See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF HOUSING AND URBAN AFFAIRS
RAJYA SABHA
UNSTARRED QUESTION NO. 3413
ANSWERED ON 23/03/2026
ACCELERATED IMPLEMENTATION OF SMART CITY MISSION
3413. SHRI LAHAR SINGH SIROYA:
Will the Minister of HOUSING AND URBAN AFFAIRS be pleased to state:
(a) whether Government has accelerated implementation of Smart Cities Mission (SCM), urban transport
projects and affordable housing initiatives across in the country;
(b) the major smart city, metro rail and housing projects undertaken in the State of Karnataka; and
(c) the outcomes of these initiatives in improving urban infrastructure, mobility and quality of life for
citizens?
ANSWER
THE MINISTER OF STATE IN THE MINISTRY OF HOUSING AND URBAN AFFAIRS
(SHRI TOKHAN SAHU)
(a) to (c): As per the provisions of Article 243W of the Constitution, in conjunction with the Seventh
and Twelfth Schedules, matters relating to urban development fall within the purview of States/Urban
Local Bodies (ULBs). However, Ministry of Housing and Urban Affairs (MoHUA) provides
programmatic support to the States/Union Territories (UTs) in their urban development agenda
through its various flagship Missions/Programmes viz. Atal Mission for Rejuvenation & Urban
Transformation 2.0 (AMRUT 2.0), Smart Cities Mission (SCM), Pradhan Mantri Awas Yojana –
Urban 2.0 (PMAY-U 2.0), Urban Transport (UT) etc.
Through these Missions/Schemes, the Central Government approves the State Plans and provides the
Central Assistance to the States. The projects are selected, designed, approved and executed by the
States/UTs and the cities. The State Governments release funds to the cities/districts.
AMRUT: The mission launched in the year 2015 in selected 500 cities (now 485 cities including 15
merged cities) and towns across the country was focused on development of basic infrastructure, in
the selected cities and towns, in the sectors of water supply; sewerage and septage management; storm
water drainage; green spaces and parks; and non-motorized urban transport. AMRUT 2.0 has been
launched in the year 2021 in all ULBs/ cities, enabling the cities to become 'self-reliant' and 'water
secure'. Providing universal coverage of sewerage and septage management in 500 AMRUT cities is
one of the major focus areas of AMRUT 2.0. Water body rejuvenation and green spaces and parks are
other components of the Mission. Under the Mission, States/UTs are empowered to select, appraise,
prioritize and implement projects.
Under AMRUT, States/UTs have grounded 6,000 projects worth ₹83,493.22 crore. These projects
include 1,403 water supply projects worth ₹43,378.59 crore, 889 sewerage/septage management
projects worth ₹34,471.1 crore, 838 drainage projects worth ₹3,017.13 crore, 348 non-motorised
urban transport projects worth ₹1,022.27 crore and 2,522 green spaces & park projects worth
₹1,604.13 crore. Under AMRUT, Karnataka State has grounded 403 projects worth ₹5,112.54 crore.
These projects include 44 water supply projects worth ₹2,213.09 crore, 55 sewerage/septage
management projects worth ₹2,499.92 crore, 83 drainage projects worth ₹238.06 crore, 41 non-
motorised urban transport projects worth ₹48.56 crore and 181 green spaces & park projects worth
₹112.91 crore.
…2/--2-
Under AMRUT 2.0, State Water Action Plans (SWAPs) have been approved for 8,771 projects worth
₹1,92,482.52 crore so far, which includes 3,531 water supply projects worth ₹1,19,670.51 crore, 584
Sewerage & Septage Management projects worth ₹65,624.98 crore, 2,991 water body rejuvenation
projects worth ₹6,083.32 crore and 1,665 parks projects worth ₹1,103.71 crore. Under AMRUT 2.0,
SWAPs of Karnataka comprising of 648 projects with a total cost of ₹10,258.46 crore have been
approved so far which include 227 water supply projects worth ₹9,574.39 crore, 192 water body
rejuvenation projects worth ₹542.28 crore and 1,665 parks projects worth ₹1,103.71 crore.
SCM: Under the Mission, in the State of Karnataka, 7 cities, viz. Belagavi, Bengaluru, Davanagere,
Hubballi-Dharwad, Mangaluru, Shivamogga and Tumakuru were selected. As reported by the State,
as on 01.03.2026, a total 917 projects amounting to ₹13,819 Cr were taken up since inception of the
mission, out of which 901 projects worth ₹13,499 Cr have been completed. The sector-wise details of
projects in Karnataka are as under:
Rs. In Crore
Sl. Sector Total Projects Completed Projects
No. No. of Cost of No. of Cost of
Projects Projects Projects Projects
1 Economic 67 727 64 696
Infrastructure
2 Environment 22 178 22 178
3 Smart Energy 71 1,672 71 1,672
4 Smart Governance 55 667 55 667
5 Smart Mobility 245 4,168 241 4,082
6 Social Infrastructure 155 1,242 154 1,135
7 Vibrant Public 178 668 171 600
Spaces
8 Wash 124 4,498 123 4,468
Grand Total 917 13,819 901 13,499
Some of the outcomes under SCM inter-alia includes establishment of 100 Special Purpose Vehicles
(SPVs) to enable faster decision making, 100 Integrated Command and Control Centres (ICCCs)
established for functions spanning crime monitoring, citizen safety, transport, waste, water, and
disaster management, building capacity in cities to develop Public Private Partnership (PPP) Projects
and replicable models for development of Cities. The SCM has already come to end on 31.03.2025.
PMAY-U: Land and Colonization are State subjects. Therefore, schemes related to housing for their
citizens are implemented by States/UTs. However, MoHUA supplements the efforts of States/UTs, by
providing Central Assistance for pucca houses to eligible urban beneficiaries across the country under
PMAY-U since 25.06.2015.
Based on the learnings from the experiences of implementation of PMAY-U, MoHUA has revamped
the scheme and launched PMAY-U 2.0 'Housing for All' Mission with effect from 01.09.2024 for
implementation in urban areas across the country to construct, purchase and rent a house by eligible
beneficiaries at affordable cost, for one crore additional eligible beneficiaries through four verticals
i.e., Beneficiary Led Construction (BLC), Affordable Housing in Partnership (AHP), Affordable
Rental Housing (ARH) and Interest Subsidy Scheme (ISS). PMAY-U 2.0 guidelines and Unified Web-
portal for submitting the online applications can be accessed through https://pmay-urban.gov.in.
…3/--3-
PMAY-U/PMAY-U 2.0 adopts a demand driven approach wherein States/UTs have conducted demand
survey through their ULBs/implementing agencies in their respective jurisdictions, based on eligibility
criteria. States/UTs formulate project proposals as per their assessed demand of houses under the
Scheme and get them approved by State Level Sanctioning & Monitoring Committee (SLSMC)
constituted under the chairmanship of Chief Secretary of the State/UT concerned. After approval from
the concerned SLSMC, States/UTs submit the proposals to this Ministry for approval of Central
assistance by the Central Sanctioning and Monitoring Committee (CSMC). Accordingly, based on
housing demand, the project proposal needs to be submitted by the State to the Ministry following
Guidelines of PMAY-U 2.0 for seeking Central Assistance. Based on the project proposals submitted
by State of Karnataka, a total of 5.77 lakh houses have been sanctioned by the Ministry under PMAY-
U till 31.03.2024. Out of the sanctioned houses, 3.98 lakh houses are completed/ delivered to the
beneficiaries.
Urban Transport: In the last 3 years 2023-24 to 2025-26 a total of 369.244 kms metro rail projects
have been sanctioned. Presently, Bangalore Metro Rail Corporation Limited has a total operational
metro length of 96.10 Km. The expansion of Metro and other mass transit systems facilitates modal
shift from private vehicles to public transport, thereby reducing congestion and vehicular emissions.
It also improves travel reliability and contributes to reduction in greenhouse gas emissions.
PM e-Bus Sewa: Under this scheme launched on 16th August 2023, 10,000 air-conditioned electric
buses have been sanctioned to 116 cities across 20 States and 6 UTs including Karnataka. 10 cities of
Karnataka have been sanctioned 750 electric buses under the scheme along with financial
assistance for the development of associated infrastructure works including Behind-the-meter (BTM)
power and civil depot infrastructure. The deployment of 10,000 electric buses aims to augment city
bus operation in urban areas. Besides that, a robust national-level infrastructure ecosystem is being
developed for operation of electric buses. A total of more than 500 km HT Lines has been laid for
charging infrastructure and 300+ acre land developed for civil depot infrastructure to ensure seamless
and efficient e-bus operation.
*****