Home India Ministry of Railways Parliament Question: Construction of ROB, Widening of Road f...
Date: 2026-08-12 Category: LOKSABHA_QNA State: Union Government Country: India

Parliament Question: Construction of ROB, Widening of Road for Risama Railway Station

Issued by Ministry of Railways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 4035 TO BE ANSWERED ON 12.08.2026 CONSTRUCTION OF ROB, WIDENING OF ROAD FOR RISAMA RAILWAY STATION †4035. SHRI VIJAY BAGHEL: Will the Minister of RAILWAYS be pleased to state: (a) the details of the progress of construction works at Amrit Bharat Station Scheme (ABSS) and the steps taken/being taken by the Government to complete the works at a fast pace; (b) the status of approval for construction of a Road Over Bridge (ROB) near Risama Railway DD-19 in Durg, the widening of the road leading to front platform of Risama Railway Station and construction of a new road to the rear platform and proceeding reservation counter and other basic facilities at Risama Railway stations; (c) the status of approval for construction of double railway line from Durg to Ravghat as many passenger trains run late by several hours; and (d) the status of approval for regular daily operation of three-day-a-week passenger train no. 78826 (Dallirajhara-Durg) and 78827 (Durg- Dallirajhara) in Durg-Raoghat section, in view of the increasing number of passengers? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (d) Ministry of Railways has launched Amrit Bharat Station Scheme for redevelopment of stations with a long-term approach. This scheme involves preparation of master plans and their implementation in phases to improve the stations of Indian Railways. The master planning, keeping in view the necessity of each station, includes: Page 1 of 13 §● Improvement of access to station and circulating areas ● Integration of station with both sides of city ● Improvement of station building ● Improvement of waiting halls, toilets, sitting arrangement, water booths ● Provision of wider foot over bridge/subway to commensurate with passenger traffic ● Provision of lifts/escalators/ramps ● Improvement of platform surface and provision of platform shelter ● Provision of kiosks for local products through schemes like ‘One Station One Product’ ● Parking development ● Amenities for Divyangjans ● Better passenger information systems ● Provision of air concourse, executive lounges, Multimodal integration, landscaping, etc. The scheme also envisages sustainable and environment friendly solutions etc. as per necessity, phasing and feasibility and creation of city centre at the station in the long term. So far, 1,340 stations have been identified for development under this scheme, out of which 32 stations, including Bhilai, Bhilai Nagar, Bhilai Power House, Durg and Marauda stations of Durg district, are located in Chhattisgarh. The names of stations identified for development under Amrit Bharat Station Scheme in Chhattisgarh are as following: Page 2 of 13State No. of Name of Stations Stations Chhattisgarh 32 Akaltara, Ambikapur, Baikunthpur Road, Balod, Baradwar, Belha, Bhanupratappur, Bhatapara, Bhilai, Bhilai Nagar, Bhilai Power House, Bilaspur, Champa, Dallirajhara, Dongargarh, Durg, Hathbandh, Jagdalpur, Janjgir Naila, Korba, Mahasamund, Mandir Hasaud, Marauda, Nipania, Pendra Road, Raigarh, Raipur Jn, Raj Nandgaon, Sarona, Tilda-Neora, Urkura, Uslapur Completed Stations of Chhattisgarh: Development works at railway stations under Amrit Bharat Station Scheme in Chhattisgarh have been taken up at a good pace. Details of stations completed in Chhattisgarh are as under: State No. of Name of stations stations Chhattisgarh 10 Ambikapur, Balod, Bhanupratappur, Bhilai, Champa, Dallirajhara, Dongargarh, Raj Nandgaon, Sarona, Urkura Out of above completed stations, Balod, Bhanupratappur and Dallirajhara are stations of Durg - Rowghat section. The activities for development at other stations have also been taken up at good pace and progress of some of the stations is as given below: Page 3 of 13Stations of Durg district in Chhattisgarh:  Bhilai Nagar station: The works of improvement of station building, entrance porch, new station building at second entry, improvement of circulating area, parking, approach road, landscaping, improvement of platform surface, platform shelters, waiting hall, artwork, new toilet block, installation of Train Indication Board, signages and CCTV have been completed. The finishing works have been taken up.  Bhilai Power House station: The works of improvement of station building at main entry, new station building at second entry, entrance porch, improvement of circulating area, parking, improvement of platform surface, 12 m wide foot over bridge, lifts, platform shelters, entry/ exit gate, water booths and new toilet block have been completed. The work of escalator has been taken up.  Durg station: The works of new station building at North side, service building, Railway Protection Force barrack and Railway Protection Force post, substation building, railway staff quarters, crew lobby building, overhead water tank, underground water tank and development of temporary parking have been taken up.  Marauda station: The works of improvement of circulating area, parking, platform shelters and improvement of platform surface have been completed. The works of extension of station building, new toilet block, improvement of drainage and entry/exit gates have been taken up. At Risama station of Durg district, located in Chhattisgarh, facilities like platform shelter, waiting hall, drinking water arrangement, circulating area, Page 4 of 13seating arrangement, high level platform, etc. are available. The station approach road leading to the existing Risama station building is sufficient to cater to present requirements of the station. The work of amenities for Divyangjan has been completed in recent years. The works of 3 m wide foot over bridge, platform shelter, new toilet block and new platform have been taken up. Further, development / redevelopment / upgradation / modernisation of stations on Indian Railways including provision of passenger amenities like approach road, booking counter, etc. is a continuous and ongoing process and works in this regard are undertaken as per requirement, subject to inter-se priority and availability of funds. Development / redevelopment / upgradation / modernisation of a station is carried out based on category of station/condition/traffic handled etc. Development / Upgradation of railway stations is a complex in nature involving safety of passengers & trains and requires various statutory clearances such as tree cutting, heritage, fire clearance, airport clearance etc. These stations are in operation since long, so brownfield work challenges are being faced, such as shifting of utilities (involving water/sewage lines, optical fibre cables, gas pipelines, power/signal cables, etc.), infringements, operation of trains without hindering passenger movement, speed restrictions due to works carried out in close proximity of the tracks and near to high voltage power lines, etc. and these factors affect the progress of work and completion time. Road Over Bridge / Road Under Bridge: Sanctioning of works of Road over Bridge (ROB)/Road under Bridge (RUB) in lieu of Level crossings (LCs) is a continuous and dynamic process of Indian Page 5 of 13Railway. Such works are prioritised and taken up on the basis of their impact on safety in train operations, mobility of trains & impact for road users and feasibility etc. No. of ROBs/ RUBs constructed on Indian Railways during the period 2004- 14 vis a vis 2014-26 (Upto May’26) is as under: Period ROBs/ RUBs constructed 2004-14 4,148 Nos. 2014-26 (Upto May’26) 14,451 Nos. (192 Nos. in the State of Chhattisgarh) As on 01.06.2026, 4,993 Nos. ROBs/ RUBs works are sanctioned at a cost of approx. ₹ 1,17,492 Cr on Indian Railways including 98 Nos. ROB/RUB works at a cost of approx. ₹ 1,693 Cr in the state of Chhattisgarh which are at various stages of planning and execution. A work for construction of Road Under Bridge (RUB) in lieu of Level Crossing (LC) Nos. DD-19 (Risama Level Crossing) at Km 889/7-8 has been sanctioned and the work has been taken up. Railways have taken several remedial measures to mitigate the problem of water logging, as under:  Adequate drainage arrangement has been made as integral part of planning of new RUB/underpasses.  In existing RUBs/underpasses remedial measures like water flow diversion to nearby bridge and nallahs/drains, provision of cover shed on approach roads, provision of hump at entry to RUB, provision of Page 6 of 13cross drains, sealing of joints etc. have been made as per feasibility, suitability and site requirements.  In addition, pumping arrangement has also been made for identified RUBs, to drain out water expeditiously in case of emergency and provision to stop road traffic in exceptional/unusual rainfall situation for safety of road users. Completion & commissioning of ROB/RUB works depends on various factors like cooperation of State Governments in giving consent for closure of LC, fixing of approach alignment, approval of General Arrangement Drawing (GAD), land acquisition, removal of encroachment, shifting of infringing utilities, statutory clearances from various authorities, law and order situation in the area of project / work sites, duration of working season in a year for the particular project / area due to climatic conditions etc. All these factors affect the completion time of the projects / works. Further, Railways have taken following measures to expedite the progress of work: i. Joint survey with concerned State Govt./Road Owning Authority is done before finalizing the General Arrangement Drawing (GAD) to ensure smooth execution. ii. Periodic meetings of Railway & State Government officials are done to resolve various issues related to ROB/RUB works. iii. Standardization of superstructure and substructure drawings for various combinations of span, skewness and width of road on the Railway portion has been done to avoid delays during the design approval. This has been issued in the form of a compendium, which Page 7 of 13can be directly adopted for Road Over Bridge across Railway lines for expeditious planning. Reservation Counter: Railway reservation counter facility is already available at Gundardehi Railway Station at a distance of 07 kms from Risama Railway Station. In addition, it is also stated that a present more than 88% reserved tickets are issued online which is also an option to get tickets from anywhere, anytime. Moreover, Railways has also launched RailOne App on 01.07.2025. This App enables passengers to book reserved as well as unreserved tickets on mobile phone. This, in effect, brings the Passenger reservation system facility to Passenger’s palm. Rail Connectivity: To improve the connectivity of Rowghat with Durg, following works have been sanctioned: S.No. Name of Works Status 1 Dallirajahra – Rowghat New Project recently completed Line Project (95 Km) 2 Rowghat – Jagdalpur New Line  249 Ha land out of total 818 Project (140 Km) Ha has been acquired for the project.  Land acquisition has been completed in Jagdalpur – Palli – Kurkanar (12 Km) Page 8 of 13S.No. Name of Works Status Section and works on important major bridges, RoBs, earthwork, minor bridges etc. have been taken up in the section.  Land acquisition work has been taken up in Rowghat – Kurkanar (128 Km) Section. CHHATTISGARH Railway Budget: Budget allocation in the recent years has increased significantly. Budget allocation for infrastructure projects and safety works, falling fully/partly in the State of Chhattisgarh is as under: Period Outlay 2009-2014 ₹311 Cr./year 2026-2027 ₹7,470 Cr. (approx. 24 times) Track Construction: The details of commissioning/laying of new track falling fully/partly in the State of Chhattisgarh is as under: Page 9 of 13New Track Average Commissioning of new Period Commissioned tracks 2009-14 32 Km 6.4 Km per year 2014-26 1,311 Km 109.29 Km per year (17 times) Projects Sanctioned: As on 01.04.2026, 36 projects (8 New Lines and 28 Doubling), of total length of 2,398 Km, costing ₹48,202 crore falling fully/partly in the State of Chhattisgarh are sanctioned. The summary is as under:- Category No. of Total Length Total Exp upto projects Length Commissioned till March 2026 (in km) March, 2026 (in Km) (₹ in cr.) NL 8 887 262 7,535 DL 28 1,512 889 11,298 TOTAL 36 2,398 1,151 18,833 Recently Completed Projects: Details of some of the recently completed projects falling fully/partly in the state of Chhattisgarh are as under: S.No. Name of Project Cost (₹ in cr.) 1 Kharsia-Korichhapar New Line (43 Km) 851 2 Bilaspur-Urkura 3rd line (110 Km) 365 3 Salka Road-Khongsara doubling (26 Km) 181 4 Durg-Rajnandgaon Doubling (31 Km) 250 Page 10 of 13S.No. Name of Project Cost (₹ in cr.) 5 Khodri-Anuppur Doubling with flyover at Bilaspur (72 792 Km) 6 Champa-Jharsuguda 3rd Line (152 Km) 1,227 7 Pendra Road-Annupur 3rd Line (50 Km) 394 8 Raipur-Titlagarh Doubling (203 Km) 1,171 9 Dallirajahra-Rowghat (95 Km) 1,628 Ongoing Projects: Some of the major projects falling fully/partly in the State of Chhattisgarh which have been taken up are as under: S.N Name of Project Cost (₹ in cr.) 1 Kharsia-Dharamjaygarh New Line (122 Km) 3,407 2 Gevra Road-Pendra Road New Line (135 Km) 3,724 3 Dharamjaigarh-Korba New Line (63 Km) 1,686 4 Chirimiri-Nagpur Halt New Line (17 Km) 670 5 Sardega-Bhalumunda New Line (37 Km) 1,282 6 Kharsia-Parmalkasa New Double line (278 Km) 7,854 7 Rowghat-Jagdalpur New Line (140 Km) 3,513 8 Kirandul-Jadgalpur Doubling (150 km) 1,780 9 Jagdalpur-Koraput Doubling (107 Km) 1,547 10 Jharsuguda-Bilaspur 4th line (206 Km) 2,596 11 Gevra Rd-Pendra Rd Doubling (135 Km) 3,475 12 Rajnandgaon-Nagpur 3rd line (228 Km) 3,545 13 Boridand-Ambikapur Doubling (80 Km) 1,577 Page 11 of 13S.N Name of Project Cost (₹ in cr.) 14 Durg-Rajnandgaon 4th line (31 Km) 464 15 Gondia-Dongargarh 4th line (84 Km) 2,223 16 Baikunth-Urkura 4th line (26 Km) 426 17 Champa-Korba 3rd Line (42 Km) 755 Completion of Railway project/s depends on various factors which include the following:  Land acquisition  Forest clearance  Shifting of infringing utilities  Statutory clearances from various authorities  Geological and topographical conditions of area  Law and order situation in the area of project site  Number of working months in a year for particular project site etc. All these factors affect the completion time and cost of the project/s. Presently, Durg-Dallirajhara sector is served by 10 train services which include 6 daily train services and 02 train services operating on 6-days a week. These are listed below: S.No. Train No. & Name 1 78815 Raipur -Antagarh DMU (Daily) 2 78816 Antagarh-Raipur DMU (Daily) 3 78817 Durg-Dalli Rajhara DMU (Daily) 4 78818 Antagarh-Durg DMU (Daily) 5 78824 Durg-Dalli Rajhara DMU (Daily) Page 12 of 13S.No. Train No. & Name 6 78825 Dalli Rajhara-Durg DMU (Daily) 7 68764 Raipur -Tadoki MEMU (6 days) 8 68765 Tadoki-Raipur MEMU (6 days) 9 78826 Dalli Rajhara-Durg DMU 10 78827 Durg-Dalli Rajhara DMU Besides, increase in frequency of train service on any route/section is an on-going process, which depends on various factors including:  Capacity of that section  Availability of path  Availability of required rolling stock  Availability of matching infrastructure for rolling stock  Maintenance requirement of railway tracks and other assets  Occupancy and the traffic requirement of the section. ***** Page 13 of 13

Continue your research