Date: 2026-03-13Category: Press ReleaseState: Union GovernmentCountry: India
Indian Railways Marks a New Phase of Connectivity and Passenger Convenience as Infrastructure and Passenger Services in West Bengal Receive Major Boost
**Executive Summary**
Indian Railways is inaugurating several key initiatives in West Bengal on March 14, 2026, to enhance connectivity, passenger convenience, and operational efficiency. These projects include the launch of a new express train, the redeveloped of six railway stations, a new third rail line, and automatic block signalling. The Ministry of Railways is investing approximately ₹93,000 crore in ongoing railway projects within the state.
**Key Points / Main Content**
* **New Rail Connectivity:**
* The Purulia-Anand Vihar Terminal Express will be flagged off, providing direct rail connectivity between West Bengal, Uttar Pradesh, Bihar, Jharkhand, and the National Capital Region.
* **Station Redevelopment:**
* Six railway stations in West Bengal – Kamakhyaguri, Tamluk, Haldia, Barabhum, Anara, and Siuri – will be inaugurated after redevelopment under the Amrit Bharat Station Scheme, featuring upgraded infrastructure and passenger amenities.
* **Capacity Enhancement:**
* The Belda-Dantan third rail line, approximately 16 kilometers long, will be dedicated to enhance capacity and improve train operations on a key corridor.
* **Operational Efficiency and Safety:**
* The Automatic Block Signalling (ABS) system will be commissioned between Kalaikunda and Kanimohuli to improve safety and enable higher train frequency.
* Over 1,400 km of new railway tracks have been laid in West Bengal since 2014, and the entire railway network is now fully electrified.
* More than 500 rail flyovers and underpasses have been constructed to improve safety.
* The Kavach Automatic Train Protection system is being deployed, with ongoing work and approvals for extensive coverage.
* **Investment and Infrastructure Development:**
* Railway projects worth around ₹93,000 crore are under implementation in West Bengal.
* 101 stations across West Bengal are being redeveloped under the Amrit Bharat Station Scheme at an estimated cost of ₹3,600 crore, with nine already completed.
* Annual railway budget allocation for the state has significantly increased.
**Impact Analysis**
**Passengers**
* **Impact:** Enhanced convenience, reduced travel times, improved access to employment and educational opportunities through new direct rail links and upgraded station facilities. Increased service frequency, better punctuality, and more efficient train operations are expected.
* **Action Required:** Passengers are advised to note the new train services and utilize the improved facilities at redeveloped stations.
**Freight Services**
* **Impact:** Smoother movement of freight services due to increased track capacity and reduced congestion.
* **Action Required:** No specific action mentioned, but an indirect benefit through improved operational efficiency.
**Indian Railways**
* **Impact:** Strengthened rail infrastructure, increased operational efficiency, improved safety, and enhanced passenger experience in West Bengal.
* **Action Required:** Indian Railways will continue to focus on expanding connectivity, improving passenger experience, and building a modern railway network.
**West Bengal and Northeastern Region**
* **Impact:** Strengthened regional integration and economic growth due to improved connectivity and the state's role as a key transit corridor for passengers and freight moving between the Northeast and other parts of the country.
* **Action Required:** No specific action mentioned, but the initiatives support regional growth and national integration.
Key Entities Referenced
Amrit Bharat Station Scheme: A scheme under which railway stations are being redeveloped to improve passenger facilities and amenities.
Ministry of Railways: The government ministry responsible for the development and operation of India's railway network.
Indian Railways: The national railway company of India, implementing the infrastructure projects.
West Bengal: The state where the majority of the railway infrastructure projects are being implemented and which is central to the policy's scope.
Purulia-Anand Vihar Terminal Express: A new train service providing direct rail connectivity between West Bengal and the National Capital Region, highlighting connectivity improvements.
Ministry of Railways
Indian Railways Marks a New Phase of
Connectivity and Passenger Convenience as
Infrastructure and Passenger Services in West
Bengal Receive Major Boost
Prime Minister to Flag off Purulia–Anand Vihar Terminal
Express, Providing Direct Rail Connectivity between West
Bengal, Uttar Pradesh, Bihar, Jharkhand and the National
Capital Region
Six Railway Stations in West Bengal Redeveloped under
Amrit Bharat Station Scheme to be Inaugurated
Belda–Dantan Third Rail Line to Enhance Capacity and
Improve Train Operations on a Key Corridor
Automatic Block Signalling between Kalaikunda and
Kanimohuli to Improve Safety and Enable Higher Train
Frequency
Over 1,400 km of New Railway Tracks laid in West Bengal
Since 2014; State Railway Network Now Fully Electrified
Railway Projects Worth Around ₹93,000 crore under
Implementation to Strengthen Rail Infrastructure in the State
Posted On: 13 MAR 2026 4:06PM by PIB Delhi
Indian Railways is set to further strengthen connectivity, passenger amenities and operational efficiency
in West Bengal with the inauguration and launch of several key railway initiatives during the Prime
Minister’s visit to the state on 14 March 2026. These projects reflect the Ministry of Railways’
continued focus on expanding capacity, improving travel experience and enhancing regional integration
through modern rail infrastructure.
A major highlight of the visit will be the flagging off of the Purulia-Anand Vihar Terminal (Delhi)
Express, strengthening rail connectivity between West Bengal, Uttar Pradesh, Bihar, Jharkhand and the
national capital region. For residents of Purulia, one of the less-connected districts of West Bengal, theservice will provide a direct rail link to the national capital for the first time. The new connection is
expected to significantly ease travel for passengers, including students, workers and families who
frequently commute between eastern India and northern states such as Uttar Pradesh and Bihar. By
reducing dependence on multiple train changes and long travel routes, the new service will offer greater
convenience, shorter travel times and improved access to employment and educational opportunities.
Passenger facilities in the state will also receive a major boost with the inauguration of six redeveloped
railway stations under the Amrit Bharat Station Scheme. The stations at Kamakhyaguri, Tamluk,
Haldia, Barabhum, Anara and Siuri have been modernised with upgraded infrastructure and
improved passenger amenities. The redeveloped stations feature enhanced waiting areas, improved
lighting, digital information systems, better circulation areas and accessibility features such as lifts and
escalators. These improvements aim to create more comfortable, accessible and efficient travel
environments for passengers while enhancing the overall station experience.
Strengthening rail capacity on key corridors, the third rail line between Belda and Dantan, spanning
around 16 kilometres, will also be dedicated to the nation. The addition of a third line on this busy
section will significantly improve line capacity, allowing more trains to operate and helping to reduce
congestion. Increased track capacity will support smoother movement of both passenger and freight
services while improving punctuality and reliability for commuters using the route.
Further enhancing operational efficiency and safety, the Automatic Block Signalling (ABS) system
between Kalaikunda and Kanimohuli will also be commissioned. Automatic Block Signalling
enables trains to run safely at shorter intervals by dividing the track into automated signal blocks. This
technology-driven upgrade will allow a greater number of trains to operate on the same stretch of track
while maintaining high safety standards. For passengers, this translates into improved service
frequency, better punctuality and more efficient train operations.
These initiatives are part of the broader transformation taking place across the railway network in West
Bengal. Since 2014, nearly 1,400 kilometres of new railway tracks have been laid in the state,
significantly expanding rail capacity and connectivity. The entire railway network in West Bengal has
also achieved 100 percent electrification, enabling faster, cleaner and more energy-efficient train
operations.
Safety and operational improvements have also been a key priority. More than 500 rail flyovers and
underpasses have been constructed across the state to eliminate level crossings, improve traffic flow
and reduce accident risks. In addition, the Kavach Automatic Train Protection system has been
deployed across 105 route kilometres in the state, with work underway on a further 1,041 route
kilometres and approvals granted for a total coverage of around 3,200 route kilometres.
Passenger infrastructure is also being upgraded at a large scale under the Amrit Bharat Station
Scheme, with 101 stations across West Bengal being redeveloped at an estimated cost of around
₹3,600 crore. Nine stations have already been completed, reflecting the ongoing efforts to modernise
railway facilities and provide improved amenities to travellers.
Significant investments are being made to further strengthen the railway network in the state. Railway
projects worth approximately ₹93,000 crore are currently under various stages of implementation in
West Bengal, covering new lines, station redevelopment, safety initiatives and capacity enhancement
works. The annual railway budget allocation for the state has also increased substantially, rising from
₹4,380 crore during 2009–14 to ₹14,205 crore in 2026–27.
West Bengal also plays a strategic role in India’s railway network as a key transit corridor connecting
the Northeast with the rest of the country. Rail routes passing through the state serve as vital links for
passengers and freight moving between northeastern states and major population centres acrossnorthern and western India. Strengthening infrastructure, signalling systems and capacity on these
routes therefore benefits not only West Bengal but also the wider northeastern region that depends on
these corridors.
Through these initiatives, Indian Railways continues to focus on expanding connectivity, improving
passenger experience and building a more efficient and modern railway network that supports regional
growth and national integration.
*****
Dharmendra Tewari/ Dr. Nayan Solanki/ Ritu Raj/ Manik Sharma
(Release ID: 2239596) Visitor Counter : 193
Read this release in: Urdu , ही , Bengali , Gujarati , Kannada