Parliament Question: Bharat Nirman

Issued by National Bank For Agriculture and Rural Development · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: The document addresses questions regarding Bharat Nirman, a rural infrastructure development initiative. It clarifies the Ministry of Rural Development's current role, focusing on the Pradhan Mantri Awaas Yojana Gramin (PMAYG) for housing and the Pradhan Mantri Gram Sadak Yojana (PMGSY) for rural roads. The PMAYG aims to provide housing for eligible rural households by March 2029, while PMGSY aims to provide all-weather road connectivity to unconnected habitations with ongoing works to be completed by March 2026 and March 2029. Key Points / Main Content: Pradhan Mantri Awaas Yojana Gramin (PMAYG): * Implemented since April 1, 2016, to provide housing assistance to 4.95 crore rural households by March 2029. * As of July 31, 2025, 4.12 crore houses have been allotted, 3.84 crore sanctioned, and 2.81 crore completed. * Beneficiaries identified using Socio Economic and Caste Census (SECC) 2011 data, verified by Gram Sabhas. * Awaas survey 2024 is being conducted to identify additional eligible beneficiaries for an additional target of 2 crore houses. * PM JANMAN launched to construct 4.90 lakh houses for Particularly Vulnerable Tribal Groups (PVTGs) by March 2026. * As of July 31, 2025, under PM JANMAN, 4.77 lakh houses allotted, 4.66 lakh sanctioned, and 1.59 lakh completed. * No projects have been financially put on hold since 2021, but delays occur due to beneficiary migration, unwillingness, death without legal heir, or delays in fund release. * The scheme is closely monitored, with emphasis on quality and timely completion using IT tools, regular reviews, and fund follow-up. Pradhan Mantri Gram Sadak Yojana (PMGSY): * Aims to ensure all-weather road connectivity to unconnected habitations. * PMGSY has multiple phases, including PMGSY-I, PMGSY-II, RCPLWEA, PMGSY-III, and PMGSY-IV (launched September 11, 2024). * PMGSY IV aims to provide connectivity to 25,000 unconnected habitations based on Census 2011 norms. * Timeline for completion of ongoing works under PMGSY-I (Chhattisgarh only), PMGSY-II, RCPLWEA, and PMGSY-III is March 31, 2026. * The timeline for PMGSY IV is till March 2029. * The road connectivity component of PM-JANMAN aims for construction of 8,000 Km road length to provide connectivity to unconnected PVTG habitations. * As of July 31, 2025, 8,38,611 km of road length sanctioned, and 7,83,527 km completed. * No projects have been financially put on hold since 2021, but delays occur due to land acquisition, forest clearance, tendering delays, law and order issues, and limited working seasons. * Progress is regularly reviewed, and technical support is provided through various agencies. Impact Analysis: State Governments/Implementing Agencies: * Impact: Responsible for implementing PMAYG and PMGSY, including beneficiary identification, house construction, and road construction. * Action Required: Ensure timely allocation of targets, monitor progress, address delays, and ensure quality construction. Beneficiaries (Rural Households and PVTGs): * Impact: Receive assistance for housing under PMAYG and road connectivity under PMGSY. * Action Required: Participate in surveys, complete required documentation, and cooperate with implementing agencies. Ministry of Rural Development: * Impact: Oversees the implementation of PMAYG and PMGSY. * Action Required: Monitor progress, provide technical support, release funds, and address implementation challenges.

Key Entities Referenced

Bharat Nirman: A time-bound business plan for building rural infrastructure across various sectors from 2005-2012. Addressed irrigation, roads, housing, water supply, electrification, and telecommunication connectivity. Pradhan Mantri Awaas Yojana Gramin (PMAYG): A scheme implemented by the Ministry of Rural Development to provide assistance for housing to eligible rural households, aiming for 'Housing for All' by March 2029. Socio Economic and Caste Census (SECC) 2011: A census used to identify beneficiaries under PMAYG based on housing deprivation parameters and exclusion criteria. PM JANMAN: A program launched to address critical gaps in the wellbeing of Particularly Vulnerable Tribal Groups (PVTGs) across the nation, including housing assistance. Particularly Vulnerable Tribal Groups (PVTGs): A group of tribal communities with specific vulnerabilities, targeted by the PM JANMAN program for assistance. Pradhan Mantri Gram Sadak Yojana (PMGSY): A scheme to ensure all-weather road connectivity to eligible unconnected habitations, enabling access to essential services and reducing rural poverty. Chhattisgarh: A State in India where the timeline for completion of ongoing works under PMGSY-I is specifically mentioned. National Rural Infrastructure Development Agency (NRIDA): The technical arm of the Ministry of Rural Development, providing technical support for the implementation of PMGSY.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO. 2736 ANSWERED ON 05/08/2025 BHARAT NIRMAN 2736. Shri Kalyan Banerjee: Will the Minister of RURAL DEVELOPMENT be pleased to state: (a) whether it is a fact that the Government has prepared a time- bound business plan for building rural infrastructure by 2025 in the areas of irrigation, roads, housing, water supply, electrification and telecommunication connectivity in the name of Bharat Nirman; (b) if so, the details of budget allocation, sanction and utilisation since 2022, State and Head-wise; and (c) the details and number of projects financially put on hold since 2021 under the development plans, if so, the reasons therefor, State-wise? ANSWER MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT (DR. CHANDRA SEKHAR PEMMASANI) (a) to (c): The Ministry of Rural Development is not implementing Bharat NirmanYojana at present. The first and second phases of Bharat Nirman were in operation from 2005-06 to 2008-09 and 2009- 10 to 2013-14 respectively. Funds were released directly by the concerned Ministries to State implementing agencies or State Governments for development of roads, construction of houses and supply of drinking water in rural areas. Pradhan MantriAwaasYojana- Gramin (PMAY-G) In order to achieve the objective of "Housing for All" in rural areas, the Ministry of Rural Development is implementing Pradhan MantriAwaasYojana- Gramin (PMAY-G) with effect from 1st April 2016 to provide assistance to 4.95 crore eligible rural households Page 1 of 8with basic amenities by March 2029. As on 31.07.2025, a cumulative target of 4.12 crore houses have been allotted to States/UTs out of which 3.84 crore houses have been sanctioned and 2.81 crore houses have been completed. Beneficiaries under PMAY-G were identified using housing deprivation parameters given in the Socio- Economic and Caste Census (SECC), 2011 data. The final selection of beneficiaries under PMAY-G is based on the housing deprivation parameters and exclusion criteria prescribed under the Socio- Economic Caste Census (SECC) 2011 and due verification by the respective Gram Sabhas and completion of an Appellate Process. The Government conducted an Awaas+ survey from January 2018 to March 2019 to identify those beneficiaries who claimed to have been left out under the 2011 SECC and thus prepared an additional list of potential beneficiaries. To achieve the additional target of 2 crore houses, Awaas+ survey 2024 app has been designed to identify the eligible beneficiaries. Eligible beneficiaries from the Awaas+ 2024 survey shall be identified post completion of survey and verification of data. The PM- JANMAN has been launched to address critical gaps in the well-being of Particularly Vulnerable Tribal Groups (PVTGs) across the nation. The target under the housing intervention of PM JANMAN is to provide assistance for the construction of 4.90 lakh houses for the PVTG beneficiaries by March 2026. As on 31.07.2025, a cumulative target of 4.77 lakh houses have been allotted to States/UTs out of which 4.66 lakh houses have been sanctioned and 1.59 lakh houses have been completed. The State/UT -wise details of central share released and funds utilized by the States/UTs during the last three years and current year as on 24.07.2025 is given as Annexure-I. No projects under the scheme have been financially put on hold by the Ministry since 2021. However, delays in some States have occurred due to various factors like such as migration of beneficiaries, unwilling beneficiaries, death of beneficiary without legal heir, delay in release of Central and State Matching Share from treasury of the State Governments. Page 2 of 8The PMAY-G is monitored very closely at all levels. There is a special emphasis on quality and timely completion of construction. The Ministry is taking various steps to increase the pace of house sanction & completion and achievement of the targets under the scheme. Some of which are as under: i. Timely allocation of targets to the States/UTs ii. Launch of PMAY-G analytic Dashboard for monitoring and supervision of the scheme. iii. Micro monitoring of house sanction and completion using latest IT tools and technologies. iv. Regular review by Hon’ble Minister, Secretary and Deputy Director General v. Focus on completion of those houses where 3rd or 2nd installment of funds has been released vi. Separate review of States with high targets vii. Timely release of funds as per requirements of States/UTs viii. Continuous follow-up with States / UTs on providing land to landless beneficiaries of PMAY-G. Pradhan Mantri Gram SadakYojana (PMGSY) (a) to (c): The Government of India had earlier implemented a comprehensive, time-bound rural infrastructure development initiative under the umbrella of Bharat Nirman (2005–2012), covering various sectors, including rural roads. Although the Bharat Nirmanprogramme has since concluded, the Government has continued to strengthen rural infrastructure through flagship schemes with specific sectoral focus, including the Pradhan Mantri Gram SadakYojana (PMGSY). In the area of rural roads, the Government is implementing PMGSY as a one-time special intervention to ensure all-weather road connectivity to eligible unconnected habitations, thereby enabling access to essential services and reducing rural poverty. PMGSY has evolved through several phases: Page 3 of 8i. PMGSY-I (2000 onwards) with the aim of connecting eligible unconnected habitations based on Census 2001 ii. PMGSY-II for consolidation of existing rural road networks iii. RCPLWEA to provide strategic connectivity in Left Wing Extremism (LWE)-affected areas iv. PMGSY-III with the objective of upgradation of rural roads for enhanced access to agricultural markets, health centres and educational institutions. v. PMGSY-IV (launched on 11th September 2024) with the aim to provide connectivity to 25,000 unconnected habitations based on Census 2011 norms The timeline for completion of ongoing works under PMGSY-I (in Chhattisgarh only), PMGSY-II, RCPLWEA, and PMGSY-III is 31st March 2026. The timeline for PMGSY IV is till March, 2029. The Ministry is also implementing the road connectivity component of PM-JanjatiyaAdivasiNayaMahaAbhiyan (JANMAN) for construction of 8,000 Km road length to provide connectivity to unconnected Particularly Vulnerable Tribal Groups(PVTG) habitations. As of 31.07.2025, a total of 8,38,611 km of road length has been sanctioned under various verticals of PMGSY out of which 7,83,527 km of road length has been completed. The State-wise details of funds released, and expenditure incurred under PMGSY—including State shares—since 2022 are provided in Annexure II and Annexure III respectively. No projects under PMGSY have been financially put on hold by the Ministry since 2021. However, delays in some States have occurred due to various factors viz. (i) land acquisition and forest clearance issues; (ii) delay in tendering and finalisation of contractors; (iii) law and order challenges in LWE-affected regions; and (iv) limited working seasons in hilly and snow-bound areas. The Ministry regularly reviews the progress with State Governments through Regional Review Meetings, Performance Review Committee Meetings, Empowered Committee meetings and Quarterly Reviews. It provides technical support through the Principal Technical Agencies (PTAs)/ State Technical Agencies (STAs) and the technical arm of the Ministry viz. the National Rural Infrastructure Development Agency (NRIDA). Page 4 of 8The Ministry remains committed to the timely execution of all sanctioned works and enhancing last-mile connectivity through the efficient and transparent implementation of rural infrastructure projects. ***** Page 5 of 8Annexure-I ANNEXURE REFERRED TO IN REPLY TO PART (a) to (c) OF LOK SABHA UNSTARRED QUESTION NO. 2736 TO BE ANSWERED ON 05.08.2025 REGARDING BHARAT NIRMAN State/UT -wise details of central share released and funds utilized by the States/UTs during the last three years and current year as on 24.07.2025 under PMAY-G Rs in Crore Funds Utilized by the States/UTs Central share Released by the Ministry including State share S.No State 2025-25 2025-26 (as 2023- 2022-23 2024-25* (as on 2022-23 2023-24* 2024-25* on 24* 20.7.2025)* 24.07.2025)* Arunachal 1 69.58 200.61 1.00 0.00 127.27 239.84 32.39 2.66 Pradesh 2 Assam 9141.75 2934.45 4336.24 22.86 10913.25 6356.77 3589.42 2271.79 3 Bihar 7497.21 29.66 2279.60 1516.28 11718.07 1097.77 4338.54 4526.18 4 Chhattisgarh 344.23 1730.76 5321.89 52.60 822.15 2201.82 5904.30 2993.05 5 Goa 0.00 0.00 0.00 0.49 0.58 0.03 1.58 6 Gujarat 911.75 559.25 1302.49 23.98 1004.67 1540.76 1368.94 723.09 7 Haryana 44.33 3.23 143.46 0.00 62.35 32.42 132.65 131.48 Himachal 8 37.86 99.46 871.39 0.00 33.24 92.40 689.95 111.62 Pradesh Jammu And 9 1031.58 1234.69 288.88 0.00 709.95 1363.33 636.37 27.15 Kashmir 10 Jharkhand 1236.02 28.09 1014.75 0.00 2127.40 523.32 677.37 911.25 11 Kerala 70.29 2.11 66.02 0.00 94.63 22.86 125.18 0.31 Madhya 12 6374.91 241.64 4277.68 1987.17 11171.29 1258.44 3734.67 3899.78 Pradesh 13 Maharashtra 1676.07 785.21 4980.59 3174.50 3098.13 1809.60 4861.40 5299.24 14 Manipur 161.14 216.45 169.64 0.00 128.80 157.32 138.14 188.95 15 Meghalaya 106.44 1591.26 0.00 0.00 88.26 1498.34 245.95 15.32 16 Mizoram 29.58 157.90 12.95 0.00 55.52 140.30 58.81 10.77 17 Nagaland 52.50 334.17 54.91 0.00 28.68 322.57 156.13 3.02 18 Odisha 1723.28 4310.71 825.05 1.98 310.83 7643.52 2714.60 396.92 19 Punjab 71.68 32.64 239.78 0.00 100.86 48.15 184.18 99.41 20 Rajasthan 2157.52 67.57 1239.90 0.00 3036.53 661.99 1440.76 1004.50 21 Sikkim 0.97 1.58 0.00 1.67 2.12 0.60 0.03 22 Tamil Nadu 2004.39 28.23 167.09 0.76 2290.47 975.55 310.84 112.51 23 Tripura 1264.20 1276.90 204.86 16.71 1325.14 1664.58 151.68 16.27 24 Uttar Pradesh 4777.03 2620.93 130.45 0.00 7317.50 5014.91 785.93 53.42 25 Uttarakhand 128.08 388.19 20.27 0.03 172.55 353.88 72.72 0.76 26 West Bengal# 0.00 0.00 0.00 0.00 1108.30 80.57 30.71 3.27 Andaman And 27 0.00 5.45 0.00 0.00 0.42 2.19 3.55 0.46 Nicobar Dadra And 28 0.00 0.00 16.12 0.00 13.49 16.73 26.40 16.11 Nagar Haveli 29 Daman And Diu 0.00 0.00 0.00 0.00 0.06 0.16 0.11 0.12 30 Lakshadweep 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31 Puducherry* 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32 Andhra Pradesh 0.00 312.25 113.50 0.00 87.65 503.66 90.91 28.46 33 Karnataka 214.92 3.61 414.04 3.85 0.00 468.67 447.06 521.79 34 Telangana* 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35 Ladakh 3.09 18.90 0.00 0.00 3.00 18.00 0.08 0.00 Total 41130.36 19215.89 28492.52 6800.72 57952.62 36113.12 32950.34 23371.28 *Including PM-JANMAN **State of Telangana& UT of Puducherry are not implementing PMAY-G. # The Ministry could not release funds to the state of West Bengal due to non-submission of the satisfactory ATRs by the state. Page 6 of 8Annexure-II ANNEXURE REFERRED TO IN REPLY TO PART (a) to (c) OF LOK SABHA UNSTARRED QUESTION NO. 2736 TO BE ANSWERED ON 05.08.2025 REGARDING BHARAT NIRMAN State-wise details of funds released under PMGSY Details of State-wise funds released under PMGSY from 2022-23 to 2025- 26 (Rs. in crore) 2025-26 S.No. Name of States/UTs 2022-23 2023-24 2024-25 (till 31-7-2025)* 1 Andaman & Nicobar 12.22 12.22 0.05 0.00 2 Andhra Pradesh 644.13 140.64 507.32 0.00 Arunachal 0.00 3 1018.74 339.90 609.00 Pradesh 4 Assam 664.91 391.29 79.24 32.33 5 Bihar 1443.23 963.37 1195.44 0.00 6 Chattisgarh 995.87 401.77 325.24 41.94 7 Goa 0.00 0.00 0.00 0.00 8 Gujarat 266.63 298.41 220.65 0.00 9 Haryana 168.25 74.01 27.38 0.00 10 Himachal Pradesh 624.76 617.56 634.82 0.00 11 Jammu & Kashmir 717.00 1304.17 1028.25 0.00 12 Jharkhand 332.63 752.80 961.77 0.00 13 Karnataka 720.47 72.25 100.58 0.00 14 Kerala 106.76 54.25 122.27 0.00 15 Madhya Pradesh 1557.47 599.42 703.29 0.00 16 Maharashtra 743.00 1110.80 854.93 0.00 17 Manipur 744.98 161.29 2.81 0.00 18 Meghalaya 405.89 122.59 219.62 11.94 19 Mizoram 584.20 141.37 87.50 0.00 20 Nagaland 183.15 161.29 2.25 2.25 21 Odisha 1235.88 1262.55 712.39 0.00 22 Puducherry 24.72 0.27 25.00 0.00 23 Punjab 231.06 265.10 319.87 0.00 24 Rajasthan 199.90 404.79 450.46 0.00 25 Sikkim 263.33 94.37 70.00 0.00 26 Tamil Nadu 613.70 411.36 638.66 0.00 27 Tripura 267.59 185.03 172.75 0.00 28 Telangana 321.43 296.9625 132.57 0.00 29 Uttar Pradesh 2068.57 2679.63 1968.60 0.00 30 Uttarakhand 1297.16 551.05 815.50 0.00 31 West Bengal 381.03 99.275 225.00 0.00 32 Ladakh 109.97 37.50 113.81 0.00 Total 18,948.61 14,007.29 13,327.02 88.01 *release of central funds has started through SNA SPARSH mechanism Page 7 of 8Annexure-III ANNEXURE REFERRED TO IN REPLY TO PART (a) to (c) OF LOK SABHA UNSTARRED QUESTION NO. 2736 TO BE ANSWERED ON 05.08.2025 REGARDING BHARAT NIRMAN State-wise details of expenditure (including the State share) from 2022-23 to 2025-26 under PMGSY State-wise details of expenditure (including the State share) from 2022-23 to 2025-26 under PMGSY (Rs. in crore) Sl. State Name 2022-23 2023-24 2024-25 2025-26 No. 1 Andaman And 7.51 22.93 3.97 2.93 Nicobar 2 Andhra Pradesh 748.63 368.03 370.60 92.27 3 Arunachal Pradesh 1,246.99 320.09 726.10 244.45 4 Assam 1,118.21 571.22 264.76 23.43 5 Bihar 2,088.54 1,815.63 2,312.80 309.28 6 Chhattisgarh 1,057.35 388.09 413.71 39.38 7 Goa 0.00 0.00 0.00 0.00 8 Gujarat 492.19 328.46 361.22 36.37 9 Haryana 213.81 150.86 34.60 1.39 10 Himachal Pradesh 626.84 371.54 904.14 293.68 11 Jammu And 1,114.78 1,256.96 1,070.58 122.99 Kashmir 12 Jharkhand 745.63 1,323.90 1,374.96 160.25 13 Karnataka 864.71 404.80 142.81 0.00 14 Kerala 124.97 161.43 249.15 29.37 15 Madhya Pradesh 1,978.73 1,105.16 966.83 91.57 16 Maharashtra 1,074.02 1,451.92 1,524.10 352.71 17 Manipur 539.11 296.83 88.75 1.08 18 Meghalaya 373.72 238.19 375.61 13.35 19 Mizoram 315.94 381.62 45.78 16.21 20 Nagaland 198.65 94.01 30.50 17.39 21 Odisha 2,088.94 1,589.8 735.0 12.70 22 Puducherry 27.08 11.89 0.00 0.00 23 Punjab 428.72 522.95 328.82 115.41 24 Rajasthan 372.38 633.09 933.32 0.00 25 Sikkim 230.34 130.13 148.98 49.51 26 Tamil Nadu 532.36 776.91 741.43 673.36 27 Tripura 152.90 112.64 98.07 18.23 28 Telangana 345.32 479.41 399.66 18.65 29 Uttar Pradesh 3,267.32 3,791.65 2,704.11 225.00 30 Uttarakhand 1,350.02 800.68 934.09 79.65 31 West Bengal 394.75 309.11 271.11 100.90 32 Ladakh 107.81 30.44 0.00 0.00 Total 24,228.27 20,240.33 18,555.51 3141.51 ***** Page 8 of 8