GOVERNMENT OF INDIA
MINISTRY OF POWER
RAJYA SABHA
UNSTARRED QUESTION NO.309
ANSWERED ON 02.02.2026
500 GW INSTALLED CAPACITY MILESTONE AND NON-FOSSIL ENERGY SHARE
309 DR. BHAGWAT KARAD:
SHRI DEEPAK PRAKASH:
SHRI BABUBHAI JESANGBHAI DESAI:
SHRI AMAR PAL MAURYA:
SMT. KIRAN CHOUDHRY:
SHRI KESRIDEVSINH JHALA:
Will the Minister of POWER be pleased to state:
(a) details of India achieving the milestone of 500 GW installed power capacity in September,
2025;
(b) the present share of non fossil fuel sources in total installed capacity and whether the fifty
percent non fossil target announced at COP26 has been achieved ahead of schedule;
(c) the renewable energy capacity additions during 2025 including solar and wind milestones
crossed;
(d) the roadmap for achieving 500 GW non fossil capacity by 2030 and the strategy for
attaining Net Zero emissions by 2070; and
(e) the status potential and Government initiatives for promoting projects in the Marathwada
region of Maharashtra?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a) & (b) : The details of installed generation capacity in September 2025, at the time of
achievement of 500 GW, and the installed generation capacity as on 31.12.2025, indicating the
percentage share of fossil and non fossil fuel sources, are given at Annexure-I. As on 31.12.2025
the total installed generation capacity is 5,13,730 MW, comprising of 2,46,942 MW (48.07 %) of
fossil-fuel sources and 2,66,788 MW (51.93 %) of non-fossil fuel sources.
India has achieved a landmark in its energy transition journey by reaching 50% of its
installed electricity capacity from non-fossil fuel sources in June, 2025 – more than five years
ahead of the target set under its Nationally Determined Contributions (NDCs) to the Paris
Agreement. This significant milestone underscores the country’s steadfast commitment to
climate action and sustainable development.
(c) : During 2025, a total of 48,436 MW Renewable energy capacity has been added. This
includes 37,945 MW of Solar power and 6,347 MW of Wind power. The details of the renewable
energy capacity additions during 2025 are given at Annexure-II.
(d) : The details of initiatives undertaken by the Government of India to achieve 500 GW non
fossil capacity by 2030 and the strategy for attaining Net Zero emissions by 2070 are as follows:1. The Government of India has taken several steps and initiatives to promote and accelerate
renewable energy capacity in the country. These, inter-alia, include the following:
(i) 100% Inter State Transmission System (ISTS) charges have been waived for inter-state
sale of solar and wind power for projects to be commissioned by 30th June 2025 (with
waiver tapering off 25% annually till June 2028), for co-located BESS projects
commissioned by June 2028, for Hydro PSP projects where construction work awarded
by June 2028, for Green Hydrogen Projects commissioned till December 2030 and for
offshore wind projects commissioned till December 2032.
(ii) Standard Bidding Guidelines for tariff based competitive bidding process for
procurement of Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm
& Dispatchable RE (FDRE) projects have been issued.
(iii) Ministry of New & Renewable Energy (MNRE) has issued Bidding Trajectory for
issuance of RE power procurement bids of 50 GW/annum by Renewable Energy
Implementing Agencies (REIAs) from FY 2023-24 to FY 2027-28.
(iv) Foreign Direct Investment (FDI) has been permitted up to 100 percent under the
automatic route.
(v) Laying of new transmission lines and creating new sub-station capacity has been
supported under the Green Energy Corridor Scheme for evacuation of renewable power
(vi) To augment transmission infrastructure needed for steep RE trajectory, transmission
plan has been prepared till 2032.
(vii) Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being
implemented to provide land and transmission to RE developers for installation of RE
projects at large scale
(viii) Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-
KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency
Solar PV Modules, New Solar Power Scheme (for Tribal and PVTG
Habitations/Villages) under Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM
JANMAN) and Dharti Aabha Janjatiya Gram Utkarsh Abhiyan (DA JGUA), National
Green Hydrogen Mission, Viability Gap Funding (VGF) Scheme for Offshore Wind
Energy Projects have been launched
(ix) Government of India, in September 2023, approved a Viability Gap Funding (VGF)
scheme for development of Battery Energy Storage Systems (BESS). BESS capacity of
13.22 GWh is under implementation with a budgetary allocation of Rs 3,760 Cr. under
this scheme. Considering the increasing demand of BESS, Ministry of Power, in June
2025, has approved another VGF scheme for development of 30 GWh BESS capacity
with a financial support of Rs 5,400 Cr from Power System Development Fund (PSDF).
(x) To boost RE consumption, Renewable Purchase Obligation (RPO) followed by
Renewable Consumption Obligation (RCO) trajectory has been notified till 2029-30.
The RCO which is applicable to all designated consumers under the Energy
Conservation Act 2001 will attract penalties on non-compliance. RCO also includes
specified quantum of consumption from Decentralized Renewable Energy sources.
(xi) “Strategy for Establishments of Offshore Wind Energy Projects” has been issued.
(xii) To achieve the objective of increased domestic production of Solar PV Modules, the
Govt. of India is implementing the Production Linked Incentive (PLI) scheme for High
Efficiency Solar PV Modules.
(xiii) 12,973.5 MW of Hydro Electric Projects are under construction. Further, 4,274 MW of
Hydro Electric Projects are under various stage of planning and targeted to be
completed by 2031-32(xiv) Ministry of Power has initiated the steps to promote Pumped Storage Projects (PSPs) to
support renewable energy integration and grid stability. At present, 10 Pumped Storage
Projects totalling 11,870 MW are under construction in the country.
2. Further, Nuclear power has huge potential to ensure long term energy security and is
vital for India’s clean energy transition towards Net Zero by 2070. It is a clean and environment
friendly source of base load power. The lifecycle emissions of nuclear power are comparable to
those of renewables like hydro and wind. The Government of India has set an ambitious target
of 100 GW nuclear power capacity by 2047. Following steps have been taken to diversify India’s
energy portfolio through Nuclear Energy:
i. A dedicated Nuclear Energy Mission with an allocation of ₹20,000 crore has been launched
to develop at least five indigenously designed Small Modular Reactors (SMRs) by 2033
and promote advanced nuclear technologies.
ii. Sustainable Harnessing and Advancement of Nuclear energy for Transforming India
(SHANTI) Act, 2025 has been enacted to pave a way to harness the potential of India’s
nuclear energy based on indigenous resources to the maximum extent through active
involvement of both the public and private sectors.
iii. Bharat Small Reactors (BSRs) of 220 MW capacity based on India’s proven Pressurized
Heavy Water Reactor (PHWR) technology are being upgraded for deployment in industrial
hubs to support decarbonisation. BARC is also developing Small Modular Reactors.
iv. India’s fuel security is being enhanced through new uranium discoveries, including a
significant discovery that would extend the life of the Jaduguda mine by over 50 years.
Progress in the closed fuel cycle, such as milestones achieved in the Prototype Fast Breeder
Reactor, will further support sustainable fuel supply.
v. To accelerate capacity addition, NPCIL and NTPC have formed the joint venture ASHVINI
for developing nuclear power plants within the existing legal framework.
3. The National Green Hydrogen Mission would also contribute significantly to India’s
efforts for decarbonization and also create opportunities for employment and economic
development. The Mission targets setting up at least 5 MMT per annum of green hydrogen capacity
by 2030.
The impact of this achievement on India’s long term energy transition roadmap is crucial
towards the goal of combating climate change, keeping in view energy security, affordability and
accessibility as critical inalienable priorities to ensure growth and development alongside Energy
transition of the economy towards net-zero by 2070.
(e) : As informed by the State Government of Maharashtra, National Institute of Wind Energy
(NIWE) has assessed that there is a potential of 1,895 MW wind power in various district of the
Marathwada region at 120 meters AGL (Above Ground Level). Against this potential, 1,141 MW
of Wind capacity has already been installed.
Similarly, as per the assessment, there is a potential of 8,462 MW of Solar power projects
out of which 2,134 MW solar power capacity has already been installed in the Marathwada region.
Maharashtra Energy Development Agency (MEDA) has taken initiatives for development
of new wind projects, repowering old sites and integrating storage and hybrid systems to promote
Renewable Energy development in the State.
**********ANNEXURE-I
ANNEXURE REFERRED IN REPLY TO PARTS (a) & (b) OF UNSTARRED QUESTION
NO. 309 ANSWERED IN THE RAJYA SABHA ON 02.02.2026
*************
The details of country's of installed generation capacity, indicating the share of renewable and non-
fossil fuel sources, percentage-wise, in September 2025 and December 2025
Installed Capacity (in MW) of the Country
as on 30.09.2025 as on 31.12.2025
Installed % Share Installed % Share
Category
Capacity (MW) in Total Capacity (MW) in Total
Coal 2,17,458 43.41% 2,19,610 42.75%
l
e Lignite 6,620 1.32% 6,620 1.29%
u
F
l
Gas 20,132 4.02% 20,122 3.92%
i
s
s Diesel 589 0.12% 589 0.11%
o
F
Total Fossil Fuel 2,44,800 48.87% 2,46,942 48.07%
RES (including Hydro) 2,47,310 49.37% 2,58,008 50.22%
Hydro (including PSPs) 50,108 10.00% 50,915 9.91%
Wind, Solar & Other RE 1,97,201 39.37% 2,07,093 40.31%
l
e
u Wind 53,124 10.61% 54,511 10.61%
F
l Solar 1,27,332 25.42% 1,35,810 26.44%
i
s
s
o BM Power/Cogen. 10,757 2.15% 10,757 2.09%
F
-
n Waste to Energy 854 0.17% 857 0.17%
o
N
Small Hydro 5,134 1.02% 5,159 1.00%
Nuclear 8,780 1.75% 8,780 1.71%
Total Non-Fossil Fuel 2,56,090 51.13% 2,66,788 51.93%
Total Installed Capacity 5,00,889 100.0% 5,13,730 100.0%
***********ANNEXURE-II
ANNEXURE REFERRED IN REPLY TO PART (c) OF UNSTARRED QUESTION NO. 309
ANSWERED IN THE RAJYA SABHA ON 02.02.2026
*************
The details of the renewable energy capacity additions during 2025
All figures in MW
Bio-Power
Small
Wind Solar Large
As on Hydro Total RES
Power Power Hydro
Bio Mass Waste to
Power
Power/Cogeneration Energy
2025
58.06 6,347.77 29.10 236.68 37,945.22 3,820.00 48,436.83
(Jan-Dec)
RES: Renewable Energy Sources
**********