This document is a corrigendum issued by the Ministry of Road Transport and Highways, amending previous notifications regarding the approval granted to M/s Reshamsingh Co. Pvt. Ltd for the transportation of stators. The amendment modifies the period for transportation and the specified route. The changes are effective as of October 11, 2017.
Key Points / Main Content:
* **Amendment Purpose:** To modify existing notifications concerning the approved transportation of stators by M/s Reshamsingh Co. Pvt. Ltd.
* **Original Approval:** Approval was initially granted to M/s Reshamsingh Co. Pvt. Ltd for the transportation of four stators individually from January 2014 to December 2016.
* **Transportation Route:** From Mumbai Port/Ennore Port to Belekheri Karwar Port by Barge, and from Belekheri Karwar Port to National Thermal Power Corporation (NTPC), Kudgi, Karnataka by road.
* **Amendment 1: Transportation Period:** The transportation period is extended to "January 2014 to June 2018," replacing the original "January 2014 to December 2016" timeframe.
* **Amendment 2: Transportation Route:** The transportation route is modified from Toshiba India Ltd. to Kamrajar Port, Chennai via Nappalayam Attipatu Pulcot Kamrajar Junction and Belekeri Karwar Port to NTPC Site via Ankola Bypass Yellapur Hubli Gadag Koppal Kusthagi Hungurd Mudgul Linsugur Narayanpur Muddebhal MDR Road Nidgundi in place of from Belekeri Jetty Ankola Bypass Yellapur Hubli Gadag Koppal Ginigara Humgun Almatti Kudgi NTPC Kudgi Site.
* **Authority:** The amendments are made in exercise of the powers conferred by subsection 3 of Section 58 and subSection 3a of Section 110 of the Motor Vehicles Act, 1988 by the Central Government.
Impact Analysis:
M/s Reshamsingh Co. Pvt. Ltd:
* Impact: The company is directly affected by the extended timeframe and altered route for stator transportation.
* Action Required: The company must adhere to the revised transportation period (January 2014 to June 2018) and the modified route.
National Thermal Power Corporation (NTPC), Kudgi, Karnataka:
* Impact: NTPC is affected as the destination for the transported stators.
* Action Required: NTPC needs to be aware of the updated transportation route for logistical planning.
Road Transport Authorities:
* Impact: Responsible for overseeing and managing transportation along the designated routes.
* Action Required: Ensure compliance with the updated notification and facilitate transportation according to the revised route.
Key Entities Referenced
Motor Vehicles Act, 1988: Indian legislation that governs road transport vehicles.
Ministry of Road Transport and Highways: The Indian government ministry responsible for the formulation and administration of rules, regulations and laws relating to road transport, national highways and transport research.
Ms. Reshamsingh Co. Pvt. Ltd, Mumbai: A Mumbai-based private limited company that received approval for transportation of stators.
Mumbai Port: A major port in Mumbai, Maharashtra, India, used as a starting point for transportation.
Ennore Port, Chennai: Also known as Kamarajar Port, a port in Chennai, Tamil Nadu, India, used as a starting or ending point for transportation.
Belekheri Karwar Port: A port in Karwar, Karnataka, India, used as a transportation hub in the mentioned project.
National Thermal Power Corporation NTPC, Kudgi, Karnataka: A power plant located in Kudgi, Karnataka, India, operated by NTPC, the destination for transported goods.
Toshiba India Ltd.: A company; starting point for revised transportation route.
jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99
vlk/kj.k
EXTRAORDINARY
Hkkx II—[k.M 3—mi&[k.M (ii)
PART II—Section 3—Sub-section (ii)
izkf/dkj ls izdkf'kr
PUBLISHED BY AUTHORITY
la- 2877] ubZ fnYyh] cq/okj] vDrwcj 11] 2017@vkf'ou 19] 1939
No. 2877] NEW DELHI, WEDNESDAY, OCTOBER 11, 2017/ASVINA 19, 1939
lM+d ifjogu vkSj jktekxZ ea=ky;
“kqf)&i=
ub Z fnYyh] 11 vDVcw j] 2017
dk-vk- 3292(v).—ekVs j;ku vf/kfu;e] 1988 dh /kkjk 58 dh mi/kkjk ¼3½ ,o a /kkjk 110 dh mi&/kkjk ¼3½ ¼v½ }kjk
inz Rr “kfDr;k sa dk iz;ksx djr s g,q dUsn z ljdkj u s fnukad 12-12-2013 dh jkti= vf/klpw uk dk-vk- 3657¼v½] fnukad
22-06-2015 dh jkti= vf/klwpuk dk-vk- 1645¼v½ vkSj fnukda 01-09-2016 dh jkti= vf/klpw uk dk-vk- 2725¼v½] }kjk
eS- j”s keflga ,.M dia uh ¼izk-½ fy-] eEq cb Z dk s tuojh] 2014 l s fnlEcj] 2016 d s chp e sa pkj vyx&vyx LVVs l Z d s eEq cb Z
ikVs @Z bUukSj ikVs Z l s cys [ksjh] dkjokj ikVs Z ckt Z }kjk ,o a cys [ksjh] dkjokj ikVs Z l s u”s kuy FkeyZ ikoj dkWiksZj”s ku ¼,u-Vh-ih-
lh-½ [ktq h] dukVZ d rd lMd+ ;krk;kr gsr q pkSM+kb Z es a /kfwj;ksa dk s pkSM+kb Z e sa tkMs u+ s gsr q vf/kdre lqjf{kr ynku Hkkj@dyq
ldy Hkkj vkSj vkdkj d s lkFk vueq kns u inz ku dh xb Z FkhA mDr vf/klpw uk e sa ;krk;kr dh vof/k “tuojh] 2014 l s
fnlEcj] 2016 d s chp” 'kCnk sa d s LFkku ij “tuojh] 2014 ls tuw ] 2018 d s chp” 'kCn i<+k tk,A mDr vf/klwpuk d s iSjk 5¼i½
e sa ;krk;kr dk fo”k"sk jkLrk “[ksjh tVs V~ h & vda kys k okbiZ kl & ;ys kiqj & gCqyh & xnkx & dkis y & fxuhxsjk & gxa qe &
vyekVh & [kqxh & ,u-Vh-ih-lh- [kxq h lkbV] dukVZ d” “kCnk sa d s LFkku ij “rksf”kok bfaM;k fyfeVMs l s dkejktkj ikVs ]Z
pUsub Z Hkk;k uIikyk;e&vkVkiVV&w iyq dkVs &dkejkt tDa ”ku ,o a cys [ksjh dkjokj ikVs Z l s ,u-Vh-ih-lh- lkbVZ ok;k vda ksyk
okbiZ kl& ;ys kiqj&gcq yh&xnkx&dkis y&d”q kFkkxh&gqxa Mq &eqnxy&fyxa lxq j&ukjk;.kiqj eqnHs kky&,eMhvkj jkMs &fuMxqMa h”
i<+k tk,A
[l-a vkj-Vh&11042@23@2013&,e-oh-,y-]
vHk; nkey]s l;a qDr lfpo
6155 GI/2017 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
CORRIGENDUM
New Delhi, the 11th October, 2017
S.O. 3292(E).—In exercise of the powers conferred by sub-section (3) of Section 58 and sub-Section 3(a) of
Section 110 of the Motor Vehicles Act, 1988, the Central Government vide Gazette notification No. S.O. 3657(E), dated
12.12.2013, S.O. No.1645(E) dated 22.06.2015 and S.O. 2725(E) dated 01.09.2016 had accorded approval to
M/s. Reshamsingh & Co. Pvt. Ltd, Mumbai for side by side coupling of hydraulic axles for transportation of four stators
individually during the period from January, 2014 to December, 2016 from Mumbai Port/Ennore Port by Barge to
Belekheri Karwar port and from Belekheri Karwar Port to National Thermal Power Corporation (NTPC), Kudgi,
Karnataka by road with maximum safe laden weight/Gross vehicles Weight and dimensions. In the above notification,
the period for transportation may be read as “during January, 2014 to June, 2018” in place of “during January, 2014 to
December, 2016”. In para 5 (i) of the above Notification, the route of the transportation may be read as “Toshiba India
Ltd. to Kamrajar Port, Chennai via Nappalayam – Attipatu – Pulcot - Kamrajar Junction and Belekeri Karwar Port to
NTPC Site via Ankola Bypass – Yellapur – Hubli – Gadag – Koppal – Kusthagi – Hungurd – Mudgul – Linsugur -
Narayanpur Muddebhal - MDR Road - Nidgundi” in place of “from Belekeri Jetty - Ankola Bypass – Yellapur –Hubli –
Gadag – Koppal – Ginigara – Humgun –Almatti – Kudgi - NTPC Kudgi Site”.
[No. RT-11042/23/2013-MVL]
ABHAY DAMLE, Jt. Secy.