Parliament Question: Accidents and elimination of Manned Level Crossings

Issued by Ministry of Railways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAJYA SABHA UNSTARRED QUESTION NO. 3297 ANSWERED ON 20.03.2026 ACCIDENTS AND ELIMINATION OF MANNED LEVEL CROSSINGS 3297 SHRI RAJINDER GUPTA: Will the Minister of RAILWAYS be pleased to state: (a) whether Government maintains data on accidents and fatalities at Manned Level Crossings (MLCs) during each of the last five years, year-wise and zone-/State-wise and if so, the details thereof; (b) the total number of MLCs currently existing on the railway network, the Zone- and State/UT-wise distribution and the number of MLCs eliminated in the last five years; and (c) whether Government has a time-bound plan for elimination of all remaining MLCs through construction of ROBs, RUBs or other grade-separated structures, if so, the details along with the expected timeline? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (c) : Safety is accorded the highest priority on Indian Railways. As a consequence of various safety measures taken over the years, there has been a steep decline in the number of accidents including accidents on level crossings. Number of Consequential Train Accidents has reduced as shown in the table below:- Year Consequential Accidents 2014-15 135 2025-26 (upto 28.02.2026) 14 (90% lesser) Another important index showing improvement in safety in train operations is Consequential Accident Index, the details of which are as under:- Consequential Accident Index:- Year Accident Index 2014-15 0.11 2024-25 0.03 (73% lesser) This index measures number of consequential accidents as a ratio of total running kilometers of all trains. §Accident Index = 234 165 135 55 31 14 2005-06 2009-10 2014-15 2019-20 2024-25 2025-26 (Feb 2026) Consequential Train Accidents on Indian Railways and casualties (including railway passengers and railway personnel) therein are as follows:- Period No. of Consequential Train No. of Deaths No. of Injuries Accidents 2004-05 to 2013-14 1,711 904 3,155 2014-15 to 2023-24 678 748 2,087 2024-25 31 18 92 The various safety measures taken to enhance safety in train operations are as under:- 1. On Indian Railways, the expenditure on Safety related activities has increased over the years as under:- Expenditure/Budget on Safety related activities (Rs. in Cr.) 2013-14 2022-23 2023-24 2024-25 2025-26 2026-27 39,200 87,336 1,01,662 1,14,022 1,17,693 1,20,389 stnediccA niarT laitneuqesnoC fo .oN No. of consequential accidents No. of trains X million kilometers run2. Electrical/Electronic Interlocking Systems with centralized operation of points and signals have been provided at 6,665 stations up to 28.02.2026 to reduce accidents due to human failure. 3. Interlocking of Level Crossing (LC) Gates has been provided at 10,153 Level Crossing Gates up to 28.02.2026 for enhancing safety at LC Gates. 4. Complete Track Circuiting of stations to enhance safety by verification of track occupancy by electrical means has been provided at 6,669 stations up to 28.02.2026. 5. Indian Railways has gone for implementation of indigenously developed Automatic Train Protection (ATP) system, which required safety certification of highest order (SIL 4). Kavach has been adopted as a National ATP system in July 2020. Based on deployment of Kavach version 3.2 on 1465 RKm on South Central Railway and experience gained, further improvements were made. Finally, Kavach specification version 4.0 was approved by RDSO on 16.07.2024. After extensive and elaborate trials, Kavach Version 4.0 has been successfully commissioned on 1,452 Route Kilometres, covering the high density Delhi- Mumbai and Delhi-Howrah routes as below: SN Section Progress Route (Km) (1) Delhi-Mumbai route: i Junction cabin – Palwal – Mathura –Nagda section 667 ii Vadodara - Ahmedabad section 96 iii Vadodara - Virar section 336 (2) Delhi – Howrah route: i Gaya Sarmatanr section 93 ii Chota Ambana - Bardhaman – Howrah section 260 Further, track side Kavach implementation work has been taken up on 24,427 RKM covering all GQ, GD, HDN and identified sections of Indian Railways. 6. Detailed instructions on issues related with safety of Signalling, e.g. mandatory correspondence check, alteration work protocol, preparation of completion drawing, etc. have been issued. 7. System of disconnection and reconnection for S&T equipment as per protocol has been re- emphasized. 8. All locomotives are equipped with Vigilance Control Devices (VCD) to improve alertness of Loco Pilots. 9. Retro-reflective sigma boards are provided on the mast which is located two OHE masts prior to the signals in electrified territories to alert the crew about the signal ahead when visibility is low due to foggy weather. §10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog affected areas which enables loco pilots to know the distance of the approaching landmarks like signals, level crossing gates, etc. 11. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base sleepers with elastic fastening, fan shaped layout turnout on PSC sleepers, Steel Channel/H-beam Sleepers on girder bridges is used while carrying out primary track renewals. 12. Mechanisation of track laying activity through use of track machines like PQRS, TRT, T-28 etc. to reduce human errors. 13. Maximizing supply of 130m/260m long rail panels for increasing progress of rail renewal and avoiding welding of joints, thereby improving safety. 14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and timely removal of defective rails. 15. Laying of longer rails, minimizing the use of Alumino Thermic Welding and adoption of better welding technology for rails i.e., Flash Butt Welding. 16. Monitoring of track geometry by OMS (Oscillation Monitoring System) and TRC (Track Recording Cars). 17. Patrolling of railway tracks to look out for weld/rail fractures. 18. The use of Thick Web Switches and Weldable CMS Crossing in turnout renewal works. 19. Inspections at regular intervals are carried out to monitor and educate staff for observance of safe practices. 20. Web based online monitoring system of track assets viz. Track database and decision support system has been adopted to decide rationalized maintenance requirement and optimize inputs. 21. Detailed instructions on issues related with safety of Track, e.g. integrated block, corridor block, worksite safety, monsoon precautions, etc. have been issued. 22. Preventive maintenance of railway assets (Coaches & Wagons) is undertaken to ensure safe train operations. 23. Replacement of conventional ICF design coaches with LHB design coaches is being done. 24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have been eliminated by January 2019. 25. Safety of Railway Bridges is ensured through regular inspection of Bridges. The requirement of repair/rehabilitation of Bridges is taken up based upon the conditions assessed during these inspections. 26. Indian Railways has displayed Statutory “Fire Notices” for widespread passenger information in all coaches. Fire posters are provided in every coach so as to educate and alert passengers §regarding various Do’s and Don’ts to prevent fire. These include messages regarding not carrying any inflammable material, explosives, prohibition of smoking inside the coaches, penalties etc. 27. Production Units are providing Fire detection and suppression system in newly manufactured Power Cars and Pantry Cars, Fire and Smoke detection system in newly manufactured coaches. Progressive fitment of the same in existing coaches is also underway by Zonal Railways in a phased manner. 28. Regular counselling and training of staff is undertaken. 29. Concept of Rolling Block introduced in Indian Railways (Open Lines) General Rules vide Gazette notification dated 30.11.2023, wherein work of integrated maintenance/ repair/replacement of assets is planned up to 52 weeks in advance on rolling basis and executed as per plan. The details of the Safety related works related to better maintenance practices, Technological improvements, better infrastructure and rolling stock etc. undertaken by Railways are tabulated below:- 2004-05 to 2014-25 Vs. S.N. Item 2014-15 to 2024-25 2013-14 2004-14 Technological Improvements 1. Use of high-quality rails 57,450 Km 1.43 Lakh Km More than 2 (60 Kg) (Km) times 2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8 times (260m) (Km) 3. Electronic Interlocking 837 Stations 3,691 Stations More than 4 (Stations) times 4. Fog Pass Safety Devices As on 31.03.14: As on 31.03.25: 25,939 288 times (Nos.) 90 Nos. Nos. 5. Thick Web Switches (Nos.) Nil 28,301 Nos. Better Maintenance Practices 1. Primary Rail Renewal (Track 32,260 Km 49,941 Km 1.5 times Km) 2. USFD (Ultra Sonic Flaw 79.43 Lakh 2 Crore More than 2 detection) Testing of Welds times (Nos.) 3. Weld failures (Nos.) In 2013-14: In 2024-25: 90 % reduction 3699 Nos. 370 Nos. 4. Rail fractures (Nos.) In 2013-14: In 2024-25: More than 88% 2548 Nos. 289 Nos. reduction Better Infrastructure and Rolling Stock 1. New Track KM added (Track 14,985 Km 34,428 Km More than 2 Km) times 2. Flyovers (RoBs)/Underpasses 4,148 Nos. 13,808 Nos. More than 3 (RUBs) (Nos.) times 3. Unmanned Level crossings As on 31.03.14: As on 31.03.24:Nil Removed (Nos.) on BG 8,948 (All eliminated by 31.01.19) 4. Manufacture of LHB Coaches 2,337 Nos. 42,677 More than 18 (Nos.) times §ROBs/RUBs As on 01.04.2025, there are 16,499 Nos. of manned Level Crossings (MLCs) on Indian Railways. All Unmanned level crossings (UMLCs) on Broad Gauge (BG) network of Indian Railways have been eliminated in 2019. During Last 10 years & Current year (upto Feb’2026), 8114 manned level crossings have been eliminated. Level Crossings (LCs) are eliminated either by providing Road over Bridges/ Road under Bridges (ROBs/ RUBs) in lieu of LCs or through direct closure (for low traffic LCs) or by diversion of road traffic to nearby ROB/RUB/LC depending upon the site conditions. Sanctioning and execution of works of Road Over Bridges/ Road Under Bridges (ROBs/RUBs) is a continuous and ongoing process on Indian Railways. Such works are prioritized and taken up on the basis of its impact on safety and mobility in train operations and impact on road users. No. of ROBs/ RUBs constructed on Indian Railways during the period 2004-14 vis a vis 2014- 26 (Upto Jan’26) is as under: Period ROBs/ RUBs constructed 2004-14 4,148 Nos. 2014-26 (Upto Jan’26) 14,024 Nos. As on 01.02.2026, 4802 no. ROBs/RUBs are sanctioned at cost of Rs. 1,14,196 Cr on Indian Railways which are at various stages of planning and execution. Completion of any ROB/RUB work depends on various factors like, fixing of approach alignment, approval of General Arrangement Drawing (GAD), land acquisition, removal of encroachment, shifting of infringing utilities, statutory clearances from various authorities, law and order situation in the area of project / work sites, number of working months in a year for particular project / work sites due to climatic conditions etc. All these factors affect the completion time of the projects / works. Further, Railways have taken following measures to expedite the progress of work: 1. Joint survey with concerned State Govt./Road Owning Authority is done before finalizing the General Arrangement Drawing (GAD) to ensure smooth execution. 2. Periodic meetings of Railway & State Government officials are done to resolve various issues related to ROB/RUB works. 3. Standardization of superstructure drawings for various combinations of span, skewness and width of road on Railway portion has been done to avoid delays during the design approval. §This has been issued in the form of compendium, which can be directly adopted for Road Over Bridge across Railway lines for expeditious planning. ***** §

Continue your research