India Adds 2,361 MW Biomass Capacity, 228 MWe Waste-to-Energy and 2.88 Lakh Biogas Plants in Last Ten Years

Issued by Ministry of Fisheries, Animal Husbandry and Dairying · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This report, dated December 17, 2025, from the Ministry of New and Renewable Energy, details the installation of bioenergy projects in India over the last ten years, supported by the National Bioenergy Programme (NBP), Phase-I. The NBP has a budget of Rs. 998 Crore for the period 2022-23 to 2025-26. Annexure-II refers to Lok Sabha Question No. 2809, to be answered on December 17, 2025. **Key Points / Main Content** * **National Bioenergy Programme (NBP)** * Phase-I was notified on November 2, 2022. * Budget outlay of Rs. 998 Crore for 2022-23 to 2025-26. * **Bioenergy Project Achievements (Past 10 Years)** * Added 2,361 MW biomass capacity. * Added 228 MWe Waste-to-Energy capacity. * Added 2.88 Lakh biogas plants. * **Central Financial Assistance (CFA) - Annexure-I** * *Waste to Energy Programme* * Biogas Generation: Rs 0.25 Crore per 12000 cum/day * BioCNG Generation: Rs 4.0 Crore per 4800 kg/day (new biogas plant), Rs 3.0 Crore per 4800 kg/day (existing biogas plant) * Power Generation based on Biogas: Rs 0.75 Crore/MW (new biogas plant), Rs 0.5 Crore/MW (existing biogas plant) * Power based on bio & agro-industrial waste: Rs 0.4 Crore/MW * *Biomass Gasifier* * Rs. 2,500 per kWe with dual fuel engines for electrical application * Rs. 15,000 per kWe with 100% gas engines for electrical application * Rs. 2 lakh per 300 kWth for thermal applications * *Biomass Programme* * Briquette manufacturing plants: Rs. 9.00 Lakhs/ TPH (Maximum CFA - Rs. 45.00 Lakh per project). * Non-Torrefied Pellet manufacturing plant: Rs. 21 lakhs/MTPH or 30% of capital cost (Max Rs. 105 lakhs). * Torrefied Pellet manufacturing plant: Rs. 42 lakhs/MTPH or 30% of capital cost (Max Rs. 210 lakhs). * Non-Bagasse Cogeneration Projects: Rs. 40 Lakhs/ Megawatt (Maximum CFA- Rs. 5.00 Crore). * *Biogas Programme* * Small biogas plants (1-25 cubic meter/day): Rs. 9,800/- to Rs. 70,400/- per plant (based on size). * Power generation & thermal application (25-2500 cubic meter/day): Rs. 35,000/- to Rs. 45,000/- per kilowatt (power), Rs. 17,500/- to Rs. 22,500/- per kilowatt equivalent (thermal). * (Note: 20% higher than Standard CFA in for NER, Island, Registered Gaushalas and SC/ST beneficiaries). * **State-wise Bioenergy Projects - Annexure-II** * Details the breakdown of biomass projects, waste-to-energy projects, and biogas plants by state. * Data includes capacity in MW/MWe and number of biogas plants. **Impact Analysis** **Stakeholders: Ministry of New and Renewable Energy** * *Impact:* Responsible for supporting and overseeing the implementation of bioenergy projects. * *Action Required:* Continue to support bioenergy projects under the NBP Phase-I. **Stakeholders: Project Developers / Implementing Agencies** * *Impact:* Benefit from financial assistance to establish Bioenergy Projects. * *Action Required:* Adhere to the guidelines for accessing Central Financial Assistance (CFA). **Stakeholders: Beneficiaries (NER, Island, Registered Gaushalas, SC/ST)** * *Impact:* Receive 20% higher CFA than the standard rate. * *Action Required:* Ensure eligibility criteria are met to avail of the increased CFA. **Stakeholders: General Public** * *Impact:* Potential for increased access to renewable energy sources and improved waste management. * *Action Required:* Stay informed about available biogas programs and opportunities to set up biogas plants. **Stakeholders: Lok Sabha** * *Impact:* Provides an update on the financial assistance for Bio-Energy Programme. * *Action Required:* Review the details of bioenergy projects installed in the country during the last ten years.

Key Entities Referenced

National Bioenergy Programme (NBP), Phase-I: A scheme to support the installation of Bioenergy Projects, notified on 02.11.2022 with a budget outlay for the period 2022-23 to 2025.26. National Biogas and Manure Management Programme (NBMMP): A scheme to support bioenergy projects during the 12th Five Year Plan. New National Biogas & Organic Manure Programme (NNBOMP): A scheme to support bioenergy projects from 2018-19 to 2020-21. Ministry of New and Renewable Energy: The ministry supporting the installation of Bioenergy Projects in the country. India: The country in which the Bioenergy Projects are being installed.
Official Source Record View Original Source →
See Full Document Text
Ministry of Fisheries, Animal Husbandry & Dairying India Adds 2,361 MW Biomass Capacity, 228 MWe Waste-to-Energy and 2.88 Lakh Biogas Plants in Last Ten Years प्रव तथ: 17 DEC 2025 12:49PM by PIB Delhi Ministry of New and Renewable Energy supports installation of Bioenergy Projects in the country under National Bioenergy Programme (NBP), Phase-I, which was notified on 02.11.2022, with a budget outlay of Rs. 998 Crore, for the period 2022-23 to 2025.26. The details of Central Financial Assistance (CFA) provided is given at Annexure-I. During the last ten years, the Government has been supporting Bioenergy Projects through various Schemes, namely National Biogas and Manure Management Programme (NBMMP) during 12th Five Year Plan, New National Biogas & Organic Manure Programme (NNBOMP) from 2018-19 to 2020-21, Scheme to support promotion of Grid interactive Biomass Power and Bagasse cogeneration in sugar mills during 12th Plan Period, Programme on Energy from Urban, Industrial and Agricultural Wastes /Residues during 12th Plan period, Scheme to support Promotion of Biomass based Cogeneration in Sugar Mills and other Industries in the Country from 2018-19 to 2020-21. The details of bioenergy projects installed in the country during the last ten years, State-wise, is given at Annexure-II. Further, new bioenergy projects are being promoted under the NBP Phase-I. Annexure-I The existing CFA Support for setting up of Bioenergy Projects in the country under National Bioenergy Programme is given as under: Waste to Energy Programme CFA in Rs Crore Biogas generation Rs 0.25 Crore per 12000cum/day BioCNG generation Rs 4.0 Crore per 4800 kg/day (for BioCNG generation from new biogas plant) Rs 3.0 Crore per 4800 kg/day (for BioCNG generation from existing Biogas plant) Power generation based on Rs 0.75 Crore/MW (for power generation from new biogas plant) Biogas Rs 0.5 Crore/MW (for power generation from existing Biogas plant) Power based on bio & agro- Rs 0.4 Crore/MW industrial wasteBiomass Gasifier Rs. 2,500 per kWe with dual fuel engines for electrical application Rs. 15,000 per kWe with 100% gas engines for electrical application Rs. 2 lakh per 300 kWth for thermal applications Biomass Programme CFA Briquette manufacturing plants Rs. 9.00 Lakhs/ TPH (Maximum CFA- Rs. 45.00 Lakh per project). Non-Torrefied Pellet Rs. 21 lakhs/MTPH production capacity or 30% of the capital cost manufacturing plant considered for plant and machinery of 1 TPH plant, whichever is lower (Maximum Rs. 105 lakhs per project) Torrefied Pellet manufacturing Rs. 42 lakhs/MTPH production capacity or 30% of the capital cost plant considered for plant and machinery of 1 TPH plant, whichever is lower (Maximum Rs. 210 lakhs per project) Non-Bagasse Cogeneration Rs. 40 Lakhs/ Megawatt Projects Maximum CFA- Rs. 5.00 Crore per project). Biogas Programme CFA For small biogas plants (1-25 Rs. 9,800/- to Rs. 70,400/- per plant based on size of the plant in cubic meter/day plant capacity): cubic meter For Power generation and Rs. 35,000/- to Rs. 45,000/- per kilowatt for power generation thermal application (25 - 2500 Rs. 17,500/- to Rs. 22,500/- per kilowatt equivalent for thermal cubic meter/day plant capacity): applications. Note: 20% higher than Standard CFA in for NER, Island, Registered Gaushalas and SC/ST beneficiaries); Annexure-II REFERRED TO IN REPLY TO THE LOK SABHA UNSTARRED QUESTION NO. 2809, Part (d) TO BE ANSWERED ON 17.12.2025 on ‘Financial Assistance for Bio-Energy Programme’. The details of bioenergy projects installed in the country during the last ten years is given as under:Biomass Projects Waste to Energy Biogas Plants Projects Sl No State Capacity (MW) Capacity (MWe) Nos 1 Andhra Pradesh 35.1 35.95 28505 2 Arunachal Pradesh 0 0 349 3 Assam 2 0 23612 4 Bihar 39.8 0.32 236 5 Chhattisgarh 54 0 11030 6 Goa 0 1 140 7 Gujarat 12 15.2 5427 8 Haryana 87.4 17.39 3487 9 Himachal Pradesh 1.5 0 294 10 Jharkhand 14.8 1.04 545 11 Karnataka 536.81 8.41 34657 12 Kerala 1.55 0.23 9639 13 Madhya Pradesh 31.2 5.86 32120 14 Maharashtra 1073.5 24.26 71653 15 Manipur 0 0 25 16 Meghalaya 0 0 867 17 Mizoram 0 0 648 18 Nagaland 0 0 102 19 Odisha 0.6 0 5966 20 Punjab 140.29 21.77 1928821 Rajasthan 19.85 1.19 2404 22 Sikkim 0 0 170 23 Tamil Nadu 112.55 8.68 1740 24 Telangana 4.03 9.79 11159 25 Tripura 0 0 546 26 Uttarakhand 12.5 6.89 8362 27 Uttar Pradesh 146.6 41.34 3594 28 West Bengal 31.6 4.06 851 29 Andaman and Nicobar 0 0 0 Islands 30 Chandigarh 0 0 0 31 Dadra and Nagar 3.75 0 18 Haveli and Daman & Diu 32 NCT of Delhi 0 24.17 0 33 Jammu & Kashmir 0 0 101 34 Ladakh 0 0 0 35 Lakshadweep 0 0 0 36 Puducherry 0 0 0 37 Others 0 0 10544 Total 2361.43 227.56 288079 *** Navin Sreejith (रलीज़ आईडी: 2205042) आगंतुक पटल : 437 इस वज्ञ को इन भाषाओ ंम पढ़: Urdu , ही