Katni 3rd line 4. Shahdol Sohagpur Chhata 175/1 0.271 (Map Anuppur – Katni 3rd line not revised) 5. Shahdol Sohagpur Chhata 175/2/1 Anuppur – Katni 3rd line 6. Shahdol Sohagpur Chhata 175/2/2 Anuppur – Katni 3rd line 7. Shahdol Sohagpur Chhata 175/2/3 Anuppur – Katni 3rd line 8. Shahdol Sohagpur Chhata 175/3/1 Anuppur – Katni 3rd line 9. Shahdol Sohagpur Chhata 175/2/4 Anuppur – Katni 3rd line 10. Shahdol Sohagpur Chhata 175/3/2 Anuppur – Katni 3rd line 11. Shahdol Sohagpur Chhata 175/3/3 Anuppur – Katni 3rd line 12. Shahdol Sohagpur Chhata 175/3/4 Anuppur – Katni 3rd line 13. Shahdol Sohagpur Chhata 175/5 Anuppur – Katni 3rd line 14. Shahdol Sohagpur Chhata 176 0.040 Anuppur – Katni 3rd line Total Private Land : 1.241 Hect. [F. No. CAO/C/BSP/APR-KTE 3rd Line/Land Acquisition] SONVIR SINGH, Chief Administrative Officer (Con) अजधसचू ना जिलासपुर, 9 िनवरी, 2020 रेल अजधजनयम 1989 की धारा 20A के अतं गतग अजधसचू ना का.आ. 298(अ).— केंद्रीय सरकार रेल अजधजनयम, 1989 (1989 का 24) (जिसे इसम ें इसके पश्चात ् उक्त अजधजनयम कहा गया ह)ै के धारा २०क की उपधारा (1) द्वारा प्रदत्त िजक्तयों का प्रयोग करत े हुए यह समाधान होन े के पश्चात ् कक लोक प्रयोिन के जलय,े वह भूजम, जिसका संजिप्त जववरण इससे उपािद्ध अनुसूची में कदया गया ह,ै मध्य प्रदेि राज्य के अनुपपरु जिले म ें जविेष रेल पररयोिना, अर्ागत,् द.पू.म. रेलवे के अतं गगत अनुपपुर - कटनी तीसरी लाइन पररयोिना (165.52 कक.मी.), के जनष्पादन के जलये अपेजित ह,ै ऐसी भूजम का अिगन करने के जलय े अपन े आिय की घोषणा करती हIै4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] उक्त भूजम म ें जहतिद्ध कोई व्यजक्त, रािपत्र म ें इस अजधसूचना के प्रकािन की तारीख स े तीस कदन के भीतर, उक्त अजधजनयम की धारा 20घ की उपधारा (1) के अधीन उपयुगक्त प्रयोिन के जलय े ऐसी भूजम के अिगन और उपयोग के संिंध म ेंआिेप कर सकेगा I प्रत्येक ऐसा आिपे सिम प्राजधकारी अर्ागत,् अनुजवभागीय अजधकारी (रािस्ट्व), िहडोल, मध्य प्रदिे को जलजखत म ें ककया िायेगा और उसमें उसके आधार उपवर्णणत करेगा और सिम प्राजधकारी आिेपकता ग को व्यजक्तगत रूप स े या जवजध व्यवसायी के माध्यम स े सुनवाई का अवसर प्रदान करेगा और सभी ऐस े आिेपों की सुनवाई करन े तर्ा ऐसी अजतररक्त िााँच, यकद कोई हो तो, करन े के पश्चात, िो सिम प्राजधकारी आवश्यक समझ,े आदिे द्वारा, आिेपों को या तो अनुज्ञात या अन अनुज्ञात कर सकेगा I उक्त अजधजनयम की धारा 20घ की उपधारा (2) के अधीन सिम प्राजधकारी द्वारा ककया गया कोई आदेि अंजतम होगा I इस अजधसूचना के अधीन आन े वाली भूजम का रेखांकन और भूजम के अन्य ब्यौरे उपलब्ध ह ैं और जहतिद्ध व्यजक्त द्वारा उनका जनररिण सिम प्राजधकारी के उपरोक्त कायागलय म ें ककया िा सकता ह ैI अनसु चू ी (A) ग्राम – छाता , तहसील - सोहागपरु , जिला – िहडोल (म. प्र.) क्र जिले का तहसील ग्राम का खसरा अर्णित की िाने वाला जिस वास्ट्ते िमीन ली िा रही ह ै नाम का नाम नाम संख्या. िेत्रफल (हे टेयर में) .1 िहडोल सोहागपुर छाता 172/1 0.494 अनुपपुर – कटनी तीसरी रेल लाइन 2. िहडोल सोहागपुर छाता 172/2 0.040 अनुपपुर – कटनी तीसरी रेल लाइन 3. िहडोल सोहागपुर छाता 174 0.396 अनुपपुर – कटनी तीसरी रेल लाइन 4. िहडोल सोहागपुर छाता 175/1 अनुपपुर – कटनी तीसरी रेल लाइन 5. िहडोल सोहागपुर छाता 175/2/1 अनुपपुर – कटनी तीसरी रेल लाइन 6. िहडोल सोहागपुर छाता 175/2/2 अनुपपुर – कटनी तीसरी रेल लाइन 7. िहडोल सोहागपुर छाता 175/2/3 अनुपपुर – कटनी तीसरी रेल लाइन 8. िहडोल सोहागपुर छाता 175/3/1 0.271 (Map not अनुपपुर – कटनी तीसरी रेल लाइन 9. िहडोल सोहागपुर छाता 175/2/4 revised) अनुपपुर – कटनी तीसरी रेल लाइन 10 िहडोल सोहागपुर छाता 175/3/2 अनुपपुर – कटनी तीसरी रेल लाइन .11 िहडोल सोहागपुर छाता 175/3/3 अनुपपुर – कटनी तीसरी रेल लाइन .11 िहडोल सोहागपुर छाता 175/3/4 अनुपपुर – कटनी तीसरी रेल लाइन .13 िहडोल सोहागपुर छाता 175/5 अनुपपुर – कटनी तीसरी रेल लाइन 14. िहडोल सोहागपुर छाता 176 0.040 अनुपपुर – कटनी तीसरी रेल लाइन Total 1.141 कुल जनिी भजू म 1.141 : ह े टेयर [फा. स.ं CAO/C/BSP/APR-KTE 3rd Line/Land Acquisition] सोनवीर ससह, मुख्य प्रिासजनक अजधकारी (जनमागण) NOTIFICATION Bilaspur, 9th January, 2020 Notification under Section 20A of the Railways Act, 1989 S.O. 298(E).—In exercise of powers conferred by sub-section (1) of section 20A of the Railways Act, 1989 (24 of 89) (hereinafter referred as the said Act), the Central Government after being satisfied that for the public purpose, the land, brief description of which is given in the schedule annexed hereto, is required for the execution of Anuppur – Katni 3rd line project (165.52 Kms), Special Railway Project of Madhya Pradesh, hereby declares its intention to acquire such land;भाग II खण् ड (ii) भारत का रािपत्र : असाधारण 5 Any persons interested in the said land may Within a period of 30 days from the date of publication of this notification in the official Gazette, raise objection to the acquisition of such land for the aforesaid purpose under sub-section (1) of Section 20D of the said Act. Every objection shall be made to the competent Authority, namely Sub Divisional Officer, Anuppur, Madhya Pradesh in writing and shall set out grounds thereof and the competent authority shall give the objector an opportunity of being heard, either in person or through a legal practitioner, and may, after hearing all such objections and after making such further enquiry, if any as the competent Authority thinks necessary, by order, either allow or disallow the objections; Any order made by the Competent Authority under sub-section (2) of section 20D of the said Act shall be final. The land plans and other defaults of the land covered under this notification are available and can be inspected by the interested person at the aforesaid office of the Competent Authority. SCHEDULE Brief Description of the land to be acquired, with or without structure, for the Special Railway Project, namely Anuppur – Katni 3rd line (165.52 Km) of Anuppur – Shahdol- Umaria – Katni, District in the State of Madhya Pradesh. (A) Village – Parswar, Tahsil - Anuppur, District- Anuppur (M.P.) Sl.No. Name of Name of Name of Khasra Area to be acquired Reason for land District Tahsil village No. (In Hect.) acquisition .1 Anuppur Anuppur Parswar 779/2 0.540 Anuppur – Katni 3rd line 2. Anuppur Anuppur Parswar 783/1 0.999 Anuppur – Katni 3rd line 3. Anuppur Anuppur Parswar 783/2 0.150 Anuppur – Katni 3rd line 4. Anuppur Anuppur Parswar 784 0.024 Anuppur – Katni 3rd line 5. Anuppur Anuppur Parswar 785/1 0.061 Anuppur – Katni 3rd line 6. Anuppur Anuppur Parswar 785/2 0.069 Anuppur – Katni 3rd line 7. Anuppur Anuppur Parswar 789 0.166 Anuppur – Katni 3rd line 8. Anuppur Anuppur Parswar 792 0.059 Anuppur – Katni 3rd line 9. Anuppur Anuppur Parswar 759 0.415 Anuppur – Katni 3rd line 10 Anuppur Anuppur Parswar 841 0.310 Anuppur – Katni 3rd line Total 2.793 ( B ) Village – Devhara, Tahsil - Anuppur, District- Anuppur (M.P.) 1. Anuppur Anuppur Devhara 139/1 0.064 Anuppur – Katni 3rd line 2. Anuppur Anuppur Devhara 139/2 ख 0.016 Anuppur – Katni 3rd line 3. Anuppur Anuppur Devhara 140 0.254 Anuppur – Katni 3rd line 4. Anuppur Anuppur Devhara 141 0.040 Anuppur – Katni 3rd line 5. Anuppur Anuppur Devhara 142/1 0.184 Anuppur – Katni 3rd line 6. Anuppur Anuppur Devhara 143/1 0.566 Anuppur – Katni 3rd line Total 1.124 Total private land : 3.917 Hect. [F. No. CAO/C/BSP/APR-KTE 3rd Line/Land Acquisition] SONVIR SINGH, Chief Administrative Officer (Con) Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.