**Executive Summary**
The Ministry of Railways has approved a ₹226 crore project to install Electronic Interlocking (EI) systems at 13 stations within the Raipur Division of South East Central Railway (SECR). Announced on July 1, 2026, this initiative aims to modernize signaling infrastructure on the Durg-Taroki section by replacing legacy Panel Interlocking systems. The project is designed to enhance operational safety, improve punctuality, and support increasing passenger and freight traffic.
**Key Points / Main Content**
* **Project Scope and Funding**
* Total sanctioned budget of ₹226 crore for infrastructure modernization.
* Target area: 13 stations on the Durg-Taroki section of the Raipur Division (SECR).
* Core objective: Replacement of existing Panel Interlocking (PI) with advanced Electronic Interlocking (EI) technology.
* **Designated Stations**
* The project covers: Marauda, Risama, Gundardehi, Latabor, Balod, Kusumkasa, Dalli Rajhara, Gudum, Bhanupratappur, Keoti, Antagarh, Taroki, and Raipur Store Depot.
* **Technical Improvements**
* Automation of route setting and signaling functions.
* Integration of advanced safety features to minimize human error and signaling failures.
* Improved system reliability and operational flexibility.
* **Operational Benefits**
* Faster restoration of services during disruptions.
* Enhanced train punctuality across the section.
* Strengthened technological foundation to handle growing volumes of freight and passenger traffic.
**Impact Analysis**
**South East Central Railway (SECR) / Raipur Division**
**Impact**
The division will transition to a modern, technology-driven signaling system, reducing the frequency of signaling failures and improving overall system reliability and flexibility.
**Action Required**
The division must manage the installation and transition from Panel Interlocking to Electronic Interlocking at the 13 specified stations.
**Passengers and Freight Consignors**
**Impact**
Users of the rail network will benefit from safer operations, improved punctuality, and a more efficient transport system capable of handling higher traffic volumes.
**Action Required**
No direct action is required from these stakeholders as they are the beneficiaries of the infrastructure upgrades.
**Ministry of Railways**
**Impact**
This approval furthers the Ministry's national program to modernize signaling systems through advanced technologies, ensuring safer and smarter operations.
**Action Required**
Continued oversight and disbursement of the sanctioned ₹226 crore to ensure project completion.
Key Entities Referenced
Electronic Interlocking (EI) Project: A ₹226 crore modernization initiative to replace existing Panel Interlocking with automated signaling technology across 13 stations for enhanced safety and efficiency.
Ministry of Railways: The primary central authority responsible for approving and overseeing the signaling infrastructure upgrade.
South East Central Railway (SECR): The specific railway zone under which the Raipur Division operates and where the project is being implemented.
Durg-Taroki Section, Raipur Division: The specific geographic and operational scope of the project, encompassing the 13 stations designated for infrastructure modernization.
Ministry of Railways
Indian Railways Approves ₹226 Crore Electronic
Interlocking Project for 13 Stations of Raipur
Division in SECR
Electronic Interlocking to Strengthen Safety, Reliability and
Signalling Efficiency at 13 Stations on the Durg-Taroki
Section of Raipur Division
प्रव तथ: 01 JUL 2026 4:29PM by PIB Delhi
In a major step towards modernising signalling infrastructure and enhancing operational safety, Indian
Railways has approved the provision of Electronic Interlocking (EI) at 13 stations on the Durg-Taroki
section of Raipur Division in South East Central Railway (SECR) at a cost of ₹226 crore.
The project involves replacing the existing Panel Interlocking (PI) system with Electronic Interlocking
(EI) at 13 stations, enabling safer, more reliable and technology-driven train operations.
Modernisation of Signalling Infrastructure
The sanctioned project covers the installation of Electronic Interlocking at the following stations of the
Durg-Taroki section of Raipur Division:
Marauda (MXA)
Risama (RSA)
Gundardehi (GDZ)
Latabor (LBO)
Balod (BXA)
Kusumkasa (KYS)
Dalli Rajhara (DRZ)
Gudum (GUDM)
Bhanupratappur (BPTP)
Keoti (KETI)
Antagarh (AAGH)
Taroki (TDOK)
Raipur Store Depot (RSD)
The transition from Panel Interlocking to Electronic Interlocking will significantly modernise signalling
infrastructure on this important section, improving operational flexibility and system reliability.
Safer, Faster and More Reliable Train Operations
Electronic Interlocking is a state-of-the-art signalling technology that automates route setting and
signalling functions while incorporating advanced safety features. The upgraded system will improve
operational efficiency, reduce the possibility of signalling failures and enable faster restoration duringdisruptions.
The project will enhance the safety and reliability of train operations, improve punctuality and provide a
stronger technological foundation for handling growing passenger and freight traffic on the South East
Central Railway network.
The approval is part of Indian Railways' ongoing programme to modernise signalling systems across the
national network through advanced technologies, ensuring safer, smarter and more efficient railway
operations.
*****
Dharmendra Tewari/ Dr. Nayan Solanki/ Ritu Raj/ Manik Sharma
(रलीज़ आईडी: 2279884) आगंतुक पटल : 407
इस वज्ञ को इन भाषाओ ंम पढ़: Urdu , ही , Gujarati , Kannada