**Executive Summary:**
The Ministry of Railways addressed concerns regarding the Amrit Bharat Station Scheme's implementation at Thawe Junction. Thawe station has been identified for development under the Amrit Bharat Station Scheme, and works for the development of Thawe station have been completed. The scheme aims to improve station amenities and connectivity, with ongoing upgrades across various stations in Bihar.
**Key Points / Main Content:**
* **Amrit Bharat Station Scheme:**
* Thawe station is included in the scheme for development.
* The scheme aims to enhance customer experience and provide better amenities through station redevelopment.
* Master plans are prepared and implemented in phases for station improvement.
* The scheme includes sustainable and environment-friendly solutions and potential creation of city centers at stations.
* 98 stations in Bihar, including Thawe, have been identified under this scheme.
* **Completed and Ongoing Works at Thawe Station:**
* Works completed at Thawe station include improvements to the station building, waiting room, approach road, entrance gate, booking counter, circulating area, parking area, platform extension, platform raising, platform surfacing, signages, new toilets, and new platform shelters.
* **Station Development in Bihar (Examples):**
* Saharsa: Structural works of new station building, parking area improvement, circulating area development completed.
* Salauna: Structural works of new station building, parking area development, raising and surfacing of platform completed.
* Luckeesarai: Structural work of new station building completed.
* Gaya: Structural works of building completed.
* Muzaffarpur Junction: Structural work of new Combined Terminal Building completed.
* **Funding and Expenditure:**
* Development is generally funded under Plan Head 53 Customer Amenities.
* ₹3,701 crore was expended up to July 2025.
* ₹6,056 crore has been allocated and ₹4,581 crore spent in the last three years and current year up to July 2025 across four railway zones covering Bihar.
* **Train Connectivity:**
* Currently, 06 Mail/Express and 22 Passenger regular train services cater to Thawe station.
* 19045/46 Surat-Chhapra Express will be extended up to Thawe.
* Siwan, near Thawe, offers additional connectivity to metropolitan cities.
**Impact Analysis:**
* **Passengers:**
* *Impact:* Improved station facilities, enhanced amenities, and better connectivity.
* *Action Required:* Utilize the upgraded facilities and provide feedback on further improvements needed.
* **Ministry of Railways:**
* *Impact:* Responsible for the planning, funding, and execution of the Amrit Bharat Station Scheme.
* *Action Required:* Continue monitoring the progress of the scheme, allocate funds as needed, and ensure timely completion of projects.
* **Local Economy:**
* *Impact:* Potential for increased economic activity due to improved station infrastructure and connectivity.
* *Action Required:* Prepare for potential growth opportunities and leverage the improved infrastructure for local business development.
Key Entities Referenced
Amrit Bharat Station Scheme: A scheme launched by Indian Railways for the redevelopment of railway stations with a long-term approach, involving master plans and phased implementation to improve station facilities and customer experience.
Thawe Junction: A railway station in Bihar, India, that has been included in the Amrit Bharat Station Scheme for development and upgradation.
Ashwini Vaishnaw: The Minister of Railways, Information Broadcasting and Electronics Information Technology, responsible for answering questions related to the Amrit Bharat Station Scheme.
Bihar: A state in India where 98 stations, including Thawe Junction, have been identified for development under the Amrit Bharat Station Scheme.
Indian Railways: The state-owned railway company of India, responsible for the development, upgradation, and modernization of railway stations and infrastructure.
Plan Head 53 Customer Amenities: A specific budgetary allocation within Indian Railways dedicated to funding customer amenities and station upgradation projects, including the Amrit Bharat Station Scheme.
Gaya station: A railway station in Bihar, India where structural works of second entry West side departure and arrival building, main entry East side departure building, new pilgrimage building and underground tank have been completed under Amrit Bharat Station Scheme.
Muzaffarpur Junction station: A railway station in Bihar, India where Structural work of new Combined Terminal Building has been completed and new ticket booking office is commissioned under Amrit Bharat Station Scheme.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 4391
TO BE ANSWERED ON 20.08.2025
AMRIT BHARAT STATION SCHEME FOR THAWE JUNCTION
4391. DR. ALOK KUMAR SUMAN:
Will the Minister of RAILWAYS be pleased to state:
(a) whether it is a fact that Thawe Junction Station has been included in
the Amrit Bharat Station Scheme for the development and the works
under the said scheme have been completed;
(b) if so, the details thereof and if not, the reasons therefor;
(c) whether some works under the said scheme are pending and would
be completed in due course due to non-availability of financial
assistance from the Government and if so, the details thereof;
(d) whether it is a fact that after the completion of work under the said
Scheme, the stations would be developed to get super trains facilities to
various stations of the Country;
(e) the details of pending works of Thawe Junction Station under the
said scheme;
(f) the details of the amount of fund sanctioned and spent under the said
scheme till date and stipulated time for sanctioning the rest amount
under the said scheme; and
(g) whether the Government is monitoring the work of the Thawe
Junction development under scheme and if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (g) Thawe station has been identified for development under AmritBharat Station Scheme. The works taken up for development of Thawe
station have completed which include improvement of station building,
waiting room, approach road, entrance gate, booking counter,
circulating area, parking area, platform extension, platform raising,
platform surfacing, signages, new toilets, new platform shelters etc.
To enhance customer experience and provide better amenities,
Indian Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master
planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement,
water booths
Provision of wider Foot Over Bridge/air concourse
commensurate with passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over
platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at
each station
The scheme also envisages sustainable and environment friendly
solutions, provision of ballastless tracks etc. as per necessity,
phasing and feasibility and creation of city centre at the station in
the long term.Under this scheme, 98 stations including Thawe station located in the
state of Bihar have been identified. List of stations identified under this
scheme in the state of Bihar is as under:
No. of
State Amrit Names of Amrit Stations
Stations
Bihar 98 Anugraha Narayan Road, Ara, Arariya Court,
Bakhtiyarpur, Banka, Banmankhi, Bapudham
Motihari, Barahiya, Barauni, Barh, Barsoi Jn,
Begusarai, Bettiah, Bhabua Road, Bhagalpur,
Bhagwanpur, Bihar Sharif, Bihiya, Bikramganj,
Buxar, Chakia, Chausa, Chhapra, Dalsingh Sarai,
Darbhanga, Dauram Madhepura, Dehri On Sone,
Dholi, Dighwara, Dumraon, Durgauti, Ekma,
Fatuha, Gaya, Ghorasahan, Guraru, Hajipur Jn,
Jamalpur Jn, Jamui, Janakpur Road, Jaynagar,
Jehanabad, Jhanjharpur, Kahalgaon, Karhagola
Road, Katihar Jn, Khagaria Jn, Kishanganj, Kudra,
Labha, Laheria Sarai, Lakhminia, Luckeesarai Jn,
Madhubani, Maheshkhunt, Mairwa, Mansi Jn,
Masrakh, Mokama, Motipur, Munger (Monghyr),
Muzaffarpur Jn, Nabinagar Road, Narkatiaganj Jn,
Naugachia, Nawadah, Paharpur, Patliputra, Patna
Jn, Piro, Pirpainti, Rafiganj, Raghunathpur.,
Rajendra Nagar Terminal (Patna), Rajgir, Ram
Dayalu Nagar, Raxaul, Sabaur, Sagauli, Saharsa,
Sahibpur Kamal, Sakri, Salauna, Salmari,
Samastipur, Sasaram, Shahpur Patoree,Shivanarayanpur, Simri Bakhtiyarpur, Simultala,
Sitamarhi, Siwan, Sonpur Jn., Sultanganj, Supaul,
Taregna, Thakurganj, Thawe
Development works at railway stations under Amrit Bharat Station
Scheme in the state of Bihar have been taken up at a good pace and
progress of some of above stations is as given below:
Saharsa station: Structural works of new station building including
new waiting hall and toilet block, improvement of parking area,
circulating area development, entrance gate, boundary wall in
circulating area have been completed and works of construction of
new 12 m wide Foot Over Bridge, new platform shelters have been
taken up.
Salauna station: Structural works of new station building,
development of new parking area, raising and surfacing of platform
no. 2 have been completed and works of construction of new 12 m
Foot Over Bridge, circulating area improvement, raising of platform
no. 1, new platform shelter work have been taken up.
Luckeesarai station: Structural work of new station building and
new toilet block have been completed. Brickwork and plaster of
new station building and toilet block, circulating area development
work, drain work, porch erection work have been taken up.
Gaya station: Structural works of second entry (West side)
departure and arrival building, main entry (East side) departure
building, new pilgrimage building and underground tank have been
completed. Two floors of new multi-level two-wheeler parking have
been commissioned, work on additional two floors has been takenup. Work of construction of air concourse, finishing work of station
buildings, new platform shelters, circulating area development etc.
have been taken up.
Muzaffarpur Junction station: Structural work of new Combined
Terminal Building has been completed and new ticket booking
office is commissioned. Structural work of second entry side
arrival and departure block building and service buildings have
been completed. Works of construction of main entry station
building, finishing work of second entry side station buildings,
construction of Foot Over Bridge, circulating area development,
elevated road work have been taken up.
The phasing of the station development projects depends on several
factors like requirement, level of existing infrastructure, changes in
station footfall, development of adjoining areas and their interaction
with the station, changes in complementary mode of transport,
availability of funds, inter-se priority etc. This is a gradually evolving
process depending upon a numbers of variables and no time frame can
be indicated at this stage.
Upgradation / modernisation of stations on Indian Railways is a
continuous and ongoing process and works in this regard are undertaken
as per requirement, inter-se priority, availability of funds etc. The priority
for development/upgradation of stations is accorded to higher category
of station over lower category of station while sanctioning and
executing the works.
Funds allotment:
Indian Railways is committed to provide enhanced and modern
amenities to passengers. During recent years, large investments havebeen made by Ministry of Railways for upgradation of customer
amenities as compared earlier period. Expenditure under Plan Head–53
‘Customer Amenities’ during 2004-14, 2014-25 and 2025-26 is as under:
Period Expenditure under Plan Head–53 ‘Customer Amenities’
2004-14 ₹ 6,733 crores
2014-25 ₹ 35,591 crores
2025-26
₹ 3,701 crores
(up to July, 2025)
Further, development / upgradation / modernization of stations including
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under
Plan Head-53 are maintained Zonal Railway-wise and not work-wise or
station-wise or state-wise. The state of Bihar is covered under the
jurisdiction of four railway zones, namely, Eastern Railway, Northeast
Frontier Railway, North Eastern Railway and East Central Railway. For
the last three years and the current year, ₹ 6,056 crore has been
allocated while an expenditure of ₹ 4,581 crore has been incurred during
the last three years and current year (up to July, 2025).
Train connectivity for Thawe station:
Indian Railways is committed to run more trains on its network.
However, introduction of new trains, increase in frequency of existing
trains, extension of existing trains etc. on any route/section depends on
various factors which include:
● Capacity of that section
● Availability of path● Availability of required rolling stock
● Availability of matching infrastructure for rolling stock
● Maintenance requirement of railway tracks and other assets
Considering the above factors, presently, 06 Mail/Express and 22
Passenger regular train services are catering to the needs of passengers
of Thawe station. These services are providing connectivity to various
destinations like Siwan, Patliputra, Gorakhpur etc. Further, 05305/06
Chhapra-Anand Vihar (T) Special and 05059/60 Kolkata-Lalkuan Special
services are providing connectivity for Delhi and Kollkata area.
Moreover, to provide additional services to the passengers of Thawe, it
has also been decided to extend 19045/46 Surat-Chhapra Express upto
Thawe.
Besides, Siwan, located at a distance of 28 km from Thawe, is also very
well connected to metropolitan cities like Mumbai, Delhi etc., which may
also be availed by the passengers of Thawe.
To increase the capacity of the rail network and hence to run more
trains, Indian Railways have taken up network expansion works in a big
way.
*****