Home India Ministry of Railways Over 90% Punctuality in 24 Divisions of Indian Railways in t...
Date: 2026-03-13 Category: Press Release State: Union Government Country: India

Over 90% Punctuality in 24 Divisions of Indian Railways in this Fiscal So Far; 19 Divisions Record 80–90% Punctuality

Issued by Ministry of Railways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** Indian Railways is prioritizing train punctuality through integrated IT systems, advanced monitoring, and the induction of new-generation coaches and locomotives. Key initiatives include providing Fog Safe Devices to loco pilots and implementing a Modified Semi-Automatic Stop Signal system, with significant progress reported in achieving high punctuality rates across various divisions by March 2026. **Key Points / Main Content** * **Punctuality Monitoring and Improvement:** * Punctuality is measured by train arrival at the destination within the scheduled time. * Integrated digital platforms like ICMS, COA, and NTES are used for real-time monitoring. * GPS devices (RTIS, REMMLOT) and data loggers on locomotives and signaling systems enable automatic and realistic timing updates. * Timetable rationalization, aided by IIT-Mumbai's traffic simulator, aims to minimize detention. * New generation, high-capacity locomotives are utilized for better train powering. * **Safety and Fog Operations:** * 29,848 GPS-based Portable 'Fog Safe Devices' (FSD) are provided to loco pilots to display critical landmarks and ensure safe operation in fog. * A Modified Semi-Automatic Stop Signal (MASS) system has been introduced in automatic signaling territories to mitigate fog-related delays. * Training on operating trains in fog and poor visibility is incorporated into the syllabus for Loco Pilots and Assistant Loco Pilots. * **Fleet Modernization:** * Conventional ICF coaches are being replaced with modern, lightweight LHB coaches, with production units exclusively producing LHB coaches since April 2018. * Over 50,000 LHB coaches have been produced. * Proliferation of Vande Bharat, Namo Bharat Rapid Rail, and Amrit Bharat trains with quick acceleration and deceleration capabilities is ongoing. * **Punctuality Results (as of March 2026):** * In the fiscal year 2025-26 (up to February 2026), Indian Railways recorded an overall punctuality of over 77%. * 24 divisions achieved punctuality of more than 90%. * 19 divisions recorded punctuality between 80% and 90%. * Across all divisions, 77% punctuality was achieved. * **Infrastructure Development:** * Significant increase in new track commissioning from 7,599 Km (2009-14) to 34,428 Km (2014-25), more than doubling the average daily commissioning. * Approximately 80% of tracks are upgraded to 110 kmph, and 50% to 130 kmph. * As of April 1, 2025, 431 railway infrastructure projects totaling 35,966 Km are sanctioned, costing ₹6.75 lakh crore. These include new lines, gauge conversion, and doubling/multitracking. * Capacity augmentation works are expected to improve train punctuality. * **Challenges Affecting Punctuality:** * **Mixed Traffic:** Different train types (Vande Bharat, Mail/Express, passenger, freight, etc.) with varying speeds share the same tracks, necessitating precedence for passenger trains. * **Heavy Traffic Load:** Approximately 25,000 trains per day, with highly congested routes like Delhi-Howrah and Mumbai-Kolkata, impacting punctual running. * External factors such as foggy weather, path constraints, asset maintenance, alarm chain pulling, agitations, and cattle run-overs also affect punctuality. **Impact Analysis** * **Loco Pilots** * **Impact:** Increased safety during foggy conditions due to GPS-based Fog Safe Devices displaying critical landmarks, and reduced stress during poor visibility. * **Action Required:** Utilize the provided Fog Safe Devices for safe train operation. * **Indian Railways (Operations and Management)** * **Impact:** Real-time monitoring of train operations, improved punctuality rates, enhanced safety, and increased efficiency through integrated IT systems and advanced technologies. Modernization of the coach fleet and introduction of new trains contribute to improved service. * **Action Required:** Continue implementing and leveraging integrated IT systems, advanced monitoring systems, LHB coach induction, AI-based timetable analysis, and infrastructure development projects. * **Passengers** * **Impact:** Improved punctuality leading to more reliable and timely train services. Enhanced safety measures, especially in adverse weather conditions. * **Action Required:** No direct action required, but will benefit from improved services. * **Assistant Loco Pilots (ALPs)** * **Impact:** Training curriculum updated to include train operation during fog and poor visibility conditions, enhancing preparedness. * **Action Required:** Participate in and complete the updated training modules.

Key Entities Referenced

Indian Railways: The primary subject of the policy, focusing on its punctuality and operational improvements. Fog Safe Device' (FSD): A GPS-based portable device provided to loco pilots to enhance safety during fog. Modified Semi-Automatic Stop Signal (MASS) System: A system introduced to minimize train delays during foggy weather conditions. Integrated Coaching Management System (ICMS): Part of an integrated digital platform for monitoring train operations. Control Office Application (COA): Part of an integrated digital platform for monitoring train operations.
Official Source Record View Original Source →
See Full Document Text
Ministry of Railways Over 90% Punctuality in 24 Divisions of Indian Railways in this Fiscal So Far; 19 Divisions Record 80–90% Punctuality 29,848 GPS Based Portable ‘Fog Safe Device’ (FSD) Provided to Loco Pilots; Modified Semi-Automatic Stop Signal System Introduced to Ensure Safer Operations in Fog Integrated IT Systems, Advanced Monitoring Systems, LHB Coach Induction, AI-Based Timetable Analysis, and Utilising New Generation High Capacity Locomotives also Improving Punctuality Posted On: 13 MAR 2026 5:21PM by PIB Delhi The punctuality of train services is measured on terminating basis and expressed in terms of the percentage of trains arriving at the destination station within specified time limit after the scheduled arrival time of the train. Monitoring of Punctuality: Punctuality is accorded high priority on Indian Railways (IR). IR makes all possible efforts to run trains on time. To ensure regular, continuous and real-time monitoring of punctuality of trains, technological tools and IT systems have been put in place. IR is using an integrated digital platform for monitoring of train operations comprising Integrated Coaching Management System (ICMS) and Control Office Application (COA) which are integrated with National Train Enquiry System (NTES). Progressive advancement for automatic uptake of timings by the train movement itself, is being achieved through GPS devices fitted locomotives {Real-Time Train Information System (RTIS) and Remote Monitoring and Management of Locomotives and Trains (REMMLOT)} and Data loggers integrated with the station signaling system. Data loggers ensure real time and realistic reporting of arrival / departure of passenger trains at stations. IR has been replacing conventional coaches (ICF coaches) by modern light weight LHB coaches having state-of-the art technology. The Production units of Indian Railways are producing only LHB coaches from April 2018 onwards. The production of LHB coaches has continually increased during the years and more than 50,000 LHB coaches have been turned out. IR has also been proliferating Vande Bharat, Namo Bharat Rapid Rail and Amrit Bharat trains, quick acceleration and deceleration.To improve punctuality, IR also undertakes rationalisation of time tables. One such exercise, in a scientific manner, was undertaken with the assistance of IIT- Mumbai using their traffic simulator. The exercise also aimed at provisioning of fixed Integrated Maintenance blocks on all sections to minimise detention and improve punctuality. New generation High capacity Locomotives are being utilised for Right powering of trains. Further, with a view to minimise and mitigate the effect of fog and to assist the Loco Pilots run the train during foggy weather conditions the following steps have been taken by Indian Railways: (a) GPS based FOG SAFE DEVICE – A Global Positioning System (GPS) based portable 'Fog Safe Device' (FSD) is being provided to Loco Pilots, which displays upcoming critical landmarks such as approaching signal, level crossing gates, permanent speed restrictions etc. in advance during poor visibility conditions like fog. This device is used for safe train operation especially during winter season and to help reduce stress on Loco Pilots while running in poor visibility conditions. As on 31.01.2026, there are 29848 Fog Safe devices available over Indian Railways. (b) Modified Semi-Automatic Stop Signal (MASS) System: MASS has been introduced on the Automatic Signalling territory during abnormal conditions like Fog & Bad Weather impairing visibility. The system helps minimise delay in train operation during foggy weather conditions. Train operation during fog and poor visibility conditions is an essential component of the training curriculum and the same has already been incorporated in the Transportation Module and Technical Module of the prescribed training syllabus for Loco Pilots (LPs) and Assistant Loco Pilots (ALPs). पंुअलटी को इंूव करने के लए अलग-अलग अोचेज ह। पहला- बहुत सार टकल टल्स लगाए गए ह। ूसरा- मटनस ैस को सफक टली इंूव कया गया ह। तीसरा- ICF कोचेज का LHB म कन्वजन और चौथा - कोच ट न सेट कन्वजन : रल मंी ी @AshwiniVaishnaw जी pic.twitter.c om/7Q6ZdAe3Jo — Ministry of Railways (@RailMinIndia) March 13, 2026 Results/outcomes: Due to these initiatives, Indian railways, during 2025-26 (upto February,2026) recorded an overall punctuality of more than 77%. No. of Divsions Punctuality percentage 24 Punctuality of more than 90% 19 Punctuality between 80% and 90% All Divisions of Indian Railways 77% 24 डवजन्स ऐस े ह जनम 90% स े अधक पंुअलटी आ चुक ह। 43 डवजन्स ह जनम 80% से अधक ह और 8 डवजन्स ह जनम 95% स े अधक पंुअलटी आ चुक ह: रल मंी ी @Ashwini Vaishnaw जी pic.twitter.com/ZWJQ7kOOdn — Ministry of Railways (@RailMinIndia) March 13, 2026 The Challenges:Several factors, both internal and external, affect punctual running of trains which include foggy weather, path constraints, asset maintenance, alarm chain pulling, agitations, cattle run over and other unforeseen circumstances. The major challenges that affect running of trains include: 1. Mixed Traffic - Different types of trains with different speeds run on the same track. Vande Bharat, Mail/ Express, Passenger trains, Suburban, Freight trains, Military consignments, Engineering machines, etc. having different speed utilise the same track. This leads to requirement of precedence for passenger carrying trains over freight and other trains affecting the through running of trains. Indian Railways has been taking many measures including infrastructure projects such as Eastern Dedicated Freight Corridor (EDFC) and Western Dedicated Freight Corridor (WDFC) to create dedicated freight paths to give exclusive access to freight trains. 2. Heavy Traffic load - Indian railways run approximately 25,000 trains per day including suburban and freight trains. The major routes like Delhi - Howrah, Mumbai - Kolkata, etc are highly congested affecting punctual running of trains. Capacity increase of existing network : Increase of capacity of existing rail network has been taken up in a big way during the last 11 years. The details of new tracks commissioned are as under:- Period New track Commissioned Average commissioning of new tracks 2009-14 7,599 Km 4.2 Km/day 2014-25 34,428 Km 8.6 Km/day (more than 2 times) Today, approximately 80% of the tracks are upgraded to 110 kmph and about 50% of the tracks are upgraded to 130 kmph: Hon’ble MR Shri @AshwiniVaishna w pic.twitter.com/OuNF7XiZqM — Ministry of Railways (@RailMinIndia) March 13, 2026 Further, as on 01.04.2025, across Indian Railways, 431 Railway infrastructure projects (154 New Line, 33 Gauge Conversion and 244 Doubling) of total length 35,966 Km, costing approx. ₹ 6.75 lakh crore are sanctioned. The summary is as under:- Category No of Total Length Commissioned Total Exp Projects Length till Mar’25 (Km) upto Mar’25 NL/GC/DL (₹ in Cr) (km) New Lines 154 16,142 3,036 1,45,318 Gauge 33 4,180 2,997 22,753 ConversionDoubling / 244 15,644 6,736 1,22,858 Multitracking Total 431 35,966 12,769 2,90,929 Zone-wise/year-wise details of all Railway projects are made available in public domain on Indian Railway’s website. With these capacity augmentation works, the punctuality of the trains will improve. This information was provided by the Union Minister for Railways, Information & Broadcasting and Electronics & Information Technology, Shri Ashwini Vaishnaw, in a reply to a question in Rajya Sabha today. ***** Dharmendra Tewari/ Nayan Solanki/ Manik Sharma (Release ID: 2239700) Visitor Counter : 464 Read this release in: ही , Gujarati , Tamil , Kannada

Continue your research