**Policy Summary:**
This notification, S.O. 1779(E), issued by the Ministry of Power on May 16, 2016, specifies inspection requirements for electricity generating stations. Exercising powers conferred by regulation 32 of the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2010, the Central Government mandates that all installations of a generating station or generating unit, including those producing electricity from renewable energy sources, with a capacity exceeding 500 kVA, must be inspected by the Electrical Inspector. This directive is referenced under F. No. 2323/ii/2014-RR.
Key Entities Referenced
Ministry of Power: The government ministry responsible for power-related matters.
New Delhi: The location where the notification was issued; capital of India.
Central Electricity Authority Measures relating to Safety and Electric Supply Regulations, 2010: The regulation under which the powers are exercised for this notification.
Central Government: The governing body specifying the inspection requirements.
Electrical Inspector: The designated authority responsible for inspecting generating stations.
generating station: Facility installations of generating units
renewable sources of energy: Source of generating unit for producing electricity.
Mayapuri, New Delhi: Location of the Dte. of Printing, New Delhi.
jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99
vlk/kj.k
EXTRAORDINARY
Hkkx II—[k.M 3—mi&[k.M (ii)
PART II—Section 3—Sub-section (ii)
izkf/dkj ls izdkf'kr
PUBLISHED BY AUTHORITY
la- 1204] ubZ fnYyh] lkseokj] ebZ 16] 2016@oS'kk[k 26] 1938
No. 1204] NEW DELHI, MONDAY, MAY 16, 2016/VAISAKHA 26, 1938
िव(cid:3)ुत मं(cid:9)ालय
अिधसूचना
नई िद(cid:6)ल ी, 16 मई, 2016
का.आ. 1779(अ).— क(cid:16)(cid:17)ीय सरकार, क(cid:16)(cid:17)ीय िव(cid:23)ुत (cid:26)ािधकरण (सरु(cid:30)ा तथा िव(cid:23)तु आपिूत# से संबंिधत उपाय) िविनयम, 2010 के िविनयम 32 *ारा
(cid:26)द+ त शि-त य. का (cid:26)योग करते हए2 िविनिद4# ट करती ह ैिक 500 के.वी.ए. से अिधक (cid:30)मता के िकसी िव(cid:23)ुत उ+प ादन :ट ेशन अथवा िव(cid:23)तु उ+प ादन यूिनट (ऊजा# के
नवीकरणीय =ोत. से िव(cid:23)ुत उ+प ादन करने वाली इकाइय. सिहत) के सभी सं:थ ापन. का िनरी(cid:30)ण व(cid:23)ै तु िनरी(cid:30)क *ारा िकया जाएगा।
[फा. सं. 23/23(ii)/2014-आर एडं आर]
Iयोित अरोरा, संयु-त सिचव
MINISTRY OF POWER
NOTIFICATION
New Delhi, the 16th May, 2016.
S.O. 1779(E).— In exercise of the powers conferred by regulation 32 of the Central Electricity Authority
(Measures relating to Safety and Electric Supply) Regulations, 2010, the Central Government hereby specifies that all
installations of a generating station or generating unit (including generating units producing electricity from renewable
sources of energy) of the capacity exceeding 500 kVA, shall be inspected by the Electrical Inspector.
[F. No. 23/23(ii)/2014-R&R]
JYOTI ARORA, Jt. Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.
2468 GI/2016