Home India Ministry of Power In exercise of the powers conferred by clause a of section 1...
Date: 2017-05-02 Category: Extra Ordinary State: Union Government Country: India

In exercise of the powers conferred by clause a of section 14 of the Energy Conservation Act

Issued by Ministry of Power · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: This notification, issued by the Ministry of Power, amends a previous notification regarding energy efficiency standards. It modifies the star rating plan for storage-type electric water heaters, updating the validity periods and efficiency requirements. Key changes include revised tables for star rating validity and specifications, effective from September 7, 2016, with updates for periods ending June 30, 2017, and December 31, 2018. Key Points / Main Content: Star Rating Plan Modifications: • Table 3.1 outlines star rating plan validity from September 7, 2016, to June 30, 2017, including rated capacity and standing losses (kWh/24 hour at 45°C). • Table 3.2 details star rating plan validity from July 1, 2017, to December 31, 2018, with corresponding rated capacity and standing losses (kWh/24 hour at 45°C). Display Permissions: • Effective July 1, 2017, permission to display particulars on storage-type electric water heaters up to 100 litres for 1-star and 2-star ratings, as specified in Table 3.2, is no longer permitted. Star Rating Thresholds: • There is no negative tolerance for star rating bands; all tested equipment must meet the minimum threshold for each star rating level. • Manufacturers must account for manufacturing tolerance and other variations when determining the star rating. Review Clause: • The star rating plan will be reviewed after the expiry of the given period in the table or as deemed necessary by the Central Government. Impact Analysis: Manufacturers of Storage-Type Electric Water Heaters Impact: Manufacturers must adhere to the updated star rating plan and ensure their products meet the revised efficiency standards. They are also impacted by the removal of display permissions for lower-rated water heaters. Action Required: Adjust manufacturing processes to meet the new star rating requirements and remove display particulars for 1-star and 2-star rated products up to 100 litres, effective July 1, 2017. Bureau of Energy Efficiency Impact: The Bureau of Energy Efficiency is consulted in the amendment process and plays a role in implementing and overseeing the updated standards. Action Required: Enforce the new regulations and potentially participate in the review of the star rating plan. Central Government Impact: The Central Government is responsible for setting and reviewing energy efficiency standards. Action Required: Oversee the implementation of the amended notification and conduct reviews of the star rating plan as needed. Consumers Impact: Consumers will have access to more energy-efficient storage-type electric water heaters and may see changes in the availability of lower-rated models. Action Required: Be aware of the updated star rating system when purchasing storage-type electric water heaters.

Key Entities Referenced

New Delhi: The location where the notification was issued. Energy Conservation Act, 2001: A law enacted by the Indian Parliament related to energy conservation. Section 14 clause a of this act is the legal basis for the current notification. Bureau of Energy Efficiency: An Indian government agency that is consulted by the Central Government in making amendments related to energy efficiency standards and labeling. Ministry of Power: The Indian government ministry responsible for issuing the notification concerning amendments to energy efficiency standards. S.O. 2902E, dated the 7th September, 2016: The original notification being amended by the current notification, related to energy efficiency standards. Central Government: The executive branch of the Government of India, responsible for making and enforcing the amendments to the energy efficiency standards. Star Rating: A rating system to measure the energy efficiency of appliances. This notification specifies revisions to the star rating plan for storage type electric water heaters. Economic Advisor: The designation of the signing authority for the notification.
Official Source Record View Original Source →
See Full Document Text
REGD. NO. D. L.-33004/99 EXTRAORDINARY II— — (ii) PART II—Section 3—Sub-section (ii) PUBLISHED BY AUTHORITY 1223] No. 1223] NEW DELHI, TUESDAY, MAY 2, 2017/VAISAKHA 12, 1939 विद्यतु मत्रं ालय अविसचू ना नई दिल्ली, 2 मई, 2017 का.आ. 1385(अ).—केन्‍द रीय स का , ऊर्ाा सं क्षण अविवनयम, 2001 (2001 का 52) की िा ा 14 के खण्ड (क) ्ा ा ्रदि्त कवतियय का ्रदयग क ते ुए,, ऊर्ाा िक्षता ब् य ू ग के ा ामका स े रा त स का के विद्यतु मंत्रालय की अविसूचना सं‍य ा का.आ. 2902(अ) ता ीख 7 वसतम् ब , 2016 में वनम् नवलवखत संकगिन क ती ैं,, अर्ाात:- उक् त अविसूचना के ार ा 3 में,- (क) उा ार ा (1) में, विद्यमान सा णी के स् र्ान ा वनम्न वलवखत सा णी खी र्ा, ं ी, अर्ाात::- सा णी: 3.1 स् टा ेटटं यगर्ना की विविमान्‍दय ता (7 वसतम्ब , 2016 स े 30 र्नू , 2017 तक) ेटेड 1 स् टा 2 स् टा 3 स् टा 4 स् टा 5 स् टा क्षमता स्र्ायी ैंावन (दकलगिॉट/24 घटं े/450 स.े) (लीट ) 6 ≤0.469 &> 0.426 ≤0.426 &> 0.387 ≤0.387 &> 0.352 ≤0.352 &> 0.320 ≤ 0.320 10 ≤0.587&> 0.534 ≤0.534&>0.485 ≤0.485 &> 0.441 ≤0.441 &> 0.401 ≤ 0.401 15 ≤ 0.675&> 0.614 ≤0.614&> 0.558 ≤ 0.558&> 0.507 ≤0.507 &> 0.461 ≤ 0.461 25 ≤0.823&>0.748 ≤0.748 &> 0.680 ≤0.680 &> 0.618 ≤0.618 &> 0.562 ≤ 0.562 35 ≤0.940&>0.855 ≤0.855 &> 0.777 ≤0.777&> 0.706 ≤0.706 &> 0.642 ≤ 0.642 50 ≤1.086&>0.988 ≤0.988&>0.898 ≤0.898&>0.816 ≤0.816 &> 0.742 ≤ 0.742 70 ≤1.233&> 1.121 ≤ 1.121 &> 1.019 ≤ 1.019 &> 0.926 ≤0.926 &> 0.842 ≤ 0.842 2889 GI/2017 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 100 ≤1.408&> 1.280 ≤ 1.280 &> 1.164 ≤1.164 &> 1.058 ≤1.058 &> 0.962 ≤ 0.962 140 ≤1.586&>1.441 ≤1.441&> 1.310 ≤1.310&> 1.191 ≤1.191 &> 1.083 ≤ 1.083 200 ≤1.761&>1.601 ≤1.601 &> 1.456 ≤1.456 &> 1.323 ≤1.323 &> 1.203 ≤ 1.203 सा णी: 3.2 स्ट ा ेटटं यगर्ना की विविमान्‍दय ता (1 र्लु ाई, 2017 स े 31 दिसम् ब , 2018 तक) रेटेड क्षमता 1 स् टार 2 स् टार 3 स् टार 4 स् टार 5 स् टार (लीटर) स्र्ायी ैंावन (दकलगिॉट/24 घटं े/450 स.े) 6 ≤0.469 &> 0.426 ≤0.426 &> 0.387 ≤0.387 &> 0.352 ≤0.352 &> 0.320 ≤ 0.320 10 ≤0.587&> 0.534 ≤0.534&>0.485 ≤0.485 &> 0.441 ≤0.441 &> 0.401 ≤ 0.401 15 ≤ 0.675&> 0.614 ≤0.614&> 0.558 ≤ 0.558&> 0.507 ≤0.507 &> 0.461 ≤ 0.461 25 ≤0.823&>0.748 ≤0.748 &> 0.680 ≤0.680 &> 0.618 ≤0.618 &> 0.562 ≤ 0.562 35 ≤0.940&>0.855 ≤0.855 &> 0.777 ≤0.777&> 0.706 ≤0.706 &> 0.642 ≤ 0.642 50 ≤1.086&>0.988 ≤0.988&>0.898 ≤0.898&>0.816 ≤0.816 &> 0.742 ≤ 0.742 70 ≤1.233&> 1.121 ≤ 1.121 &> 1.019 ≤ 1.019 &> 0.926 ≤0.926 &> 0.842 ≤ 0.842 100 ≤1.408&> 1.280 ≤ 1.280 &> 1.164 ≤1.164 &> 1.058 ≤1.058 &> 0.962 ≤ 0.962 140 ≤1.586&>1.441 ≤1.441&> 1.310 ≤1.310&> 1.191 ≤1.191 &> 1.083 ≤ 1.083 200 ≤1.761&>1.601 ≤1.601 &> 1.456 ≤1.456 &> 1.323 ≤1.323 &> 1.203 ≤ 1.203”; (ii) उा ार ा (1) के ाश्च ात वनम् नवलवखत उा ार ा अंत:स्र्वात दकया र्ा, ा, अर्ाात: :- “(1क) उक् त रंडा ण ्रदका के वबर्ली के िॉट ैंीट के न्‍द यूनतम ऊर्ाा वन‍ा ािन स्त कग उन्‍द नत बनान े के विचा स े 1 र्ुलाई 2017 से सा णी 3.2 में वनर्ि‍ा ट 1 स्ट ा 2 स्ट ा के वल, 100 लीट की ेडटड क्षमता िाल े रंडा ण ्रदका के वबर्ली के िॉट ैंीट ा विि ण के सम््रदिका के वल, अनुज्ञा नैंीं िी र्ा, ी। (iii) उा ार ा (2) मे वनवम्न्‍दलवखत उा ार ा अंत:स्र्ावात दकया र्ा, ा, अर्ाात: :- (2) स्ट ा ेटटं ब,ड के वल, कगई ाणा‍ मक ूूट नैंीं ैंग ी सरी ा खे , उाक ण ्रद‍ येक स्ट ा ेटटं स्त के वल, न्‍द यूनतम रेशेक ैंगल् ड ाू े क ें े विवनमााण ूूट के विस् ता अन्‍द य विविितां कग स्ट ा ेटटं का वनिा ा ण क ते समय विवनमााता ्ा ा विचा में वलया र्ा, ा। स्ट ा ेटटं यगर्ना की ाुनर्िालगदकत उा गक्त सा णी में िी ई समय अिवि ाू ी ैंगने के बाि या केन्‍द रीय स का ्ा ा अवनिाया ठीक र्ाने ा की र्ा, ी।”. [फा. सं. 13/14/2014–ईसी] ार् ााल, आर्र्ाक सलाैंका डटप् ाण : मूल अविसूचना रा त के ार्ात्र, असािा ण, रा II, खण्ड 3, उा-खण्ड (ii) में अविसूचना सं. का. आ. 2902(अ) ता ीख 7 वसतम् ब , 2016 ्ा ा ्रदकावकत की ई र्ी।II (ii) 3 MINISTRY OF POWER NOTIFICATION New Delhi, the 2nd May, 2017 S.O. 1385(E).—In exercise of the powers conferred by clause (a) of section 14 of the Energy Conservation Act, 2001 (52 of 2001), the Central Government, in consultation with the Bureau of Energy Efficiency, hereby makes the following amendments in the notification of the Government of India in the Ministry of Power number S.O. 2902(E), dated the 7th September, 2016, namely:- In the said notification, in paragraph 3,- (a) in sub-paragraph (1), for the existing Table, the following Tables shall be substituted, namely:- “TABLE: 3.1 Star rating plan validity (From 7th September, 2016 to 30th June 2017) Rated 1 star 2 star 3 star 4 star 5 star Capacity Standing Losses (kWh/24 hour/45°C) (Litres) 6 ≤0.469 & > 0.426 ≤0.426 & > 0.387 ≤0.387 & > 0.352 ≤0.352 & > 0.320 ≤ 0.320 10 ≤0.587 & > 0.534 ≤0.534 & > 0.485 ≤0.485 & > 0.441 ≤0.441 & > 0.401 ≤ 0.401 15 ≤ 0.675 & > 0.614 ≤0.614 & > 0.558 ≤ 0.558 & > 0.507 ≤0.507 & > 0.461 ≤ 0.461 25 ≤0.823 & > 0.748 ≤0.748 & > 0.680 ≤0.680 & > 0.618 ≤0.618 & > 0.562 ≤ 0.562 35 ≤0.940 & > 0.855 ≤0.855 & > 0.777 ≤0.777 & > 0.706 ≤0.706 & > 0.642 ≤ 0.642 50 ≤1.086 & > 0.988 ≤0.988 & > 0.898 ≤0.898 & > 0.816 ≤0.816 & > 0.742 ≤ 0.742 70 ≤1.233 & > 1.121 ≤ 1.121 & > 1.019 ≤ 1.019 & > 0.926 ≤0.926 & > 0.842 ≤ 0.842 100 ≤1.408 & > 1.280 ≤ 1.280 & > 1.164 ≤1.164 & > 1.058 ≤1.058 & > 0.962 ≤ 0.962 140 ≤1.586 & > 1.441 ≤1.441 & > 1.310 ≤1.310 & > 1.191 ≤1.191 & > 1.083 ≤ 1.083 200 ≤1.761 & > 1.601 ≤1.601 & > 1.456 ≤1.456 & > 1.323 ≤1.323 & > 1.203 ≤ 1.203 TABLE: 3.2 Star rating plan validity (From 1st July, 2017 to 31st December, 2018) Rated 1 star 2 star 3 star 4 star 5 star Capacity Standing Losses (kWh/24 hour/45°C) (Litres) 6 ≤0.469 & > 0.426 ≤0.426 & > 0.387 ≤0.387 & > 0.352 ≤0.352 & > 0.320 ≤ 0.320 10 ≤0.587 & > 0.534 ≤0.534 & > 0.485 ≤0.485 & > 0.441 ≤0.441 & > 0.401 ≤ 0.401 15 ≤ 0.675 & > 0.614 ≤0.614 & > 0.558 ≤ 0.558 & > 0.507 ≤0.507 & > 0.461 ≤ 0.461 25 ≤0.823 & > 0.748 ≤0.748 & > 0.680 ≤0.680 & > 0.618 ≤0.618 & > 0.562 ≤ 0.562 35 ≤0.940 & > 0.855 ≤0.855 & > 0.777 ≤0.777 & > 0.706 ≤0.706 & > 0.642 ≤ 0.642 50 ≤1.086 & > 0.988 ≤0.988 & > 0.898 ≤0.898 & > 0.816 ≤0.816 & > 0.742 ≤ 0.742 70 ≤1.233 & > 1.121 ≤ 1.121 & > 1.019 ≤ 1.019 & > 0.926 ≤0.926 & > 0.842 ≤ 0.842 100 ≤1.408 & > 1.280 ≤ 1.280 & > 1.164 ≤1.164 & > 1.058 ≤1.058 & > 0.962 ≤ 0.962 140 ≤1.586 & > 1.441 ≤1.441 & > 1.310 ≤1.310 & > 1.191 ≤1.191 & > 1.083 ≤ 1.083 200 ≤1.761 & > 1.601 ≤1.601 & > 1.456 ≤1.456 & > 1.323 ≤1.323 & > 1.203 ≤ 1.203”; (b) for sub-paragraph (2), the following sub-paragraphs shall be substituted, namely:- “(2) The permission for display of particulars on the storage type electric water heater up to the rated capacity of 100 litres for 1 star and 2 star specified in Table 3.2 shall not be permitted with effect from the 1st day of July, 2017 with a view to upgrade the minimum energy performance level of such storage type electric water heater.4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] (3) There shall be no negative tolerance for Star Rating Bands and all tested equipments shall meet the minimum threshold for each star rating level; and the scope for manufacturing tolerance and other variations shall be accounted by the manufacturer when determining the star rating. (4) The star rating plan shall be reviewed after the expiry of period given in Table above or as deemed necessary by the Central Government.”. [No. 13/14/2014-EC] RAJ PAL, Economic Advisor Note: The principal notification was published in the Gazette of India, Extraordinary, Part II, section-3, sub-section (ii) vide notification number S.O. 2902(E), dated the 7th September, 2016. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research