**Executive Summary**
Indian Railways has approved the 54 km Kiul-Jhajha 3rd Line Project at an estimated cost of ₹962 crore to augment capacity on the high-density Howrah-Delhi corridor. Announced on 19 May 2026, the project addresses the current over-utilization of the existing double-line section and prepares for future traffic growth. The initiative aims to enhance punctuality, improve operational flexibility, and support regional industrial development across Eastern and Northern India.
**Key Points / Main Content**
**Project Specifications and Investment**
* The project involves the construction of a 54 km third railway line between Kiul and Jhajha.
* Total financial outlay for the project is sanctioned at ₹962 crore.
* The section is officially identified as part of the High Traffic Density Network of Indian Railways.
**Operational Improvements**
* The new infrastructure aims to reduce congestion on a route currently operating beyond optimal capacity.
* The project is expected to significantly improve the punctuality and operational flexibility of both passenger and freight services.
* Enhancements will provide long-term infrastructure support to meet rising traffic demands.
**Strategic Connectivity**
* The project strengthens the rail link between Patna and Kolkata.
* It provides critical connectivity between Kolkata/Haldia ports and Raxaul/Nepal.
* The route serves as a vital corridor for moving freight to major industrial hubs, including Barh STPP, Jawahar STPP, and Birganj ICD.
**Regional and Industrial Impact**
* The project is designed to facilitate seamless trade connectivity and support regional industrial growth.
* Improved carrying capacity will lead to more efficient logistics movement between economic centres in Northern and Eastern India.
**Impact Analysis**
**Passenger Rail Users**
**Impact**
Commuters will experience improved train punctuality, reduced congestion, and more reliable transport services on the Howrah-Delhi route.
**Action Required**
No specific action is required from passengers; they will benefit from the enhanced infrastructure upon completion.
**Industrial and Logistics Stakeholders (e.g., Barh STPP, Birganj ICD)**
**Impact**
These entities will benefit from strengthened trade connectivity, more efficient freight movement, and increased carrying capacity for industrial goods.
**Action Required**
Logistics managers should plan for increased freight volume and improved supply chain reliability once the additional line is operational.
**Indian Railways / Project Executors**
**Impact**
The organization gains greater operational flexibility and the ability to manage high-density traffic more effectively.
**Action Required**
Project teams must oversee the construction and integration of the 54 km line into the existing High Traffic Density Network.
Key Entities Referenced
Kiul-Jhajha 3rd Line Project: A 54 km railway infrastructure project approved at a cost of ₹962 crore to enhance capacity and reduce congestion on the Howrah-Delhi route.
High Traffic Density Network: A strategic category of Indian Railways corridors identified for infrastructure augmentation to support high volumes of passenger and freight traffic.
Howrah-Delhi Route: The high-density rail corridor whose operational efficiency, punctuality, and capacity are the primary targets of this project.
Ashwini Vaishnaw: The Union Minister for Railways who highlighted the project's role in regional industrial growth and trade connectivity.
Ministry of Railways: The primary governing body responsible for the approval and implementation of the rail infrastructure project.
Ministry of Railways
Indian Railways Approves 54 Km Kiul-Jhajha 3rd
Line Project at ₹962 Crore to Boost Capacity on
High-Density Howrah-Delhi Route
Kiul-Jhajha 3rd Line Project to Strengthen Passenger
Movement, Connectivity and Regional Industrial Growth:
Ashwini Vaishnaw
Posted On: 19 MAY 2026 11:35AM by PIB Delhi
Indian Railways has approved the Kiul-Jhajha 3rd Line Project (54 km) at a cost of ₹962 crore,
reinforcing its commitment towards enhancing capacity, improving operational efficiency and ensuring
seamless rail transportation on the high-density Howrah-Delhi corridor. The project forms an important
part of the High Traffic Density Network of Indian Railways and is expected to strengthen both
passenger and freight movement across Eastern and Northern India.
The Union Minister for Railways, Shri Ashwini Vaishnaw stated that the Kiul-Jhajha 3rd Line Project
will significantly enhance capacity on the heavily utilised Howrah-Delhi corridor and help improve
punctuality and operational flexibility of train services. He said the additional line infrastructure will
facilitate seamless movement of passenger and freight trains while supporting industrial growth and
trade connectivity across the region.
At present, the existing double line section between Kiul and Jhajha is operating beyond optimal
capacity utilisation, while traffic demand on the corridor is expected to increase further in the coming
years, necessitating additional infrastructure augmentation. The proposed 54 km third line project will
significantly improve line capacity, reduce congestion and facilitate smoother movement of both
passenger and freight trains. The project will strengthen connectivity between Patna and Kolkata, while
also supporting freight movement linked to major industrial and logistics hubs across Northern and
Eastern India.
The route also provides critical connectivity between Kolkata/Haldia ports and Raxaul/Nepal, and
handles substantial freight traffic associated with key industrial establishments including Barh STPP,
Jawahar STPP and Birganj ICD. The section has been identified under the High Traffic Density Network
Corridor of Indian Railways.
With rising traffic demand on this strategic corridor, the project is expected to provide long-term
infrastructure support for both passenger and freight operations. The enhanced connectivity and
additional carrying capacity will contribute towards more efficient logistics movement, reduced
congestion and improved rail transport reliability between key economic centres of Eastern and
Northern India.
*****Dharmendra Tewari/ Dr. Nayan Solanki/ Ritu Raj/ Manik Sharma
(Release ID: 2262633) Visitor Counter : 623
Read this release in: Urdu , ही , Bengali , Bengali-TR , Gujarati , Tamil , Kannada