See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-डी.एल.-अ.-22042023-245344
xxxGIDHxxx
CG-DL-E-22042023-245344
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग III—खण् ड 4
PART III—Section 4
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 258] नई दिल्ली, िुक्रवार, अप्रलै 21, 2023/विै ाख 1, 1945
No. 258] NEW DELHI, FRIDAY, APRIL 21, 2023/VAISAKHA 1, 1945
dsUæh; fo|qr fofu;ked vk;kxs
अजधसचू ना
नई दिल्ली, 05 अप्रैल, 2023
la- bZdks&bZ@2023&dsfofovk.—fnukad 03-11-2020 ds la'kk/s ku ds lkFk ifBr **dk;s yk vk/kkfjr FkeZy ikoj
ifj;kts ukvks a ls ikoj ds lkFk laijw d] fxzM lac) uohdj.kh; ÅtkZ fo|qr ifj;kts ukvks a ls jkm.M fn DykWd fo|qr
dh izkfIr ds fy, VSfjQ vk/kkfjr izfrLi/kkZRed ckys h izfØ;k ds fy, ekxZfunZs'k** ij fnukad 22-07-2020 ls lacaf/kr
fo|qr ea=ky; ds izLrko ds iSjkxzkQ 5-1 vkSj iSjkxzkQ 6-4 ds vuqlj.k es a dsUnzh; fo|qr fofu;ked vk;kxs cksyh
ewY;kadu ds ç;kts u ds fy, fuEufyf[kr njks a vkSj vU; iSjkehVjksa dks vf/klwfpr djrk gSA
I: cksyh ewY;kda u ds fy, okf"kZd o`f) njsa ¼31-03-2024 rd [kqyus okyh cksyh ds fy,½
ckys h ewY;kda u gsrq okf"kZd o`f) njsa
Ø-l-a fooj.k
¼%½
1- Lon's kh dks;yk ds fy, o`f) nj 3-76
2- Lon's kh xSl ds fy, o`f) nj 2-44
3- dks;ys ds vra nsZ'kh; ifjogu çHkkj gsrq o`f) njsa
3-1 125 fdyksehVj dh njw h rd 12-81
3-2 500 fdyksehVj dh njw h rd 8-74
3-3 1000 fdykes hVj dh njw h rd 8-02
3-4 2000 fdykes hVj dh njw h rd 6-02
3-5 2000 fdykes hVj dh njw h ls vkxs 5-51
2622 GI/2023 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
4- xSl ds fy, vra nZs'kh; ifjogu çHkkj grs q o`f) njsa 3-23
5- vk;kfrr dks;ys ds fy, o`f) nj (-)2-03
6- vk;kfrr xSl ds fy, o`f) nj (-)3-62
7- vk;kfrr dks;ys ds ifjogu ds fy, o`f) nj (-)6-50
8- vk;kfrr xSl ds ifjogu ds fy, o`f) nj (-)6-50
9- ckys h ewY;kadu ds fy, ç;qDr dh tkus okyh cV~Vk nj 7-70
gjizhr flag izqFkh] lfpo
[जवज्ञापन-III/4/असा./39/2023-24]
CENTRAL ELECTRICITY REGULATORY COMMISSION
NOTIFICATION
New Delhi, 5th April, 2023
No. Eco-E/2023-CERC.—In pursuance of paragraph 5.1 and paragraph 6.4 of the Ministry of Power’s
Resolution dated 22.07.2020on “Guidelines for Tariff Based Competitive Bidding Process for Procureent of
Round-The-Clock Power from Grid Connected Renewable Energy Power Projects, complemented with Power
from Coal Based Thermal Power Projects” read with amendment dated 03.11.2020, the Central Electricity
Regulatory Commission notifies the following rates and other parameters for the purpose of bid evaluation.
I: Annual Escalation Rates for Bid Evaluation (for bid opening up to31.03.2024)
Sr. Description Annual Escalation Rates for Bid
No. Evaluation(%)
1 Escalation rate for domestic coal 3.76
2 Escalation rate for domestic gas 2.44
3 Escalation rate for inland transportation charges for coal
3.1 Upto125 Km distance 12.81
3.2 Upto 500 Km distance 8.74
3.3 Upto 1000 Km distance 8.02
3.4 Upto 2000 Km distance 6.02
3.5 Beyond 2000 Km distance 5.51
4 Escalation rate for inland transportation charges for gas 3.23
5 Escalation rate for imported coal (-)2.03
6 Escalation rate for imported gas (-)3.62
7 Escalation rate for transportation of imported coal (-)6.50
8 Escalation rate for transportation of imported gas (-)6.50
9 Discount rate to be used for bid evaluation 7.70
HARPREET SINGH PRUTHI, Secy.