Home India Ministry of Road Transport and Highways NHAI Takes Measures to Mitigate Heatwave Effect on Workforce...
Date: 2026-04-28 Category: Press Release State: Union Government Country: India

NHAI Takes Measures to Mitigate Heatwave Effect on Workforce involved in Construction and Maintenance of National Highways

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** On April 28, 2026, the National Highways Authority of India (NHAI) issued mandatory guidelines to protect the workforce and highway users from ongoing heatwave conditions. These measures, effective immediately, require contractors, concessionaires, and toll agencies to adjust working hours, provide cooling infrastructure, and enhance emergency response. NHAI field officials will conduct weekly inspections to ensure strict compliance with these safety protocols. **Key Points / Main Content** * **Work Scheduling and Management** * Staggered working hours are mandated for construction and maintenance to avoid peak heat between 12:00 PM and 4:00 PM. * Toll operations must minimize outdoor exposure for personnel between 11:00 AM and 3:00 PM through rotational rosters. * Labour-intensive or heat-generating tasks, such as welding and asphalt laying, must be shifted to early morning or late evening. * Night hours are to be utilized for administrative and maintenance activities that do not require presence in toll lanes. * **Health and Safety Protocols** * Mandatory cooling breaks must be provided at regular intervals, with increased frequency during extreme heat alerts. * New or returning personnel must undergo a 3–5 day acclimatization period before starting strenuous tasks. * Workers and toll staff must be trained to identify and respond to heat-related illnesses, including heatstroke. * Construction workers are advised to wear breathable, cotton-based high-visibility vests. * **On-site Infrastructure and Supplies** * Temporary shaded and ventilated rest areas must be provided, along with uninterrupted access to cool potable drinking water. * First-aid stations, patrolling vehicles, and toll locations are required to stock Oral Rehydration Salts (ORS) and glucose. * Air-conditioned cooling rooms must be established in toll booths, office blocks, and rest areas. * Temporary sheds and awnings must be installed for personnel working near toll lanes or open areas. * **Emergency and Monitoring Services** * NHAI patrol ambulances must be equipped with ice packs, cold water, and IV fluids. * Route Patrolling Units (RPUs) are directed to increase monitoring frequency to assist commuters with heat issues or vehicle breakdowns. * Weekly inspections will be conducted by NHAI field officials across all project sites and toll plazas. **Impact Analysis** **Contractors and Concessionaires** **Impact** They are held responsible for the immediate implementation of safety protocols and the logistical restructuring of work shifts. **Action Required** Rearrange work schedules, provide necessary cooling infrastructure (sheds, AC rooms), supply ORS/glucose, and ensure staff receive heat-response training. **On-site Workforce and Toll Staff** **Impact** Employees gain protection from extreme weather through adjusted hours, better gear, and access to medical supplies. **Action Required** Follow staggered shift timings, utilize mandatory cooling breaks, and undergo the required 3–5 day acclimatization period when returning to work. **NHAI Field Officials** **Impact** These officials are tasked with increased oversight to maintain safety standards across jurisdiction. **Action Required** Perform mandatory weekly inspections at construction sites and toll plazas to ensure adherence to the heatwave guidelines. **National Highway Users** **Impact** Commuters benefit from enhanced safety monitoring and emergency support during transit in high temperatures. **Action Required** No specific action required, though they may receive assistance from RPUs or trained toll staff in case of heat-related emergencies or vehicle overheating.

Key Entities Referenced

National Highways Authority of India (NHAI): The primary authority that issued and enforces mandatory heatwave mitigation guidelines for workforce safety and highway operations. Ministry of Road Transport & Highways: The overseeing ministry responsible for the policy measures to safeguard the health of workers involved in National Highway projects.
Official Source Record View Original Source →
See Full Document Text
Ministry of Road Transport & Highways NHAI Takes Measures to Mitigate Heatwave Effect on Workforce involved in Construction and Maintenance of National Highways Posted On: 28 APR 2026 4:50PM by PIB Delhi In view of the ongoing heatwave conditions and above normal temperatures during the current summer season, NHAI has issued comprehensive guidelines aimed at mandating precautionary measures to safeguard health of the workforce and ensure safety of National Highway users during the heatwave conditions. The guidelines outline mandatory safety protocols for construction sites, maintenance work and toll plazas under NHAI jurisdiction. The safety measures based on best practices will be immediately implemented by all contractors, concessionaires and toll collection agencies to ensure staff and workers’ well-being. Guidelines for Construction & Maintenance Projects NHAI has directed contractors and concessioners to provide staggered working hours for workers to avoid peak heat hours, typically between 12:00 PM and 4:00 PM. Labour-intensive and heat-generating activities such as asphalt laying, welding etc. are to be carried out during early morning or late evening hours. Mandatory cooling breaks at regular intervals have been prescribed with increased frequency during extreme heat alerts. Special emphasis has been placed on acclimatization of workers, ensuring that new or returning personnel are gradually exposed to strenuous tasks over a period of 3–5 days. Workers are also to be trained to identify and respond to heat-related illnesses or health issues, including heatstroke. To ensure adequate on-site support, temporary shaded rest areas with proper ventilation along with uninterrupted access to cool and potable drinking water are to be provided. First-aid stations, patrolling vehicles and site supervisors are required to stock Oral Rehydration Salts (ORS) and glucose. While adherence to wearing safety gear on construction sites remains mandatory, the use of breathable, cotton- based high-visibility vests has been advised. Emergency preparedness has also been strengthened. NHAI patrol ambulances are to be equipped with ice packs, cold water, and IV fluids. Route Patrolling Units (RPUs) have been instructed to increase monitoring frequency to assist Highway users facing heat-related issues and vehicle breakdowns due to overheating. Guidelines for Toll Plazas & Operations For toll operations, NHAI has advised minimizing outdoor exposure of personnel during peak heat hours from 11:00 AM to 3:00 PM through optimized shift management and rotational rosters. Night hours will be effectively utilized for administrative and maintenance operational activities that do not require peak- hour lane presence. Toll Plaza staff will also be trained in recognizing and responding to heat-related health conditions for assisting staff and commuters.Also, cooling rooms with air-conditioning in toll booths, rest areas and office blocks will be created. Temporary sheds and awnings to be installed to provide shade for personnel working near lanes and in open areas. In addition, continuous availability of cool drinking water, along with ORS and glucose, has been made mandatory at all toll locations. To ensure compliance, NHAI field officials will conduct weekly inspections across project sites and toll plazas. These measures will help to minimise heatwave effect while ensuring uninterrupted National Highway construction and operations. NHAI remains committed to prioritizing the well-being of the workforce and safety of the National Highway users across the country. ***** GDH/DS (Release ID: 2256267) Visitor Counter : 216 Read this release in: Urdu , ही

Continue your research