GOVERNMENT OF INDIA
MINISTRY OF COMMERCE & INDUSTRY
DEPARTMENT FOR PROMOTION OF INDUSTRY AND INTERNAL TRADE
RAJYA SABHA
UNSTARRED QUESTION NO. 853.
TO BE ANSWERED ON FRIDAY, THE 06TH FEBRUARY, 2026.
ALLOCATION FOR KOCHI-BENGALURU INDUSTRIAL CORRIDOR /
PALAKKAD INDUSTRIAL SMART CITY
853. SMT. JEBI MATHER HISHAM:
Will the Minister of Commerce and Industry be pleased to state:
(a) the total allocation for the Kochi-Bengaluru Industrial Corridor (KBIC), particularly
the Palakkad Industrial Smart City and how much central funding has been released to
Kerala so far;
(b) the current status of the Industrial Manufacturing Cluster (IMC) at Palakkad and its
implementation progress;
(c) the land acquisition details for the IMC project, including extent acquired, cost, pending
cases and rehabilitation measures;
(d) whether the proposed Global City at Ayyampuzha (Kochi) has been included in KBIC,
if so, the approval status, and if not, the reasons therefor; and
(e) list industrial corridors under the National Infrastructure Pipeline with total allocations
and present project-wise status?
ANSWER
THE MINISTER OF STATE IN THE MIN ISTRY OF COMMERCE & INDUSTRY
(SHRI JITIN PRASADA)
(a): As part of the National Industrial Corridor Development Programme (NICDP), the
Government of India has approved the development of Integrated Manufacturing
Cluster (IMC) at Palakkad in Kerala under the Kochi-Bengaluru Industrial Corridor
(extension of the Chennai Bengaluru Industrial Corridor) for an area of 1,710 acres with
a total project cost of Rs. 3,806 crores on 28th Aug 2024. As of 20th Jan 2026, State
Government has transferred 646 acres of land to project Special Purpose Vehicle-
Kerala Industrial Corridor Development Corporation (KICDC)- and matching equity
amounting to Rs. 616.20 crore has been released by National Industrial Corridor
Development and Implementation Trust (NICDIT);
(b): The Project Manager for New Cities (PMNC) has been appointed and the Engineering,
Procurement, and Construction contract has been awarded.
(c): The Palakkad node is being implemented in two (2) phases. As informed by the
Government of Kerala, approximately 92% of the land for Phase-I (Pudussery Central
and Kannambra), admeasuring 1,343 acres out of a total of 1,461 acres, is in possession.For the land acquisition for Phase-II, the Section 11(1) notification under Right to Fair
Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement
Act, 2013 has been issued by the Government of Kerala.
(d): Development of Global City at Ayyampuzha (Kochi) is not envisaged under National
Industrial Corridor Development Programme (NICDP).
(e): As part of NICDP, Government of India has approved 20 industrial corridor projects
across 13 states along 7 industrial corridors. The status of these projects is placed at
Annexure-A.
******ANNEXURE-A
ANNEXURE REFERRED TO IN REPLY TO PART (e) OF THE RAJYA SABHA
UNSTARRED QUESTION NO. 853 FOR ANSWER ON 06.02.2026.
Corridor Name Status Project cost
Sl.
(Rs. Cr.)
No.
1. Dholera Special Investment 2,784.83*
1.
Region (DSIR), 22.5 sq. km,
Gujarat
2. Shendra Bidkin Industrial 7,947.66*
Trunk infrastructure works
Area (SBIA), 40.18 sq.
complete and Allotment/
km, Maharashtra
Sale of land with plug-n-
3. Integrated Industrial 1,714.70
play facilities underway, a
DMIC: Delhi
Township- Greater
total of 434 Plots
Mumbai
Noida (IIT-GN), 747.5
admeasuring 4,641 acres
Industrial
Corridor acres, Uttar Pradesh have been allotted till mid-
4. Integrated Industrial January, 2026. 808.60
Township – Vikram
Udyogpuri (IIT-VUL),
1100 acres, Madhya
Pradesh
5. Integrated Multi- 1,029.49
Modal Logistics Hub –
Nangal Chaudhary, 886
acres, Haryana RFP was floated for
6. Multi Modal Logistics the onboarding of a 3,883.80
Hub & Multi Modal concessionaire on
PPP mode.
Transport Hub (MMLH
& MMTH), 1183 acres,
Uttar Pradesh
7. Dighi Port Industrial Programme manager for 5,468.99
Area, 6056 acres, new cities (PMNC) and
Maharashtra Engineering, Procurement,
8. Jodhpur Pali Marwar Construction Contractor 921.66
Industrial Area, 1578 (EPCC) appointed.
acres, Rajasthan
CBIC: 9. Krishnapatnam Industrial 2,139.44
2.
Chennai Area, 2500 acres, Andhra
Bengaluru Pradesh Trunk infrastructure
Industrial works in progress
10. Tumakuru Industrial 1,701.81
Corridor
Area, 1736 acres,
Karnataka
Extension of PMNC and EPC 3,805.98
3. 11. Palakkad Industrial
CBIC to Area, 1710 acres, Kerala contractor appointed
Kochi via
Coimbatore
AKIC: 12. Prayagraj IMC, 352 acres, EPC contractor appointed 658.31
4.
Amritsar Uttar Pradesh
Kolkata
Industrial
Corridor 13. Rajpura Patiala IMC, 1100 PMNC appointed; 1,367.72
acres, Punjab Appointment of EPC
14. Gaya IMC, 1670 acres, contractor underway 1,339.02
Bihar15. Khurpia Farm Integrated PMNC and EPC 1,265.37
Manufacturing Cluster contractor appointed
(IMC), 1002 acres
Uttarakhand
16. Hisar IMC, 2988 4,679.56
acres, Haryana Appointment of PMNC
underway.
17. Agra IMC, 1058 acres, Uttar Pradesh 1,811.82
HNIC: PMNC and EPC 2,360.54
5. 18. Zaheerabad Industrial
Hyderabad contractor appointed
Area, Phase 1, 3245
Nagpur
acres, Telangana
Industrial
Corridor
HBIC: 2,786.10
Hyderabad 19. Orvakal Industrial Area,
6 Bengaluru 2621 acres, Andhra
Industrial Pradesh PMNC and EPC contractor
Corridor appointed
VCIC: Vizag 20. Koparthy Industrial Area, 2,136.51
7 Chennai 2596 acres, Andhra
Industrial Pradesh
Corridor
*excl. land cost
******