(a) whether the Government is aware that there is no arrangement for
coach display/train indicator system at Bihar Sharif railway station,
Rajgir railway station and other railway stations in Nalanda district
under the Danapur Division and if so, the details thereof;
(b) whether in the absence of coach display and train indicator systems,
passengers particularly senior citizens, women and patients, face
difficulties and sometimes they even miss their trains;
(c) if so, the details thereof; and
(d) the time by which the coach display and train indicator systems are
likely to be provided at these stations?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d): Information regarding train placement at platforms, coach
positions of reserved trains, and trains arrival and departure timings is
available through multiple channels, including mobile applications such as
RailOne. In addition to the Coach Guidance System (CGS) / Coach
Indication Boards (CIBs), Train Indication Boards (TIBs) and standard
signages provided at stations, these information are also disseminated
§ Page 1 of 6locally through the Public Address System for the convenience of
passengers.
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve the stations of Indian Railways. The master planning,
keeping in view the necessity of each station, includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/subway to commensurate with
passenger traffic
Provision of lifts/escalators/ramps
Improvement of platform surface/ provision of platform shelter
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking development
Amenities for Divyangjans
Better passenger information systems including Train Indication
Board, Coach Indication Board etc.
Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
Page 2 of 6The scheme also envisages sustainable and environment friendly solutions
etc. as per necessity, phasing and feasibility and creation of city centre at
the station in the long term.
So far, 1340 stations have been identified for development under Amrit
Bharat Station Scheme, out of which 98 stations, including Bihar Sharif and
Rajgir stations of Nalanda district, are located in Bihar. The names of
stations identified for development under Amrit Bharat Station Scheme in
Bihar are as following:
State No. of Names of Stations
Stations
Bihar 98 Anugraha Narayan Road, Ara, Arariya
Court, Bakhtiyarpur, Banka, Banmankhi,
Bapudham Motihari, Barahiya, Barauni,
Barh, Barsoi Jn, Begusarai, Bettiah,
Bhabua Road, Bhagalpur, Bhagwanpur,
Bihar Sharif, Bihiya, Bikramganj, Buxar,
Chakia, Chausa, Chhapra, Dalsingh Sarai,
Darbhanga, Dauram Madhepura, Dehri On
Sone, Dholi, Dighwara, Dumraon, Durgauti,
Ekma, Fatuha, Gaya, Ghorasahan, Guraru,
Hajipur Jn, Jamalpur, Jamui, Janakpur
Road, Jaynagar, Jehanabad, Jhanjharpur,
Kahalgaon, Karhagola Road, Katihar,
Khagaria Jn, Kishanganj, Kudra, Labha,
Laheria Sarai, Lakhminia, Luckeesarai,
Madhubani, Maheshkhunt, Mairwa, Mansi
Jn, Mashrakh, Mokama, Motipur, Munger,
Page 3 of 6State No. of Names of Stations
Stations
Muzaffarpur, Nabinagar Road,
Narkatiaganj, Naugachia, Nawadah,
Paharpur, Patliputra, Patna, Piro, Pirpainti,
Rafiganj, Raghunathpur, Rajendra Nagar,
Rajgir, Ram Dayalu Nagar, Raxaul, Sabaur,
Sagauli, Saharsa, Sahibpur Kamal, Sakri,
Salauna, Salmari, Samastipur, Sasaram,
Shahpur Patoree, Shivanarayanpur, Simri
Bakhtiyarpur, Simultala, Sitamarhi, Siwan,
Sonpur Jn., Sultanganj, Supaul, Taregna,
Thakurganj, Thawe
Completed Stations:
Development works at railway stations under Amrit Bharat Station Scheme
in Bihar have been taken up at a good pace. Details of stations completed
in Bihar are as under:
No. of
State Name of Stations
Stations
Bihar 8 Banmankhi, Dauram Madhepura,
Kahalgaon, Pirpainti, Sabaur,
Shivanarayanpur, Simultala, Thawe
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below
Page 4 of 6 Bihar Sharif station: The works of new station building, new 6 m wide
foot over bridge, boundary wall on main entry side, lifts, escalators,
improvement of circulating area and parking have been taken up.
Rajgir station: The works of station building at main entry side, new
12 m wide foot over bridge, lifts and escalators, boundary wall,
improvement of circulating area and parking have been taken up.
Gaya station: The work of new arrival building at second entry has
been completed. The works of new departure building at second
entry, new arrival and departure building at main entry, new platform
no. 8, new platform shelters, air concourse and improvement of
circulating area have been taken up.
Luckeesarai Junction station: The works of new station building at
main entry, extension of foot over bridge and improvement of
circulating area have been completed. The work of installation of lift
for existing foot over bridge has been taken up.
Anugraha Narayan Road station: The works of extension and
surfacing of platform no. 1/2 & 3/4 and new toilet block have been
completed. The works of improvement of station building,
improvement of circulating area, entry/exit gate, new water booths,
platform shelter and new 6 m wide foot over bridge have been taken
up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways including provision of Coach Indication Board,
Train Indication Board etc. is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
Page 5 of 6upgradation / modernisation of a station is carried out based on category
of station/condition/traffic handled etc.
Development / Upgradation of railway stations is a complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as tree cutting, heritage, fire clearance, airport clearance
etc. These stations are in operation since long, so brownfield work
challenges are being faced, such as shifting of utilities (involving
water/sewage lines, optical fibre cables, gas pipelines, power/signal
cables, etc.), infringements, operation of trains without hindering
passenger movement, speed restrictions due to works carried out in close
proximity of the tracks and near to high voltage power lines, etc. and these
factors affect the progress of work and completion time.
Development / upgradation / modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not station-wise or state-
wise. Bihar is covered under the jurisdiction of four railway zones, namely,
Eastern Railway, East Central Railway, North Eastern Railway and
Northeast Frontier Railway. For these zones, an allocation of ₹ 1,543 crore
has been made for the financial year 2026-27, out of which an expenditure
(up to June, 2026) of ₹ 677 crore has been incurred so far.
*****
Page 6 of 6