See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 4004
TO BE ANSWERED ON 12.08.2026
INCREASING THE NUMBER OF GENERAL CLASS COACHES AND
PERMANENT HOLDING AREAS AT RAILWAY STATIONS
†4004. SHRI MURARI LAL MEENA:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government is aware that severe overcrowding and
shortage of seats in General Class coaches are causing disputes and
mishap among passengers and mishaps are taking place including a
recent incident at Shahdara Railway Station in Delhi where a youth lost
his life in a dispute over a seat in a general coach and if so, the findings
of the Government investigation into this incident;
(b) whether the Government has made any assessment of accidents and
untoward incidents caused by overcrowding in General Class Coaches
during the last three years and if so, the details thereof, year-wise; and
(c) whether the Government is working on a plan to increase the number of
General Class Coaches in major trains keeping in view the rising
passenger volume and to develop permanent holding areas for
systematic passenger management at major stations like Dausa and
Bandikui and if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (c): On Indian Railways, traffic pattern of passengers is not uniform
throughout the year and it varies over lean and peak periods. During peak
rush periods, the occupancy of the trains especially on popular routes
remains full whereas during lean period and on less popular routes, there is
sub optimal utilization.
With a view to meet the demand of passengers travelling in unreserved
coaches Indian Railways (IR) have significantly increased the facilities for
passengers demanding general class travel. During the financial year 2024-
§ Page 1 of 1225 alone, 1250 general coaches have been utilised in various long-distance
trains to have at least 4 general class coaches. Similarly, during the year
2025-26 about 870 Coaches including 160 General Class coaches have
been utilised for permanent augmentation.
Moreover, Indian Railways constantly endeavour to improve connectivity for
the travelling passengers. To this end, new services are introduced,
existing train services are extended and their frequency increased.
Accordingly, on the Indian Railways network, during 2024-2025, 2025-2026
and 2026-2027 (till June, 2026) more than 720 train services have been
introduced, more than 300 train services have been extended and
frequency of about 46 trains have been increased.
To cater to the travel demand of the low and middle income families, Indian
Railways(IR) have taken up manufacturing of 17,000 non-AC coaches
(general/sleeper).
On Indian Railways, the percentage of non-AC coaches is about 70%, while
the percentage of non-AC seats is around 78% as compared to AC seats
which is around 22%. The details are as under:
Table 1: Distribution of Coaches:
Type of Coaches No. of Percentage
Coaches
Non-AC coaches (general and ~62,000 ~70%
sleeper)
AC coaches ~27,000 ~30%
Total coaches ~89,000 100%
Table 2: Distribution of Seats:
Type of Seats Number of Seats Percentage
Non-AC Seats ~54 lakhs ~78%
AC Seats ~15 lakhs ~22%
Total Seats ~69 lakhs 100%
Page 2 of 12Moreover, to provide greater accommodation for the passengers using
General and non-AC Sleeper Coaches, the extant policy regarding
composition of Mail/Express trains provides for 12 (Twelve) General class &
Sleeper class non- AC coaches and 08 (eight) AC-Coaches, in a train of 22
coaches, thereby providing greater accommodation for the passengers
using General and non-AC Sleeper Coaches.
Further, to cater to the needs of passengers desirous of availing
unreserved accommodation, Indian Railways (IR) operate unreserved non-
AC passenger trains/ MEMU / EMU etc. for affordable travel, which are in
addition to the unreserved accommodation (coaches) available in
Mail/Express services.
SPECIAL TRAINS
IR also operates Special train services during festivals, holidays, etc. to
cater to the extra needs of passengers and supplement the
accommodation available by regular services.
Accordingly, the number of Special trains operated across the Indian
Railways network, to facilitate the passengers during Summer/winter
vacations, festivals like Holi, Durga Puja, Diwali, Chhath, Christmas,
Sabrimala, Id-ul-fitr etc. are as below:
Year No. of trips
2023-24 ~40,500
2024-25 ~85,400
2025-26 ~80,500
Indian Railway, in its constant endeavour to provide affordable, good
quality services to all sections of society, introduces new train services,
augments the existing trains and also runs special trains.
AMRIT BHARAT AND NAMO BHARAT RAPID RAIL SERVICES:
Amrit Bharat Service
To provide affordable means of transportation to the low and middle
income families, Indian Railways have introduced Amrit Bharat services
that are fully non-AC modern trains. The present composition of Amrit
Bharat consists of 11 General Class coaches, 8 Sleeper Class coaches, 01
Pantry car and 02 Luggage cum Divyangjan coaches.
High Speed and enhanced Safety standards are the hallmarks of these
trains with following enhanced features and amenities:
Page 3 of 12i. Better aesthetics of seat and berths with enhanced look & feel on the
lines of Vande Bharat Sleeper.
ii. Jerk Free Semi-Automatic Couplers.
iii. Improved Crashworthiness in coaches by provision of crash tube.
iv. Provision of CCTV system in all coaches and Luggage room.
v. Improved designs of toilets.
vi. Improved design of Ladder for ease of climbing on to the berth.
vii. Improved LED Light fitting & Charging Sockets.
viii. Provision of EP assisted braking system.
ix. Aerosol based fire suppression system in toilets and electrical
cubicles.
x. USB Type-A and Type-C mobile charging sockets.
xi. Emergency Talk Back system for two-way communication between
Passenger and Guard/Train Manager.
xii. Non-AC pantry with enhanced heating capacity.
xiii. Fully sealed gangways with quick release mechanism for easy
attachment and detachment.
As on 07.08.2026, the following 36 pairs Amrit Bharat Express services are
being operated on the Indian Railways network:
S.No Train No. and Name
.
1 11015/11016 Lokmanya Tilak (T) - Saharsa Amrit Bharat Express
2 13697/13698 Gaya - Delhi Amrit Bharat Express
3 15293/15294 Muzaffarpur - Charlapalli Amrit Bharat Express
4 15557/15558 Darbhanga - Anand Vihar (T) Amrit Bharat Express
5 15561/15562 Darbhanga - Gomtinagar Amrit Bharat Express
6 15567/15568 BapudhamMotihari - Anand Vihar (T) Amrit Bharat
Express
7 22361/22362 Rajendranagar (T) - New Delhi Amrit Bharat Express
8 13433/13434 SMVT Bengaluru - Malda Town Amrit Bharat Express
9 13435/13436 Malda Town - Gomtinagar Amrit Bharat Express
10 15133/15134 Chhapra - Anand Vihar (T) Amrit Bharat Express
11 14047/14048 Sitamarhi - Delhi Amrit Bharat Express
12 14627/14628 Saharsa - Chheharta Amrit Bharat Express
Page 4 of 1213 19623/19624 Madar - Darbhanga Amrit Bharat Express
14 16601/16602 Erode - Jogbani Amrit Bharat Express
15 19021/19022 Udhna - Brahmapur Amrit Bharat Express
16 15671/15672 Kamakhya - Rohtak Amrit Bharat Express
17 20609/20610 New Jalpaiguri - Tiruchchirappalli Amrit Bharat
Express
18 16597/16598 SMVT Bengaluru - Alipurduar Amrit Bharat Express
19 11031/11032 Panvel - Alipurduar Amrit Bharat Express
20 16107/16108 Tambaram - Santragachi Amrit Bharat Express
21 13065/13066 Howrah - Anand Vihar (T) Amrit Bharat Express
22 22587/22588 Sealdah - Banaras Amrit Bharat Express
23 20603/20604 New Jalpaiguri - Nagercoil Amrit Bharat Express
24 15949/15950 Dibrugarh - Gomti Nagar Amrit Bharat Express
25 16121/16122 Tambaram - Thiruvananthapuram Central Amrit Bharat
Express
26 16329/16330 Nagercoil - Mangaluru Amrit Bharat Express
27 17041/17042 Charlapalli - Thiruvananthapuram North Amrit Bharat
Express
28 16619/16620 Podanur-Dhanbad Amrit Bharat Express
29 16357/16358 Nagercoil-Charlapalli Amrit Bharat Express
30 15673/15674 Charlapalli - Kamakhya Amrit Bharat Express
31 17065/17066 Charlapalli - Shalimar Amrit Bharat Express
32 22589/22590 Banaras- Hadapsar Amrit Bharat Express
33 22111/22112 Lokmanya Tilak(T)- Ayodhya Amrit Bharat Express
34 14663/14664 Amritsar- New Jalpaiguri Amrit Bharat Express
35 19725/19726 Khatipura- Darbhanga Amrit Bharat Express
36 11431/11432 Pune - Danapur Amrit Bharat Express
Page 5 of 12Namo Bharat Rapid Rail service
Indian Railways have introduced Namo Bharat Rapid Rail services. These
services are aimed to enhance the travel experience to the suburban and
regional commuters for short distance travel. The prominent features of
Namo Bharat Rapid Rail are as follows:
1. Centrally controlled Double Leaf Automatic Sliding Doors.
2. CCTVs for safety and passenger surveillance.
3. Modular interior with Cushioned Seats and Sealed Flexible Gangway.
4. Emergency Talk System.
5. Continuous LED lighting with Energy Efficient Lighting system.
6. FRP Modular Toilets with vacuum evacuation.
7. Fully Air-Conditioned trains with Driver cab AC.
As on 27.07.2026, the following 4 Namo Bharat Rapid Rail services are in
operation:
S.No. Train Number and Name
1 94801/94802 Ahmedabad-Bhuj Namo Bharat Rapid Rail
2 94803/94804 Jaynagar-Patna Namo Bharat Rapid Rail
On 20.06.2026, a dispute over boarding a general coach at Delhi Shahdara
Railway Station led to the death of a youth. In this regard, Government
Railway Police (GRP), Delhi registered FIR No. 38/2026 under Sections 105
and 3(5) of the Bharatiya Nyaya Sanhita (BNS) at Police Station Old Delhi
Railway Station.
Safety and Security of Passengers
The following steps are being taken by the Railways in coordination with
Government Railway Police (GRP)/Local Police for safety and security of
passengers at stations: -
i. For immediate assistance to railway passengers, the online grievance
redressal mechanism ‘RailMadad’ provides an integrated platform for
raising grievances, seeking assistance, and making inquiries. Through
RailMadad, passengers can seek redressal via multiple channels such
as Helpline number 139, the RailMadad website, mobile app, and SMS.
The platform also enables passengers to share feedback on the
resolution of their grievances.
ii. Railways remain in regular touch with passengers through various
social media platforms, viz. Twitter, Facebook etc., to enhance
passenger security and address their security concerns.
Page 6 of 12iii. Frequent announcements are made through Public Address System to
educate passengers to take precautions against theft, snatching,
drugging etc.
iv. Surveillance is maintained through CCTV cameras installed in several
coaches and railway stations to enhance passenger security.
v. State Level Security Committee of Railways (SLSCR) have been
constituted for all State/Union Territories under the Chairmanship of
respective Director General of Police/Commissioner of States/Union
Territories for regular monitoring and review of security arrangements
of the Railways.
vi. Coordination with GRP/State Police and concerned railway
departments are made for ensuring crowd management.
vii. Vulnerability assessment is done across railway stations and
accordingly Government Railway Police (GRP) & Railway Protection
Force (RPF) staff are deployed to the extent possible at sensitive
locations to regulate crowd smoothly during the heavy rush period
and render real time assistance to passengers.
viii. GRP & RPF staff are deployed at foot-over bridges to regulate crowd
smoothly in order to avoid stampede like situation during the heavy
rush period and render real time assistance to passengers.
Further to handle heavy rush of passengers at stations over the Indian
Railways, following decisions have also been taken by railways -
I. Creation of Permanent holding areas at identified stations for crowd
management over Indian Railways: The Ministry of Railways has
initiated plans to establish passenger holding areas to decongest
the platforms at stations, designed as comfortable, organized
spaces with essential amenities such as seating, drinking water,
toilets, ticketing facilities, information displays, and security
checks to handle peak-hour footfall. Holding area at New Delhi
Railway Station has already been commissioned, easing congestion
and enhancing passenger convenience with facilities like additional
ticket counters, Automatic Ticket Vending Machines (ATVMs),
Passenger Awareness System (PAS), electronic train information
boards, CCTV surveillance, luggage scanners, Door Frame Metal
Detectors (DFMDs), uninterrupted power supply, improved lighting,
High Volume Low Speed (HVLS) fans, fire-fighting and lightning
protection systems, RO drinking water, and separate toilets for
men, women, and Divyangjans.
Page 7 of 12II. Provision of complete access control, allowing passengers with
confirmed reserved tickets direct entry to the platforms, while
those without tickets or holding waiting list tickets are
accommodated in designated outside waiting areas. Complete
access control is being provided where passengers with confirmed
reserved tickets are given direct access to the platforms whereas,
passengers without a ticket or with a waiting list ticket wait in the
holding area.
III. Provision of a large number of AI-enabled CCTV cameras at railway
stations and adjoining areas to facilitate close monitoring and
effective crowd management.
IV. Establishing War rooms at major stations, where officers from all
departments can work in coordination to manage crowd situations
effectively.
V. Installation of latest design digital communication equipment like
walkie-talkies, announcement systems, calling systems on all heavy
crowd stations.
VI. Issuing of newly designed QR-based ID cards to all staff and
service personnel to ensure controlled and secure access to the
station.
VII. Providing new design uniforms to all staff members so that they
can be easily identified during a crisis situation.
VIII. Designating a senior officer at all major stations, as the Station
Director, vested with financial powers to take on-the-spot decisions
for station improvement. All other departments to report directly to
the Station Director to ensure unified command and efficient
management.
IX. Empowering Station Director to control the sale of tickets as per
capacity of the station and the available trains.
Amrit Bharat Stations:
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
At Dausa Station following works have been completed under Amrit Bharat
Station Scheme:
Improvement of station building, porch
Improvement of circulating area and parking
Improvement of platform surface
Page 8 of 12 Improvement of waiting hall and toilets
Provision of new 12m wide foot over bridge
Provision of platform shelter
Provision of lifts
At Bandikui station, the following works have been completed under Amrit
Bharat Station Scheme:
Improvement of station building
Improvement of circulating area and parking
Improvement of platform surface
Provision of new waiting hall
Improvement of toilet
Provision of platform shelter
Provision of 12 m wide foot over bridge
The works of lifts at Bandikuistation have been taken up.
The above facilities are sufficient to tackle the current passenger traffic.
Amrit Bharat StationScheme involves preparation of master plans and their
implementation in phases to improve the stations of Indian Railways. The
master planning, keeping in view the necessity of each station, includes:
● Improvement of access to station and circulating areas
● Integration of station with both sides of city
● Improvement of station building
● Improvement of waiting halls, toilets, sitting arrangement, water
booths
● Provision of wider foot over bridge/subway to commensurate with
passenger traffic
● Provision of lifts/ escalators/ ramps
● Improvement of platform surface and provision of platform shelter
● Provision of kiosks for local products through schemes like ‘One
Station One Product’
● Parking development
● Amenities for Divyangjans
● Better passenger information systems
● Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
Page 9 of 12The scheme also envisages sustainable and environment friendly solutions
etc. as per necessity, phasing and feasibility and creation of city centre at
the station in the long term.
So far, 1,340 stations have been identified for development under this
scheme, out of which 85 stations are located in Rajasthan. The names of
stations identified for development under Amrit Bharat Station Scheme in
Rajasthan are as following:
No. of Name of Stations
State
Stations
Rajasthan 85 Abu Road, Ajmer, Alwar, Anupgarh,
AsalpurJobner, Balotra, Bandikui, Baran,
Barmer, Bayana, Beawar, Bharatpur, Bhawani
Mandi, Bhilwara, Bijainagar, Bikaner, Bundi,
Chanderiya, Chhabra Gugor, Chittorgarh Jn.,
Churu, Dausa, Deeg, Degana, Deshnoke, Dholpur,
Didwana, Dungarpur, Falna, Fatehnagar,
Fatehpur Shekhawati, Gandhinagar Jaipur,
Gangapur City, Gogameri, Gotan, Govind Garh,
Hanumangarh, Hindaun City, Jaipur Jn,
Jaisalmer, Jalor, Jawai Bandh, Jhalawar City,
Jhunjhunu, Jodhpur, Kapasan, Khairthal, Kherli,
Kota Jn, Lalgarh Jn, Mandal Garh,
MandawarMahwa Road, Marwar Bhinmal,
Marwar Jn, Mavli Jn, Merta Road Jn, Nagaur,
Naraina, New Kota, Nim ka Thana, Nokha, Pali
Marwar, Phalodi Jn, Phulera Jn, Pindwara, Rai
Singh Nagar, Rajgarh, Ramdevra, Ramganj Mandi
Jn, Ranapratapnagar, Rani, Ratangarh Jn, Ren,
Ringas, Sadulpur, Sanganer, Sawai Madhopur,
Shri Mahaveerji, Sikar, Sojat Road, Somesar, Sri
Ganganagar, Sujangarh, Suratgarh, Udaipur City
Page 10 of 12Completed Stations of Rajasthan:
Development works at railway stations under Amrit Bharat Station Scheme
in Rajasthan have been taken up at a good pace. Details of stations
completed in Rajasthan are as under:
State No. of Name of stations
stations
Rajasthan 18 Barmer, Bundi, Dausa, Deeg, Deshnoke,
Fatehnagar, Fatehpur Shekhawati, Gangapur City,
Gogameri, Gotan, Govind Garh, Jaisalmer,
Khairthal, Mandal Garh, MandawarMahwa Road,
Rajgarh, Sojat Road, Somesar
Jaisalmer station: Development works at Jaisalmer station have been
completed which includes new station building at main entry side, 36
m wide air concourse with waiting area, new 6 m wide foot over
bridge, improvement of circulating area, parking, new platform
shelter, improvement of platform surface, lifts and escalators.
Barmer station: Development works at Barmer station have been
completed which includes improvement of station building,
improvement of circulating area, new 12 m wide foot over bridge,
platform shelter, improvement of platform surface, new waiting hall,
toilets and lifts.
The activities for development at other stations of Rajasthan have also
been taken up at good pace and progress of some of the stations is as
given below:
Gandhinagar Jaipur station: The works of station building at main
entry, station building at second entry, two level basement, air
concourse, launching of through roof, provision of platform shelters,
improvement of platform surface and improvement of circulating area
have been completed. The finishing work has been taken up.
Jaipur Junction station: The works of 6 m wide foot over bridge at
Dausa end, second entry side basement, approach road, structural
work of main entry side basement, structural work of air concourse
and 8 m wide central foot over bridge connecting concourse have
been completed. The work of 6 m wide foot over bridge at Sikar end,
structural work of main entry station building, foot over bridge along
Page 11 of 12the track and roofing & flooring work of central foot over bridge have
been taken up.
New Kota station: The structural work of front and rear station
building, parcel building, new panel room, Railway Protection Force
building, improvement of rear and front side circulating area, platform
shelter at platform no. 1 and air concourse have been completed. The
works of lifts, escalators, through roof, finishing of front and rear side
station building, improvement of platform shelter at platform no 2&3,
overhead tank and underground tank etc. have also been taken up.
Churu station: The works of new station building, improvement of
platform shelter at platform no. 1 & 2, booking office, waiting room,
retiring room, toilet, installation of Coach Indication Board and
signages have been completed. The works of 12 m wide foot over
bridge and lifts have been taken up.
Falna station: The works of improvement of station building, entrance
porch, improvement of circulating area, parking, entry/exit gate,
waiting room, amenities for Divyangjan, signages, platform shelters
and improvement of platform surface have been completed. The
works of toilet block, 12 m wide foot over bridge and lifts have been
taken up.
Jawai Bandh station: The works of improvement of circulating area,
parking entry/exit gate, booking counter, entrance porch, waiting
room, platform shelters, improvement of platform surface, toilet
blocks, amenities for Divyangjan, signages, new retiring room and
development of station building at second entry have been completed.
The works of 12 m wide foot over bridge and water booths have been
taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways including provision of passenger amenities is a
continuous and ongoing process and works in this regard are undertaken
as per requirement, subject to inter-se priority and availability of funds.
Development / redevelopment / upgradation / modernisation of a station is
carried out based on category of station/condition/traffic handled etc.
*****
Page 12 of 12