## Policy Analysis Report: Bureau of Indian Standards Notification Regarding Indian Standards
**1. Executive Summary:**
This report analyzes a notification from the Bureau of Indian Standards (BIS) regarding the establishment and revision of several Indian Standards. The notification details the establishment dates for new versions of standards related to photovoltaic devices, three-phase induction motors, and photovoltaic modules. Key findings indicate the adoption of updated international standards (IEC) and revisions to existing Indian Standards, aiming to align with technological advancements and enhance safety and performance benchmarks within these sectors. The policy also provides a deadline for the withdrawal of earlier versions of these standards.
**2. Introduction:**
This report aims to provide a clear and concise overview of a recent notification published by the Bureau of Indian Standards (BIS) concerning the establishment, revision, and withdrawal of specific Indian Standards. The analysis is based solely on the provided policy text, focusing on its implications for relevant industries and stakeholders.
**3. Policy Overview:**
This notification outlines amendments and updates to existing Indian Standards. The core objective, inferred from the text, is to maintain and improve the quality, safety, and performance standards of products and systems related to photovoltaic devices, three-phase induction motors, and photovoltaic modules by adopting updated revisions and international standards.
**4. Background and Rationale:**
The provided text suggests that the amendments are driven by the need to:
* Update standards for photovoltaic devices and modules to reflect technological advancements in the field, as evidenced by the adoption of IEC standards.
* Revise standards to improve safety and performance, likely based on accumulated experience and evolving best practices.
* Ensure the continued relevance and applicability of Indian Standards in a rapidly changing technological landscape.
**5. Key Provisions / Changes:**
This notification introduces specific changes to existing standards. It details the following:
* **Adoption of updated standards:** The notification establishes new versions of several Indian Standards, including:
* IS 12762 Part 2: 2025 (Photovoltaic Reference Devices)
* IS 14578: 2025 (Three Phase Induction Motors for Use in Nuclear Power Plants)
* ISIEC 617301: 2023 (Photovoltaic PV Module Safety Qualification Part 1)
* ISIEC 617302: 2023 (Photovoltaic PV Module Safety Qualification Part 2)
* ISIEC 625481: 2023 (Photovoltaic PV Arrays Part 1)
* ISIEC TS 62915: 2023 (Photovoltaic PV Modules Type Approval, Design and Safety Qualification Retesting)
* **Alignment with International Standards:** Several revisions incorporate international standards from the International Electrotechnical Commission (IEC), demonstrating an effort to align Indian standards with global best practices.
* **Withdrawal of Previous Standards:** The notification specifies that the older versions of the standards will be withdrawn on *December 9, 2025*. This introduces a transition period where both the old and new standards are concurrently valid.
**In summary, this is a revisionary policy updating standards with IEC standards and setting a sunset date for the older standards.**
**6. Target Audience and Stakeholders:**
The primary target audience and stakeholders for this notification include:
* Manufacturers of photovoltaic devices and modules.
* Manufacturers of three-phase induction motors, particularly those intended for use in nuclear power plants.
* Testing and certification bodies involved in assessing compliance with Indian Standards.
* Engineering firms and project developers involved in the design and implementation of photovoltaic systems and nuclear power facilities.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency:** The Bureau of Indian Standards (BIS) is the responsible agency for implementing and enforcing these standards.
* **Timelines:** The notification specifies the date of establishment (June 9, 2025) for the new standards and the date of withdrawal (December 9, 2025) for the superseded standards. This implies a transition period where manufacturers and other stakeholders need to adopt the revised standards.
**8. Expected Outcomes / Impact of Changes:**
The expected outcomes and impacts of these revisions include:
* **Enhanced product quality and safety:** The adoption of updated standards, including those aligned with IEC specifications, is expected to improve the quality, reliability, and safety of photovoltaic devices, modules, and three-phase induction motors.
* **Improved competitiveness:** Alignment with international standards can enhance the competitiveness of Indian manufacturers in the global market.
* **Reduced risk of failures:** Incorporating revisions based on experience and best practices can mitigate risks associated with design, construction, and operation of these products and systems.
**9. Conclusion:**
The BIS notification represents a crucial step in maintaining and improving the standards governing key sectors such as photovoltaic technology and nuclear power. By adopting updated standards and aligning with international best practices, the notification aims to enhance product quality, safety, and competitiveness while mitigating potential risks. Stakeholders should take note of the new standards and withdrawal dates to ensure compliance and maintain industry best practice.
Key Entities Referenced
NEW DELHI: Place of Publication of the Gazette of India, located in Delhi
Bureau of Indian Standards: An organization that establishes Indian standards. Part of Department of Consumer Affairs.
Department of Consumer Affairs: The department to which the Bureau of Indian Standards belongs.
Bureau of Indian Standards Rules, 2018: Rules governing the Bureau of Indian Standards.
Indian Standards: Standards established and notified by the Bureau of Indian Standards.
IS 12762 Part 2 : 2025: Indian Standard for Photovoltaic Devices, Part 2 Requirements for Photovoltaic Reference Devices, Third Revision
IEC 609042 : 2023: International Standard for Photovoltaic Devices, Part 2 Requirements for Photovoltaic Reference Devices, Second Revision
IS 14578 : 2025: Indian Standard for Three Phase Induction Motors for Use in Nuclear Power Plants Specification, First Revision
ISIEC 617301 : 2023: Indian Standard for Photovoltaic PV Module Safety Qualification Part 1 Requirements for Construction, Second Revision
ISIEC 617302 : 2023: Indian Standard for Photovoltaic PV Module Safety Qualification Part 2 Requirements for Testing, Second Revision
ISIEC 625481 : 2023: Indian Standard for Photovoltaic PV Arrays Part 1 Design Requirements, First Revision
ISIEC TS 62915 : 2023: Indian Standard for Photovoltaic PV Modules Type Approval, Design and Safety Qualification Retesting First Revision
CHITRA GUPTA: Scientist G DDG Hallmarking and Training
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-डी.एल.-अ.-21062025-264037
xxxGIDHxxx
CG-DL-E-21062025-264037
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग III—खण्ड 4
PART III—Section 4
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 448] नई दिल्ली, िुक्रिार, िनू 20, 2025/ज्य ष्े ठ 30, 1947
No. 448] NEW DELHI, FRIDAY, JUNE 20, 2025/JYAISTHA 30, 1947
भारतीय मानक ब्य रू ो
(उपभोक्त ा मामल ेजिभाग)
अजधसचू ना
नई दिल्ली, 17 िून, 2025
सिं भ:भ HQ-PUB013/1/2020-PUB-BIS(1262).—भारतीय मानक ब्यूरो जनयम, 2018 के जनयम 15 के उपजनयम
(1) के अनुसरण में भारतीय मानक ब्यूरो एतिद्वारा अजधसूजचत करता ह ैकी जिन भारतीय मानकों के जििरण इसमें संलग्न अनूसूची के
जद्वतीय स्ट्तंभ में दिये गये ह,ैं तीसरे स्ट्तंभ में इंजगत जतजि को स्ट्िाजपत हो गये ह|ैं चौिे स्ट्तंभ में दिये गये मानकों के जििरण, यदि कोई हो
तो िे भी साि-साि लागू रहेंगे िब तक िे पााँचिें स्ट्तंभ में इंजगत जतजि को िापस जलए िाने ह|ैं
अनसु चू ी
क्रम स्ट्िाजपत भारतीय मानकों की संख्या, िर्भ प्रजतस्ट्िापन जतजि भारतीय मानकों, यदि िापस जलए िापस होने की
स.ं तिा िीर्भक िाने ह,ैं की संख्या, िर्भ तिा िीर्भक जतजि
(1) (2) (3) (4) (5)
1 09 िून 2025
आई एस 12762 (भाग 2) : 2025 आई एस 12762 (भाग 2) : 2018 09 दिसम्बर
आई ई सी 60904-2 : 2023 आई ई सी 60904-2 : 2015 2025
प्रकाििोल्टीय युजियााँ प्रकाििोल्टीय युजियााँ
भाग 2 संिभभ प्रकाििोल्टीय युजियों की भाग 2 संिभ भसौर युजियों की
अपेक्षाएाँ (तीसरा पुनरीक्षण) अपेक्षाए ाँ
(िसू रा पुनरीक्षण)
4047 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
2 09 िून 2025
आई एस 14578 : 2025 आई एस 14578 : 1999 09 दिसम्बर
नाजभकीय पािर संयंत्रों में उपयोग के जलए नाजभकीय पािर संयंत्रों में उपयोग 2025
तीन-फेज़ िाली प्रेरण मोटरें — जिजिजि के जलए तीन-फेज़ िाली प्रेरण मोटरें
(पहला पुनरीक्षण) — जिजिजि
3 09 िून 2025
आई एस/आई ई सी 61730-1 : 2023 आई एस/आई ई सी 61730-1 : 09 दिसम्बर
प्रकाििोल्टीय (पीिी) मॉड्यूल — सुरक्षा 2016 2025
अहतभ ा प्रकाििोल्टीय ( पीिी ) मॉड्यूल
भाग 1 जनमाभण हते ु अपेक्षाएाँ सुरक्षा अहतभ ा
(िसू रा पुनरीक्षण) भाग 1 जनमाभण हते ु अपेक्षाएाँ
(पहला पुनरीक्षण)
4 09 िून 2025
आई एस/आई ई सी 61730-2 : 2023 आई एस/आई ई सी 61730-2 : 09 दिसम्बर
प्रकाििोल्टीय (पीिी) मॉड्यूल — सुरक्षा 2016 2025
अहतभ ा भाग 2 परीक्षण अपेक्षाएाँ प्रकाििोल्टीय ( पीिी ) मॉड्यूल
(िसू रा पुनरीक्षण) सुरक्षा अहतभ ा
भाग 2 परीक्षण अपेक्षाएाँ
(पहला पुनरीक्षण)
5 09 िून 2025
आई एस/आई ई सी 62548-1 : 2023 आई एस/आई ई सी 62548 : 09 दिसम्बर
प्रकाििोल्टीय (पीिी) सारजणयााँ 2016 2025
भाग 1 जडज़ाइन अपेक्षाएाँ प्रकाििोल्टीय ( पी िी ) सरणी —
जडिाइन आिश्यकताएाँ
(पहला पुनरीक्षण)
6 09 िून 2025
आई एस/आई ई सी टी एस 62915 : 2023 आई एस/आई ई सी टी एस 62915 09 दिसम्बर
प्रकाििोल्टीय (पीिी) मॉड्यूल — प्रकार : 2018 2025
अनुमोिन, जडज़ाइन और सुरक्षा अहतभ ा — प्रकाििोल्टीय ( पीिी ) मॉड्यूल्स
पुन: परीक्षण — प्रकार अनुमोिन, जडज़ाइन एिं
(पहला पुनरीक्षण) संरक्षा जिजििताऐं — पुनपभरीक्षण
जचत्रा गुप्ता, िैज्ञाजनक िी एिं उप महाजनिेिक (हॉलमार्किंग एि ं रेननंग)
[जिज्ञापन-III/4/असा./181/2025-26]
BUREAU OF INDIAN STANDARDS
(Department of Consumer Affairs)
NOTIFICATION
New Delhi, the 17th June,2025
Ref: HQ-PUB013/1/2020-PUB-BIS(1262).—In pursuance of Sub-rule (1) of Rule (15) of the Bureau of
Indian Standards Rules, 2018, the Bureau of Indian Standards hereby notifies that Indian standards, particulars of
which are given in the second column of the schedule hereto annexed have been established on the date indicated
against it in third column. The particulars of the standards, if any which are given in the fourth column shall also
remain in force concurrently till they are withdrawn on the date indicated against them in the fifth column.[भाग III—खण्ड 4] भारत का रािपत्र : असाधारण 3
SCHEDULE
Sl No., Year & Title of the Indian Date of No. , Year & Title of the Date of
No. Standards Established Establishment Indian Standards to be Withdrawal
Withdrawn, if any
(1) (2) (3) (4) (5)
09 June 2025 09 December 2025
1 IS 12762 (Part 2) : 2025 IS 12762 (Part 2) : 2018
IEC 60904-2 : 2023 IEC 60904-2 : 2015
Photovoltaic Devices Photovoltaic Devices
Part 2 Requirements for Part 2 Requirements for
Photovoltaic Reference Devices Photovoltaic Reference Devices
(Third Revision) (Second Revision)
09 June 2025 09 December 2025
2 IS 14578 : 2025 IS 14578 : 1999
Three Phase Induction Motors for Three Phase Induction Motors
Use in Nuclear Power Plants — for Use in Nuclear Power Plants
Specification — Specification
(First Revision)
09 June 2025 09 December 2025
3 IS/IEC 61730-1 : 2023 IS/IEC 61730-1 : 2016
Photovoltaic (PV) Module — Photovoltaic (PV) Module
Safety Qualification Safety Qualification
Part 1 Requirements for Part 1 Requirements for
Construction Construction
(Second Revision) (First Revision)
09 June 2025 09 December 2025
4 IS/IEC 61730-2 : 2023 IS/IEC 61730-2 : 2016
Photovoltaic (PV) Module — Photovoltaic (PV) Module
Safety Qualification Safety Qualification
Part 2 Requirements for Testing Part 2 Requirements for Testing
(Second Revision)
(First Revision)
09 June 2025 09 December 2025
5 IS/IEC 62548-1 : 2023 IS/IEC 62548 : 2016
Photovoltaic (PV) Arrays Photovoltaic PV Arrays —
Part 1 Design Requirements Design Requirements
(First Revision)
09 June 2025 09 December 2025
6 IS/IEC TS 62915 : 2023 IS/IEC TS 62915 : 2018
Photovoltaic (PV) Modules — Photovoltaic ( PV ) Modules —
Type Approval, Design and Safety Type Approval, Design and
Qualification — Retesting Safety Qualification —
(First Revision) Retesting
CHITRA GUPTA, Scientist G & DDG (Hallmarking and Training)
[ADVT.-III/4/Exty./181/2025-26]