GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 3116
ANSWERED ON 06TH AUGUST, 2026
BLACK SPOTS ON RAJGANJ-GOVINDPUR NH STRETCH IN
DHANBAD
3116. SHRI DULU MAHATO:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) whether the Ministry is aware of the reported 91 deaths and 15
black spots on the Rajganj–Govindpur stretch of National Highway
(NH) in Dhanbad district during the period from January to April,
2026, if so, the details thereof;
(b) the immediate engineering measures being undertaken to rectify
road design deficiencies, unauthorized openings and high-risk black
spots on the said National Highway (NH) stretch;
(c) the timeline fixed for repair and restoration of non-functional
streetlights on the corridor to address poor visibility and fatal night-
time accidents;
(d) whether safety infrastructure such as foot overbridges, zebra
crossings, rumble strips and Closed-Circuit Television (CCTV)
cameras are being installed for enhancement of road safety and
traffic monitoring on the said stretch, if so, the details thereof; and
(e) the enforcement measures being undertaken to curb wrong-side
driving, over-speeding and drunken driving for protection of
pedestrians and two-wheeler riders on the said National Highway
(NH) stretch?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)(a) to (c) Total 8 numbers of black spots were identified as per
the Black Spot series 2021-23 issued by the Government in Ministry
of Road Transport & Highways between the stretch from Rajganj to
Govindpur. Out of this, 5 black spots have already been rectified by
providing underpass, foot overbridge, service road, & other safety
measures during 6-lane widening of NH-19. The remaining 3 number
of black spots at Chainages 407+500, 408+120, and 410+180 fall
within the 6-lane Govindpur Elevated project stretch and will be
rectified upon completion of the elevated corridor. The scheduled
completion date of the project is March 2028. Further, unauthorized
openings are regularly being closed with the help of District
Administration.
Moreover, all the streetlights along the project corridor are currently
functional, and defects, if any, during the operation period are being
rectified.
(d) & (e) 03 numbers of Foot Over Bridge (FOB), rumble marking
and other safety measures have been provided and Closed-Circuit
Television (CCTV) cameras at 2 km intervals have been installed for
traffic monitoring. Further, road safety campaigns/awareness
programmes are being conducted in coordination with State
Government/District Administration on regular basis to curb wrong-
side driving, over-speeding and drunken driving etc.
*****