GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 247
TO BE ANSWERED ON 05.08.2026
ACCIDENT AT LEVEL CROSSING IN MURSHIDABAD DISTRICT, WEST
BENGAL
*247. SHRI SELVAGANAPATHI T.M.:
Will the Minister of RAILWAYS be pleased to state:
(a) whether accidents at level crossings have increased during the last
several years and if so, the details thereof;
(b) the details of such incidents reported during the last three years, year-
wise;
(c) whether it is a fact that recently four casualties were reported after a
train rammed into a multi-utility vehicle at an open level crossing in
Murshidabad district of West Bengal and if so, the details thereof; and
(d) whether it is a fact that the gate dashing at level crossings has become
a serious issue and the Railway is yet to come up with a firm solution to
address this issue and if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d): A Statement is laid on the Table of the House.
*****
§STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (d) OF STARRED
QUESTION NO.247 TO BE ANSWERED ON 05.08.2026 IN LOK SABHA
(a) to (d): Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there has
been a steep decline in the number of accidents.
s 234
t
n
e
d
i
c
c
A
n
165
i
a
r 135
T
l
a
i
t
n
e
u
q
e
s 55
n
o
C
f
16
o
.o 31 2
N
2005-06 2009-10 2014-15 2019-20 2024-25 2025-26 2026-27
(upto June
2026)
Number of Consequential Train Accidents has reduced as shown in the
table below:-
Year Consequential Accidents
2014-15 135
2025-26 16 (88% lesser)
2026-27 (Up to June 2026) 2
Another important index showing improvement in safety in train operations
is Consequential Accident Index, the details of which are as under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2025-26 0.01 (91% lesser)
Page 1 of 11This index measures number of consequential accidents as a ratio of total
running kilometers of all trains.
No. of consequential accidents
Accident Index =
No. of trains X million kilometers run
During the last 3 years and the current year 2026-27 (up to 30.07.2026),
there have been 3 consequential train accidents on manned level crossing
gates over Indian Railways.
The various safety measures taken to enhance safety in train operations
are as under:-
1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
Expenditure/Budget on Safety related activities (Rs.
Year
in Cr.)
2013-14 39,200
2022-23 87,336
2023-24 1,01,662
2024-25 1,14,022
2025-26 1,17,693
2026-27 1,20,389
2. Electrical/Electronic Interlocking Systems with centralized operation
of points and signals have been provided at 6,671 stations up to
30.06.2026 to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 10,395
Level Crossing Gates up to 30.06.2026 for enhancing safety at LC
Gates.
Page 2 of 114. Complete Track Circuiting of stations to enhance safety by verification
of track occupancy by electrical means has been provided at 6,671
stations up to 30.06.2026.
5. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
6. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
7. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
8. Retro-reflective sigma boards are provided on the mast which is
located two OHE masts prior to the signals in electrified territories to
alert the crew about the signal ahead when visibility is low due to
foggy weather.
9. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
10. Modern track structure consisting of 60kg, 90 Ultimate Tensile
Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide
base sleepers with elastic fastening, fan shaped layout turnout on PSC
sleepers, Steel Channel/H-beam Sleepers on girder bridges is used
while carrying out primary track renewals.
11. Mechanisation of track laying activity through use of track machines
like PQRS, TRT, T-28 etc. to reduce human errors.
12. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
13. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and
timely removal of defective rails.
Page 3 of 1114. Laying of longer rails, minimizing the use of Alumino Thermic Welding
and adoption of better welding technology for rails i.e., Flash Butt
Welding.
15. Monitoring of track geometry by OMS (Oscillation Monitoring System)
and TRC (Track Recording Cars).
16. Patrolling of railway tracks to look out for weld/rail fractures.
17. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
18. Inspections at regular intervals are carried out to monitor and educate
staff for observance of safe practices.
19. Web based online monitoring system of track assets viz. Track
database and decision support system has been adopted to decide
rationalized maintenance requirement and optimize inputs.
20. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon
precautions, etc. have been issued.
21. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
22. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
23. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have
been eliminated by January 2019.
24. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken up
based upon the conditions assessed during these inspections.
25. Indian Railways has displayed Statutory “Fire Notices” for widespread
passenger information in all coaches. Fire posters are provided in
every coach so as to educate and alert passengers regarding various
Do’s and Don’ts to prevent fire. These include messages regarding not
Page 4 of 11carrying any inflammable material, explosives, prohibition of smoking
inside the coaches, penalties etc.
26. Production Units are providing Fire detection and suppression system
in newly manufactured Power Cars and Pantry Cars, Fire and Smoke
detection system in newly manufactured coaches. Progressive fitment
of the same in existing coaches is also underway by Zonal Railways in
a phased manner.
27. Regular counselling and training of staff is undertaken.
28. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein
work of integrated maintenance/ repair/replacement of assets is
planned up to 52 weeks in advance on rolling basis and executed as
per plan.
The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
S. 2004-05 to 2014-15 to 2014-26 Vs.
Item
No. 2013-14 2025-26 2004-14
Technological Improvements
1. Use of high-quality 57,450 Km 1.63 Lakh Km More than
rails(60 Kg) (Km) 2.8 times
2. Longer Rail Panels 9,917 Km 87,219 Km Nearly
(260m) (Km) 9 times
3. Electronic 837 3,691 Stations More than
Interlocking Stations 4 times
(Stations)
4. Fog Pass Safety As on As on 31.03.26: 352 times
Devices (Nos.) 31.03.14: 31,693 Nos.
90 Nos.
5. Thick Web Nil 35,971 Nos.
Switches (Nos.)
Better Maintenance Practices
1. Primary Rail 32,260 Km 57,583 Km 1.78 times
Renewal (Track
Km)
Page 5 of 112. USFD (Ultra Sonic 79.43 Lakh 2.25 Crore More than
Flaw detection) 2.8 times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013-14: In 2025-26: 93 %
3,699 Nos. 272 Nos. reduction
4. Rail fractures In 2013-14: In 2025-26: 92%
(Nos.) 2,548 Nos. 208 Nos. reduction
Better Infrastructure and Rolling Stock
1. New Track KM 14,985 Km 36,429 Km Almost
added (Track Km) 2.5 times
2. Flyovers 4,148 Nos. 14,362 Nos. More than
(RoBs)/Underpasses 3 times
(RUBs) (Nos.)
3. Unmanned Level As on As on 31.03.26:Nil Removed
crossings 31.03.14: (All eliminated by
(Nos.) on BG 8,948 31.01.19)
4. Manufacture of LHB 2,337 Nos. 49,366 Nos. More than
Coaches (Nos.) 21 times
Implementation of Kavach:-
1. Kavach is an indigenously developed Automatic Train Protection (ATP)
system. Kavach is a highly technology intensive system, which
requires safety certification of highest order (SIL-4).
2. Kavach aids the Loco Pilot in running of trains within specified speed
limits by automatic application of brakes in case Loco Pilot fails to do
so and also helps the trains to run safely during inclement weather.
3. The first field trials on the passenger trains were started in February
2016. Based on the experience gained and Independent Safety
Assessment of the system by Independent Safety Assessor (ISA), three
firms were approved in 2018-19, for supply of Kavach Ver 3.2.
4. Kavach was adopted as National ATP system in July, 2020.
5. Implementation of Kavach System involves following Key Activities:-
a. Installation of Station Kavach at each and every station, block
section.
Page 6 of 11b. Installation of RFID Tags throughout the track length.
c. Installation of telecom Towers throughout the section.
d. Laying of Optical Fibre Cable along the track.
e. Provision of Loco Kavach on each and every Locomotive running
on Indian Railways.
6. Based on deployment of Kavach version 3.2 on 1465 RKm on South
Central Railway and experience gained, further improvements were
made. Finally, Kavach specification version 4.0 was approved by RDSO
on 16.07.2024.
7. Kavach version 4.0 covers all the major features required for the
diverse railway network. This is a significant milestone in safety for
Indian Railways. Within a short period, IR has developed, tested and
started deploying Automatic Train Protection System.
8. Major improvement in Version 4.0 includes increased Location
Accuracy, Improved Information of Signal Aspects in bigger yards,
Station to Station Kavach interface on OFC and Direct Interface to
existing Electronic Interlocking System. With these improvements,
Kavach Ver.4.0. is planned for large scale deployment over Indian
Railways.
9. After extensive and elaborate trials, Kavach Version 4.0 has been
successfully commissioned on 2,633 Route Kilometres as on
31.07.2026, covering the high density Delhi- Mumbai and Delhi-Howrah
routes as below:-
S. No. Section Progress
(Route Km)
(1) Delhi– Mumbai route: 1,423 Rkm
I Tilak Bridge – Junction cabin – Palwal – Mathura – 1,327
Kota – Nagda – Ratlam – Vadodra – Virar Section
ii Vadodara – Ahmedabad Section 96
Page 7 of 11(2) Delhi – Howrah route: 1,210 Rkm
i. Chipyana – Tundla – Kanpur – Subedarganj Section 563
ii. Kanpur – Lucknow Section 71
iii. Mirzapur – DDU (Excluding) Section 64
iv. DDU(FOC) – Bhabua Road Section 50
v. Sasaram – Pheser Section 43
vi. Gaya – Sarmatarn – Nimiaghat Section 159
vii Chota Ambana – Bardhaman – Howrah Section 260
10. In addition, track side Kavach implementation work is being taken up
on 21,794 RKM covering all GQ,GD,HDN and identified sections of
Indian Railways.
11. The total progress of key items of Kavach on Indian Railway sections
are as under:-
S. No. Item Progress
i Laying of Optical Fibre Cable 11,547 Km
ii Installation of Telecom Towers 1,721 Nos.
iii Station Data Centre 1,009 Station
iv Installation of Track side equipment 7,726 RKm
v Provision of Kavach in Loco 6,290 Nos.
12. In addition, work for installation of Kavach in 7,190 Locomotives and
1,200 EMU/MEMU has been taken up.
13. Specialized training programmes on Kavach are being conducted at
centralized training institutes of Indian Railways to impart training to
all concerned officials. By now more than 94,000 technicians,
operators and engineers have been trained on Kavach technology. This
Page 8 of 11includes about 57,000 Loco Pilots & Assistant Loco Pilots. Courses
have been designed in collaboration with IRISET.
14. The cost for provision of Track Side including Station equipment of
Kavach is approximately Rs. 50 Lakhs/Km and cost for provision of
Kavach equipment on locomotives is approximately Rs. 80 Lakh/Loco.
15. The funds utilized on Kavach works so far up to Jun’26 are Rs. 3,875
Crore. The allocation of funds during the year 2026-27 is Rs. 2,066
Crore. Kavach work is going at good pace in the entire country.
Requisite funds are made available as per the progress of works.
The Murshidabad Incident:-
A collision incident of a school van (Tata Sumo) with the passenger train
(53054 DN Nimtita – Katwa passenger) took place in the morning (at about
6:41 Hrs) of 17.07.2026 at the Manned Level Crossing (MLC) gate no 24 A/2
on the Azimganj – Katwa Section of Howrah Division of Eastern Railway.
The details are as under:
Azimganj – Katwa section is a double line section. At about 06:41 Hrs on
17.07.2026, 53054 DN Nimtita – Katwa Passenger (going towards Katwa on
Down line) reached Manned level crossing no. 24A/2 (situated between
Khagraghat Road and Karna Subarana stations) and dashed with Tata
Sumo which was crossing the railway tracks through level crossing. While
the train was passing, level crossing gate was supposed to be closed but it
was in open condition.
Just before this train, 13431 UP Nabadwip Express (going towards
Azimganj on UP line) passed this level crossing at about 06:39 Hrs with
level crossing gate in closed condition. However, the gate was opened by
Gateman after this train passed before allowing 53054 DN Nimtita – Katwa
Passenger train which was about to arrive.
Page 9 of 11Prima Facie cause of the accident was opening of gate after passing of UP
train no. 13431 Nabadwip – Belurghat Express without passing 53054 DN
Nimtita – Katwa Passenger.
FIR has been registered against the on duty Gateman by GRP/Azimganj and
Gateman has been arrested. The concerned Permanent way supervisor has
also been suspended. Further, a senior level departmental Inquiry is being
conducted to ascertain why the gate was opened by the Gateman.
In the said incident, 5 persons lost their lives and 4 persons sustained
injuries. Total amount of Rs 56 Lakhs has been paid by the Railways as ex-
gratia payment to the next of kin of the deceased and injured individuals.
Construction of Road over Bridges/ Road under Bridges:-
Level Crossings (LCs) are eliminated either by providing Road over Bridges/
Road under Bridges (ROBs/ RUBs) in lieu of LCs or through direct closure
(for low traffic LCs) or by diversion of road traffic to nearby ROB/RUB/LC
depending upon the site conditions.
No. of ROBs/ RUBs constructed on Indian Railways during the period 2004-
14 viz-a-viz 2014-26 (Upto May’26) is as under:-
Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-26 (Upto May’26) 14,451 Nos.
(547 Nos. in the State of West Bengal)
As on 01.06.2026, 4,993 Nos. ROBs/RUBs works are sanctioned at a cost of
approx.₹ 1,17,492 Cr on Indian Railways which are at various stages of
planning and execution.
Of these, 363 Nos. ROBs/ RUBs works at a cost of approx. ₹8,060 Cr are
sanctioned in the state of West Bengal including 27 Nos. ROB/RUB works at
Page 10 of 11a cost of approx. ₹ 428 Cr in Murshidabad district which are at various
stages of planning and execution.
Completion & commissioning of ROB/RUB works depends on various
factors like cooperation of State Governments in giving consent for
closure of LC, fixing of approach alignment, approval of General
Arrangement Drawing (GAD), land acquisition, removal of encroachment,
shifting of infringing utilities, statutory clearances from various
authorities, law and order situation in the area of project / work sites,
duration of working season in a year for the particular project / area due to
climatic conditions etc. All these factors affect the completion time of the
projects/works.
Further, Railways have taken following measures to expedite the progress
of work:
i. Joint survey with concerned State Govt./Road Owning Authority is done
before finalizing the General Arrangement Drawing (GAD) to ensure
smooth execution.
ii. Periodic meetings of Railway & State Government officials are done to
resolve various issues related to ROB/RUB works.
iii. Standardization of superstructure and substructure drawings for
various combinations of span, skewness and width of road on the
Railway portion has been done to avoid delays during the design
approval. This has been issued in the form of a compendium, which can
be directly adopted for Road Over Bridge across Railway lines for
expeditious planning.
*****