Skip to content
Home India Ministry of Railways Notifications Indian Railways Operates 19 Rail Neer Plants Acros... (Official PDF)
Date: 5th August 2026 Category: Press Release Jurisdiction: India, Central Government

Indian Railways Operates 19 Rail Neer Plants Across the Country, - 5th August 2026 - Ministry of Railways - Gazette Notification PDF

Issued by Ministry of Railways

Read or download the official PDF of this gazette notification issued by the Ministry of Railways on 5th August 2026. Classified under Press Release.

Executive Summary & Key Takeaways

Summary of Indian Railways Rail Neer Operations

On August 5, 2026, the Ministry of Railways provided an update regarding the production and distribution of ‘Rail Neer’ Packaged Drinking Water (PDW) across the country. The Indian Railways currently operates 19 Rail Neer plants to ensure the supply of safe drinking water to passengers at stations and on all important trains.

Key Operational and Financial Data

  • Executing Agency: The Indian Railways Catering and Tourism Corporation (IRCTC) is responsible for setting up these plants based on regional requirements and demand.
  • Capacity: Each Rail Neer plant has a production capacity of 1,00,000 (1 lakh) bottles per day.
  • Establishment Cost: Under the Public-Private Partnership (PPP) model, the tentative cost of setting up a plant with a 1-lakh bottle daily capacity is approximately ₹10 crore. This cost includes the installation of plant and machinery and the construction of a Pre-engineered Building (PEB) shed, but excludes the cost of land.

Operational Rail Neer Plant Locations The 19 operational plants are distributed across various states as follows:

  1. Nangloi: Delhi
  2. Danapur: Bihar
  3. Ambernath: Maharashtra
  4. Palur: Tamil Nadu
  5. Maneri: Madhya Pradesh
  6. Amethi: Uttar Pradesh
  7. Nagpur: Maharashtra
  8. Una: Himachal Pradesh
  9. Hapur: Uttar Pradesh
  10. Jagiroad: Assam
  11. Sankrail: West Bengal
  12. Kota: Rajasthan
  13. Mandideep: Madhya Pradesh
  14. Sanand: Gujarat
  15. Bhusawal: Maharashtra
  16. Bhubaneswar: Odisha
  17. Bilaspur: Chhattisgarh
  18. Simhadri: Andhra Pradesh
  19. Vijayawada: Andhra Pradesh

Official Information Source This data was formally presented to the Lok Sabha by Shri Ashwini Vaishnaw, Union Minister for Railways, Information & Broadcasting, and Electronics & Information Technology. The press release (ID: 2294809) was coordinated by Dharmendra Tewari, Dr. Nayan Solanki, Ritu Raj, and Vanshita Jaiswal.

Key Entities Referenced

Rail Neer: The official brand of packaged drinking water (PDW) supplied by Indian Railways to passengers across stations and trains. Indian Railways Catering and Tourism Corporation (IRCTC): The agency vested with the responsibility of setting up and managing Rail Neer production plants at identified locations across India. Ministry of Railways: The primary governing ministry overseeing the operations, production capacity, and expansion of Rail Neer plants nationwide. Ashwini Vaishnaw: The Union Minister for Railways who provided the official status update and financial breakdown regarding Rail Neer operations in the Lok Sabha.
Official Gazette PDF Record Download Official PDF (Indian Railways Operates 19 Rail...) →

Official Gazette Notification PDF Viewer

See Full Document Text & PDF Transcript
Ministry of Railways Indian Railways Operates 19 Rail Neer Plants Across the Country, Supplying Safe Packaged Drinking Water to Passengers Capacity of Each Rail Neer Plant is 1 Lakh Bottles Per Day प्रव तथ: 05 AUG 2026 3:28PM by PIB Delhi At present, the demand of Packaged Drinking Water (PDW) ‘Rail Neer’ in all the important trains and at stations is being met from the existing operational Rail Neer plants across the country. Indian Railways Catering and Tourism Corporation (IRCTC) has been vested with the task of setting up Rail Neer plants at identified locations depending upon requirement and demand of Rail Neer over Indian Railways. The tentative cost of setting-up of a Rail Neer Plant (PPP Model) is about ₹10 crore for plant capacity of 1,00,000 bottles per day. The costs include construction of Pre-engineered Building (PEB) Shed, installation of Plant & Machinery and excluding the cost of land. The details of 19 operational Rail Neer plants across the country are as under: S.No. Plant State 1 Nangloi Delhi 2 Danapur Bihar 3 Ambernath Maharashtra 4 Palur Tamil Nadu 5 Maneri Madhya Pradesh 6 Amethi Uttar Pradesh 7 Nagpur Maharashtra 8 Una Himachal Pradesh 9 Hapur Uttar Pradesh10 Jagiroad Assam 11 Sankrail West Bengal 12 Kota Rajasthan 13 Mandideep Madhya Pradesh 14 Sanand Gujarat 15 Bhusawal Maharashtra 16 Bhubaneswar Odisha 17 Bilaspur Chhattisgarh 18 Simhadri Andhra Pradesh 19 Vijayawada Andhra Pradesh This information was provided by the Union Minister for Railways, Information & Broadcasting and Electronics & Information Technology, Shri Ashwini Vaishnaw, in a reply to a question in the Lok Sabha today. ***** Dharmendra Tewari/ Dr. Nayan Solanki/ Ritu Raj/ Vanshita Jaiswal (रलीज़ आईडी: 2294809) आगंतुक पटल : 1226 इस वज्ञ को इन भाषाओ ंम पढ़: Urdu , ही , Marathi , Bengali , Bengali-TR , Punjabi , Gujarati , Tamil , Kannada

Continue your research