See Full Document Text
Ministry of Railways
Indian Railways Sanctions Upgradation of
Electric Traction System on Bengaluru-Tumkur
Section
प्रव तथ: 08 JUN 2026 6:13PM by PIB Delhi
In a significant step towards enhancing rail capacity and operational efficiency on one of Karnataka’s
busiest railway corridors, Indian Railways has sanctioned the upgradation of the electric traction system
on the Bengaluru-Tumkur section of South Western Railway.
The project involves the conversion of the existing 1x25 kV electric traction system to a 2x25 kV
electric traction system over a stretch of 120 Track Kilometres (TKM). The sanctioned cost of the project
is ₹162.57 crore.
The Bengaluru-Tumakuru section forms part of the strategically important Highly Utilized Network
(HUN) Route-10, which connects major economic and industrial centres along the Pune-Hubballi-
Chikjajur-Birur-Tumkur-Bengaluru-Salem-Kanniyakumari corridor.
The adoption of the 2x25 kV traction system will strengthen power supply arrangements for train
operations, enabling the section to handle higher traffic volumes more efficiently. The upgraded system
is expected to support the operation of heavier freight trains and longer passenger services while
improving overall reliability of electric traction infrastructure.
The project will contribute to decongesting a key rail route serving the Bengaluru metropolitan region
and adjoining districts, while also supporting smoother movement of passenger and freight traffic across
Karnataka and southern India. The enhancement aligns with Indian Railways’ ongoing efforts to
modernise its electrical infrastructure, increase network capacity and improve operational performance
on high-density corridors.
*****
Dharmendra Tewari/ Dr. Nayan Solanki/ Ritu Raj/ Manik Sharma
(रलीज़ आईडी: 2270343) आगंतुक पटल : 593
इस वज्ञ को इन भाषाओ ंम पढ़: Urdu , ही , Gujarati , Tamil , Kannada