Home India Ministry of Heavy Industries INSTALLATION OF EV CHARGING STATIONS...
Date: 2025-12-09 Category: Press Release State: Union Government Country: India

INSTALLATION OF EV CHARGING STATIONS

Issued by Ministry of Heavy Industries · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The Ministry of Power issued guidelines on 17.09.2024 for the installation and operation of Electric Vehicle Charging Infrastructure 2024, aiming to create a connected and interoperable EV charging network. The PM E-DRIVE Scheme, with an allocation of Rs. 2,000 crore, provides capital subsidies for upstream infrastructure and EVSE based on location categories, implemented by the Ministry of Heavy Industries. Operational guidelines for deployment were issued on 26th September, 2025. **Key Points / Main Content** * **General Provisions:** * Setting up EV charging stations (EVCS) is an unlicensed activity. * Any entity (including manufacturers of EVs/EV chargers and private entities) is free to set up, operate and maintain EVCS across India. * PM E-DRIVE Scheme has an allocation of Rs. 2,000 crore. * **Eligibility and Implementation:** * Eligible entities for subsidy funding: GoI Ministries, Central Public Sector Enterprises (CPSEs)/Autonomous bodies under GoI Ministries, States/Union Territories, and their PSUs. * Entities appoint Nodal Agencies to aggregate demand and oversee implementation. * **Subsidy Structure (PM E-DRIVE Scheme):** * Category A: 100% subsidy on Upstream Infrastructure and 100% on EVSE * Locations: State/Central Govt. Premises (Govt. offices, residential complexes, hospitals, educational institutes, CPSEs, other Govt. establishments). Chargers must be available to any private individual for charging their EVs without restrictions (free public access). * Category B: 80% subsidy on Upstream Infrastructure and 70% on EVSE * Locations: Cities and highways owned/controlled/managed by State/Central Govt. or their public sector undertakings (e.g., Railway stations, airports, retail outlets of public sector OMCs, bus stations, metro stations, municipal parking lots, public sector ports, toll plazas, way-side amenities). * Category C: 80% subsidy on Upstream Infrastructure. * Locations: All other locations not included in categories A & B (e.g., Cities - Streets, shopping malls, market complexes, Highways/Expressways). * Category D: 80% subsidy on Upstream Infrastructure. * Locations: Battery Swapping Stations (BSS)/Battery Charging Stations (BCS) deployed at any location. * **Financial Benchmarks:** * Costs for upstream infrastructure and EVSE are based on benchmarks provided by Bureau of Energy Efficiency (BEE) under the Ministry of Power. **Impact Analysis** **GoI Ministries, Central Public Sector Enterprises (CPSEs)/Autonomous bodies under GoI Ministries, States/Union Territories, and their PSUs.** * **Impact:** Eligible to receive subsidy funding and submit proposals for EV public charging stations (EVPCS) under the PM E-DRIVE scheme. * **Action Required:** Appoint Nodal Agencies to aggregate demand and oversee implementation. **Private Entities, Manufacturers of EVs/EV Chargers** * **Impact:** Enabled to setup, operate, and maintain EVCS across India without licensing. * **Action Required:** Follow the guidelines and protocols outlined in "Guidelines for installation and operation of Electric VehicleCharging Infrastructure 2024" and "Operational Guidelines for Deployment of EV Public Charging Stations (EV PCS) under the PM E-DRIVE Scheme".

Key Entities Referenced

PM E-DRIVE Scheme: A scheme implemented by the Ministry of Heavy Industries for setting up public EVCS/ charging infrastructure on pan India basis, providing capital subsidies for upstream infrastructure and EVSE. Ministry of Heavy Industries: The primary ministry responsible for implementing the PM E-DRIVE Scheme and issuing guidelines for EV charging stations. Guidelines for installation and operation of Electric VehicleCharging Infrastructure 2024: A document outlining the standards and protocols to create connected and interoperable EV charging infrastructure network including Battery Swapping /Charging Stations. Electric Vehicle Charging Stations (EVCS): The core infrastructure that the policy aims to promote and regulate. Bureau of Energy Efficiency (BEE): An organization under the Ministry of Power that provides benchmarks for upstream infrastructure and EVSE costs.
Official Source Record View Original Source →
See Full Document Text
Ministry of Heavy Industries INSTALLATION OF EV CHARGING STATIONS प्रव तथ: 09 DEC 2025 3:41PM by PIB Delhi The Ministry of Power has issued “Guidelines for installation and operation of Electric VehicleCharging Infrastructure 2024” on 17.09.2024 which outline the standards and protocols to create connected andinteroperable EV charging infrastructure network including Battery Swapping /Charging Stations. Setting up of EV charging stations (EVCS) is an unlicensed activity and any institution/entity including manufacturers of EVs/ EV chargers and private entities are freeto setup, operate and maintain EVCS across India. An allocation of Rs.2,000 crore has been made under the PM E-DRIVE Scheme, being implemented by the Ministry of Heavy Industries for setting up ofpublic EVCS/ charging infrastructure on pan India basis including cities and highways. The entities eligible to receive subsidy funding and submit proposals for EV public charging stations (EVPCS) under PM E-DRIVE scheme are GoI Ministries, Central Public Sector Enterprises (CPSEs)/ Autonomous bodies under GoI Ministries, States/Union Territories, and their PSUs. These entities appoint Nodal Agencies to aggregate demand and oversee implementation. The PM E-DRIVE Scheme provides capital subsidies for upstream infrastructure and EVSE (charging equipment) based on location category: Category Locations % Subsidy A State / Central Govt. Premises – Govt. offices, Govt. residential 100% on complexes, Govt. hospitals, Govt. educational institutes, CPSEs or Upstream any other Govt. establishments. (said chargers to be available to any Infrastructure and private individual for charging their EVs without any restrictions, i.e. 100% on EVSE free public access) B Locations in cities and along highways which are owned / controlled 80% on Upstream / managed by State / Central Govt. or their public sector undertakings Infrastructure and e.g. Railway stations, airports (operated & maintained by Airports 70% on EVSE Authority of India), retail outlets of public sector OMCs, bus stations operated by STUs, metro stations, municipal parking lots, public sector ports and NHAI / State Govt. controlled / managed toll plazas & way-side amenities on highways / expressways.Category Locations % Subsidy C All other locations not included in categories A & B, e.g. 80% on Upstream Infrastructure Cities - Streets, shopping malls, market complexes etc. Highways/Expressways D Battery Swapping Stations (BSS) / Battery Charging Stations (BCS) 80% on Upstream deployed at any location Infrastructure The costs for upstream infrastructure and EVSE is based on benchmarks provided by Bureau of Energy Efficiency (BEE) under Ministry of Power. The mechanisms put in place to coordinate and effectively implement the installation and maintenance of EV charging stations have been issued by the Ministry of Heavy Industries on 26th September, 2025 in the ‘Operational Guidelines for Deployment of EV Public Charging Stations (EV PCS) under the PM E- DRIVE Scheme’. This information was given by the Minister of State for Heavy Industries, Shri Bhupathiraju Srinivasa Varma in a written reply in the Lok Sabha today. ***** TPJ/NJ (रलीज़ आईडी: 2200851) आगंतुक पटल : 816 इस वज्ञ को इन भाषाओ ंम पढ़: Urdu , ही

Continue your research