MINISTRY OF RAILWAYS
RAJYA SABHA
UNSTARRED QUESTION NO. 3307
ANSWERED ON 20.03.2026
BAIDYANATH DHAM TO PASHUPATINATH DHAM RAIL PROJECT
3307# PROF. MANOJ KUMAR JHA:
Will the Minister of RAILWAYS be pleased to state:
(a) whether Government is considering to approve the Baidyanath Dham to Pashupatinath Dham (via
Bhagalpur-Singheshwar Dham-Bhimnagar) rail project, if so, the progress made so far; and
(b) if not, whether the Ministry is considering to approve the Bhagalpur to Bhimnagar via Naugachia-
Udakishunganj-Singheshwar-Bhimnagar rail project?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) and (b): Baidyanathdham is an existing railway station on Indian Railway Network and is connected
to Bhagalpur via Jasidih Jn and Barahat Jn. Singheshwar Dham is served by Dauram Madhepura
railway station (about 10 Km away from Singheshwar). Pashupatinath Dham is located outside India in
Kathmandu, Nepal. Nearest Railway station is Raxaul, which is well connected with railway network.
Final Location Survey of Raxaul (India)-Kathmandu (Pashupatinath) new line (136 Km) has been
completed and Detailed Project Report (DPR) prepared.
After preparation of Detailed Project Report (DPR), sanctioning of project requires consultation with
various stake-holders including State Governments and necessary approvals viz. appraisal of NITI
Aayog, Ministry of Finance etc. As sanctioning of projects is a continuous and dynamic process, exact
timelines depends upon appraisals and approvals by various stakeholders.
Dauram Madhepura-Singheshwar Asthan-Bhimnagar-Pratapganj feasibility study was carried out. The
project could not be taken up due to low traffic projection.
To improve connectivity of Baidyanathdham and Bhagalpur with Northern Bihar region including
Naugachia, Udakishunganj, Singheshwar and Bhimnagar, Bikramshila-Katareah new rail line (26 km)
project alongwith construction of a Bridge across River Ganga and Kursela-Bihariganj new line project
has been taken up.Bihar
Railway Budget:
Budget allocation for Infrastructure projects and safety works, falling fully/partly in the State of Bihar
is as under:
Period Outlay
₹1,132 Cr./year
2009-14
₹10,066 Cr. (Nearly 9 times)
2025-26
Track construction:
The details of commissioning/laying of new track falling fully/partly in the State of Bihar during 2009-
14 and 2014-25 is as under :-
Period New Track Commissioned Average Commissioning of new tracks
318 Km 63.6 Km/year
2009-14
1,899 Km 172.6 Km/year (More than 2.5 times)
2014-25
Projects sanctioned:
As on 01.04.2025, 52 projects (31 New Lines, 01 Gauge Conversions and 20 Doubling), of a total
length of 4,663 km, costing ₹86,107 crore, falling fully/partly in Bihar, are sanctioned, out of which
1,014 km length has been commissioned and an expenditure of ₹29,353 crore has been incurred upto
March’ 2025. The summary is as under:-
Length
No of Total Length Total Exp upto
Commissioned till
Category sanctioned NL/GC/DL Mar'25
Mar'25
Projects (in Km) (₹ in Cr)
(in Km)
New Lines 31 2,691 516 16,814
Gauge Conversion 1 69 52 544
Doubling/Multi-
20 1,904 446 11,995
tracking
Total 52 4,663 1,014 29,353
Recently completed projects:
Details of some of the recently completed projects falling fully/partly in Bihar are as under:-
SN. Project Length Cost
(Km)
(In Crores of
Rs)
1 Patna rail cum road Bridge 28 3,210
2 Munger rail cum road Bridge 15 3,0403 Kosi Bridge 22 863
4 Daniawan-Biharsharif New Line 38 354
5 Chandan-Banka New Line 40 496
6 Rampurhat-Mandarhill New Line 130 908
7 Maharajganj-Masrakh New Line 35 412
8 Rajgir-Tilaiya & Natesar-lslampur New Line 67 726
9 Mansi-Saharsa-Purnia Gauge Conversion 141 752
10 Jaynagar-Narkatiaganj Gauge Conversion 260 967
11 Kaptanganj-Chhapra Gauge Conversion 234 819
12 Sakri-Nirmali & Saharasa-Forbesganj Gauge Conversion 206 2,113
13 Mansi-Saharsa, Saharsa-Purnia & Banmakhi- Bihariganj 169 752
Gauge Conversion
14 Sahibganj-Pirpainti Doubling 23 129
15 Maheshkunt-Thanabihpur Doubling 32 115
16 Hajipur-Ramdayalu Nagar Doubling 48 367
17 Pirpainti-Bhagalpur Doubling 51 493
18 Bakhtiyarpur-Barh Doubling 19 237
19 Kiul-Gaya Doubling 124 2,462
20 Hajipur-Bachwara Doubling 72 930
21 Darbhanga bypass 9 253
22 Araria-Galgalia (Thakurganj) New Line 110 2,132
23 Saraigarh Byepass line 5 79
24 Chhapra-Chhapra Kacheri 3rd line 3 33
Ongoing projects:
Some of the projects falling fully/partly in the State of Bihar which have been taken up are as under:
SN. Project Length (Km) Cost
(Rs. in Cr.)
1 Sakri-Hasanpur new line 76 735
2 Khagaria-Kusheshwarsthan New line 42 1,511
3 Fatuha-lslampur new line 167 2,882
4 Koderma-Tilaiya new line 65 1,980
5 Hajipur-Sagauli new line 151 2,702
6 Araria-Supaul new line 96 1,925
7 Kursela-Bihariganj new line 58 194
8 Bikramshila-Katareah new line 26 2,171
9 Jhajha-Batia new line 20 588
10 Pirpainti-Jassidih new line 97 2,611
11 Chhitauni-Tumkuhi Road new line 59 1,73112 Jalalgarh-Kishanganj new line 51 360
13 Jogbani-Biratnagar (Nepal) new line 19 402
14 Darbhanga-Kusheshwarasthan new line 70 367
15 Motihari-Sitamarhi new line 77 1,007
16 Sitamarhi-Nirmali new line 189 2,833
17 Nawada-Laxmipur new line 137 3,121
18 Ara-Bhabua Road new line 150 2,397
19 Gaya-Daltonganj new line 137 2,861
20 Muzaffarpur-Darbhanga new line 69 282
21 Muzaffarpur-Janakpur Road new line 67 228
22 Dehri on Sone-Banjari new line 35 111
23 Chhapra-Muzzafarpur new line 78 1,894
24 Bihta-Aurangabad new line 120 2,995
25 Gaya-Chatra and Gaya-Natesar new line 135 4,543
26 Deogarh-Sultanganj new line incl.Banka-Barahat and 154 665
Banka-Bhitiah Road
27 Sultanganj-Katuria new line 77 291
28 Bariarpur-Mananpur new line 68 251
29 Hathua-Bhatni new line 80 318
30 Aurangabad Terminal-Anugrah Narayan Road new 13 441
line
31 Nawadah-Pawapuri New line 25 492
32 Jaynagar-Bijalpura Gauge conversion 69 790
33 Dhanbad-Sonnagar 3rd line 291 7,906
34 Samastipur-Darbhanga Doubling 38 826
35 Rampur Dumra-Tal-Rajendra Pul-Additional bridge 14 2,535
and Doubling
36 Sagauli-Valmikinagar Doubling 110 1,456
37 Gaya Bye pass for Manpur 2 30
38 Muzaffarpur-Sugauli Doubling 101 1,586
39 Barauni-Bachwara 3rd & 4th line 32 486
40 Sonenagar bye pass(Chiralapothu to Bagha 10 224
Bishunpur)
41 Narkatiaganj-Darbhanga& Sitamarhi-Muzaffarpur 256 4,080
Doubling
42 Chhapra-Ballia Patch Doubling 65 1,046
43 Gorakhpur-Valmikinagar Doubling 96 1,121
44 Katihar-Kumedpur and Katihar-Mukuria Doubling 65 943
45 Bhadaura Station and Karma Station Surface Triangle 11 200
Line
46 ROR at Sasaram connecting GC to Ara-Sasaram Line 9 470
47 Ara Bye pass Line to be connected from Jagjivan Halt 3 119to existing ARA-Sasaram line through link cabin (Y-
Connectivity at Ara)
48 Son Nagar-Andal Multitracking 749 12,334
49 Bulb line at Nabinagar (Ankorha) 17 612
50 Punarakh- Barh-Bhaktiyarpur New 4th line & balance 28 422
3rd line
51 Sanjaygram to Dhachna By Pass line 2 34
52 Aluabari Road-Thakurganj Doubling 20 327
53 Aluabari Road-New Jalpaiguri 3rd & 4th Line 57 1,630
54 Bhagalpur-Jamalpur 3rd Line 53 1,156
55 Bhagalpur-Dumka-Rampurh at Doubling 177 3,169
56 Bakhtiyarpur-Rajgir-Tilaiya Doubling 104 2,192
57 Bakthiyarpur-Fatuha 3rd and 4th line 24 931
Zonal Railway wise details of Railway projects are made available in public domain on Indian Railway’s
website.
Sanction of any railway project depend upon many parameters/factors which include the following:
Anticipated traffic projections and Remunerativeness of the proposed route
First and last mile connectivity provided by the project
Connection of missing links and providing additional route
Augmentation of congested/saturated lines
Demands raised by State Governments/Central Ministries/Public representatives,
Railway’s own operational requirements
Socio-economic considerations
Overall availability of funds
Completion of Railway project/s depends on various factors which include the following:
Land acquisition by State Government
Forest clearance
Shifting of infringing utilities
Statutory clearances from various authorities
Geological and topographical conditions of area
Law and order situation in the area of project site
Number of working months in a year for particular project site etc.
All these factors affect the completion time and cost of the project/s.
*****