**Executive Summary**
Indian Railways has approved the reconstruction of the Shastriya Road Over Bridge (ROB No. 103-C) in Indore Yard, Madhya Pradesh, at an estimated cost of ₹139 crore. Announced on 17 June 2026, the project aims to enhance rail-road connectivity, reduce traffic bottlenecks, and improve urban mobility. The initiative involves building a modern four-lane bridge alongside comprehensive upgrades to local sewage and electrical infrastructure.
**Key Points / Main Content**
**Project Design and Specifications**
* Construction of a new 4-lane Road Over Bridge to replace the existing Shastriya Bridge.
* Features a 72-metre camel-back superstructure utilizing PSC girders and a full viaduct arrangement.
* Provision of 6-metre-wide service roads on both sides beneath the bridge to facilitate local traffic and maintenance access.
* Designed to accommodate increasing traffic demands while ensuring safer movement for commuters.
**Infrastructure and Utility Upgrades**
* Extensive relocation and modernization of existing sewer infrastructure to ensure uninterrupted drainage services.
* Shifting and renewal of electrical infrastructure, including the installation of new poles and advanced lighting systems.
* Sanctioned under Indian Railways’ ongoing programme for the modernization of road over bridges and related infrastructure.
**Connectivity and Urban Development**
* Aims to significantly reduce traffic congestion and bottlenecks within Indore.
* Strengthens the integration between railway networks and urban transport infrastructure.
* Supports the city’s growing mobility requirements through modernized transport networks.
**Impact Analysis**
**Commuters and Residents of Indore**
**Impact**
Residents will benefit from improved road connectivity, reduced travel times, and safer movement across railway crossings.
**Action Required**
Utilize the new 4-lane bridge and service roads for local travel once construction is finalized.
**Indian Railways**
**Impact**
The project enhances the safety and efficiency of rail-road interfaces and fulfills the department's commitment to modernizing infrastructure.
**Action Required**
Manage the ₹139 crore budget and oversee the construction and integration of the ROB within the Indore Yard.
**Local Utility and Municipal Authorities**
**Impact**
City infrastructure, specifically sewer lines and electrical grids, will be upgraded and modernized as part of the bridge reconstruction.
**Action Required**
Coordinate with railway authorities for the shifting and renewal of sewer lines and electrical poles to ensure service continuity.
Key Entities Referenced
Indian Railways: The primary government entity responsible for approving and funding the rebuilding of infrastructure projects to improve rail-road connectivity.
Shastriya Bridge (Road Over Bridge No. 103-C): The specific infrastructure asset in Indore Yard being reconstructed as a 4-lane bridge to improve urban mobility and traffic flow.
Indore, Madhya Pradesh: The central location for the implementation of the bridge reconstruction and associated utility modernization works.
Programme for construction and modernization of road over bridges and road under bridges: The specific Indian Railways initiative focused on enhancing safety and mobility at railway crossings under which this project was sanctioned.
Ministry of Railways
Indian Railways Approves Rebuilding of
Shastriya ROB in Indore Yard at ₹139 Crore to
Improve Urban Mobility and Rail-Road
Connectivity
4-Lane Road Over Bridge with Service Roads to Ease Traffic
Congestion and Ensure Safer Movement for Commuters
प्रव तथ: 17 JUN 2026 1:53PM by PIB Delhi
In a major boost towards improving urban transportation infrastructure and enhancing rail-road
connectivity in Madhya Pradesh, Indian Railways has approved the rebuilding of Road Over Bridge
(ROB) No. 103-C, popularly known as Shastriya Bridge, in Indore Yard at a cost of ₹139 crore.
The project has been sanctioned under Indian Railways’ ongoing programme for construction and
modernization of road over bridges, road under bridges and related infrastructure aimed at improving
mobility and safety at railway crossings.
Modern Four-Lane Bridge for Improved Traffic Movement
The approved project involves construction of a 4-lane Road Over Bridge featuring a 72-metre camel-
back superstructure with PSC girders and a full viaduct arrangement. The new bridge is designed to
accommodate increasing traffic demand while providing smoother and safer movement for commuters. To
facilitate local traffic circulation and maintenance access, 6-metre-wide service roads will be provided on
both sides beneath the bridge.
Comprehensive Infrastructure Upgradation
Apart from reconstruction of the bridge structure, the project includes extensive utility shifting and
modernization works. Existing sewer infrastructure will be relocated and upgraded through construction of
new sewer lines to ensure uninterrupted drainage services.
The project also includes shifting and renewal of electrical infrastructure, including installation of new
poles, lighting systems and associated equipment, ensuring improved public utility services and urban
infrastructure integration.
Boost to Connectivity and Urban Development
The rebuilding of Shastriya Bridge will significantly improve road connectivity in Indore, reduce traffic
bottlenecks and enhance ease of movement for residents. The project is expected to strengthen integration
between railway and urban transport infrastructure while supporting the city's growing mobility
requirements.The approval reflects Indian Railways’ continued commitment towards modern infrastructure
development, improved passenger and public convenience, and creation of safer and more efficient
transport networks across the country.
*****
Dharmendra Tewari/ Dr. Nayan Solanki/ Ritu Raj/ Manik Sharma
(रलीज़ आईडी: 2273932) आगंतुक पटल : 289
इस वज्ञ को इन भाषाओ ंम पढ़: Urdu , ही , Gujarati , Tamil , Kannada