**Executive Summary:**
This document presents the Ministry of Railways' response to Lok Sabha Unstarred Question No. 2809 regarding the CAG Audit Report on Train Derailment. It highlights the improvements in railway safety, measures taken to enhance safety, and details regarding Track Recording Car (TRC) inspections. There are no immediate deadlines or explicit action items stated other than ongoing maintenance and safety improvements.
**Key Points / Main Content:**
* **Railway Safety Improvements:**
* Consequential Train Accidents decreased from 135 in 2014-15 to 31 in 2024-25, and further to 3 up to June 2025.
* Accidents Per Million Train Kilometer (APMTKM) reduced from 0.11 in 2014-15 to 0.03 in 2024-25.
* **Safety Measures and Expenditure:**
* Increased expenditure on safety-related activities from ₹39,463 Cr in 2013-14 to ₹1,16,470 Cr in 2025-26 (BE).
* Provision of Electrical/Electronic Interlocking Systems at 6,635 stations up to 30.06.2025.
* Interlocking of Level Crossing Gates at 11,096 locations up to 30.06.2025.
* Complete Track Circuiting at 6,640 stations up to 30.06.2025.
* Kavach deployment on 1548 RKm and work in progress on Delhi-Mumbai and Delhi-Howrah corridors, commissioned over 324 Route Kilometers on 30.07.2025.
* Implementation of various technological improvements and better maintenance practices.
* **Track Maintenance and Monitoring:**
* Adoption of a fully mechanized Track Management System (TMS).
* Use of Track Recording Cars (TRCs) for track parameter checks.
* Addition of 4 TRCs to the existing 5.
* No shortfall in TRC inspections during the financial years 2022-23, 2023-24, 2024-25 and year 2025-26 up to June 2025.
* TRC recording achieved: 282754 Km in 2023-24 and 262018 Km in 2024-25 against annual requirements of 271332 Km and 226258 Km respectively.
* **Technological Improvements:**
* Increased use of high-quality 60 Kg rails (1.43 Lakh Km).
* Increased use of longer rail panels (77,522 Km).
* Increase in Electronic Interlocking Stations (3,691 Stations).
* Increase in Fog Pass Safety Devices (25,939 Nos.).
* Increased use of Thick Web Switches (28,301 Nos.).
* **Better Maintenance Practices:**
* Increase in Primary Rail Renewal Track (49,941 Km).
* Increase in USFD Ultra Sonic Flaw detection Testing of Welds (2 Crore Nos.).
* Reduction in Weld failures (370 Nos. in 2024-25).
* Reduction in Rail fractures (289 Nos. in 2024-25).
* **Better Infrastructure and Rolling Stock:**
* Increase in New Track added (34,428 Km).
* Increase in Flyovers RoBs Underpasses RUBs (13,808 Nos.).
* All Unmanned Level crossings on BG removed.
* Increase in Manufacture of LHB Coaches (42,677 Nos.).
**Impact Analysis**
* **Railway Passengers:**
* *Impact:* Enhanced safety measures contribute to safer train travel, reducing the risk of accidents and potential injuries.
* *Action Required:* Be aware of safety guidelines and cooperate with railway staff to ensure a safe journey.
* **Railway Staff (Loco Pilots, Maintenance Crews, Engineers, etc.):**
* *Impact:* Requires adherence to updated safety protocols, increased vigilance, and continuous training to implement new technologies and maintenance practices.
* *Action Required:* Participate in training programs, implement safety measures diligently, and ensure regular maintenance and inspections are carried out effectively.
* **Ministry of Railways:**
* *Impact:* Demonstrates commitment to improving railway safety and addressing concerns raised in the CAG Audit Report.
* *Action Required:* Continue to invest in safety measures, monitor the effectiveness of implemented technologies and practices, and ensure accountability in maintenance activities.
* **CAG (Comptroller and Auditor General of India):**
* *Impact:* Provides a basis for assessing the actions taken by the Ministry of Railways in response to the audit findings.
* *Action Required:* Review the implemented measures and their impact on reducing train derailments and improving overall railway safety for future audits.
Key Entities Referenced
Indian Railways: The national railway system of India, responsible for the operation and maintenance of the railway network.
CAG Audit Report on Train Derailment Report No. 22 of 2022: A report by the Comptroller and Auditor General (CAG) of India regarding train derailments on Indian Railways, specifically Report No. 22 of 2022.
Track Recording Cars (TRC): Specialized railway vehicles used to inspect and monitor the condition of railway tracks.
SHRI ASHWINI VAISHNAW: The Minister of Railways, Information Broadcasting and Electronics Information Technology.
Kavach: An Automatic Train Protection (ATP) system adopted as a National ATP system in July 2020 designed to enhance railway safety by preventing collisions and overspeeding.
South Central Railway: One of the 18 railway zones in India.
North Central Railway: One of the 18 railway zones in India.
Oscillation Monitoring System (OMS): A system used to monitor track geometry and identify irregularities that could affect train safety.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO.2809
TO BE ANSWERED ON 06.08.2025
CAG AUDIT REPORT ON TRAIN DERAILMENT
2809. MR. PATHAN YUSUF:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Performance Audit Report of the CAG on Derailment
in Indian Railways Report No. 22 of 2022 clearly mentioned that
one of the main reasons of train accidents is poor maintenance
of Railway Tracks, if so, details thereof;
(b) whether it is a fact that there is a shortfall of ranging between
30 per cent to 100 per cent in TRC (Track Recording Cars)
Inspections as per the Audit Report, if so, the details thereof; and
(c) the details of TRC Inspections done along with the number of
inspections that are due during the last two years, Zone-wise?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (c): Safety is accorded the highest priority on Indian Railways. As
a consequence of various safety measures taken over the years, there
has been a steep decline in the number of accidents. Consequential
Train Accidents have reduced from 135 in 2014-15 to 31 in 2024-25 asshown in the graph below. The causes of the accidents that took place
over Indian Railways broadly include track defects, loco/coach
defects, equipment failures, human errors, etc.
It may be noted that the Consequential Train Accidents during
the period 2004-14 was 1711 (average 171 per annum), which has
declined to 31 in 2024-25 and further to 3 in 2025-26 (upto June, 2025).
Another important index showing improved safety in train
operations is Accidents Per Million Train Kilometer (APMTKM) which
has reduced from 0.11 in 2014-15 to 0.03 in 2024-25, indicating an
improvement of approx. 73% during the said period.
234
s
t
n
e
d
ic
c
A
n
165
ia
r
T
la 135
it
n
e
u
q
e
s
n
o
C
f
o
.o 55
N 48
40
35 31
22
3
2005- 2009- 2014- 2019- 2020- 2021- 2022- 2023- 2024- 2025-26
06 10 15 20 21 22 23 24 25 (up to
Covid yearCovid year Jun'25)The various safety measures that include track infrastructure
also, taken to enhance safety in train operations are as under:-
1. On Indian Railways, the expenditure on Safety related activities
has increased over the years as under:-
Expenditure on Safety related activities (Rs. in Cr.)
2013-14 2022-23 2023-24 RE 2024-25 BE 2025-26
(Act.) (Act.) (Act.)
Maintenance of 9,172 18,115 20,322 21,800 23,316
Permanent Way &
Works
Maintenance of 14,796 27,086 30,864 31,540 30,666
Motive Power and
Rolling Stock
Maintenance of 5,406 9,828 10,772 12,112 12,880
Machines
Road Safety LCs 1,986 5,347 6,662 8,184 7,706
and ROBs/ RUBs
Track Renewals 4,985 16,326 17,850 22,669 22,800
Bridge Works 390 1,050 1,907 2,130 2,169
Signal & Telecom 905 2,456 3,751 6,006 6,800
Works
Workshops Incl. 1,823 7,119 9,523 9,581 10,134
PUs and Misc.
expenditure on
Safety
Total 39,463 87,327 1,01,651 1,14,022 1,16,470
2. Electrical/Electronic Interlocking Systems with centralized
operation of points and signals have been provided at 6,635
stations up to 30.06.2025 to reduce accident due to human failure.3. Interlocking of Level Crossing (LC) Gates has been provided at
11,096 level Crossing Gates up to 30.06.2025 for enhancing safety
at LC gates.
4. Complete Track Circuiting of stations to enhance safety by
verification of track occupancy by electrical means has been
provided at 6,640 stations up to 30.06.2025.
5. Kavach is a highly technology intensive system, which requires
safety certification of highest order. Kavach was adopted as a
National ATP system in July 2020. Kavach is provided
progressively in phased manner. Kavach has already been
deployed on 1548 RKm on South Central Railway and North
Central Railway. Presently, the work is in progress on Delhi-
Mumbai and Delhi-Howrah corridors (approximately 3000 RKm).
Kavach has been successfully commissioned over Kota–Mathura
section (Delhi–Mumbai route) covering 324 Route Kilometers on
30.07.2025.
6. Detailed instructions on issues related with safety of Signalling,
e.g. mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
7. System of disconnection and reconnection for S&T equipment as
per protocol has been re-emphasized.
8. All locomotives are equipped with Vigilance Control Devices (VCD)
to improve alertness of Loco Pilots.
9. Retro-reflective sigma boards are provided on the mast which is
located two OHE masts prior to the signals in electrified
territories to alert the crew about the signal ahead when visibility
is low due to foggy weather.10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in
fog affected areas which enables loco pilots to know the distance
of the approaching landmarks like signals, level crossing gates,
etc.
11. Modern track structure consisting of 60kg, 90 Ultimate Tensile
Strength (UTS) rails, Prestressed Concrete Sleeper (PSC)
Normal/Wide base sleepers with elastic fastening, fan shaped
layout turnout on PSC sleepers, Steel Channel/H-beam Sleepers on
girder bridges is used while carrying out primary track renewals.
12. Mechanisation of track laying activity through use of track
machines like PQRS, TRT, T-28 etc. to reduce human errors.
13. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws
and timely removal of defective rails.
15. Laying of longer rails, minimizing the use of Alumino Thermic
Welding and adoption of better welding technology for rails i.e.,
Flash Butt Welding.
16. Monitoring of track geometry by OMS (Oscillation Monitoring
System) and TRC (Track Recording Cars).
17. Patrolling of railway tracks to look out for weld/rail fractures.
18. The use of Thick Web Switches and Weldable CMS Crossing in
turnout renewal works.
19. Inspections at regular intervals are carried out to monitor and
educate staff for observance of safe practices.20. Web based online monitoring system of track assets viz. Track
database and decision support system has been adopted to decide
rationalized maintenance requirement and optimize inputs.
21. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon
precautions, etc. have been issued.
22. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
23. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route
have been eliminated by January 2019.
25. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is
taken up based upon the conditions assessed during these
inspections.
26. Indian Railways has displayed Statutory “Fire Notices” for
widespread passenger information in all coaches. Fire posters are
provided in every coach so as to educate and alert passengers
regarding various Do’s and Don’ts to prevent fire. These include
messages regarding not carrying any inflammable material,
explosives, prohibition of smoking inside the coaches, penalties
etc.
27. Production Units are providing Fire detection and suppression
system in newly manufactured Power Cars and Pantry Cars, Fire
and Smoke detection system in newly manufactured coaches.Progressive fitment of the same in existing coaches is also
underway by Zonal Railways in a phased manner.
28. Regular counselling and training of staff is undertaken.
29. Concept of Rolling Block introduced in Indian Railways (Open
Lines) General Rules vide Gazette notification dated 30.11.2023,
wherein work of integrated maintenance/ repair/replacement of
assets is planned up to 52 weeks in advance on rolling basis and
executed as per plan.
The details of the Safety related works related to better
maintenance practices, technological improvements, better
infrastructure and rolling stock etc. undertaken by Railways are
tabulated below:-
2004-05 to 2014-15 to 2024-25 2014-25 Vs.
S.N. Item
2013-14 (till March 25) 2004-14
Technological Improvements
1. Use of high-quality 57,450 1.43 Lakh Km More than
rails (60 Kg) (Km) Km 2 times
2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8
(260m) (Km) times
3. Electronic 837 3,691 Stations More than
Interlocking Stations 4 times
(Stations)
4. Fog Pass Safety As on As on 31.03.25: 288 times
Devices (Nos.) 31.03.14: 25,939
90 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better Maintenance Practices
1. Primary Rail 32,260 Km 49,941 Km 1.5 times
Renewal (Track
Km)2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than
Flaw detection) 2 times
Testing of Welds
(Nos.)
3. Weld failures In 2013-14: In 2024-25: 90 %
(Nos.) 3699 Nos. 370 Nos. reduction
4. Rail fractures In 2013-14: In 2024-25: More than
(Nos.) 2548 Nos. 289 Nos. 88%
reduction
Better Infrastructure and Rolling Stock
1. New Track KM 14,985 34,428 Km More than
added (Track km) Km. 2 times
2. Flyovers (RoBs)/ 4,148 13,808 Nos. More than
Nos. 3 times
Underpasses
(RUBs) (Nos.)
3. Unmanned Level As on As on 31.03.24: Nil Removed
crossings 31.03.14: (All eliminated by
(nos.) on BG 8948 31.01.19)
4. Manufacture of LHB 2,337 42,677 More than
Coaches (Nos.) Nos. 18 times
As regards the recommendations by CAG in its Report No. 22 of
2022 on “Derailment in Indian Railways” that “Indian Railways may
develop a strong monitoring mechanism to ensure timely
implementation of maintenance activities by adopting fully
mechanized methods of track maintenance and improved
technologies”, it is submitted that Indian Railways has already
adopted a fully mechanized Track Management System (TMS) to
ensure monitoring of the track maintenance activities.
There are various means of inspection of track and inspection by
Track Recording Car (TRC) is one of the means. Track Recording Car
carries out super check of track parameters, which are measured andmonitored by the supervisors on the field. There were a total of 5 TRCs
in Indian Railways during the period of study by Audit. After that, 04
more TRCs have been added to carry out the inspections. However, in
case of non availability of TRC, alternative means such as Oscillation
Monitoring System (OMS) is used.
As far as recording of track by TRC is concerned, no shortfall in
inspection is observed during the financial years 2022-23, 2023-24,
2024-25 and year 2025-26 (upto June 2025).
The details of TRC recording achieved over Indian Railways
during the last two years are as under:-
Year Annual Requirement (Km) Recording Done (Km)
2023-24 271332 282754
2024-25 226258 262018
*****