## Report on the Indian Boiler Regulations Amendment, 2022
**1. Executive Summary:**
This report analyzes the notification published in the Gazette of India on February 24, 2022, concerning an amendment to the Indian Boiler Regulations, 1950. The amendment focuses on modifying the examination process for certification under the regulations, specifically addressing examination methods, weightage and passing criteria. The core purpose of the amendment is to refine and clarify the examination process, potentially aiming to improve the competency assessment of candidates involved in the design, manufacture, operation, and maintenance of boilers. The key finding is a detailed shift in the examination structure, involving alterations to written exam content, weightage, and qualification criteria.
**2. Introduction:**
The purpose of this report is to provide a detailed overview and analysis of the amendment to the Indian Boiler Regulations, 1950, as published in the Gazette of India on February 24, 2022. This report is based solely on the information provided in the given policy text.
**3. Policy Overview:**
* This report concerns an *amendment* to the existing Indian Boiler Regulations, 1950.
* **Core Objective(s) (Inferred):** To refine and clarify the examination process for candidates seeking certification related to boilers, encompassing design, manufacturing, operation, maintenance, inspection and certification. The objective is potentially to improve the standardization and robustness of competency assessment.
**4. Background and Rationale:**
* **Rationale for Amendment (Inferred):** The amendment likely addresses a perceived need to update and clarify the examination methods and criteria for certification under the Indian Boiler Regulations. The changes to the examination weightage and passing marks suggest an effort to balance theoretical knowledge with practical application. The introduction of specifics related to topics such as Non-Destructive Testing (NDT) emphasizes the importance of these techniques.
**5. Key Provisions / Changes:**
This section focuses specifically on the changes introduced by the amendment.
* **Specific Part of Original Policy Changed:** The amendment modifies Regulation 4J, sub-regulation 3, clause (i) of the Indian Boiler Regulations, 1950. This clause concerns the examination process for certification.
* **New Rule/Provision:** The original clause (i) is substituted with a new clause outlining a detailed examination process, namely:
* An examination conducted by the Central Boilers Board Examination Standing Committee or an authorized agency or Regional Examination Standing Committees.
* The examination methods are defined as:
* A written examination consisting of design, manufacture, operation and maintenance of the boiler, Non Destructive Testing Techniques, inspection and certification of boilers during manufacture and use as per Indian Boiler Regulations (70% weightage).
* Candidate shall secure at least 45 marks in individual written examination papers and at least 60 marks in aggregate to qualify for viva-voce.
* Viva-voce (30% weightage).
* Candidate shall secure at least 60 marks in aggregate written exam with 70 weightage and viva-voce with 30 weightage in order to pass the examination.
* The Central Boilers Board shall issue a passing grade certificate to the candidate after passing the examination.
* **Difference/Effect of the Change:** The amendment introduces a more structured and detailed examination process compared to the original regulation (as implied by the replacement). It specifies the topics covered in the written examination (including NDT), defines the weightage assigned to the written exam and viva-voce, and sets minimum passing marks for individual papers, aggregate scores, and overall qualification. This change aims to standardize the examination process and ensure a consistent level of competency among certified individuals. The introduction of minimum scores for both individual papers and the aggregate score raises the standard of examination.
**6. Target Audience and Stakeholders:**
The target audience and stakeholders directly affected by these changes include:
* Individuals seeking certification related to boilers (design, manufacture, operation, maintenance, inspection and certification).
* The Central Boilers Board Examination Standing Committee, authorized agencies, and Regional Examination Standing Committees responsible for conducting the examinations.
* Training institutions providing courses related to boiler technology and inspection.
* Industries that manufacture, operate, and maintain boilers, and rely on certified personnel.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency/Bodies:** The Central Boilers Board, the Central Boilers Board Examination Standing Committee, authorized agencies, and Regional Examination Standing Committees are responsible for implementing the revised examination process.
* **Timelines/Procedures:** The amendment states that it will come into force on the date of its final publication in the Official Gazette. The notification also provided a period of forty-five days from the date of publication for stakeholders to submit objections or suggestions to the Central Boilers Board.
* **Specific to the Amendment:** The implementation of the change requires the Central Boilers Board to update its examination procedures and materials to reflect the new content areas, weightage, and passing criteria. The authorized agencies and Regional Examination Standing Committees will need to align their examination processes with the revised guidelines.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcome of these specific changes is:
* Improved standardization and quality of the certification process for boiler-related professionals.
* Ensuring a consistent level of competency in design, manufacture, operation, maintenance, inspection, and certification of boilers, including Non-Destructive Testing Techniques.
* Increased confidence in the skills and knowledge of certified personnel, leading to enhanced safety and efficiency in boiler operations.
* Potentially, an increase in the difficulty of obtaining certification, potentially reducing the pool of certified personnel in the short term, but raising the overall competence.
**9. Conclusion:**
The amendment to the Indian Boiler Regulations, 1950, focusing on the examination process for certification, represents a significant step toward standardizing and enhancing the assessment of competency in the boiler industry. The changes to the examination methods, weightage, and passing criteria are designed to ensure a consistent and robust evaluation of candidates' knowledge and skills. This amendment is expected to have a positive impact on the overall quality and safety of boiler operations by ensuring a higher level of competence among certified professionals. While the text provides details on the examination process, further information regarding the enforcement and evaluation of these changes would be beneficial for a more complete understanding of the amendment's impact.
Key Entities Referenced
Indian Boiler Regulations, 1950: A set of regulations pertaining to boilers in India, which is being amended by the current notification.
Boilers Act, 1923: An act of the Indian Parliament that provides the legal framework for the regulation of boilers. Specifically, section 28 and subsection 1 of section 31 are referenced.
Central Boilers Board: The central authority responsible for making regulations regarding boilers, under the Ministry of Commerce and Industry.
Ministry of Commerce and Industry: The Indian government ministry responsible for the Department for Promotion of Industry and Internal Trade and the Central Boilers Board.
Department for Promotion of Industry and Internal Trade: A department within the Ministry of Commerce and Industry that oversees the Central Boilers Board.
New Delhi: The location of the Central Boilers Board and the origin of the notification (likely National Capital Territory of Delhi).
Indian Boiler Amendment Regulations, 2022: The name of the regulations that are proposed to amend the Indian Boiler Regulations, 1950.
Central Boilers Board Examination Standing Committee: The committee responsible for conducting examinations related to boilers.
Regional Examination Standing Committees: Regional committees authorized by the Central Boilers Board Examination Standing Committee to conduct examinations.
Udyog Bhawan, New Delhi 110 011: The address of the Ministry of Commerce and Industry Department for Promotion of Industry and Internal Trade.
T. S. G. NARAYANNEN: The Secretary of the Central Boilers Board.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
xxxGIDHxxx
सी.जी.-डी.एलxx.x-GअID.-E2x4xx0 22022-233715
CG-DL-E-24022022-233715
असाधारण
EXTRAORDINARY
भाग II—खण्ड 3—उप-खण्ड (i)
PART II—Section 3—Sub-section (i)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 153] नई ददल्ली, बहृ स्ट्प जतवार, फरवरी 24, 2022/फाल्गनु 5, 1943
No. 153] NEW DELHI, THURSDAY, FEBRUARY 24, 2022/PHALGUNA 5, 1943
वाजणज्य और उद्योग मत्रं ालय
(उद्योग सवं धनध और आतं ररक व्यापार जवभाग)
(केंद्रीय बॉयलस धबोडध)
अजधसचू ना
नई ददल्ली, 24 फरवरी, 2022
सा.का.जन 156(अ).—कजतपय जवजनयमों का जनम्नजलजखत प्रारुप, भारतीय बॉयलर जवजनयम, 1950 को संिोजधत
करने के जलए, जिसे केन्द्द्रीय बॉयलस ध बोड,ध बॉयलर अजधजनयम, 1923 (1923 का 5) की धारा 28 के द्वारा प्रदत्त िजियों
का प्रयोग करत े हुए बनाने का प्रस्ट्ताव करता ह,ै उि अजधजनयम की धारा 31 की उप-धारा (1) द्वारा यथा अपेजित उन
सभी व्यजियों, जिनके इससे प्रभाजवत होने की संभावना ह,ै की िानकारी के जलए प्रकाजित दकया िाता ह ै और सचू ना दी
िाती ह ैदक इन प्रारुप जवजनयमों की अजधसूचना के प्रकािन वाला रािपत्र आम िनता को उपलब्ध कराए िाने से पततालीस
ददनों की अवजध की समाजि के पश्चात उि प्रारुप जवजनयमों पर जवचार दकया िाएगा;
उि प्रारूप जवजनयमों के संबंध म ें जनधाधररत अवजध के भीतर दकसी व्यजि स े पाि आपजत्तयों या सुझावों पर
केन्द्द्रीय बॉयलस ध बोड धद्वारा जवचार दकया िाएगा;
आपजत्तयां या सुझाव, यदद कोई हों, उि जनधाधररत अवजध के भीतर सजचव, केन्द्द्रीय बॉयलस ध बोडध, वाजणज्य और
उद्योग मंत्रालय (उद्योग संवधधन और आंतररक व्यापार जवभाग), कमरा न.ं 358 उद्योग भवन, नई ददल्ली- 110011 अथवा
ई-मेल (tsg.narayannen@nic.in) पर मले दकए िा सकत े ह।त
1309 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]
प्रारूप जवजनयम
1. सजं िि िीर्कध और आरंभ -- (1) इन जवजनयमों को भारतीय बॉयलर (संिोधन) जवजनयम, 2022 कहा िाए।
(2) य ेिासकीय रािपत्र में अंजतम प्रकािन की तारीख से लाग ूहोंगे।
2. भारतीय बॉयलर जवजनयम, 1950 के जवजनयम 4ि, उप-जवजनयम (3) में खंड (i) को जनम्न जलजखत से प्रजतस्ट् थाजपत दकया
िाएगा, नामत:-
“(i) केंद्रीय बॉयलस ध बोड ध स्ट्थ ायी परीिा सजमजत अथवा इसके द्वारा प्राजधकृत एिेंसी अथवा िेत्रीय स्ट् थायी परीिा
सजमजत द्वारा जनम्न जलजखत तरीकों से परीिा आयोजित की िाएगी, नामत:-
(क) जलजखत परीिा म ें बॉयलर का जडिाइन, जवजनमाधण, प्रचालन और अनुरिण, गैर-जवध् वंसक परीिण
तकनीकें, भारतीय बॉयलर जवजनयमों के अनुसार जवजनमाधण के दौरान बॉयलस ध का जनरीिण और
प्रमाणीकरण तथा उसका उपयोग अंतर्ववष्ट होगा (70 प्रजतित भाररता);
(ख) मौजखक परीिा हते ु अहतध ा के जलए अभ् यथी को प्र्येक जलजखत परीिा में 45 प्रजतित और कुल जमलाकर
कम-स-े कम 60 प्रजतित अंक प्राप् त करन े होंग;े
(ग) उपयुधक् त से संबंजधत मौजखक परीिा (30 प्रजतित भाररता);
(घ) अभ्यथी द्वारा परीिा को उत्तीणध करन े के जलए, उसके कुल प्रािांक का कम स े कम 60 प्रजतित होना
चाजहए (जलजखत परीिा की भाररता 70 प्रजतित होगी और मौजखक परीिा की भाररता 30 प्रजतित
होनी चाजहए)
(ङ) केंद्रीय बॉयलस ध बोडध, परीिा उत्तीणध करन े के बाद अभ् यथी को उत्तीणध श्रेणी का प्रमाण-पत्र िारी करेगा।”
[फा. सं. पी-30026/4/2020-बॉयलर]
टी.एस.िी. नारायणन, सजचव,
नोट : प्रमुख जवजनयम सा.आ.600 ददनांक 15 जसतंबर, 1950 के िररए भारत के रािपत्र म ें प्रकाजित हुए थ े और इनम ें
अंजतम संिोधन सा.का.जन. 551(अ) ददनांक 11 जसतंबर, 2020 के िररए दकया गया था।
MINISTRY OF COMMERCE AND INDUSTRY
(Department for Promotion of Industry and Internal Trade)
(CENTRAL BOILERS BOARD)
NOTIFICATION
New Delhi, the 24th February, 2022.
G.S.R. 156(E).—The following draft regulations to amend the Indian Boiler Regulations, 1950,
which the Central Boilers Board proposes to make in exercise of the powers conferred by section 28 of the
Boilers Act, 1923 (5 of 1923), is hereby published as required by sub-section (1) of section 31 of the said
Act for the information of all persons likely to be affected thereby and notice is hereby given that the said
draft regulations will be taken into consideration after expiry of a period of forty-five days from the date
the Gazette containing the publication of this notification is made available to the public;
Any objections or suggestions which may be received from any person with respect to the said
draft regulations within the period so specified will be considered by the Central Boilers Board;
Objections or suggestions, if any, may be addressed to the Secretary, Central Boilers Board,
Ministry of Commerce and Industry (Department for Promotion of Industry and Internal Trade), Room No.
358, Udyog Bhawan, New Delhi- 110 011 or sent by email (tsg.narayannen@nic.in) within the period
specified above.[भाग II—खण् ड 3(i)] भारत का रािपत्र : असाधारण 3
DRAFT REGULATIONS
1. Short title and commencement.—(1) These regulations may be called the Indian Boiler (Amendment)
Regulations, 2022.
(2) They shall come into force on the date of their final publication in the Official Gazette.
2. In the Indian Boiler Regulations, 1950, in regulation 4J, in sub-regulation (3), for clause (i) the following
clause shall be substituted, namely:-
“(i) an examination shall be conducted by the Central Boilers Board Examination Standing Committee or
an agency or Regional Examination Standing Committees authorized by it, as per the following
examination methods, namely:-
(a) written Examination consisting of design, manufacture, operation and maintenance of the
boiler, Non Destructive Testing Techniques, inspection and certification of boilers during
manufacture and use as per Indian Boiler Regulations( 70% weightage);
(b) candidate shall secure at least 45% marks in individual written examination papers and at
least 60% marks in aggregate to qualify for viva-voce.
(c) viva-voce on the above (30% weightage ).
(d) candidate shall secure at least 60% marks in aggregate (written exam with 70% weightage
and viva-voce with 30% weightage) in order to pass the examination.
(e) the Central Boilers Board shall issue a passing grade certificate to the candidate after passing
the examination.”.
[F. No. P-30026/4/2020-Boiler]
T. S. G. NARAYANNEN, Secy.
Note : The principal regulations were published in the Gazette of India, vide, number S.O. 600, dated the
15th day of September, 1950 and last amended vide G.S.R.551(E), dated the 11th September, 2020.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.