**Executive Summary**
On 22 March 2026, Indian Railways successfully commissioned the indigenous Kavach Automatic Train Protection (ATP) system across 190 route kilometres of the Prayagraj–Kanpur section. This milestone on the Delhi–Howrah high-density corridor enables train operations at 160 kmph while significantly enhancing safety and operational efficiency. The initial phase covers eight pairs of trains, with plans for progressive expansion to Vande Bharat rakes and the Ghaziabad–Tundla section.
**Key Points / Main Content**
**System Implementation and Scope**
* **Coverage:** The system was commissioned on the Prayagraj (Excluding) – Kanpur (Excluding) section, covering 190 route kilometres.
* **Initial Rollout:** Kavach is currently enabled on eight pairs of trains (including 14113/14114, 12307/12308, and 15003/15004), with Vande Bharat trains to be included progressively.
* **Version 4.0:** This deployment utilizes Kavach Version 4.0, which has been successfully commissioned on a total of 1,452 route kilometres across the Delhi–Mumbai and Delhi–Howrah routes.
**Safety and Operational Features**
* **Core Functions:** The system provides Automatic Train Protection (ATP) and prevents Signal Passing at Danger (SPAD).
* **Human Error Mitigation:** Includes automatic brake application features to intervene in the event of human error.
* **Speed Enhancement:** The commissioning paves the way for increasing train speeds to 160 kmph on vital corridors.
**Trials and Validation**
* **Extensive Testing:** More than 20,000 kilometres of passenger trial runs were completed with satisfactory system validation.
* **Technical Testing:** Trials involved WAP-7 locomotives with 8, 16, and 22 LHB coach configurations, as well as 20-coach Vande Bharat rakes.
* **Reliability:** Passenger trials using the Chauri Chaura Express (15003/15004) demonstrated consistent and reliable performance during regular service.
**Strategic Objectives**
* **Mission Raftaar:** The next phase of implementation is targeted for the Ghaziabad–Tundla section to support the objectives of Mission Raftaar.
* **Indigenization:** Developed under the "Make in India" initiative, Kavach is intended for progressive deployment across the entire Indian Railways network to modernize operations.
**Impact Analysis**
**Indian Railways Operations and Management**
**Impact**
The system enhances operational efficiency and safety framework reliability. It allows for higher speed limits (160 kmph) on high-density corridors, requiring a shift in monitoring and inspection protocols.
**Action Required**
Senior officers and divisional managers must continue conducting footplate inspections and overseeing the progressive inclusion of additional trains and Vande Bharat rakes into the Kavach network.
**Technical and Maintenance Teams**
**Impact**
Teams are responsible for the upkeep of high-performance WAP-7 locomotives and specialized LHB coach configurations integrated with Kavach Version 4.0 hardware.
**Action Required**
Maintenance staff must ensure continuous system reliability under varied operational conditions and support the upcoming implementation in the Ghaziabad – Tundla section.
**Passengers**
**Impact**
Passengers benefit from a significantly safer and more reliable transport framework with the potential for reduced travel times due to increased operational speeds.
**Action Required**
No specific action is required from passengers; however, they will experience the rollout first on the eight designated train pairs mentioned in the first phase.
Key Entities Referenced
Kavach (Automatic Train Protection System): An indigenously developed safety system (Version 4.0) designed to prevent signal passing at danger and human error, enabling train speeds up to 160 KMPH.
Ministry of Railways: The primary government body responsible for the commissioning and deployment of the Kavach system across high-density corridors in India.
Delhi–Howrah High-Density Corridor: A vital railway route where the Kavach system was commissioned on the 190 km Prayagraj–Kanpur section to enhance safety and operational efficiency.
Make in India: The national initiative under which the Kavach system was indigenously developed to modernize train operations and strengthen the safety framework.
Mission Raftaar: A railway project focused on increasing train speeds to 160 KMPH, for which the deployment of Kavach is a key technical requirement.
Ministry of Railways
Indian Railways Commissions Kavach on 190
Route Kilometres of Prayagraj–Kanpur Section of
Delhi–Howrah High-Density Corridor
Commissioning of Key Section Paves the Way for 160 kmph
Train Operations, Enhancing Safety and Operational
Efficiency on One of Indian Railways’ Most Vital Corridors
Posted On: 23 MAR 2026 5:57PM by PIB Delhi
Indian Railways successfully commissioned the Kavach Automatic Train Protection (ATP) System on
the Prayagraj (Excluding) – Kanpur (Excluding) section (190 Route Kilometres) of Delhi–Howrah high-
density corridor on 22 March 2026. The Kavach system was implemented through Train No. 14163. The
General Manager also conducted a footplate inspection onboard Train No. 14163 from Subedarganj to
Manauri station to assess the performance of the Kavach system. Senior officers including PHODs,
DRM/Prayagraj, Headquarters officers, and Divisional officers were present on the occasion.
In the first phase, Kavach will be enabled on eight pairs of trains: 14113/14114, 14163/14164,
12307/12308, 12417/12418, 22437/22438, 15003/15004, 20433/20434, and 12403/12404. Additional
trains and Vande Bharat will be progressively included.
This commissioning marks a significant milestone in running trains at 160 KMPH and enhancing
railway safety and improving operational efficiency on one of the most vital sections of Indian Railway.Prior to commissioning, extensive and rigorous trials were successfully conducted. Trial runs included
WAP-7 locomotives with 8, 16, and 22 LHB coach configurations, as well as a 20-coach Vande Bharat
rake, ensuring system reliability under varied operational conditions. The WAP-7 is a high-performance
electric locomotive used by Indian Railways for hauling passenger trains, including premium services
like Rajdhani, Shatabdi, and Duronto Express.
Passenger trials were also conducted using Train No. 15003/15004 (Chauri Chaura Express), which
demonstrated consistent and reliable performance during regular service.
More than 20,000 kilometres of passenger trial runs have been successfully completed, with all system
validations found satisfactory.
The Kavach system significantly enhances railway safety through the following features:
Automatic Train Protection (ATP)
Prevention of Signal Passing at Danger (SPAD)
Automatic brake application in case of human error.
Kavach is an indigenously developed Automatic Train Protection system under the Make in India
initiative and is being progressively deployed across Indian Railways to strengthen safety and
modernize train operations.
Prior to this, after extensive and elaborate trials, Kavach Version 4.0 has been successfully
commissioned on 1,452 Route Kilometres, covering the high-density Delhi–Mumbai and Delhi–Howrah
routes.
Indian Railways remains committed to adopting modern safety technologies and strengthening the
safety framework, ensuring safer, more reliable, and efficient train operations for passengers.
In the next phase Kavach system will be introduced in Ghaziabad – Tundla section for running trains at
160 KMPH as one of the objectives of Mission Raftaar.
*****
Dharmendra Tewari/ Dr. Nayan Solanki/ Manik Sharma
(Release ID: 2244076) Visitor Counter : 355
Read this release in: Urdu , ही , Telugu , Kannada