GOVERNMENT OF INDIA
MINISTRY OF FINANCE
DEPARTMENT OF EXPENDITURE
LOKSABHA
UNSTARRED QUESTION No. 1316
TO BE ANSWERED ON MONDAY, JULY 27, 2026/
SHRAVANA 5, 1948 (SAKA)
Backward Region Grants for Rayalaseema, Prakasam and North Coastal
Andhra
1316. Shri G Lakshminarayana:
Will the Minister of FINANCE be pleased to state:
(a) the amount of grants sanctioned, released by the Central Government and utilised by the
Government of Andhra Pradesh for the backward regions of Rayalaseema, Prakasam and North
Coastal Andhra, as announced in the Union Budget 2024-25, year-wise;
(b) the number and details of projects approved under the said grants, district-wise, indicating the
sector, approved project cost and the implementing agency;
(c) the physical and financial progress of each approved project, including the present stage of
implementation and the expected date of completion; and
(d) whether the Government has established any monitoring and evaluation mechanism to assess the
implementation and outcomes of the grants, if so, the details thereof, including the progress
achieved in improving regional development indicators in the beneficiary districts?
ANSWER
THE MINISTER OF STATE FOR FINANCE
(SHRI PANKAJ CHAUDHARY)
(a) to (c): Details of funds sanctioned/released and utilized since 2024-25 for the backward regions
of Rayalaseema, Prakasam, and North Coastal Andhra under Special Assistance to States for Capital
Investment (SASCI), Centrally Sponsored Schemes (CSS), and as Special Assistance, as provided by
Government of Andhra Pradesh, are as follows:Grants sanctioned/released, and utilized for the backward regions of Rayalaseema, Prakasam, and North Coastal
Andhra (Rs. in Crore)
2024-25 2025-26 2026-27* Grand Total
S.No. Grant
Amount Amount Amount Amount Amount Amount Amount Amount
Sanctioned Utilised Sanctioned Utilised Sanctioned Utilised Sanctioned Utilised
1 SASCI 4,520.56 4,520.56 4,338.67 4,338.67 1,615.99 808.00 10,475.22 9,667.23
2 CSS 516.33 516.33 1,172.56 1,172.56 390.93 390.93 2,079.81 2,079.81
Special
3 350.00 350.00 0.00 0.00 0.00 0.00 350.00 350.00
Assistance
Total 5,386.89 5,386.89 5,511.23 5,511.23 2,006.92 1,198.93 12,905.03 12,097.04
* as on 23.07.2026
Further details of funds released under SASCI, CSS, and Special Assistance, as provided by
Government of Andhra Pradesh, are enclosed as Annexure I, Annexure II, and Annexure III
respectively.
(d): Grants released as Special Assistance are recommended by NITI Aayog. While
recommending release of Rs 350 crores as Special Assistance in 2024-25, NITI Aayog, vide OM
dated 01.11.2024 stated that of the Special Assistance of Rs 1750 crores released so far for
development of seven backward districts in Andhra Pradesh under Andhra Pradesh Reorganization
Act 2014, Andhra Pradesh has submitted Utilization Certificate (UC) for Rs 1743.53 crores, leaving
a balance of Rs 6.47 crores for which UCs are pending. NITI Aayog further stated that such Special
Assistance was mainly used for school infrastructure development including co-locating of
Anganwadi centres, construction of additional classrooms, construction of compound walls,
providing electrification and drinking water supply.
The evaluation and monitoring of the CSS is carried out by the concerned Ministry/Department of
Government of India as per extant guidelines.
***Annexure I referred to in reply of part (a) to (c) of Lok Sabha Unstarred Question No. 1316 to be answered Lok Sabha on July 27, 2026.
Details of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
HNSS Project - Phase -1 - Package-3- widening of HNSS Main Irrigation & Water Water Resources
1 2024-25 Ananthapuramu 23.81 Completed Completed 23.81
Canal up to Jeedipalli Reservoir Resources Department
Irrigation & Water Water Resources
2 2024-25 Bhairavanithippa Project Ananthapuramu 18.58 Completed Completed 18.58
Resources Department
Irrigation & Water Water Resources
3 2024-25 CM&CD Works of Main Canal in Ananthapuramu District Ananthapuramu 24.78 Completed Completed 24.78
Resources Department
Irrigation & Water Water Resources
4 2024-25 HNSS Project Phase II Ananthapuramu 64.21 Completed Completed 64.21
Resources Department
Stabilization of Ayacut by constructing of water harvesting
Irrigation & Water Water Resources
5 2024-25 structures viz., Check Dams, Sluices, Weirs, Bund, etc., in Ananthapuramu 25.38 Completed Completed 25.38
Resources Department
Ananthapuramu district
Stabilization of Ayacut by constructing of water harvesting
Irrigation & Water Water Resources
6 2024-25 structures viz., Check Dams, Sluices, Weirs, Bund, etc., in Chittoor 36.38 Completed Completed 36.38
Resources Department
Chittoor district
Irrigation & Water Water Resources
7 2024-25 HNSS Project Phase II Ananthapuramu 15.99 Completed Completed 15.99
Resources Department
Irrigation & Water Water Resources
8 2024-25 HNSS Project Phase II Ananthapuramu 6.41 Completed Completed 6.41
Resources Department
Irrigation & Water Water Resources
9 2024-25 HNSS Project Phase I Kurnool 10.8 Completed Completed 10.8
Resources Department
Investigation, preparation of Hydraulic particulars, designs & Irrigation & Water Water Resources
10 2024-25 Kurnool 8.91 Completed Completed 8.91
drawings and excavation of HNSS Main Canal Resources Department
KCC Lift- Investigation, design, Construction of 3 nos of pump
Irrigation & Water Water Resources
11 2024-25 house near Mutchumarri village including design, manufacture, Kurnool 8.26 Completed Completed 8.26
Resources Department
suppl
Upgradation of Canal System from Pothireddy padu Head
Irrigation & Water Water Resources
12 2024-25 Regulator and BCR Complex from foreshore of Srisailam Kurnool 127.71 Completed Completed 127.71
Resources Department
Reservoir and Improvements in Kurnool district
Irrigation & Water Water Resources
13 2024-25 Package-2 Enhancement of Jonnagiri Tank Kurnool 5.53 Completed Completed 5.53
Resources Department
Irrigation & Water Water Resources
14 2024-25 Widening of HNSS Main canal from km -1.150 to km 78.670 Kurnool 31.33 Completed Completed 31.33
Resources Department
Irrigation & Water Water Resources
15 2024-25 Improvements to Tungabhadra Left Canal in Kurnool District Kurnool 15.3 Completed Completed 15.3
Resources Department
Upgradation of Canal System from Pothireddy padu Head
Irrigation & Water Water Resources
16 2024-25 Regulator and BCR Complex from foreshore of Srisailam Kurnool 169.18 Completed Completed 169.18
Resources Department
Reservoir and Improvements in Kurnool district
Stabilization of Ayacut by constructing of water harvesting
Irrigation & Water North Coastal Water Resources
17 2024-25 structures viz., Check Dams, Sluices, Weirs, Bund, etc., in North 25.62 Completed Completed 25.62
Resources Region Department
Coastal RegionDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Construction of a Tunnel including construction of Head
Irrigation & Water Water Resources
18 2024-25 regulator and approach channel of VGP in Prakasam Dt. Prakasam 22.03 Completed Completed 22.03
Resources Department
including all allied
Construction of Double Lane Bridge on Ogeru vagu @ km
Irrigation & Water Water Resources
19 2024-25 63.000 Near Chilakaluripet (V) in Chilakaluripet Mandal in Prakasam 7.75 Completed Completed 7.75
Resources Department
Guntur District.
Stabilization of Ayacut by constructing of water harvesting
Irrigation & Water Water Resources
20 2024-25 structures viz., Check Dams, Sluices, Weirs, Bund, etc., in Prakasam 12.72 Completed Completed 12.72
Resources Department
Prakasam district
Irrigation & Water Water Resources
21 2024-25 PSVGP -Construction of Balance of work of Tunnel-2 Prakasam 56.69 Completed Completed 56.69
Resources Department
Excavation of approach channel, Tunnel and Formation of Irrigation & Water Water Resources
22 2024-25 Prakasam 6.66 Completed Completed 6.66
approach road to the top of NOF Dam of Kakarla Dam Resources Department
Irrigation & Water Water Resources
23 2024-25 Widening the left main canal of Lower Sagileru Project YSR Kadapa 12.45 Completed Completed 12.45
Resources Department
Stabilization of Ayacut by constructing of water harvesting
Irrigation & Water Water Resources
24 2024-25 structures viz., Check Dams, Sluices, Weirs, Bund, etc., in YSR YSR Kadapa 26.04 Completed Completed 26.04
Resources Department
Kadapa district
Irrigation & Water Water Resources
25 2024-25 VARIKUNTLA LIFT SCHEME YSR Kadapa 13.83 Completed Completed 13.83
Resources Department
Irrigation & Water Water Resources
26 2024-25 GNSS Package No.30 Kurnool 24.63 Completed Completed 24.63
Resources Department
Strengthening and Widening of Major District Roads in Transport, Roads and
27 2024-25 Roads & Buildings Rayalaseema Region 77.48 Completed Completed 77.48
Rayalaseema Region Buildings Department
Strengthening and Widening of Other District Roads in Transport, Roads and
28 2024-25 Roads & Buildings Rayalaseema Region 29.04 Completed Completed 29.04
Rayalaseema Region Buildings Department
Andhra Pradesh
Medical Services &
Construction of Government Medical College Buildings at Infrastructure
29 2024-25 Health Kurnool 475 Completed Completed 99.65
Nandyal Development
Corporation
(APMSIDC)
Improvement to Escape Channel, Nippulavagu, Galeru River Irrigation & Water Water Resources
30 2024-25 Nandyal 1806.82 Completed Completed 136.57
and Kundu River, Rajoli and Joladharasi Resources Department
Lift Irrigation System from HNSS Main Canal in Puttaparthi Irrigation & Water Water Resources
31 2024-25 Ananthapuramu 735.97 Completed Completed 33.76
Assembly Constituency Resources Department
HNSS PROJECT PHASE II PACKAGE No.56B EWE and Irrigation & Water Water Resources
32 2024-25 Ananthapuramu 33.07 Completed Completed 29.46
construction of CM & CD works Resources Department
Lift from HNSS main canal PUTTAPARTHI to 195 MI Tanks in Irrigation & Water Water Resources
33 2024-25 Rayalaseema Region 156.55 Completed Completed 156.55
Rayalaseema Region Resources DepartmentDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Irrigation & Water Water Resources
34 2024-25 Rayalaseema Lift Scheme Rayalaseema Region 143.33 Completed Completed 143.33
Resources Department
Gandikota Balancing Reservoir-Package 50 GORUKALLU Irrigation & Water Water Resources
35 2024-25 Rayalaseema Region 40.61 Completed Completed 40.61
(V),PANYAM(M) Resources Department
Irrigation & Water Water Resources
36 2024-25 Strengthening of Irrigation Channels in Rayalaseema Region Rayalaseema Region 40.02 Completed Completed 40.02
Resources Department
Strengthening and Restoration of Minor Irrigation Tanks in Irrigation & Water Water Resources
37 2024-25 Rayalaseema Region 36.86 Completed Completed 36.86
Rayalaseema Region Resources Department
Irrigation & Water Water Resources
38 2024-25 Strengthening of Canal System from PRP-Head Regulator. Rayalaseema Region 32.57 Completed Completed 32.57
Resources Department
Providing LIS to Drinking Water and Irrigation facilities under Irrigation & Water Water Resources
39 2024-25 Rayalaseema Region 15.46 Completed Completed 15.46
68 Tanks in the upland areas Resources Department
Strengthening and Restoration of Minor Irrigation Tanks in Irrigation & Water North Coastal Water Resources
40 2024-25 13.88 Completed Completed 13.88
North Coastal Region Resources Region Department
PSVGP -Construction of Tunnel-2 of 9.2 m intrnal diameter for a Irrigation & Water Water Resources
41 2024-25 Prakasam 109.4 Completed Completed 109.4
length of 7575 m Resources Department
Irrigation & Water Water Resources
42 2024-25 Construction of AVR HNSS PHASE-1, STAGE-2 Kurnool 7.41 Completed Completed 7.41
Resources Department
Irrigation & Water Water Resources
43 2024-25 Construction of HNSS Project - Phase-II Ananthapuramu 6.6 Completed Completed 6.6
Resources Department
Cross Masonry and Cross Drainage (CM & CD) Works of HNSS Irrigation & Water Water Resources
44 2024-25 Ananthapuramu 20.95 Completed Completed 20.95
PROJECT PHASE II Resources Department
HNSS Project Phase-II Package No.5 Earth work excavation Irrigation & Water Water Resources
45 2024-25 Ananthapuramu 19.23 Completed Completed 19.23
and construction of CM and CD works on HNSS Main Canal Resources Department
HNSS Project - Phase-I - Package no: 36A - widening of Peruru Irrigation & Water Water Resources
46 2024-25 Ananthapuramu 16.21 Completed Completed 16.21
Branch Canal Resources Department
HNSS Project Phase II Pacakge No:13 B Earth Work Excavation Irrigation & Water Water Resources
47 2024-25 Ananthapuramu 10.04 Completed Completed 10.04
(EWE) and construction of CM & CD works on HNSS Main canal Resources Department
Irrigation & Water Water Resources
48 2024-25 GNSS PKG25:Widening of Srisailam Right Bank Canal (SRBC) Nandyal 14.39 Completed Completed 14.39
Resources Department
Balance work of GNSS Package No.30 - Investigation, Design,
Irrigation & Water Water Resources
49 2024-25 Excavation and Lining of Owk Tunnel-II and Diversion Tunnel- Nandyal 19.99 Completed Completed 19.99
Resources Department
I&II
Lining of existing GNSS Flood flow canal b/w Gorukallu Irrigation & Water Water Resources
50 2024-25 Nandyal 19.4 Completed Completed 19.4
Reservoir to Owk Reservoir including Owk tunnel III Resources Department
GNSS Main Canal work excavation - Package No.03/2006 - Irrigation & Water Water Resources
51 2024-25 YSR Kadapa 12.56 Completed Completed 12.56
Investigation, Design and Earth Resources Department
Providing CC Lining to TGP Main Canal from BCR Complex to Irrigation & Water Water Resources
52 2024-25 Nandyal 24.58 Completed Completed 24.58
Velugodu Balancing Reservoir Resources DepartmentDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Andhra Pradesh
Installation of Lines and Cable Net work for providing un- North Coastal Eastern Power
53 2024-25 Energy 137.79 Completed Completed 130
interrupted power supply Region Distribution Company
Limited (APEPDCL)
Andhra Pradesh
Installation of Power Transformers for providing un- North Coastal Eastern Power
54 2024-25 Energy 50.07 Completed Completed 40
interrupted power supply Region Distribution Company
Limited (APEPDCL)
Andhra Pradesh
Installation of Distribution Transformers for providing un- North Coastal Eastern Power
55 2024-25 Energy 125.06 Completed Completed 110
interrupted power supply Region Distribution Company
Limited (APEPDCL)
Andhra Pradesh
Ensuring Safety and disaster Management for network and North Coastal Eastern Power
56 2024-25 Energy 12 Completed Completed 12
equipment to avoid electric accidents Region Distribution Company
Limited (APEPDCL)
Interlinking lines, Additional Distribution Transformers (DTR) Andhra Pradesh
& Power Transformers (PTRs) and Enhancement of PTRs & Southern Power
57 2024-25 Energy Rayalaseema Region 392.84 Completed Completed 121.41
DTRs to cater the load growth and provide uniterrupted power Distribution Company
supply Limited (APSPDCL)
Rendering Safety Measures, Cyclone Damages, Wedge
Andhra Pradesh
Connectors, Operation Safety Budget, Distribution
Southern Power
58 2024-25 Transformers (DTR) & Power Transformers (PTRs) to safe Energy Rayalaseema Region 198.81 Completed Completed 192.89
Distribution Company
guard the Network, Equipement and provide uniterrupted
Limited (APSPDCL)
power supply
Lining of existing GNSS Flood flow canal b/w Gorukallu
Irrigation & Water Water Resources
59 2024-25 Reservoir to Owk Reservoir including Owk tunnel III and Nandyal 465.34 Completed Completed 465.34
Resources Department
Package 30 balance work
Formation of Jilledubanda Reservoir near Mudigubba including Irrigation & Water Water Resources
60 2024-25 Ananthapuramu 180.18 Completed Completed 180.18
construction of 2 Nos off take sluices weir Resources Department
Formation of Balancing Reservoirs -Mudivedu in Kurabalakota
Irrigation & Water Water Resources
61 2024-25 (M), Nethiguntapalli in Punganur (M) and Avulapalli in Somala Chittoor 154.47 Completed Completed 154.47
Resources Department
(M)
Improvement to Escape Channel. Nippulavagu, Galeru River Irrigation & Water Water Resources
62 2024-25 Nandyal 51.1 Completed Completed 51.1
and Kundu River ,Rajoli and Joladharasi Resources DepartmentDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Restoration of Right main canal and Head works with ring bund
Irrigation & Water Water Resources
63 2024-25 of Pincha Projects near Pincha village H/o Mdumpadu (V) in YSR Kadapa 22.95 Completed Completed 22.95
Resources Department
T.Sundupall
Irrigation & Water Water Resources
64 2024-25 Modernization of Thotapalli old Regulator Srikakulam 17.62 Completed Completed 17.62
Resources Department
Formation of new tank across Badapala vanka near Irrigation & Water Water Resources
65 2024-25 Chittoor 13.59 Completed Completed 13.59
Bandakindapalle (V) in Rompicherla (M) of Chittoor District Resources Department
Greater
Visakhapatnam
66 2024-25 Working women hostel Welfare VISAKHAPATANAM 172 Ongoing 31-12-2026 Ongoing 30.00
Municipal Corporation
(GVMC)
Construction of Lift Irrigation Scheme for Drawl and Lifting of Irrigation & Water Water Resources
67 2024-25 Nandyal 56.77 Completed Completed 56.77
water from Gotta Barrage Right Main Canal Resources Department
Investigation and Construction of Lift Irrigation Scheme from Irrigation & Water Water Resources
68 2024-25 YSR Kadapa 52.62 Completed Completed 52.62
GNSS to HNSS Resources Department
Construction of Lift Irrigation Scheme from HNSS Main Canal at Irrigation & Water Water Resources
69 2024-25 Ananthapuramu 51.32 Completed Completed 51.32
Puttaparthy Resources Department
Irrigation & Water Water Resources
70 2024-25 HNSS Phase II - Construction of Sreenivasapuram Reservoir Ananthapuramu 25.93 Completed Completed 25.93
Resources Department
Formation of Balancing Reservoirs -Mudivedu in Kurabalakota
Irrigation & Water Water Resources
71 2024-25 (M), Nethiguntapalli in Punganur (M) and Avulapalli in Somala Chittoor 26.02 Completed Completed 26.02
Resources Department
(M)
Improvements & Providing Lining to GNSS Main canal in YSR Irrigation & Water Water Resources
72 2024-25 YSR Kadapa 5.59 Completed Completed 5.59
District. Resources Department
Construction of C.C Walls of Kondavagu near Deebaguntla Irrigation & Water Water Resources
73 2024-25 Nandyal 5.57 Completed Completed 5.57
Village Nandyal Mandl KURNOOL Dis (Now Nandyal Dt) Resources Department
Cross Masonry and Cross Drainage (CM & CD) Works in HNSS Irrigation & Water Water Resources
74 2024-25 Chittoor 5.28 Completed Completed 5.28
Phase II from 523 KM to 546 KM Resources Department
Enhancement of Existing storage capaciy of venkatapuram M.I Irrigation & Water Water Resources
75 2024-25 Kurnool 5.17 Completed Completed 5.17
Tank near Venkatapuram (V), Udumulapadu M.I Tank near Ud Resources Department
Package III under SPVBR Left main canal beyond porumamilla Irrigation & Water Water Resources
76 2024-25 YSR Kadapa 5.13 Completed Completed 5.13
tank of NTR TGP in YSR Kadapa Resources Department
Widening and Strengthening of State Highways in Kadapa Transport, Roads and
77 2024-25 Roads & Buildings YSR Kadapa 37.4 Completed Completed 37.4
District Buildings Department
Widening and Strengthening of State Highways in Transport, Roads and
78 2024-25 Roads & Buildings Ananthapuramu 16.73 Completed Completed 16.73
Anantapuramu District Buildings DepartmentDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Widening and Strengthening of State Highways in Kurnool Transport, Roads and
79 2024-25 Roads & Buildings Kurnool 15.83 Completed Completed 15.83
District Buildings Department
Transport, Roads and
80 2024-25 Widening and Strengthening of State Highways in Pulivendula Roads & Buildings YSR Kadapa 7.22 Completed Completed 7.22
Buildings Department
Widening and Strengthening of State Highways in YSR Kadapa Transport, Roads and
81 2024-25 Roads & Buildings YSR Kadapa 5.02 Completed Completed 5.02
District Buildings Department
Widening and Strengthening of State Highways in Chittoor Transport, Roads and
82 2024-25 Roads & Buildings Chittoor 8.76 Completed Completed 8.76
District Buildings Department
Reconstruction of State Highways and Major District Roads in Transport, Roads and
83 2024-25 Roads & Buildings Palnadu 25.36 Completed Completed 25.36
Palnadu Region Buildings Department
Reconstruction of State Highways and Major District Roads in Transport, Roads and
84 2024-25 Roads & Buildings Rayalaseema Region 24.37 Completed Completed 24.37
Rayalaseema Region Buildings Department
Reconstruction of State Highways and Major District Roads in North Coastal Transport, Roads and
85 2024-25 Roads & Buildings 13.39 Completed Completed 13.39
North Coastal Region Region Buildings Department
Widening and Strengthening of State Highways in West Transport, Roads and
86 2024-25 Roads & Buildings Kurnool 25.13 Completed Completed 25.13
Godavari District Buildings Department
Widening and Strengthening of State Highways in Chittoor Transport, Roads and
87 2024-25 Roads & Buildings Chittoor 12.29 Completed Completed 12.29
District Buildings Department
Transport, Roads and
88 2024-25 Widening and Strengthening of State Highways in Eluru Roads & Buildings Vizianagaram 8.5 Completed Completed 8.5
Buildings Department
Transport, Roads and
89 2024-25 Widening and Strengthening of State Highways in YSR Kadapa Roads & Buildings YSR Kadapa 16.24 Completed Completed 16.24
Buildings Department
Widening and Strengthening of State Highways in Transport, Roads and
90 2024-25 Roads & Buildings Ananthapuramu 15.6 Completed Completed 15.6
Anantapuramu District Buildings Department
Widening and Strengthening of State Highways in Kurnool Transport, Roads and
91 2024-25 Roads & Buildings Kurnool 32.5 Completed Completed 32.5
District Buildings Department
Widening and Strengthening of State Highways in Nandyal Transport, Roads and
92 2024-25 Roads & Buildings Ananthapuramu 16.23 Completed Completed 16.23
District Buildings Department
Widening and Strengthening of State Highways in Parvathipuram Transport, Roads and
93 2024-25 Roads & Buildings 17.07 Completed Completed 17.07
Parvathipuram Manyam District Manyam Buildings DepartmentDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Transport, Roads and
94 2024-25 Widening and Strengthening of State Highways in Pulivendula Roads & Buildings YSR Kadapa 7.2 Completed Completed 7.2
Buildings Department
Widening and Strengthening of State Highways in Vizianagaram Transport, Roads and
95 2024-25 Roads & Buildings YSR Kadapa 11.16 Completed Completed 11.16
District Buildings Department
Construction of Primary Health Centres in North Coastal North Coastal Transport, Roads and
96 2024-25 Health 12.71 Completed Completed 12.71
Districts Region Buildings Department
Transport, Roads and
97 2024-25 Construction of Primary Health Centres in Kadapa District Health YSR Kadapa 5.48 Completed Completed 5.48
Buildings Department
Transport, Roads and
98 2024-25 Construction of Primary Health Centres in Kurnool District Health Kurnool 12.19 Completed Completed 12.19
Buildings Department
Transport, Roads and
99 2024-25 Construction of Primary Health Centres in Nandyal District Health Nandyal 14.85 Completed Completed 14.85
Buildings Department
Transport, Roads and
100 2024-25 Construction of Primary Health Centres in Palnadu District Health Palnadu 8.16 Completed Completed 8.16
Buildings Department
Transport, Roads and
101 2024-25 Construction of Primary Health Centres in Sri Satya Sai District* Health Sri Satyasai 6.63 Completed Completed 6.63
Buildings Department
Formation of Balancing Reservoirs -Mudivedu in Kurabalakota
Irrigation & Water Water Resources
102 2024-25 (M), Nethiguntapalli in Punganur (M) and Avulapalli in Somala Chittoor 149.05 Completed Completed 149.05
Resources Department
(M)
Protection arrangements to L/s Flood bank(No.3 Surplus
Irrigation & Water Water Resources
103 2024-25 course of Ramanna tank ) at Singapeta village of Allur mandal Nandyal 91.23 Completed Completed 91.23
Resources Department
in SPSR N
Andhra Pradesh
Civil Aviation & Airports Development
104 2024-25 Providing External connectivity to Bhogapuram Airport Vizianagaram 8.4 Completed Completed 8.4
Airports Corporation Ltd.
(APADCL)
Tribal Welfare
Improvements to infrastructure amenities in Paderu and
105 2024-25 Tribal Infrastructure Paderu and Manyam 5.93 Engineering Completed Completed 5.93
Manyam tribal districts
Department
Construction of CD&CM Works in Left Main Canal of PIP Irrigation & Water
106 2025-26 VISAKHAPATANAM 150 Irrigation Completed Completed 150
(PIPLMC) Package 1 to 7 in Visakhapatnam district Resources
Cross Masonry and Cross Drainage (CM & CD) Works of Irrigation & Water
107 2025-26 VISAKHAPATANAM 16.59 Irrigation Completed Completed 16.59
PIPLMC Package 8 to 15 in Visakhapatnam district ResourcesDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Excavation of main canal, formation of main canal including
Irrigation & Water
108 2025-26 canal lining and construction of cm & cd works LMC of PIP - VISAKHAPATANAM 30 Irrigation Completed Completed 30
Resources
Package No.6A
Strengthening and Restoration of Minor Irrigation Tanks in Irrigation & Water
109 2025-26 Ananthapuramu 39.77 Irrigation Completed Completed 39.77
Anantapur district Resources
Strengthening and Restoration of Minor Irrigation Tanks in Irrigation & Water
110 2025-26 Chittoor 127.71 Irrigation Completed Completed 127.71
Chittoor district Resources
Strengthening and Restoration of Minor Irrigation Tanks in YSR Irrigation & Water
111 2025-26 YSR Kadapa 49.41 Irrigation Completed Completed 49.41
Kadapa district Resources
Strengthening and Restoration of Minor Irrigation Tanks in Irrigation & Water
112 2025-26 Kurnool 24.42 Irrigation Completed Completed 24.42
Kurnool district Resources
Strengthening and Restoration of Minor Irrigation Tanks in Irrigation & Water
113 2025-26 Prakasam 16.69 Irrigation Completed Completed 16.69
Prakasam district Resources
Strengthening and Restoration of Minor Irrigation Tanks in Irrigation & Water
114 2025-26 Srikakulam 35.32 Irrigation Completed Completed 35.32
Srikakulam district Resources
Strengthening and Restoration of Minor Irrigation Tanks in Irrigation & Water
115 2025-26 VISAKHAPATANAM 27.65 Irrigation Completed Completed 27.65
Visakhapatnam district Resources
Strengthening and Restoration of Minor Irrigation Tanks in Irrigation & Water
116 2025-26 Vizianagaram 16.32 Irrigation Completed Completed 16.32
Vizianagaram district Resources
Improvements to School Infrastructure including digital
117 2025-26 Education Anakapalli 5.31 School Education Completed Completed 5.31
facilities in Anakapalli district
Improvements to School Infrastructure including digital
118 2025-26 Education Ananthapuramu 17.94 School Education Completed Completed 17.94
facilities in Ananthapuram district
Improvements to School Infrastructure including digital
119 2025-26 Education Annamayya 10.77 School Education Completed Completed 10.77
facilities in Annamayya district
Improvements to School Infrastructure including digital
120 2025-26 Education Chittoor 17.85 School Education Completed Completed 17.85
facilities in Chittoor district
Improvements to School Infrastructure including digital
121 2025-26 Education Kurnool 14.38 School Education Completed Completed 14.38
facilities in Kurnool district
Improvements to School Infrastructure including digital
122 2025-26 Education Nandyal 16.45 School Education Completed Completed 16.45
facilities in Nandyal district
Improvements to School Infrastructure including digital
123 2025-26 Education Prakasam 12.24 School Education Completed Completed 12.24
facilities in Palnadu region
Improvements to School Infrastructure including digital
124 2025-26 Education Sri Satyasai 18.04 School Education Completed Completed 18.04
facilities in Sri Satyasai district
Improvements to School Infrastructure including digital
125 2025-26 Education Tirupati 14.47 School Education Completed Completed 14.47
facilities in Tirupati district
Improvements to School Infrastructure including digital
126 2025-26 Education VISAKHAPATANAM 24 School Education Completed Completed 24
facilities in North Coastal Region
Improvements to School Infrastructure including digital
127 2025-26 Education YSR Kadapa 9.54 School Education Completed Completed 9.54
facilities in YSR Kadapa districtDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Laying & improving road connectivity of State Highways and
128 2025-26 Roads & Buildings Anakapalli 18.02 Roads & Buildings Completed Completed 18.02
Major District Roads in Anakapalli district
Laying & improving road connectivity of State Highways and
129 2025-26 Roads & Buildings Ananthapuramu 24.81 Roads & Buildings Completed Completed 24.81
Major District Roads in Anantapur district
Laying & improving road connectivity of State Highways and
130 2025-26 Roads & Buildings Annamayya 12.41 Roads & Buildings Completed Completed 12.41
Major District Roads in Annamayya district
Laying & improving road connectivity of State Highways and
131 2025-26 Roads & Buildings Chittoor 65.5 Roads & Buildings Completed Completed 65.5
Major District Roads in Chittoor district
Laying & improving road connectivity of State Highways and
132 2025-26 Roads & Buildings Kurnool 43.27 Roads & Buildings Completed Completed 43.27
Major District Roads in Kurnool district
Laying & improving road connectivity of State Highways and Parvathipuram
133 2025-26 Roads & Buildings 5.89 Roads & Buildings Completed Completed 5.89
Major District Roads in Parvathipuram Manyam district Manyam
Laying & improving road connectivity of State Highways and
134 2025-26 Roads & Buildings Nandyal 54.49 Roads & Buildings Completed Completed 54.49
Major District Roads in Nandyal district
Laying & improving road connectivity of State Highways and
135 2025-26 Roads & Buildings Prakasam 7.81 Roads & Buildings Completed Completed 7.81
Major District Roads in Prakasam district
Laying & improving road connectivity of State Highways and
136 2025-26 Roads & Buildings Sri Satyasai 13.56 Roads & Buildings Completed Completed 13.56
Major District Roads in Sri Satyasai district
Laying & improving road connectivity of State Highways and
137 2025-26 Roads & Buildings Vizianagaram 42.2 Roads & Buildings Completed Completed 42.2
Major District Roads in North Coastal Region
Laying & improving road connectivity of State Highways and
138 2025-26 Roads & Buildings YSR Kadapa 79.98 Roads & Buildings Completed Completed 79.98
Major District Roads in Y.S.R. district
Construction of Infrastructure Development Works of Andhra
139 2025-26 Health VISAKHAPATANAM 34 AP Med Tech Zone Completed Completed 34
Pradesh Med Tech Zone in Visakhapatnam
Construction of buildings and other infrastructure facilities in
140 2025-26 Health Palnadu 51 APMSIDC Completed Completed 51
new medical colleges in Piduguralla
Panchayat Raj
141 2025-26 Improvements to road network in Markapur Constituency Roads & Buildings Prakasam 29.67 Engineering Completed Completed 29.67
Department
Panchayat Raj
142 2025-26 Improvements to road network in Rayadurg Constituency Roads & Buildings Ananthapuramu 41.42 Engineering Completed Completed 41.42
DepartmentDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Irrigation & Water
143 2025-26 Construction of PSVGP Prakasam 137.15 Irrigation Department Completed Completed 137.15
Resources
Upgradation of Canal System from Pothireddy padu Head Irrigation & Water
144 2025-26 Nandyal 39.96 Irrigation Department Completed Completed 39.96
Regulator Resources
Irrigation & Water
145 2025-26 Improvements to Inspection Track of KC Canal Nandyal 6.83 Irrigation Department Completed Completed 6.83
Resources
Irrigation & Water
146 2025-26 Rayalaseema Lift Irrigation Scheme Nandyal 39.8 Irrigation Department Completed Completed 38.17
Resources
147 2025-26 Comprehensive development of pudimadaka fishing harbour Ports & Harbour Anakapalli 450 AP Maritime Board Completed Completed 92.4
Comprehensive development of budagatlapalem fishing
148 2025-26 Ports & Harbour Srikakulam 450 AP Maritime Board Completed Completed 89.1
harbour
149 2025-26 Comprehensive development of kothapatnam fishing harbour Ports & Harbour Prakasam 450 AP Maritime Board Completed Completed 89.1
150 2025-26 Construction of fish landing centers-Bhimili Ports & Harbour VISAKHAPATANAM 45 AP Maritime Board Completed Completed 19.8
151 2025-26 Construction of fish landing centers-Rajayyapeta Ports & Harbour Anakapalli 45 AP Maritime Board Completed Completed 19.8
152 2025-26 Construction of fish landing centers-Dondawaka Ports & Harbour Anakapalli 45 AP Maritime Board Completed Completed 19.8
Strenthening and improvement of Major District Roads in Roads & Buildings
153 2025-26 Roads & Buildings VISAKHAPATANAM 70 Completed Completed 70
Coastal Region Department
Strenthening and improvement of Major District Roads in Roads & Buildings
154 2025-26 Roads & Buildings Ananthapuramu 30 Completed Completed 30
Rayalaseema Region Department
Strenthening and improvement of State Highways in Roads & Buildings
155 2025-26 Roads & Buildings Ananthapuramu 30 Completed Completed 30
Rayalaseema Region Department
Cross Masonry and Cross Drainage Works of GNSS - SRBC Irrigation & Water Water Resources
156 2025-26 KURNOOL 15.4 Completed Completed 15.4
including all other allied works under Package No 26-2006 Resources Department
Cross Masonry and Cross Drainage Works of GNSS Main Canal Irrigation & Water Water Resources
157 2025-26 Ananthapuramu 14.39 Completed Completed 14.39
from Km 141.350 to Km 16 Resources Department
Irrigation & Water Water Resources
158 2025-26 Hiramandalam Lift Irrigation Scheme SRIKAKULAM 29.31 Completed Completed 29.31
Resources Department
Irrigation & Water Water Resources
159 2025-26 Anantapur Community Lift cum Drip Irrigation Ananthapuramu 86 Completed Completed 86
Resources Department
Construction of Vedavathi (Hagari) River Lift Irrigation Scheme Irrigation & Water Water Resources
160 2025-26 KURNOOL 60 Completed Completed 60
at Gulyam (V), Halaharvi (M), Kurnool District Resources Department
Irrigation & Water Water Resources
161 2025-26 Gandikota Lift Irrigation Scheme-02 YSR Kadapa 6.44 Completed Completed 6.44
Resources Department
Irrigation & Water Water Resources
162 2025-26 Gandikota Lift Irrigation Scheme-05 YSR Kadapa 8.53 Completed Completed 8.53
Resources Department
Irrigation & Water Water Resources
163 2025-26 Gandikota Lift Irrigation Scheme-04 YSR Kadapa 9.91 Completed Completed 9.91
Resources DepartmentDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
HNSS Project Phase II Pacakge No 13 B EWE and construction
Irrigation & Water Water Resources
164 2025-26 of CM & CD works on HNSS Main canal from Km 380.000 to Ananthapuramu 10.04 Completed Completed 10.04
Resources Department
396/100/400
Irrigation & Water Water Resources
165 2025-26 Package-LI-03 /06-07 Gandikota CBR Lift Irrigation Scheme YSR Kadapa 10.36 Completed Completed 10.36
Resources Department
Irrigation & Water Water Resources
166 2025-26 MAHENDRATANYA OFFSHORE RESERVOIR PROJECT SRIKAKULAM 10.83 Completed Completed 10.83
Resources Department
Irrigation & Water Water Resources
167 2025-26 GNSS Package-29 KURNOOL 11.94 Completed Completed 11.94
Resources Department
Irrigation & Water Water Resources
168 2025-26 Construction of Kuppam Branch Canal CHITTOOR 14.8 Completed Completed 14.8
Resources Department
Upgradation of canal system from Pothireddypadu Head
Irrigation & Water Water Resources
169 2025-26 Regulator & BCR Complex from foreshore of Srisailam Nandyal 18.44 Completed Completed 18.44
Resources Department
Reservoir
Irrigation & Water Water Resources
170 2025-26 Pula Subbaiah Veligonda Project PRAKASAM 78 Completed Completed 78
Resources Department
Irrigation & Water Water Resources
171 2025-26 Merlapaka mallemadugu lift irrigation scheme Tirupati 75 Completed Completed 75
Resources Department
Construction of Double Lane Road Bridge on Revanuru Irrigation & Water Water Resources
172 2025-26 KURNOOL 8.07 Completed Completed 8.07
Irrigation Canal Resources Department
AVR HNSS Project - HNSS Phase- II - Installation of Sree Rami Irrigation & Water Water Resources
173 2025-26 Ananthapuramu 5.95 Completed Completed 5.95
Reddy drinking water pipe lines Resources Department
Irrigation & Water Water Resources
174 2025-26 Construction of Tungabhadra High level Main Canal KURNOOL 13.39 Completed Completed 13.39
Resources Department
Excavation of Galeru Nagari Sujala Sravanthi (GNSS) Canal from Irrigation & Water Water Resources
175 2025-26 KURNOOL 6.63 Completed Completed 6.63
Km.33.170 to Km.338.721 (up to Nagari River) Resources Department
"VAMSADHARA FLOOD BANKS PACKAGE – II Formation of Irrigation & Water Water Resources
176 2025-26 SRIKAKULAM 6.65 Completed Completed 6.65
Flood Bank on Vamsadhara river on Left margin from Rugada" Resources Department
Irrigation & Water Water Resources
177 2025-26 Commission & Construction of Tandyam L I Scheme SRIKAKULAM 7.31 Completed Completed 7.31
Resources Department
P.S. Veligonda Project, Package-IV, Kakarla NOF Dam , Link Irrigation & Water Water Resources
178 2025-26 PRAKASAM 7.77 Completed Completed 7.77
Canal and Eastern main canal Stage-I and Stage-II Resources Department
Construction of Head Regulator at Km 0.00 of Eastern main Irrigation & Water Water Resources
179 2025-26 PRAKASAM 8.56 Completed Completed 8.56
canal" as additional work Resources Department
Retrofitting to Radial gates and Head regulator of Gandikota Irrigation & Water Water Resources
180 2025-26 YSR Kadapa 10.2 Completed Completed 10.2
dam in kondapuram mandal of YSR district. Resources Department
Cross Masonry and Cross Drainage Works of Bhairavani Thippa Irrigation & Water Water Resources
181 2025-26 Ananthapuramu 56.33 Completed Completed 56.33
Project in Gummagatta Resources Department
Irrigation & Water Water Resources
182 2025-26 Somasila Project GKN Canal Package-11 YSR Kadapa 16.58 Completed Completed 16.58
Resources DepartmentDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Irrigation & Water Water Resources
183 2025-26 Flood Damage Restoration to Kalugodu Distributory Walls Ananthapuramu 17.8 Completed Completed 17.8
Resources Department
Formation of Earth Dam for Hiramandalam Reservior to store a Irrigation & Water Water Resources
184 2025-26 SRIKAKULAM 25.28 Completed Completed 25.28
capacity of 19.05 TMC of water Resources Department
Irrigation & Water
185 2025-26 Construction of Vamsadhara Stage-II Phase-II SRIKAKULAM 10 Irrrigation Ongoing 31-12-2026 Ongoing #REF!
Resources
Irrigation & Water
186 2025-26 Improvements to Thotapalli Barrage Head Works SRIKAKULAM 10 Irrrigation Ongoing 31-12-2026 Ongoing #REF!
Resources
Irrigation & Water
187 2025-26 Improvements to Tarakaramateertha Sagaram Head Works VIZIANAGARAM 20 Irrrigation Ongoing 31-12-2026 Ongoing #REF!
Resources
Irrigation & Water
188 2025-26 Interlinking of Nagavali-Champavati VIZIANAGARAM 10 Irrrigation Ongoing 31-12-2026 Ongoing #REF!
Resources
Irrigation & Water
189 2025-26 Construction of Poola Subbaiah Veligonda Project (PSVGP) PRAKASAM 125 Irrrigation Ongoing 31-12-2026 Ongoing #REF!
Resources
Irrigation & Water
190 2025-26 Improvements to Tungabhadra High level Canal (HLC) Ananthapuramu 30 Irrrigation Ongoing 31-12-2026 Ongoing #REF!
Resources
Irrigation & Water
191 2025-26 Modernisation of Tungabhadra Project Ananthapuramu 93 Irrrigation Ongoing 31-12-2026 Ongoing #REF!
Resources
Strenthening and improvement of Major District Roads Phase II
192 2025-26 Roads & Buildings VISAKHAPATANAM 25 Roads & Buildings Completed Completed 25
in Coastal Region
Strenthening and improvement of Major District Roads Phase II
193 2025-26 Roads & Buildings Ananthapuramu 25 Roads & Buildings Completed Completed 25
in Rayalaseema Region
Strenthening and improvement of State HighwaysPhase II in
194 2025-26 Roads & Buildings VISAKHAPATANAM 25 Roads & Buildings Completed Completed 25
Coastal Region
Strenthening and improvement of State Highways Phase II in
195 2025-26 Roads & Buildings Ananthapuramu 25 Roads & Buildings Completed Completed 25
Rayalaseema Region
Strenthening and improvement of Rural Roads Phase III in
196 2025-26 Roads & Buildings Ananthapuramu 12 Roads & Buildings Ongoing 31-12-2026 Ongoing #REF!
Anantapur District
Strenthening and improvement of Rural Roads Phase III in
197 2025-26 Roads & Buildings CHITTOOR 15 Roads & Buildings Ongoing 31-12-2026 Ongoing #REF!
Chittoor District
Panchayat Raj
Strenthening and improvement of Rural Roads Phase III in YSR
198 2025-26 Roads & Buildings YSR Kadapa 25 Engineering Ongoing 31-12-2026 Ongoing #REF!
Kadapa District
Department
Panchayat Raj
Strenthening and improvement of Rural Roads Phase III in
199 2025-26 Roads & Buildings KURNOOL 16 Engineering Ongoing 31-12-2026 Ongoing #REF!
Kurnool District
Department
Panchayat Raj
Strenthening and improvement of Rural Roads Phase III in
200 2025-26 Roads & Buildings PRAKASAM 12 Engineering Ongoing 31-12-2026 Ongoing #REF!
Prakasam District
Department
Panchayat Raj
Strenthening and improvement of Rural Roads Phase III in
201 2025-26 Roads & Buildings SRIKAKULAM 17 Engineering Ongoing 31-12-2026 Ongoing #REF!
Srikakulam District
Department
Panchayat Raj
Strenthening and improvement of Rural Roads Phase III in
202 2025-26 Roads & Buildings VISAKHAPATANAM 15 Engineering Ongoing 31-12-2026 Ongoing #REF!
Visakhapatnam District
DepartmentDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Panchayat Raj
Strenthening and improvement of Rural Roads Phase III in
203 2025-26 Roads & Buildings VIZIANAGARAM 15 Engineering Ongoing 31-12-2026 Ongoing #REF!
Vizianagaram District
Department
Andhra Pradesh State
Commissioning and construction of optical fiber network in Information
204 2025-26 Ananthapuramu 12 FiberNet Limited Completed Completed 12
Anantapur District Technology
(APSFL)
Andhra Pradesh State
Commissioning and construction of optical fiber network in Information
205 2025-26 CHITTOOR 15 FiberNet Limited Completed Completed 15
Chittoor District Technology
(APSFL)
Andhra Pradesh State
Commissioning and construction of optical fiber network in Information
206 2025-26 YSR Kadapa 12 FiberNet Limited Completed Completed 12
YSR Kadapa District Technology
(APSFL)
Andhra Pradesh State
Commissioning and construction of optical fiber network in Information
207 2025-26 KURNOOL 14 FiberNet Limited Completed Completed 14
Kurnool District Technology
(APSFL)
Andhra Pradesh State
Commissioning and construction of optical fiber network in Information
208 2025-26 PRAKASAM 15 FiberNet Limited Completed Completed 15
Prakasam District Technology
(APSFL)
Andhra Pradesh State
Commissioning and construction of optical fiber network in Information
209 2025-26 SRIKAKULAM 8 FiberNet Limited Completed Completed 8
Srikakulam District Technology
(APSFL)
Andhra Pradesh State
Commissioning and construction of optical fiber network in Information
210 2025-26 VISAKHAPATANAM 12 FiberNet Limited Completed Completed 12
Visakhapatnam District Technology
(APSFL)
Andhra Pradesh State
Commissioning and construction of optical fiber network in Information
211 2025-26 VIZIANAGARAM 12 FiberNet Limited Completed Completed 12
Vizianagaram District Technology
(APSFL)
Andhra Pradesh
Development of External Infrastructure of Micro Small and Industrial
General
212 2025-26 Medium Enterprises (MSME) Industrial Parks Flatted Factory Ananthapuramu 8 Infrastructure Ongoing 31-12-2026 Ongoing #REF!
Administration
Complexes in Anantapur District Corporation Ltd
(APIIC)
Andhra Pradesh
Development of External Infrastructure of Micro Small and Industrial
213 2025-26 Medium Enterprises (MSME) Industrial Parks Flatted Factory Urban & Housing CHITTOOR 10 Infrastructure Ongoing 31-12-2026 Ongoing #REF!
Complexes in Chittoor District Corporation Ltd
(APIIC)
Andhra Pradesh
Development of External Infrastructure of Micro Small and Industrial
214 2025-26 Medium Enterprises (MSME) Industrial Parks Flatted Factory Urban & Housing YSR Kadapa 7 Infrastructure Ongoing 31-12-2026 Ongoing #REF!
Complexes in YSR Kadapa District Corporation Ltd
(APIIC)Details of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Andhra Pradesh
Development of External Infrastructure of Micro Small and Industrial
215 2025-26 Medium Enterprises (MSME) Industrial Parks Flatted Factory Urban & Housing KURNOOL 6 Infrastructure Ongoing 31-12-2026 Ongoing #REF!
Complexes in Kurnool District Corporation Ltd
(APIIC)
Andhra Pradesh
Development of External Infrastructure of Micro Small and Industrial
216 2025-26 Medium Enterprises (MSME) Industrial Parks Flatted Factory Urban & Housing PRAKASAM 9 Infrastructure Ongoing 31-12-2026 Ongoing #REF!
Complexes in Prakasam District Corporation Ltd
(APIIC)
Andhra Pradesh
Development of External Infrastructure of Micro Small and Industrial
217 2025-26 Medium Enterprises (MSME) Industrial Parks Flatted Factory Urban & Housing SRIKAKULAM 8 Infrastructure Ongoing 31-12-2026 Ongoing #REF!
Complexes in Srikakulam District Corporation Ltd
(APIIC)
Andhra Pradesh
Development of External Infrastructure of Micro Small and Industrial
218 2025-26 Medium Enterprises (MSME) Industrial Parks Flatted Factory Urban & Housing VISAKHAPATANAM 5 Infrastructure Ongoing 31-12-2026 Ongoing #REF!
Complexes in Visakhapatnam District Corporation Ltd
(APIIC)
Andhra Pradesh
Development of External Infrastructure of Micro Small and Industrial
219 2025-26 Medium Enterprises (MSME) Industrial Parks Flatted Factory Urban & Housing VIZIANAGARAM 8 Infrastructure Ongoing 31-12-2026 Ongoing #REF!
Complexes in Vizianagaram District Corporation Ltd
(APIIC)
Irrigation & Water Water Resources
220 2025-26 Construction of B.R.R Vamsadhara phase II of stage II VISAKHAPATANAM 40 Completed Completed 40
Resources Department
Irrigation & Water Water Resources
221 2025-26 Construction of SGL Thotapally Barrage Project VISAKHAPATANAM 20 Completed Completed 20
Resources Department
Irrigation & Water Water Resources
222 2025-26 Construction of SGSN Madduvalasa Reservoir Project Stage-II VISAKHAPATANAM 10 Completed Completed 10
Resources Department
Widening the Left Main Canal of Lower Sagileru Project from Irrigation & Water Water Resources
223 2025-26 YSR Kadapa 10.2 Completed Completed 10.2
0.000 Km to 23.000 Km in YSR Kadapa district Resources Department
Irrigation & Water Water Resources
224 2025-26 Laying of internal road infrastructure at Veligonda Projet site PRAKASAM 5.1 Completed Completed 5.1
Resources Department
Construction of Protection Wall for Paidipalem Dam in YSR Irrigation & Water Water Resources
225 2025-26 YSR Kadapa 5.1 Completed Completed 5.1
Kadapa district Resources Department
Andhra Pradesh
Industrial
Construction and Commissioning of External Water Supply
226 2025-26 Urban & Housing KURNOOL 207.85 Infrastructure Completed Completed 207.85
Scheme to MIH Orvakal ( Phase-1 under Package-1)
Corporation Ltd
(APIIC)Details of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Andhra Pradesh
Industrial
227 2025-26 Internal Road work at MIP Mallavalli Industrial Park Roads & Buildings KURNOOL 13.5 Infrastructure Completed Completed 13.5
Corporation Ltd
(APIIC)
Andhra Pradesh
Education & Welfare
228 2025-26 Construction of Integrated Collectorate at Srikakulam district Buildings SRIKAKULAM 6.3 Infrastructure Completed Completed 6.3
Development
(APEWIDC)
Transports, Roads and
Strengthening and improvement of State Highways Phase IV in
229 2025-26 Roads & Buildings SRIKAKULAM 9.9 Buildings Department Completed Completed 9.9
Srikakulam district for a road length of 22 Kms
(TR&B)
Transports, Roads and
Strengthening and improvement of State Highways Phase IV in
230 2025-26 Roads & Buildings VIZIANAGARAM 8.95 Buildings Department Completed Completed 8.95
Vizianagaram district for a road length of 19.88 Kms
(TR&B)
Transports, Roads and
Strengthening and improvement of State Highways Phase IV in
231 2025-26 Roads & Buildings VISAKHAPATANAM 7.25 Buildings Department Completed Completed 7.25
Visakhapatnam district for a road length of 16.11 Kms
(TR&B)
Transports, Roads and
Strengthening and improvement of State Highways Phase IV in
232 2025-26 Roads & Buildings PRAKASAM 8.88 Buildings Department Completed Completed 8.88
Prakasam district for a road length of 19.73 Kms
(TR&B)
Transports, Roads and
Strengthening and improvement of State Highways Phase IV in
233 2025-26 Roads & Buildings CHITTOOR 8.75 Buildings Department Completed Completed 8.75
Chittoor district for a road length of 19.44 Kms
(TR&B)
Transports, Roads and
Strengthening and improvement of State Highways Phase IV in
234 2025-26 Roads & Buildings YSR Kadapa 6.5 Buildings Department Completed Completed 6.5
YSR Kadapa district for a road length of 14.4 Kms
(TR&B)
Transports, Roads and
Strengthening and improvement of State Highways Phase IV in
235 2025-26 Roads & Buildings KURNOOL 6.5 Buildings Department Completed Completed 6.5
Kurnool district for a road length of 14.4 Kms
(TR&B)
Transports, Roads and
Strengthening and improvement of State Highways Phase IV in
236 2025-26 Roads & Buildings Ananthapuramu 6.5 Buildings Department Completed Completed 6.5
Anantapur district for a road length of 14.4 Kms
(TR&B)
Greater
Development of Sewerage Network system in Gajuwaka &
Visakhapatnam
237 2025-26 Malkapuram areas and Supply of recycled water to industries in Urban & Housing VISAKHAPATANAM 49.7 Completed Completed 49.7
Municipal Corporation
Visakhapatnam (Package -2)
(GVMC)
Irrigation & Water Water Resources
238 2025-26 Widening of canal in HNSS Project Package 1 in Kurnool district KURNOOL 44.98 Completed Completed 44.98
Resources Department
Construction of Social Welfare hostel complex in Kadapa
239 2025-26 Buildings YSR Kadapa 5.11 APEWIDC Completed Completed 5.11
district
Improvements to Welfare Hostels (BC & SC Welfare) in
240 2025-26 Buildings KURNOOL 5.02 APEWIDC Completed Completed 5.02
Rayalaseema Region in Phase II
Additional infrastructure in Polytechnic Colleges in North
241 2025-26 Education VISAKHAPATANAM 9.72 APEWIDC Completed Completed 9.72
Coastal Region in Phase IIDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Tribal Welfare
Parvathipuram
242 2025-26 Improvements to Tribal Roads in agency area in Phase I Roads & Buildings 5.74 Engineering Completed Completed 5.74
Manyam
Department
Construction of Community Health Centres in North Coastal
243 2025-26 Health VISAKHAPATANAM 40.88 APMSIDC Completed Completed 40.88
Region
Construction of Community Health Centres in Rayalaseema
244 2025-26 Health YSR Kadapa 7.8 APMSIDC Completed Completed 7.8
Region
Panchayat Raj
Strengthening of Internal Roads and Approach Roads of Gram
245 2025-26 Roads & Buildings VISAKHAPATANAM 5.02 Engineering Completed Completed 5.02
Panchayats in Visakhapatanam district
Department
Panchayat Raj
Strengthening of Internal Roads and Approach Roads of Gram
246 2025-26 Roads & Buildings PRAKASAM 8.56 Engineering Completed Completed 8.56
Panchayats in Prakasam district
Department
Panchayat Raj
Strengthening of Internal Roads and Approach Roads of Gram
247 2025-26 Roads & Buildings CHITTOOR 17.62 Engineering Completed Completed 17.62
Panchayats in Chittoor district
Department
Panchayat Raj
Strengthening of Internal Roads and Approach Roads of Gram
248 2025-26 Roads & Buildings KURNOOL 21.98 Engineering Completed Completed 21.98
Panchayats in Kurnool district
Department
Panchayat Raj
Strengthening of Internal Roads and Approach Roads of Gram
249 2025-26 Roads & Buildings Ananthapuramu 22.35 Engineering Completed Completed 22.35
Panchayats in Anantapur district
Department
250 2025-26 Construction of Electrical sub station Energy VIZIANAGARAM 77 APTRANSCO Completed Completed 77
Improvements to administrative block & VVIP lounge at Civil Aviation &
251 2025-26 KURNOOL 5 APIIC Completed Completed 5
Kurnool airport Airports
Improvements to Canals under Handri Neeva Sujala Sravanthi Irrigation & Water Water Resources
252 2025-26 Ananthapuramu 43.42 Completed Completed 43.42
(HNSS) project in Ananthapuramu district Resources Department
Comprehensive strengthening of minor and medium irrigation Irrigation & Water Water Resources
253 2025-26 VISAKHAPATANAM 5.5 Completed Completed 5.5
tanks in North Coastal Region Resources Department
Comprehensive strengthening of minor and medium irrigation Irrigation & Water Water Resources
254 2025-26 Ananthapuramu 8.11 Completed Completed 8.11
tanks in Rayalaseema Region Resources Department
Drinking Water & Rural Water Supply
255 2025-26 Augmentation of water supply in Tungabhadra region Ananthapuramu 8.65 Completed Completed 8.65
Sanitation Department
Andhra Pradesh
Medical Services and
Establishment of new Medical College along with Hospital in Infrastructure
256 2025-26 Health YSR Kadapa 8.06 Completed Completed 8.06
Rayalaseema region Development
Corporation
(APMSIDC)Details of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Andhra Pradesh
Medical Services and
Parvathipuram Infrastructure
257 2025-26 Establishment of Multi Speciality Hospitals in Tribal Areas Health 7 Completed Completed 7
Manyam Development
Corporation
(APMSIDC)
Andhra Pradesh
Medical Services and
Establishment of 100 bedded medical hospital in YSR Kadapa Infrastructure
258 2025-26 Health YSR Kadapa 12.89 Completed Completed 12.89
district Development
Corporation
(APMSIDC)
Transports, Roads and
Construction of Public Healthcare centres in North Coastal
259 2025-26 Health VISAKHAPATANAM 5.23 Buildings Department Completed Completed 5.23
Region
(TR&B)
Transports, Roads and
Construction of Public Healthcare centres in Rayalaseema
260 2025-26 Health KURNOOL 5.12 Buildings Department Completed Completed 5.12
Region
(TR&B)
Improving internal infrastructure in Gram Panchayats in
261 2025-26 Roads & Buildings SRIKAKULAM 8.56 Planning Department Completed Completed 8.56
Coastal Region
Panchayat Raj
262 2025-26 Strengthening of rural roads in North Coastal Region Roads & Buildings VISAKHAPATANAM 11.8 Engineering Completed Completed 11.8
Department (PRED)
Panchayat Raj
263 2025-26 Strengthening of rural roads in Rayalaseema Region Roads & Buildings KURNOOL 21.12 Engineering Completed Completed 21.12
Department (PRED)
Panchayat Raj
264 2025-26 Strengthening of rural roads in South Coastal Region Roads & Buildings PRAKASAM 9.11 Engineering Completed Completed 9.11
Department (PRED)
Transports, Roads and
Strengthening State Highways (SH) from Mandal to District
265 2025-26 Roads & Buildings VISAKHAPATANAM 15.75 Buildings Department Completed Completed 15.75
headquarters in North Coastal Region
(TR&B)
Transports, Roads and
Strengthening State Highways (SH) from Mandal to District
266 2025-26 Roads & Buildings CHITTOOR 20.69 Buildings Department Completed Completed 20.69
headquarters in Rayalaseema Region
(TR&B)
Transports, Roads and
Improvements to riding surface in Major District Roads (MDR)
267 2025-26 Roads & Buildings Ananthapuramu 33.42 Buildings Department Completed Completed 33.42
in Rayalaseema Region
(TR&B)
Greater
Construction and Commissioning of Non Revenue Water Supply Visakhapatnam
268 2025-26 Urban & Housing VISAKHAPATANAM 11.41 Completed Completed 11.41
(NRW) in GVMC area under Phase I Municipal Corporation
(GVMC)
Irrigation & Water Water Resources
269 2025-26 Merlapaka Mallemadugu Lift Irrigation Scheme Phase II Tirupati 15 Completed Completed 15
Resources DepartmentDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Transports, Roads and
Strenthening and improvement of State Highways Phase III in
270 2025-26 Roads & Buildings SRIKAKULAM 7.25 Buildings Department Completed Completed 7.25
Srikakulam district
(TR&B)
Transports, Roads and
Strenthening and improvement of State Highways Phase III in
271 2025-26 Roads & Buildings VIZIANAGARAM 8.12 Buildings Department Completed Completed 8.12
Vizianagaram district
(TR&B)
Transports, Roads and
Strenthening and improvement of State Highways Phase III in
272 2025-26 Roads & Buildings VISAKHAPATANAM 8.88 Buildings Department Completed Completed 8.88
Visakhapatnam district
(TR&B)
Transports, Roads and
Strenthening and improvement of State Highways Phase III in
273 2025-26 Roads & Buildings PRAKASAM 9.45 Buildings Department Completed Completed 9.45
Prakasam district
(TR&B)
Transports, Roads and
Strenthening and improvement of State Highways Phase III in
274 2025-26 Roads & Buildings CHITTOOR 8.95 Buildings Department Completed Completed 8.95
Chittoor district
(TR&B)
Transports, Roads and
Strenthening and improvement of State Highways Phase III in
275 2025-26 Roads & Buildings YSR Kadapa 7.15 Buildings Department Completed Completed 7.15
YSR Kadapa district
(TR&B)
Transports, Roads and
Strenthening and improvement of State Highways Phase III in
276 2025-26 Roads & Buildings KURNOOL 9.9 Buildings Department Completed Completed 9.9
Kurnool district
(TR&B)
Transports, Roads and
Strenthening and improvement of State Highways Phase III in
277 2025-26 Roads & Buildings Ananthapuramu 6.5 Buildings Department Completed Completed 6.5
Anantapur district
(TR&B)
Panchayat Raj
Strenthening and improvement of Rural Roads Phase IV in
278 2025-26 Roads & Buildings Ananthapuramu 5.25 Engineering Completed Completed 5.25
Anantapur District
Department (PRED)
Panchayat Raj
Strenthening and improvement of Rural Roads Phase IV in
279 2025-26 Roads & Buildings CHITTOOR 7.5 Engineering Completed Completed 7.5
Chittoor District
Department (PRED)
Panchayat Raj
Strenthening and improvement of Rural Roads Phase IV in YSR
280 2025-26 Roads & Buildings YSR Kadapa 5.25 Engineering Completed Completed 5.25
Kadapa District
Department (PRED)
Panchayat Raj
Strenthening and improvement of Rural Roads Phase IV in
281 2025-26 Roads & Buildings KURNOOL 5.85 Engineering Completed Completed 5.85
Kurnool District
Department (PRED)
Panchayat Raj
Strenthening and improvement of Rural Roads Phase IV in
282 2025-26 Roads & Buildings PRAKASAM 5.5 Engineering Completed Completed 5.5
Prakasam District
Department (PRED)
Panchayat Raj
Strenthening and improvement of Rural Roads Phase IV in
283 2025-26 Roads & Buildings SRIKAKULAM 8.5 Engineering Completed Completed 8.5
Srikakulam District
Department (PRED)
Panchayat Raj
Strenthening and improvement of Rural Roads Phase IV in
284 2025-26 Roads & Buildings VISAKHAPATANAM 5.25 Engineering Completed Completed 5.25
Visakhapatnam District
Department (PRED)Details of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Panchayat Raj
Strenthening and improvement of Rural Roads Phase IV in
285 2025-26 Roads & Buildings VIZIANAGARAM 6.25 Engineering Completed Completed 6.25
Vizianagaram District
Department (PRED)
Andhra Pradesh State
Commissioning and Construction of Optical Fiber Network Information
286 2025-26 Ananthapuramu 5.25 FiberNet Limited Completed Completed 5.25
Phase III in Anantapur District Technology
(APSFL)
Andhra Pradesh State
Commissioning and construction of Optical Fiber Network Information
287 2025-26 CHITTOOR 5.75 FiberNet Limited Completed Completed 5.75
Phase III in Chittoor District Technology
(APSFL)
Andhra Pradesh State
Commissioning and construction of Optical Fiber Network Information
288 2025-26 YSR Kadapa 5.25 FiberNet Limited Completed Completed 5.25
Phase III in YSR Kadapa District Technology
(APSFL)
Andhra Pradesh State
Commissioning and construction of Optical Fiber Network Information
289 2025-26 KURNOOL 5.5 FiberNet Limited Completed Completed 5.5
Phase III in Kurnool District Technology
(APSFL)
Andhra Pradesh State
Commissioning and construction of Optical Fiber Network Information
290 2025-26 PRAKASAM 5.85 FiberNet Limited Completed Completed 5.85
Phase III in Prakasam District Technology
(APSFL)
291 2026-27 Modernisation of Tungabhadra Canal System Phase III Irrigation Ananthapuramu 150 Water Resources Ongoing 31-03-2027 13 75.0
Improvements to Tarakaramateertha Sagaram Head Works
292 2026-27 Irrigation Vizianagaram 200 Water Resources Ongoing 31-03-2027 14 100.0
Phase II
293 2026-27 Construction of Mahendratanaya Reservoir Project Phase II Irrigation Srikakulam 100 Water Resources Ongoing 31-03-2027 12 50.0
294 2026-27 Construction of Thotapalli Reservoir Project Phase II Irrigation Visakhapatanam 100 Water Resources Ongoing 31-03-2027 11 50.0
295 2026-27 Construction of Madduvalasa Reservoir Project Phase II Irrigation Visakhapatanam 50 Water Resources Ongoing 31-03-2027 10 25.0
Transports, Roads and
Road Infrastructure Improvement for Major District Roads
296 2026-27 Roads Ananthapuramu 42.29 Buildings Department Ongoing 31-03-2027 13 21.1
(MDR) for 105.73 Kms in Ananthapur district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for Major District Roads
297 2026-27 Roads Chittoor 34.23 Buildings Department Ongoing 31-03-2027 16 17.1
(MDR) for 85.58 Kms in Chittoor district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for Major District Roads
298 2026-27 Roads YSR Kadapa 37.92 Buildings Department Ongoing 31-03-2027 12 19.0
(MDR) for 94.79 Kms in Kadapa district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for Major District Roads
299 2026-27 Roads Kurnool 48.25 Buildings Department Ongoing 31-03-2027 11 24.1
(MDR) for 120.63 Kms in Kurnool district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for Major District Roads
300 2026-27 Roads Srikakulam 17.42 Buildings Department Ongoing 31-03-2027 12 8.7
(MDR) for 43.55 Kms in Srikakulam district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for Major District Roads
301 2026-27 Roads Visakhapatanam 28.95 Buildings Department Ongoing 31-03-2027 16 14.5
(MDR) for 72.37 Kms in Visakhapatnam district
(TR&B)Details of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Transports, Roads and
Road Infrastructure Improvement for Major District Roads
302 2026-27 Roads Vizianagaram 18.11 Buildings Department Ongoing 31-03-2027 12 9.1
(MDR) for 45.28 Kms in Vizianagaram district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for State Highways (SH) for
303 2026-27 Roads Ananthapuramu 14.45 Buildings Department Ongoing 31-03-2027 12 7.2
36.13 Kms in Ananthapur district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for State Highways (SH) for
304 2026-27 Roads Chittoor 8.62 Buildings Department Ongoing 31-03-2027 11 4.3
21.56 Kms in Chittoor district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for State Highways (SH) for
305 2026-27 Roads YSR Kadapa 8.88 Buildings Department Ongoing 31-03-2027 11 4.4
22.21 Kms in Kadapa district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for State Highways (SH) for
306 2026-27 Roads Kurnool 20.95 Buildings Department Ongoing 31-03-2027 11 10.5
52.38 Kms in Kurnool district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for State Highways (SH) for
307 2026-27 Roads Srikakulam 8.93 Buildings Department Ongoing 31-03-2027 12 4.5
22.32 Kms in Srikakulam district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for State Highways (SH) for
308 2026-27 Roads Visakhapatanam 12.33 Buildings Department Ongoing 31-03-2027 16 6.2
30.82 Kms in Visakhapatnam district
(TR&B)
Transports, Roads and
Road Infrastructure Improvement for State Highways (SH) for
309 2026-27 Roads Vizianagaram 11.68 Buildings Department Ongoing 31-03-2027 12 5.8
29.2 Kms in Vizianagaram district
(TR&B)
Andhra Pradesh
Construction of Classrooms, Dormitories, Toilets, RO Plants, Education & Welfare
310 2026-27 Inverters along with furniture in 5 Social Welfare Hostels in Building Ananthapuramu 50 Infrastructure Ongoing 31-03-2027 12 25.0
Rayalaseema Region Development
(APEWIDC)
Andhra Pradesh
Education & Welfare
Construction of 10 Integrated Finance Office Complex under
311 2026-27 Building Visakhapatanam 25 Infrastructure Ongoing 31-03-2027 11 12.5
Phase II
Development
(APEWIDC)
Construction and Commissioning of Micro Irrigation Project in Horticulture
312 2026-27 Agriculture Ananthapuramu 36.15 Ongoing 31-03-2027 12 18.1
Ananthapur district to cover 16594.07 hectares Department
Construction and Commissioning of Micro Irrigation Project in Horticulture
313 2026-27 Agriculture YSR Kadapa 35.83 Ongoing 31-03-2027 11 17.9
YSR Kadapa district to cover 13899.79 hectares Department
Construction and Commissioning of Micro Irrigation Project in Horticulture
314 2026-27 Agriculture Sri Satyasai 20.73 Ongoing 31-03-2027 10 10.4
Sri Sathya Sai district to cover 11231.47 hectares Department
Construction and Commissioning of Micro Irrigation Project in Horticulture
315 2026-27 Agriculture Annamayya 20.01 Ongoing 31-03-2027 13 10.0
Annamayya district to cover 8764.42 hectares DepartmentDetails of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Construction and Commissioning of Micro Irrigation Project in Horticulture
316 2026-27 Agriculture Chittoor 19.52 Ongoing 31-03-2027 16 9.8
Chittoor district to cover 7938.32 hectares Department
Construction and Commissioning of Micro Irrigation Project in Horticulture
317 2026-27 Agriculture Tirupati 12.5 Ongoing 31-03-2027 14 6.3
Tirupati district to cover 5191.08 hectares Department
Construction and Commissioning of Micro Irrigation Project in Horticulture
318 2026-27 Agriculture Kurnool 11.74 Ongoing 31-03-2027 12 5.9
Kurnool district to cover 5315.27 hectares Department
Construction and Commissioning of Micro Irrigation Project in Horticulture
319 2026-27 Agriculture Nandyal 5.75 Ongoing 31-03-2027 13 2.9
Nandyal district to cover 4663.73 hectares Department
Panchayat Raj
Strengthening and improvement of Rural Roads for a road
320 2026-27 Roads Ananthapuramu 14 Engineering Ongoing 31-03-2027 16 7.0
length of 28 Kms in Ananthapur District
Department (PRED)
Panchayat Raj
Strengthening and improvement of Rural Roads for a road
321 2026-27 Roads Chittoor 15.8 Engineering Ongoing 31-03-2027 12 7.9
length of 31.6 Kms in Chittoor District
Department (PRED)
Panchayat Raj
Strengthening and improvement of Rural Roads for a road
322 2026-27 Roads YSR Kadapa 17.5 Engineering Ongoing 31-03-2027 14 8.8
length of 35 Kms in Kadapa District
Department (PRED)
Panchayat Raj
Strengthening and improvement of Rural Roads for a road
323 2026-27 Roads Kurnool 22.27 Engineering Ongoing 31-03-2027 10 11.1
length of 44.54 Kms in Kurnool District
Department (PRED)
Panchayat Raj
Strengthening and improvement of Rural Roads for a road
324 2026-27 Roads Srikakulam 8 Engineering Ongoing 31-03-2027 16 4.0
length of 16 Kms in Srikakulam District
Department (PRED)
Panchayat Raj
Strengthening and improvement of Rural Roads for a road
325 2026-27 Roads Visakhapatanam 14 Engineering Ongoing 31-03-2027 12 7.0
length of 28 Kms in Visakhapatnam District
Department (PRED)
Panchayat Raj
Strengthening and improvement of Rural Roads for a road
326 2026-27 Roads Vizianagaram 8 Engineering Ongoing 31-03-2027 14 4.0
length of 16 Kms in Vizianagaram District
Department (PRED)
Transports, Roads and
Strengthening State Highways (SH) from Mandal to District
327 2026-27 Roads Visakhapatanam 27.3 Buildings Department Ongoing 31-03-2027 11 13.7
headquarters in North Coastal Region for 19.88 Kms
(TR&B)
Transports, Roads and
Strengthening State Highways (SH) from Mandal to District
328 2026-27 Roads Ananthapuramu 20.88 Buildings Department Ongoing 31-03-2027 11 10.4
headquarters in Rayalaseema Region for 18.02 Kms
(TR&B)
Transports, Roads and
Improvements to riding surface in Major District Roads (MDR)
329 2026-27 Roads Visakhapatanam 24.67 Buildings Department Ongoing 31-03-2027 14 12.3
in North Coastal Region for 18.57 Kms
(TR&B)
Transports, Roads and
Improvements to riding surface in Major District Roads (MDR)
330 2026-27 Roads Ananthapuramu 11.45 Buildings Department Ongoing 31-03-2027 13 5.7
in Rayalaseema Region for 14.12 Kms
(TR&B)Details of projects approved under SASCI since 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
Expected
Implementing Present
S.No. Year Name of the Project Sector District Project Cost Date of Physical Progress Financial Progress
Agency Status
Completion
Panchayat Raj
Reconstruction of Major District Roads & State Highways in
331 2026-27 Roads Ananthapuramu 24.67 Engineering Ongoing 31-03-2027 16 12.3
Rayalaseema Region for 18.01 Kms
Department (PRED)
Panchayat Raj
Reconstruction of Rural Roads in Rayalaseema Region for 18.62
332 2026-27 Roads Ananthapuramu 21.33 Engineering Ongoing 31-03-2027 14 10.7
Kms
Department (PRED)
Augmentation of existing water supply scheme in Anantapur Rural Water Supply
333 2026-27 Drinking Water Ananthapuramu 13.83 Ongoing 31-03-2027 11 6.9
district (RWS)
Augmentation of existing water supply scheme in Chittoor Rural Water Supply
334 2026-27 Drinking Water Chittoor 6.51 Ongoing 31-03-2027 12 3.3
district (RWS)
Augmentation of existing water supply scheme in Kurnool Rural Water Supply
335 2026-27 Drinking Water Kurnool 12.55 Ongoing 31-03-2027 12 6.3
district (RWS)
Augmentation of existing water supply scheme in Srikakulam Rural Water Supply
336 2026-27 Drinking Water Srikakulam 8.46 Ongoing 31-03-2027 14 4.2
district (RWS)
Augmentation of existing water supply scheme in Rural Water Supply
337 2026-27 Drinking Water Visakhapatanam 17.26 Ongoing 31-03-2027 12 8.6
Visakhapatanam district (RWS)
Augmentation of existing water supply scheme in Vizianagaram Rural Water Supply
338 2026-27 Drinking Water Vizianagaram 7.41 Ongoing 31-03-2027 11 3.7
district (RWS)
Augmentation of existing water supply scheme in Kadapa Rural Water Supply
339 2026-27 Drinking Water YSR Kadapa 7.86 Ongoing 31-03-2027 12 3.9
district (RWS)
Andhra Pradesh
Construction of Boundary Wall/ Chain Link Fencing for 14Km Civil Aviation and Airports Development
340 2026-27 Vizianagaram 100 Ongoing 31-03-2027 11 50.0
in Bhogapuram International Airport Airports Corporation Limited
(APADCL)
Andhra Pradesh
Construction of Road Works for 10.6 Km in Bhogapuram Civil Aviation and Airports Development
341 2026-27 Vizianagaram 50 Ongoing 31-03-2027 14 25.0
International Airport Airports Corporation Limited
(APADCL)
Andhra Pradesh State
Construction and Commissioning of LI Scheme in North Coastal Irrigation
342 2026-27 Irrigation Visakhapatanam 6 Ongoing 31-03-2027 12 3.0
Region Development
Corporation (APSIDC)
Andhra Pradesh State
Construction and Commissioning of LI Scheme in Rayalaseema Irrigation
343 2026-27 Irrigation Ananthapuramu 6 Ongoing 31-03-2027 12 3.0
Region Development
Corporation (APSIDC)Annexure II referred to in reply of part (a) to (c) of Lok Sabha Unstarred Question No. 1316 to be answered Lok Sabha on July 27, 2026.
Details of Sector wise Central Share Transferred Under CSS (Rs. in Crore)
2024-25 2025-26 2026-27 Grand Total
District Sector Amount Amount Amount Amount Amount Amount Amount
Amount Utilised
Sanctioned Utilised Sanctioned Utilised Sanctioned Utilised Sanctioned
Alluri Sitharama Raju 104.00 104.00 83.59 83.59 41.69 41.69 229.28 229.28
Agriculture 1.97 1.97 7.86 7.86 0.56 0.56 10.40 10.40
Animal Husbandary 0.03 0.03 0.00 0.00 0.08 0.08 0.11 0.11
Education 0.00 0.00 0.18 0.18 0.00 0.00 0.18 0.18
Health 19.31 19.31 20.99 20.99 7.60 7.60 47.90 47.90
Irrigation & Flood control 72.64 72.64 2.75 2.75 0.81 0.81 76.19 76.19
Planning 0.00 0.00 0.24 0.24 0.00 0.00 0.24 0.24
Rural Development 0.00 0.00 17.66 17.66 21.23 21.23 38.90 38.90
Transport 0.00 0.00 0.25 0.25 0.00 0.00 0.25 0.25
Welfare 10.04 10.04 33.67 33.67 11.40 11.40 55.12 55.12
YSR Kadapa 39.17 39.17 152.01 152.01 29.44 29.44 220.62 220.62
Agriculture 4.14 4.14 17.39 17.39 0.88 0.88 22.41 22.41
Animal Husbandary 0.00 0.00 0.05 0.05 0.11 0.11 0.16 0.16
Education 0.00 0.00 0.43 0.43 0.00 0.00 0.43 0.43
Forest 0.00 0.00 0.20 0.20 0.00 0.00 0.20 0.20
Health 28.06 28.06 33.52 33.52 10.70 10.70 72.28 72.28
Irrigation & Flood control 0.02 0.02 0.00 0.00 0.00 0.00 0.02 0.02
Planning 0.00 0.00 0.08 0.08 0.00 0.00 0.08 0.08
Rural Development 0.31 0.31 37.39 37.39 11.23 11.23 48.93 48.93
Transport 6.30 6.30 29.83 29.83 0.00 0.00 36.13 36.13
Urban Development 0.00 0.00 15.07 15.07 0.48 0.48 15.55 15.55
Welfare 0.35 0.35 18.04 18.04 6.04 6.04 24.43 24.43
Srikakulam 63.02 63.02 115.14 115.14 20.84 20.84 199.00 199.00
Agriculture 2.49 2.49 10.97 10.97 0.21 0.21 13.66 13.66
Animal Husbandary 0.24 0.24 1.86 1.86 1.10 1.10 3.21 3.21
Education 0.00 0.00 0.66 0.66 0.00 0.00 0.66 0.66
Forest 0.00 0.00 0.06 0.06 0.00 0.00 0.06 0.06
Health 28.97 28.97 28.90 28.90 9.54 9.54 67.40 67.40
Irrigation & Flood control 0.00 0.00 0.64 0.64 0.00 0.00 0.64 0.64
Law & Order 0.00 0.00 0.30 0.30 0.00 0.00 0.30 0.30
Planning 0.00 0.00 0.15 0.15 0.00 0.00 0.15 0.15
Rural Development 0.32 0.32 13.51 13.51 6.57 6.57 20.41 20.41
Transport 20.61 20.61 29.63 29.63 0.00 0.00 50.23 50.23
Welfare 10.39 10.39 28.46 28.46 3.42 3.42 42.28 42.28
Sri Sathya Sai 32.37 32.37 110.17 110.17 30.69 30.69 173.23 173.23
Agriculture 0.85 0.85 8.95 8.95 0.45 0.45 10.24 10.24
Animal Husbandary 0.16 0.16 0.00 0.00 0.02 0.02 0.18 0.18
Education 0.00 0.00 0.53 0.53 0.00 0.00 0.53 0.53
Forest 0.00 0.00 0.10 0.10 0.00 0.00 0.10 0.10
Health 16.89 16.89 23.75 23.75 9.33 9.33 49.98 49.98
Planning 0.00 0.00 0.05 0.05 0.00 0.00 0.05 0.05
Rural Development 0.00 0.00 2.74 2.74 2.34 2.34 5.08 5.08
Transport 14.25 14.25 56.65 56.65 12.27 12.27 83.18 83.18
Welfare 0.21 0.21 17.39 17.39 6.28 6.28 23.88 23.88
Prakasam 49.46 49.46 95.59 95.59 24.88 24.88 169.93 169.93
Agriculture 2.06 2.06 12.45 12.45 2.39 2.39 16.90 16.90
Animal Husbandary 0.19 0.19 0.15 0.15 0.37 0.37 0.71 0.71
Education 0.00 0.00 0.83 0.83 0.00 0.00 0.83 0.83
Forest 0.00 0.00 1.13 1.13 0.00 0.00 1.13 1.13
Health 23.77 23.77 31.85 31.85 10.58 10.58 66.20 66.20
Irrigation & Flood control 11.80 11.80 12.33 12.33 0.47 0.47 24.60 24.60
Planning 0.00 0.00 0.09 0.09 0.00 0.00 0.09 0.09
Rural Development 0.21 0.21 5.94 5.94 3.36 3.36 9.51 9.51
Transport 11.19 11.19 8.36 8.36 0.00 0.00 19.55 19.55
Urban Development 0.00 0.00 2.65 2.65 0.03 0.03 2.68 2.68
Welfare 0.25 0.25 19.82 19.82 7.68 7.68 27.75 27.75
Tirupati 25.59 25.59 94.10 94.10 29.15 29.15 148.84 148.84
Agriculture 1.37 1.37 10.23 10.23 1.76 1.76 13.35 13.35
Animal Husbandary 0.28 0.28 0.29 0.29 0.22 0.22 0.80 0.80
Education 0.00 0.00 0.50 0.50 0.00 0.00 0.50 0.50
Forest 0.00 0.00 0.12 0.12 0.00 0.00 0.12 0.12
Health 17.38 17.38 23.45 23.45 7.83 7.83 48.66 48.66
Planning 0.00 0.00 0.11 0.11 0.00 0.00 0.11 0.11
Rural Development 0.00 0.00 5.91 5.91 0.53 0.53 6.44 6.44
Transport 4.71 4.71 22.53 22.53 4.89 4.89 32.13 32.13
Urban Development 1.70 1.70 12.77 12.77 5.27 5.27 19.74 19.74
Welfare 0.16 0.16 18.19 18.19 8.65 8.65 27.00 27.00
Ananthapuramu 25.15 25.15 82.07 82.07 25.27 25.27 132.49 132.49
Agriculture 2.62 2.62 14.29 14.29 1.12 1.12 18.04 18.04
Animal Husbandary 0.11 0.11 0.01 0.01 0.02 0.02 0.14 0.14
Education 0.00 0.00 0.78 0.78 0.00 0.00 0.78 0.78
Forest 0.00 0.00 0.07 0.07 0.00 0.00 0.07 0.07
Health 16.95 16.95 23.43 23.43 10.23 10.23 50.61 50.61
Irrigation & Flood control 0.01 0.01 0.00 0.00 0.00 0.00 0.01 0.01
Planning 0.00 0.00 0.05 0.05 0.00 0.00 0.05 0.05
Rural Development 0.20 0.20 9.83 9.83 2.73 2.73 12.77 12.77
Transport 3.01 3.01 7.11 7.11 0.00 0.00 10.12 10.12
Urban Development 2.05 2.05 8.20 8.20 4.87 4.87 15.12 15.12
Welfare 0.20 0.20 18.28 18.28 6.30 6.30 24.78 24.78Kurnool 19.96 19.96 70.18 70.18 38.12 38.12 128.25 128.25
Agriculture 2.58 2.58 8.84 8.84 1.10 1.10 12.51 12.51
Animal Husbandary 0.00 0.00 0.01 0.01 0.00 0.00 0.01 0.01
Education 0.00 0.00 0.83 0.83 0.00 0.00 0.83 0.83
Forest 0.00 0.00 0.06 0.06 0.00 0.00 0.06 0.06
Health 15.04 15.04 16.47 16.47 7.77 7.77 39.28 39.28
Irrigation & Flood control 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Law & Order 0.00 0.00 1.07 1.07 0.00 0.00 1.07 1.07
Planning 0.00 0.00 0.05 0.05 0.00 0.00 0.05 0.05
Rural Development 0.11 0.11 6.69 6.69 0.83 0.83 7.64 7.64
Transport 1.93 1.93 11.10 11.10 22.52 22.52 35.55 35.55
Urban Development 0.00 0.00 6.12 6.12 0.21 0.21 6.33 6.33
Welfare 0.30 0.30 18.94 18.94 5.69 5.69 24.92 24.92
Nandyal 22.83 22.83 55.89 55.89 48.47 48.47 127.19 127.19
Agriculture 1.97 1.97 10.33 10.33 1.32 1.32 13.62 13.62
Animal Husbandary 0.03 0.03 0.00 0.00 0.03 0.03 0.06 0.06
Education 0.00 0.00 0.70 0.70 0.00 0.00 0.70 0.70
Forest 0.00 0.00 1.04 1.04 0.00 0.00 1.04 1.04
Health 8.31 8.31 11.06 11.06 3.68 3.68 23.05 23.05
Planning 0.00 0.00 0.05 0.05 0.00 0.00 0.05 0.05
Rural Development 0.00 0.00 3.57 3.57 0.36 0.36 3.93 3.93
Transport 6.89 6.89 13.57 13.57 35.86 35.86 56.32 56.32
Welfare 5.64 5.64 15.57 15.57 7.22 7.22 28.43 28.43
Vizianagaram 31.48 31.48 71.11 71.11 17.56 17.56 120.15 120.15
Agriculture 2.18 2.18 7.73 7.73 1.56 1.56 11.46 11.46
Animal Husbandary 0.18 0.18 0.28 0.28 0.12 0.12 0.58 0.58
Education 0.00 0.00 0.57 0.57 0.00 0.00 0.57 0.57
Forest 0.00 0.00 0.05 0.05 0.00 0.00 0.05 0.05
Health 18.37 18.37 20.94 20.94 8.45 8.45 47.76 47.76
Irrigation & Flood control 0.00 0.00 0.30 0.30 0.00 0.00 0.30 0.30
Planning 0.00 0.00 0.09 0.09 0.00 0.00 0.09 0.09
Rural Development 0.29 0.29 7.39 7.39 2.30 2.30 9.98 9.98
Transport 0.95 0.95 3.94 3.94 0.00 0.00 4.89 4.89
Urban Development 0.00 0.00 6.82 6.82 0.00 0.00 6.82 6.82
Welfare 9.51 9.51 23.00 23.00 5.14 5.14 37.65 37.65
Chittoor 18.28 18.28 68.27 68.27 27.89 27.89 114.44 114.44
Agriculture 5.60 5.60 17.70 17.70 8.27 8.27 31.56 31.56
Animal Husbandary 0.00 0.00 0.01 0.01 0.00 0.00 0.01 0.01
Education 0.00 0.00 0.72 0.72 0.00 0.00 0.72 0.72
Forest 0.00 0.00 0.10 0.10 0.00 0.00 0.10 0.10
Health 12.23 12.23 18.05 18.05 6.14 6.14 36.42 36.42
Law & Order 0.00 0.00 1.27 1.27 0.00 0.00 1.27 1.27
Planning 0.00 0.00 0.09 0.09 0.00 0.00 0.09 0.09
Rural Development 0.35 0.35 6.92 6.92 5.05 5.05 12.33 12.33
Transport 0.00 0.00 6.84 6.84 0.00 0.00 6.84 6.84
Welfare 0.11 0.11 16.56 16.56 8.42 8.42 25.09 25.09
Annamayya 28.66 28.66 62.63 62.63 21.04 21.04 112.34 112.34
Agriculture 2.80 2.80 13.64 13.64 4.65 4.65 21.08 21.08
Animal Husbandary 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01
Education 0.00 0.00 0.43 0.43 0.00 0.00 0.43 0.43
Forest 0.00 0.00 0.10 0.10 0.00 0.00 0.10 0.10
Health 14.44 14.44 19.11 19.11 6.73 6.73 40.28 40.28
Planning 0.00 0.00 0.05 0.05 0.00 0.00 0.05 0.05
Rural Development 0.00 0.00 14.28 14.28 6.68 6.68 20.96 20.96
Transport 10.55 10.55 0.00 0.00 0.00 0.00 10.55 10.55
Welfare 0.87 0.87 15.02 15.02 2.98 2.98 18.87 18.87
Parvathipuram Manyam 28.76 28.76 60.13 60.13 21.22 21.22 110.12 110.12
Agriculture 4.60 4.60 12.01 12.01 1.36 1.36 17.96 17.96
Animal Husbandary 0.10 0.10 0.00 0.00 0.04 0.04 0.15 0.15
Education 0.00 0.00 0.33 0.33 0.00 0.00 0.33 0.33
Forest 0.00 0.00 0.01 0.01 0.00 0.00 0.01 0.01
Health 9.96 9.96 11.32 11.32 4.06 4.06 25.34 25.34
Law & Order 0.00 0.00 0.18 0.18 0.00 0.00 0.18 0.18
Planning 0.00 0.00 0.15 0.15 0.00 0.00 0.15 0.15
Rural Development 0.00 0.00 8.69 8.69 2.61 2.61 11.30 11.30
Transport 5.55 5.55 2.91 2.91 0.00 0.00 8.45 8.45
Welfare 8.55 8.55 24.53 24.53 13.15 13.15 46.23 46.23
Visakhapatnam 27.59 27.59 51.67 51.67 14.66 14.66 93.92 93.92
Agriculture 0.22 0.22 4.10 4.10 0.18 0.18 4.51 4.51
Animal Husbandary 0.23 0.23 0.60 0.60 0.07 0.07 0.90 0.90
Education 0.00 0.00 0.18 0.18 0.00 0.00 0.18 0.18
Forest 0.00 0.00 0.03 0.03 0.00 0.00 0.03 0.03
Health 15.02 15.02 16.92 16.92 5.89 5.89 37.84 37.84
Irrigation & Flood control 11.58 11.58 11.11 11.11 3.35 3.35 26.04 26.04
Law & Order 0.00 0.00 0.24 0.24 0.00 0.00 0.24 0.24
Planning 0.00 0.00 0.03 0.03 0.00 0.00 0.03 0.03
Rural Development 0.30 0.30 1.78 1.78 1.14 1.14 3.22 3.22
Transport 0.00 0.00 1.32 1.32 0.00 0.00 1.32 1.32
Urban Development 0.00 0.00 5.41 5.41 0.00 0.00 5.41 5.41
Welfare 0.23 0.23 9.95 9.95 4.03 4.03 14.21 14.21
Grand Total 516.33 516.33 1,172.56 1,172.56 390.93 390.93 2,079.81 2,079.81Annexure III referred to in reply of part (a) to (c) of Lok Sabha Unstarred Question No. 1316 to be answered Lok Sabha on July 27, 2026.
Details of projects approved under Special Assistance in 2024-25 for the backward regions of Rayalaseema, Prakasam, and North Coastal Andhra
S.No Year Name of the Project Sector District Project Cost Implementing Agency
1 2024-25 Infrastructure development works in Srikakulam district Multi-sector Srikakulam 50 Multiple Departments
2 2024-25 Infrastructure development works in Vizianagaram district Multi-sector Vizianagaram 50 Multiple Departments
3 2024-25 Infrastructure development works in Visakhapatnam district Multi-sector VISAKHAPATANAM 50 Multiple Departments
4 2024-25 Infrastructure development works in YSR Kadapa district Multi-sector YSR Kadapa 50 Multiple Departments
5 2024-25 Infrastructure development works in Ananthapuramu district Multi-sector Ananthapuramu 50 Multiple Departments
6 2024-25 Infrastructure development works in Kurnool district Multi-sector Kurnool 50 Multiple Departments
7 2024-25 Infrastructure development works in Chittoor district Multi-sector Chittoor 50 Multiple Departments
Total 350