**Executive Summary** This document is an official government response to a parliamentary question (No. 2103), answered on 12.02.2026, regarding coal-based thermal power plants in India. It details the number of plants, emission monitoring systems, emission norm violations, modernisation efforts, and government measures for compliance and monitoring. The information includes generation data up to December 31, 2025, and future timelines for renovation and modernisation (R&M) plans extending until 2046. **Key Points / Main Content** * **Number of Coal and Lignite Based Thermal Power Plants:** * As of 31.12.2025, there are 200 operational plants in the country, including those of central generation companies (GENCOs), state GENCOs, and Independent Power Producers (IPPs). * These plants have a combined capacity of about 226.23 GW. * From April 2025 to December 2025, they generated approximately 9,42,542.70 MU of electricity. * **Continuous Emission Monitoring Systems (CEMS) and Online Continuous Emission & Effluent Monitoring System (OCEMS):** * State Pollution Control Boards (SPCBs)/Pollution Control Committees (PCCs) have been directed by Central Pollution Control Board (CPCB) to ensure installation of Online Continuous Emission & Effluent Monitoring System (OCEMS) in thermal power plants (TPPs) as part of 17 industry categories. * Installation of OCEMS is required as a specific condition in the Consent to Operate Order (CTO) for industries commissioned after 28.02.2017. * OCEMS data is primarily for self-monitoring by the industries, which is shared with the CPCB and the concerned SPCB/PCC servers by the industries including TPPs. * The list of Industries connected with Central Pollution Control Board (CPCB) server under Power Plant category (as of date 06.02.2026) is given as Annexure-II. * **Enforcement and Environmental Compliance:** * Environmental compliance is primarily enforced by SPCBs/PCCs through the consent mechanism. * Show-Cause Notice cum Directions have been issued to one Thermal Power Plant (Unit 2 of M/s Bhavnagar Lignite TPS, GSECL, Gujarat) due to violation of prescribed emission standards. * Thermal Power Plants are regulated and monitored through SPCBs as per the provisions of Water (Prevention and Control of Pollution) Act, 1974 and Air (Prevention and Control of Pollution) Act, 1981. * For non-compliance beyond prescribed timelines, Environmental Compensation will be levied on non-compliant TPPs: * 0-180 days: Rs. 0.20 per unit electricity generated * 181-365 days: Rs. 0.30 per unit electricity generated * 366 days and beyond: Rs. 0.40 per unit electricity generated * **Renovation and Modernisation (R&M) / Life Extension (LE):** * Central Electricity Authority (CEA) identified 223 units (total capacity 63,440 MW) for potential R&M/LE works (older than 20 years as of December 2022). * R&M/LE works are to be implemented in nine phases to avoid major energy demand-supply gaps. * The first phase is effective from 01.01.2024 to 30.06.2026, with details of R&M status provided for 37 units of 7,960 MW installed capacity. * **R&M Status (Central Sector):** * Out of 11 TPP units (2,230 MW), 8 units (1,600 MW) are undergoing need-based R&M, and 3 units (630 MW) are under R&M program implementation. * **R&M Status (State Sector):** * Out of 25 units (5,230 MW), 9 units (1,890 MW) are undergoing need-based R&M, 10 units (2,090 MW) are under R&M program implementation, and 2 units (420 MW) are undergoing R&M and Life Extension studies. Remaining 4 units (830 MW) are retired. * **R&M Status (Private Sector):** * 1 unit of 500 MW installed capacity does not intend to carry out R&M due to a short PPA duration (5 years). * **Supercritical and Ultra-Supercritical Units:** * Promoting supercritical/ultra-supercritical units for higher efficiency and reduced CO2 emissions. * As of 31.12.2025, 70,850 MW (102 units) of supercritical units and 8,340 MW (12 units) of ultra-supercritical units are commissioned. **Impact Analysis** **Stakeholder: State Pollution Control Boards (SPCBs) / Pollution Control Committees (PCCs)** * **Impact:** SPCBs/PCCs are responsible for enforcing environmental compliance in thermal power plants through the consent mechanism. * **Action Required:** SPCBs/PCCs must ensure the installation of Online Continuous Emission & Effluent Monitoring Systems (OCEMS) in thermal power plants and incorporate specific conditions in the Consent to Operate Order (CTO). **Stakeholder: Thermal Power Plants (TPPs)** * **Impact:** TPPs are required to comply with emission standards, install OCEMS, and undergo R&M/LE as per the government’s directives. * **Action Required:** TPPs must self-monitor OCEMS data and ensure compliance with the prescribed emission norms. Non-compliant TPPs will be subject to Environmental Compensation as per specified timelines and rates. TPP units identified for R&M/LE must plan and implement these works according to the phasing plan. **Stakeholder: Central Electricity Authority (CEA)** * **Impact:** CEA is involved in identifying and planning the R&M/LE works for thermal power plants. * **Action Required:** CEA needs to monitor the implementation of R&M/LE works as per the phasing plan. **Stakeholder: Central Pollution Control Board (CPCB)** * **Impact:** CPCB plays a role in directing SPCBs/PCCs regarding OCEMS installation and in monitoring emissions. * **Action Required:** CPCB needs to review the OCEMS data shared by TPPs, to monitor and to enforce thermal power plants' compliance to stipulated norms. **Stakeholder: GENCOs, State GENCOs, and IPPs** * **Impact:** The entities operating coal and lignite based thermal plants are required to operate within environmental compliance standards. * **Action Required:** Installation and maintenance of OCEMS is required, in addition to participating in any future CPCB audits.

Key Entities Referenced

State Pollution Control Boards (SPCBs)/ Pollution Control Committees (PCCs): State-level bodies responsible for environmental regulation and enforcement, directed to ensure installation of Online Continuous Emission & Effluent Monitoring System (OCEMS). Central Pollution Control Board (CPCB): The central authority directing SPCBs/PCCs to ensure installation of OCEMS and sharing of OCEMS data. Online Continuous Emission & Effluent Monitoring System (OCEMS): Real-time monitoring system to be installed in thermal power plants and other industries, data to be shared with CPCB and SPCBs/PCCs. Water (Prevention and Control of Pollution) Act, 1974: A law referenced as a basis for regulating and monitoring thermal power plants. Air (Prevention and Control of Pollution) Act, 1981: A law referenced as a basis for regulating and monitoring thermal power plants.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA UNSTARRED QUESTION NO.2103 ANSWERED ON 12.02.2026 COAL-BASED THERMAL POWER PLANTS 2103. DR. BYREDDY SHABARI: Will the Minister of POWER be pleased to state: (a) the number of coal-based thermal power plants in the country during the last ten years, State-wise and year-wise along with their installed, operational, and idle/non- operational capacities; (b) the number of such plants where Continuous Emission Monitoring Systems (CEMS) have been installed and are operational, and the timelines for making CEMS functional in remaining plants; (c) the details of violations of prescribed emission norms, including penalties imposed, realised and pending, State-wise and year-wise; (d) the present status of modernisation and efficiency upgradation of coal-based thermal power plants, including conversion or retrofitting with supercritical and ultra- supercritical technologies; and (e) the measures taken by the Government to ensure compliance with emission standards, strengthen real-time monitoring and reporting and improve enforcement and accountability in coal-based thermal power plants? A N S W E R THE MINISTER OF STATE IN THE MINISTRY OF POWER (SHRI SHRIPAD NAIK) (a) : As on 31.12.2025, there are 200 coal and lignite based thermal power plants, of central generation companies (GENCOs), state GENCOS and Independent Power Producers (IPPs), operational in the country with a total of about 226.23 GW of capacity and about 9,42,542.70 MU of generation during the period: Apr’25 to Dec’25. The details of State-Wise, Station-Wise Generation Data for the last ten years (2015-16 to 2024-25) and current financial year 2025-26 (upto Dec'25) are given at Annexure-I. (b), (c) & (e): (i) State Pollution Control Boards (SPCBs)/ Pollution Control Committees (PCCs) have been directed by Central Pollution Control Board (CPCB) to ensure installation of Online Continuous Emission & Effluent Monitoring System (OCEMS) in 17 categories of industries (including thermal power plants (TPPs)) and also directed to incorporate specific condition in the Consent to Operate Order (CTO) for OCEMS in these industries, commissioned after 28.02.2017.(ii) The OCEMS data is primarily for self-monitoring by the industries, which is shared with the CPCB and the concerned SPCB/PCC servers by the industries including TPPs. The list of Industries connected with Central Pollution Control Board (CPCB) server under Power Plant category (as of date 06.02.2026) is given as Annexure-II. (iii) The environmental compliance of power plants is primarily enforced by the respective State Pollution Control Boards (SPCBs) or Pollution Control Committees (PCCs) through the consent mechanism. Based on emission monitoring carried out by CPCB, CPCB has issued Show-Cause Notice cum Directions to 01 Thermal Power Plant (Unit 2 of M/s Bhavnagar Lignite TPS, GSECL, Gujarat) due to violation of prescribed emission standards. (iv) The Thermal Power Plants are regulated and monitored through SPCBs as per the provisions of Water (Prevention and Control of Pollution) Act, 1974 and Air (Prevention and Control of Pollution) Act, 1981. (v) In case of non-compliance beyond the prescribed timelines, the following Environmental Compensation will be levied on non-compliant TPPs: Non-Compliant operation beyond the Environmental Compensations (Rs. Timeline Per unit electricity generated) 0-180 days 0.20 181-365 days 0.30 366 days and beyond 0.40 (d): Central Electricity Authority (CEA) has identified 223 units with total capacity of 63,440 MW as potential candidates for Renovation and Modernization/ Life Extension (R&M/LE) works with age older than 20 years as on December, 2022. R&M/LE works in these units have to be implemented in nine phases to avoid any major energy demand- supply gap. The phasing plan of 223 units along with tentative timelines for implementation of R&M/LE intervention is given as under: Central Central State State Private Private Total Total Phase Timeline Sector Sector Sector Sector Sector Sector Units Capacity Units Capacity Units Capacity Units Capacity 01-01-2024 to Phase 1 11 2,230 25 5,230 1 500 37 7,960 30-06-2026 01-07-2026 to Phase 2 18 5,170 10 2,140 0 0 28 7,310 31-12-2028 01-01-2029 to Phase 3 12 2,810 14 3,560 0 0 26 6,370 30-06-2031 01-07-2031 to Phase 4 8 2,550 15 3,730 2 500 25 6,780 31-12-2033 01-01-2034 to Phase 5 5 1,630 17 4,330 3 750 25 6,710 30-06-2036 01-07-2036 to Phase 6 12 5,420 8 2,175 0 0 20 7,595 31-12-203801-01-2039 to Phase 7 5 2,000 16 4,590 4 1,000 25 7,590 30-06-2041 01-07-2041 to Phase 8 5 1,740 9 2,655 9 2,660 23 7,055 31-12-2043 01-01-2044 to Phase 9 5 2,490 2 460 7 3,120 14 6,070 30-06-2046 Total Overall 81 26,040 116 28,870 26 8,530 223 63,440 The first phase of Renovation and Modernisation (R&M) plan is effective from 01.01.2024 to 30.06.2026. The details of R&M status of 37 units of 7,960 MW installed capacity is given as under: i. Central Sector: Out of 11 TPP units of 2,230 MW installed capacity, 8 units of 1,600 MW installed capacity are undergoing need based R&M and remaining 3 units of 630 MW installed capacity are under implementation of R&M programme. ii. State Sector: Out of 25 units of 5,230 MW installed capacity, 9 units of 1,890 MW installed capacity are undergoing need based R&M, 10 units of 2,090 MW installed capacity are under implementation of R&M programme, 2 units of 420 MW installed capacity are undergoing R&M and Life extension study. Remaining 4 units of 830 MW installed capacity has been retired. iii. Private Sector: 1 unit of 500 MW installed capacity does not intend to carry out R&M as PPA is only for 5 years with minimum allowed capex. Further, installation of efficient Supercritical/ Ultra Super-critical units over Subcritical Thermal Units is promoted as these units are more efficient and their CO 2 emission per unit of electricity generation is less than subcritical units. This results in corresponding savings in coal consumption and a reduction in greenhouse gas (GHG) emissions. A total capacity of 70,850 MW (102 units) of Supercritical units and 8,340 MW (12 units) of Ultra-Supercritical units has been commissioned till 31.12.2025. **********ANNEXURE-I ANNEXURE REFERRED IN REPLY TO PART (a) OF UNSTARRED QUESTION NO. 2103 ANSWERED IN THE LOK SABHA ON 12.02.2026 ************* The details of State-Wise & Coal & Lignite Based Power Station-Wise Generation Data for FY 2025-26 (Till 31.12.2025) Capacity Generation Sl No State Station Name (MW) (MUs) FY 2025-26 (upto Dec 2025) A. Coal Based Power Stations 1 DAMODARAM SANJEEVAIAH TPS 2,400.00 8,671.23 2 Dr. N.TATA RAO TPS 2,560.00 10,166.20 3 PAINAMPURAM TPP 1,320.00 5,967.75 4 RAYALASEEMA TPS 1,650.00 6,457.22 5 Andhra Pradesh SGPL TPP 1,320.00 7,184.47 6 SIMHADRI 2,000.00 8,189.17 7 SIMHAPURI TPS 600.00 2,032.72 8 THAMMINAPATNAM TPS 1,000.00 1,176.94 9 VIZAG TPP 1,040.00 3,823.75 10 Assam BONGAIGAON TPP 750.00 3,318.11 11 BARAUNI TPS 500.00 2,562.70 12 BARH STPS 3,300.00 12,495.52 13 BUXAR TPP 660.00 372.86 14 Bihar KAHALGAON TPS 2,340.00 11,685.04 15 MUZAFFARPUR TPS 390.00 1,832.94 16 NABINAGAR STPP 1,980.00 9,703.99 17 NABINAGAR TPP 1,000.00 4,713.43 18 ADANI POWER LIMITED RAIGARH TPP 600.00 2,829.49 19 ADANI POWER LIMITED RAIPUR TPP 1,370.00 5,992.41 20 AKALTARA TPS 1,800.00 8,681.98 21 BALCO TPS 600.00 2,824.22 22 BANDAKHAR TPP 300.00 1,586.13 23 BARADARHA TPS 1,200.00 6,536.33 24 BHILAI TPS 500.00 2,742.08 25 BINJKOTE TPP 600.00 3,194.51 26 CHAKABURA TPP 30.00 152.57 27 DSPM TPS 500.00 2,956.62 28 KASAIPALLI TPP 270.00 1,144.22 29 KORBA STPS 2,600.00 14,707.17 Chhattisgarh 30 KORBA-WEST TPS 1,340.00 5,995.18 31 LARA TPP 1,600.00 8,958.73 32 MARWA TPS 1,000.00 5,029.18 33 NAWAPARA TPP 600.00 2,917.03 34 OP JINDAL TPS 1,000.00 5,713.08 35 PATHADI TPP 600.00 3,237.46 36 RATIJA TPS 100.00 457.26 37 SIPAT STPS 2,980.00 15,560.49 38 SVPL TPP 63.00 264.12 39 TAMNAR TPP 2,400.00 13,408.59 40 UCHPINDA TPP 1,440.00 5,995.78 41 Vedanta Ltd Chhattisgarh TPP 600.00 1,341.71 ADANI POWER LIMITED MUNDRA TPP - I & 42 II 2,640.00 10,000.13 43 ADANI POWER LIMITED MUNDRA TPP - III 1,980.00 8,831.15 44 GANDHI NAGAR TPS 630.00 1,018.10 45 Gujarat MUNDRA UMTPP 4,000.00 6,414.01 46 SABARMATI (D-F STATIONS) 362.00 1,914.16 47 SALAYA TPP 1,200.00 4,420.47 48 SIKKA REP. TPS 500.00 400.11 49 UKAI TPS 1,110.00 4,221.8650 WANAKBORI TPS 2,270.00 6,065.90 51 INDIRA GANDHI STPP 1,500.00 5,686.08 52 MAHATMA GANDHI TPS 1,320.00 5,396.42 53 Haryana PANIPAT TPS 710.00 2,446.04 54 RAJIV GANDHI TPS 1,200.00 3,064.97 55 YAMUNA NAGAR TPS 600.00 2,727.62 56 BOKARO TPS `A` EXP 500.00 1,963.47 57 CHANDRAPURA(DVC) TPS 500.00 2,144.20 58 JOJOBERA TPS 240.00 1,270.77 59 KODARMA TPP 1,000.00 4,730.94 60 Jharkhand MAHADEV PRASAD STPP 540.00 2,697.28 61 MAITHON RB TPP 1,050.00 5,113.69 62 NORTH KARANPURA TPP 1,980.00 9,044.77 63 PATRATU STPP 800.00 847.60 64 TENUGHAT TPS 420.00 1,456.07 65 ADANI POWER LIMITED UDUPI TPP 1,200.00 3,430.03 66 BELLARY TPS 1,700.00 5,742.87 67 KUDGI STPP 2,400.00 6,911.58 68 Karnataka RAICHUR TPS 1,720.00 5,230.82 69 TORANGALLU TPS(SBU-I) 260.00 1,511.21 70 TORANGALLU TPS(SBU-II) 600.00 2,663.13 71 YERMARUS TPP 1,600.00 3,903.28 72 AMARKANTAK EXT TPS 210.00 1,288.56 73 ANUPPUR TPP 1,250.00 6,519.98 74 BINA TPS 500.00 2,437.56 75 GADARWARA TPP 1,600.00 6,653.80 76 KHARGONE STPP 1,320.00 5,192.55 77 MAHAN TPP 1,200.00 6,008.09 78 NIGRI TPP 1,320.00 7,658.54 Madhya Pradesh 79 NIWARI TPP 90.00 411.87 80 SANJAY GANDHI TPS 1,340.00 5,652.13 81 SASAN UMTPP 3,960.00 22,520.93 82 SATPURA TPS 500.00 2,430.94 83 SEIONI TPP 600.00 2,882.09 84 SHREE SINGAJI TPP 2,520.00 9,922.86 85 VINDHYACHAL STPS 4,760.00 24,637.45 86 ADANI POWER LIMITED TIRODA TPP 3,300.00 15,108.77 87 AMRAVATI TPS 1,350.00 7,078.35 88 BELA TPS 270.00 1,432.57 89 BHUSAWAL TPS 1,870.00 6,548.80 90 BUTIBORI TPP 600.00 1,709.13 91 CHANDRAPUR(MAHARASHTRA) STPS 2,920.00 10,176.05 92 DAHANU TPS 500.00 2,112.10 93 DHARIWAL TPP 600.00 3,357.93 94 GEPL TPP Ph-I 120.00 0.00 95 GMR WARORA TPS 600.00 3,280.96 96 JSW RATNAGIRI TPP 300.00 1,381.01 Maharashtra 97 KHAPARKHEDA TPS 1,340.00 5,536.51 98 KORADI TPS 2,190.00 9,487.26 99 MAUDA TPS 2,320.00 11,210.86 100 MIHAN TPS 246.01 0.00 101 NASIK TPS 630.00 2,037.55 102 PARAS TPS 500.00 2,064.27 103 PARLI TPS 750.00 1,892.28 104 SHIRPUR TPP 300.00 1,346.37 105 SOLAPUR STPS 1,320.00 4,799.79 106 TROMBAY TPS 750.00 2,873.53 107 WARDHA WARORA TPP 540.00 2,922.14108 DARLIPALI STPS 1,600.00 8,453.12 109 DERANG TPP 1,200.00 6,696.93 110 IB VALLEY TPS 1,740.00 9,227.56 111 JSW Energy Utkal Limited 700.00 2,954.60 Odisha 112 KAMALANGA TPS 1,050.00 5,874.10 113 Maadurga Thermal Power Company Ltd. 60.00 255.61 114 TALCHER STPS 3,000.00 15,557.89 115 VEDANTA TPP 600.00 1,839.51 116 GH TPS (LEH.MOH.) 920.00 4,328.35 117 GOINDWAL SAHIB TPP 540.00 2,007.29 118 Punjab RAJPURA TPP 1,400.00 7,201.54 119 ROPAR TPS 840.00 3,287.28 120 TALWANDI SABO TPP 1,980.00 8,050.02 121 ADANI POWER LIMITED KAWAI TPP 1,320.00 5,869.19 122 CHHABRA-I PH-1 TPP 500.00 2,115.16 123 CHHABRA-I PH-2 TPP 500.00 2,383.75 124 CHHABRA-II TPP 1,320.00 4,698.88 125 Rajasthan KALISINDH TPS 1,200.00 4,826.99 126 KOTA TPS 1,240.00 5,357.15 127 SHREE CEMENT LTD TPS 344.00 962.52 128 SURATGARH STPS 1,320.00 5,292.05 129 SURATGARH TPS 1,500.00 4,043.72 130 ITPCL TPP 1,200.00 4,443.04 131 METTUR TPS 840.00 3,296.55 132 METTUR TPS-II 600.00 1,994.92 133 MUTHIARA TPP 1,200.00 3,515.93 134 NORTH CHENNAI TPS STAGE 1 630.00 2,104.63 135 NORTH CHENNAI TPS STAGE 2 1,200.00 3,637.01 136 Tamil Nadu NTPL TUTICORIN TPP 1,000.00 3,856.63 137 OPG Power Generation Private Limited 414.00 1,475.05 138 TCP Limited 63.50 0.00 139 TUTICORIN (P) TPP 300.00 0.00 140 TUTICORIN TPP ST-IV 525.00 2,095.08 141 TUTICORIN TPS 1,050.00 2,676.38 142 VALLUR TPP 1,500.00 5,705.22 143 BHADRADRI TPP 1,080.00 3,703.72 144 KAKATIYA TPS 1,100.00 5,363.87 145 KOTHAGUDEM TPS (NEW) 1,000.00 3,136.48 146 KOTHAGUDEM TPS (STAGE-7) 800.00 2,990.22 147 Telangana RAMAGUNDEM STPS 2,600.00 9,983.61 148 RAMAGUNDEM-B TPS 62.50 0.00 149 SINGARENI TPP 1,200.00 5,517.65 150 TELANGANA STPP PH-1 1,600.00 6,978.30 151 YADADRI TPS 1,600.00 3,654.68 152 ANPARA C TPS 1,200.00 6,048.81 153 ANPARA TPS 2,630.00 13,611.31 154 BARKHERA TPS 90.00 239.95 155 DADRI (NCTPP) 1,820.00 6,589.81 156 GHATAMPUR TPP 1,320.00 2,799.99 157 HARDUAGANJ TPS 1,265.00 3,557.74 158 JAWAHARPUR STPP 1,320.00 2,036.71 159 KHAMBARKHERA TPS 90.00 228.75 160 Uttar Pradesh KHURJA TPP 1,320.00 4,274.54 161 KUNDARKI TPS 90.00 244.76 162 LALITPUR TPS 1,980.00 8,979.63 163 MAQSOODPUR TPS 90.00 238.25 164 MEJA STPP 1,320.00 5,863.92 165 OBRA TPS 2,320.00 7,399.77 166 PANKI TPS EXT 660.00 1,344.16 167 PARICHHA TPS 920.00 3,587.16 168 PRAYAGRAJ TPP 1,980.00 9,638.85169 RIHAND STPS 3,000.00 16,155.39 170 ROSA TPP Ph-I 1,200.00 5,206.89 171 SINGRAULI STPS 2,000.00 10,382.65 172 TANDA TPS 1,760.00 6,960.58 173 UNCHAHAR TPS 1,550.00 6,928.81 174 UTRAULA TPS 90.00 230.36 175 BAKRESWAR TPS 1,050.00 6,068.76 176 BANDEL TPS 270.00 1,482.28 177 BUDGE BUDGE TPS 750.00 4,017.60 178 D.P.L. TPS 550.00 2,565.20 179 DURGAPUR STEEL TPS 1,000.00 4,561.11 180 FARAKKA STPS 2,100.00 9,239.77 181 HALDIA TPP 600.00 3,761.33 West Bengal 182 HIRANMAYE TPP 300.00 1,309.78 183 KOLAGHAT TPS 840.00 4,055.68 184 MEJIA TPS 2,340.00 11,596.13 185 RAGHUNATHPUR TPP 1,200.00 4,940.40 186 SAGARDIGHI TPS 1,600.00 9,200.70 187 SANTALDIH TPS 500.00 3,097.65 188 SOUTHERN REPL. TPS 135.00 180.45 Coal Based Sub Total 2,19,610.01 9,20,460.50 B. Lignite Based Power Stations 1 AKRIMOTA LIG TPS 250.00 90.64 2 BHAVNAGAR CFBC TPP 500.00 1,241.27 Gujarat 3 KUTCH LIG. TPS 150.00 238.96 4 SURAT LIG. TPS 500.00 2,314.49 5 BARSINGSAR LIGNITE 250.00 1,134.38 6 Rajasthan GIRAL TPS 250.00 0.00 7 JALIPA KAPURDI TPP 1,080.00 4,754.56 8 NEYVELI ( EXT) TPS 420.00 1,644.46 9 NEYVELI NEW TPP 1,000.00 4,196.89 10 Tamil Nadu NEYVELI TPS-II 1,470.00 4,056.18 11 NEYVELI TPS-II EXP 500.00 1,258.45 12 NEYVELI TPS(Z) 250.00 1,151.92 Lignite Based Sub Total 6,620.00 22,082.20 Grand Total (No of Plants =200 Nos) 2,26,230.01 9,42,542.70The details of State-Wise & Coal & Lignite Based Power Station-Wise Generation Data for FY 2023- 24 and 2024-25 Sl Capacity Generation Capacity Generation State Station Name No (MW) (MUs) (MW) (MUs) FY 2023-24 FY 2024-25 A. Coal Based Power Stations 1 Andhra DAMODARAM 2,400.00 9,751.63 2,400.00 11,859.81 Pradesh SANJEEVAIAH TPS 2 Dr. N.TATA RAO TPS 2,560.00 12,062.94 2,560.00 14,381.73 3 PAINAMPURAM TPP 1,320.00 9,522.77 1,320.00 8,134.65 4 RAYALASEEMA TPS 1,650.00 10,423.04 1,650.00 9,318.22 5 SGPL TPP 1,320.00 9,287.00 1,320.00 9,485.55 6 SIMHADRI 2,000.00 11,641.37 2,000.00 12,233.13 7 SIMHAPURI TPS 600.00 3,098.28 600.00 3,252.71 8 THAMMINAPATNAM 300.00 - 300.00 269.48 TPS 9 VIZAG TPP 1,040.00 5,454.21 1,040.00 3,897.66 10 Assam BONGAIGAON TPP 750.00 5,058.11 750.00 4,787.20 11 Bihar BARAUNI TPS 710.00 3,151.64 710.00 3,632.02 12 BARH STPS 2,640.00 14,392.04 2,640.00 16,667.03 13 KAHALGAON TPS 2,340.00 16,555.49 2,340.00 16,525.32 14 MUZAFFARPUR TPS 390.00 2,906.20 390.00 2,802.01 15 NABINAGAR STPP 1,980.00 14,411.96 1,980.00 14,044.14 16 NABINAGAR TPP 1,000.00 6,944.47 1,000.00 7,087.23 17 Chhattisgarh ADANI POWER LIMITED 600.00 3,971.95 600.00 4,370.64 RAIGARH TPP 18 ADANI POWER LIMITED 1,370.00 8,687.26 1,370.00 9,395.44 RAIPUR TPP 19 AKALTARA TPS 1,800.00 10,716.06 1,800.00 10,630.78 20 BALCO TPS 600.00 3,259.83 600.00 4,031.65 21 BANDAKHAR TPP 300.00 2,176.19 300.00 1,958.01 22 BARADARHA TPS 1,200.00 9,004.67 1,200.00 8,917.50 23 BHILAI TPS 500.00 3,875.74 500.00 3,613.86 24 BINJKOTE TPP 600.00 2,949.11 600.00 3,704.52 25 CHAKABURA TPP 30.00 220.13 30.00 189.31 26 DSPM TPS 500.00 4,072.79 500.00 3,733.11 27 KASAIPALLI TPP 270.00 1,508.73 270.00 1,380.66 28 KATGHORA TPP 35.00 - 35.00 - 29 KORBA STPS 2,600.00 20,517.25 2,600.00 20,671.02 30 KORBA-WEST TPS 1,340.00 9,607.08 1,340.00 8,301.97 31 LARA TPP 1,600.00 11,751.56 1,600.00 12,648.07 32 MARWA TPS 1,000.00 7,388.58 1,000.00 6,804.82 33 NAWAPARA TPP 600.00 3,430.44 600.00 3,859.20 34 OP JINDAL TPS 1,000.00 7,517.45 1,000.00 7,293.09 35 PATHADI TPP 600.00 3,872.30 600.00 4,315.03 36 RATIJA TPS 100.00 643.65 100.00 607.61 37 SALORA TPP 135.00 - 135.00 - 38 SIPAT STPS 2,980.00 22,358.74 2,980.00 22,986.72 39 SVPL TPP 63.00 338.82 63.00 381.62 40 SWASTIK KORBA TPP 25.00 - 25.00 - 41 TAMNAR TPP 2,400.00 17,140.60 2,400.00 18,979.52 42 UCHPINDA TPP 1,440.00 7,379.70 1,440.00 7,657.23 43 Gujarat ADANI POWER LIMITED 2,640.00 10,639.41 2,640.00 16,762.56 MUNDRA TPP - I & II 44 ADANI POWER LIMITED 1,980.00 11,847.96 1,980.00 11,990.52 MUNDRA TPP - III 45 GANDHI NAGAR TPS 630.00 2,966.65 630.00 2,373.57 46 MUNDRA UMTPP 4,000.00 20,275.93 4,000.00 23,655.33 47 SABARMATI (D-F 362.00 2,892.14 362.00 2,578.41 STATIONS) 48 SALAYA TPP 1,200.00 4,029.55 1,200.00 5,707.94 49 SIKKA REP. TPS 500.00 784.77 500.00 889.64 50 UKAI TPS 1,110.00 5,274.58 1,110.00 5,683.31 51 WANAKBORI TPS 2,270.00 12,070.01 2,270.00 10,128.5652 Haryana INDIRA GANDHI STPP 1,500.00 8,284.84 1,500.00 8,711.53 53 MAHATMA GANDHI 1,320.00 8,251.07 1,320.00 8,132.51 TPS 54 PANIPAT TPS 710.00 3,707.13 710.00 4,489.69 55 RAJIV GANDHI TPS 1,200.00 4,304.34 1,200.00 5,551.36 56 YAMUNA NAGAR TPS 600.00 3,512.77 600.00 3,343.47 57 Jharkhand BOKARO TPS `A` EXP 500.00 3,607.92 500.00 3,188.70 58 CHANDRAPURA(DVC) 500.00 3,747.66 500.00 3,479.40 TPS 59 JOJOBERA TPS 240.00 1,713.30 240.00 1,685.54 60 KODARMA TPP 1,000.00 7,066.86 1,000.00 7,358.35 61 MAHADEV PRASAD 540.00 3,740.28 540.00 3,886.08 STPP 62 MAITHON RB TPP 1,050.00 8,179.04 1,050.00 7,253.28 63 NORTH KARANPURA 1,320.00 5,335.16 1,320.00 9,708.54 TPP 64 TENUGHAT TPS 420.00 2,374.59 420.00 2,252.32 65 Karnataka ADANI POWER LIMITED 1,200.00 5,655.83 1,200.00 5,450.40 UDUPI TPP 66 BELLARY TPS 1,700.00 8,208.51 1,700.00 8,182.28 67 KUDGI STPP 2,400.00 12,092.37 2,400.00 12,090.09 68 RAICHUR TPS 1,720.00 7,875.64 1,720.00 8,310.39 69 TORANGALLU 260.00 1,711.45 260.00 1,595.43 TPS(SBU-I) 70 TORANGALLU 600.00 2,693.49 600.00 2,825.05 TPS(SBU-II) 71 YERMARUS TPP 1,600.00 6,229.29 1,600.00 5,914.29 72 Madhya AMARKANTAK EXT 210.00 1,804.17 210.00 1,546.01 Pradesh TPS 73 ANUPPUR TPP 1,250.00 8,429.27 1,250.00 8,515.23 74 BINA TPS 500.00 3,328.98 500.00 3,006.48 75 GADARWARA TPP 1,600.00 9,995.71 1,600.00 9,027.54 76 KHARGONE STPP 1,320.00 7,686.92 1,320.00 7,421.16 77 MAHAN TPP 1,200.00 6,736.17 1,200.00 8,324.39 78 NIGRI TPP 1,320.00 9,840.56 1,320.00 9,357.73 79 NIWARI TPP 90.00 540.25 90.00 526.85 80 SANJAY GANDHI TPS 1,340.00 7,991.71 1,340.00 8,445.18 81 SASAN UMTPP 3,960.00 32,529.74 3,960.00 31,425.10 82 SATPURA TPS 1,330.00 3,900.76 1,330.00 3,756.02 83 SEIONI TPP 600.00 3,596.53 600.00 3,216.46 84 SHREE SINGAJI TPP 2,520.00 14,912.41 2,520.00 15,042.59 85 VINDHYACHAL STPS 4,760.00 37,386.85 4,760.00 36,506.02 86 Maharashtra ADANI POWER LIMITED 3,300.00 21,262.06 3,300.00 21,595.86 TIRODA TPP 87 AMRAVATI TPS 1,350.00 9,758.55 1,350.00 9,278.91 88 BELA TPS 270.00 1,790.43 270.00 1,862.03 89 BHUSAWAL TPS 1,210.00 7,575.38 1,870.00 7,250.32 90 BUTIBORI TPP 600.00 - 600.00 - 91 CHANDRAPUR(MAHAR 2,920.00 16,279.77 2,920.00 14,900.57 ASHTRA) STPS 92 DAHANU TPS 500.00 3,248.48 500.00 3,200.80 93 DHARIWAL TPP 600.00 4,421.55 600.00 4,588.52 94 GEPL TPP Ph-I 120.00 - 120.00 - 95 GMR WARORA TPS 600.00 4,374.59 600.00 4,452.36 96 JSW RATNAGIRI TPP 300.00 1,975.40 300.00 1,971.76 97 KHAPARKHEDA TPS 1,340.00 8,267.44 1,340.00 8,811.42 98 KORADI TPS 2,190.00 13,173.34 2,190.00 13,608.83 99 MAUDA TPS 2,320.00 14,906.24 2,320.00 14,264.23 100 MIHAN TPS 246.01 - 246.01 - 101 NASIK (P) TPS 1,350.00 - 1,350.00 - 102 NASIK TPS 630.00 2,647.28 630.00 2,973.62 103 PARAS TPS 500.00 3,596.01 500.00 3,041.57 104 PARLI TPS 750.00 4,103.55 750.00 3,952.75105 SHIRPUR TPP 300.00 334.11 300.00 1,487.97 106 SOLAPUR STPS 1,320.00 7,181.43 1,320.00 6,830.21 107 TROMBAY TPS 750.00 4,179.09 750.00 3,192.59 108 WARDHA WARORA TPP 540.00 3,850.10 540.00 3,892.91 109 Odisha DARLIPALI STPS 1,600.00 12,054.96 1,600.00 12,096.12 110 DERANG TPP 1,200.00 8,289.60 1,200.00 9,043.44 111 IB VALLEY TPS 1,740.00 11,799.68 1,740.00 12,769.14 112 UTKAL TPP (IND 350.00 262.99 350.00 1,984.08 BARATH) 113 KAMALANGA TPS 1,050.00 7,581.80 1,050.00 7,944.68 114 Maadurga Thermal - - 60.00 197.15 Power Company Ltd. 115 TALCHER STPS 3,000.00 22,625.01 3,000.00 21,382.44 116 VEDANTA TPP 600.00 2,996.34 600.00 2,442.35 117 Punjab GH TPS (LEH.MOH.) 920.00 4,639.97 920.00 4,865.76 118 GOINDWAL SAHIB TPP 540.00 2,464.79 540.00 3,061.23 119 RAJPURA TPP 1,400.00 10,344.57 1,400.00 10,085.85 120 ROPAR TPS 840.00 3,953.06 840.00 4,553.78 121 TALWANDI SABO TPP 1,980.00 11,060.46 1,980.00 11,008.59 122 Rajasthan ADANI POWER LIMITED 1,320.00 8,881.72 1,320.00 9,177.28 KAWAI TPP 123 CHHABRA-I PH-1 TPP 500.00 3,481.68 500.00 3,411.49 124 CHHABRA-I PH-2 TPP 500.00 2,544.58 500.00 3,590.70 125 CHHABRA-II TPP 1,320.00 7,229.32 1,320.00 8,017.52 126 KALISINDH TPS 1,200.00 7,062.75 1,200.00 7,565.81 127 KOTA TPS 1,240.00 8,482.51 1,240.00 8,796.64 128 SHREE CEMENT LTD 300.00 445.25 300.00 1,377.53 TPS 129 SURATGARH STPS 1,320.00 6,489.12 1,320.00 6,952.58 130 SURATGARH TPS 1,500.00 7,084.69 1,500.00 7,655.53 131 Tamil Nadu ITPCL TPP 1,200.00 7,440.83 1,200.00 6,936.33 132 METTUR TPS 840.00 5,805.22 840.00 4,989.65 133 METTUR TPS - II 600.00 3,202.15 600.00 2,704.65 134 MUTHIARA TPP 1,200.00 5,518.77 1,200.00 5,236.46 135 NORTH CHENNAI TPS 1,830.00 9,986.57 1,830.00 8,306.98 136 NTPL TUTICORIN TPP 1,000.00 5,462.36 1,000.00 5,236.46 137 OPG Power Generation 414.00 492.17 414.00 2,323.98 Private Limited 138 TCP Limited - - 63.50 - 139 TUTICORIN (P) TPP 300.00 - 300.00 - 140 TUTICORIN TPP ST-IV 525.00 3,041.79 525.00 3,039.92 141 TUTICORIN TPS 1,050.00 6,485.17 1,050.00 5,941.41 142 VALLUR TPP 1,500.00 6,623.27 1,500.00 8,660.91 143 Telangana BHADRADRI TPP 1,080.00 6,953.98 1,080.00 5,332.79 144 KAKATIYA TPS 1,100.00 8,227.68 1,100.00 6,443.45 145 KOTHAGUDEM TPS 1,000.00 6,828.34 1,000.00 5,940.32 (NEW) 146 KOTHAGUDEM TPS 800.00 6,011.28 800.00 5,538.98 (STAGE-7) 147 RAMAGUNDEM STPS 2,600.00 16,949.35 2,600.00 15,037.78 148 RAMAGUNDEM-B TPS 62.50 258.90 62.50 21.09 149 SINGARENI TPP 1,200.00 8,853.53 1,200.00 7,986.30 150 TELANGANA STPP PH- 1,600.00 2,830.67 1,600.00 10,404.44 1 151 YADADRI TPS - - 800.00 264.05 152 Uttar ANPARA C TPS 1,200.00 8,161.55 1,200.00 8,160.08 153 Pradesh ANPARA TPS 2,630.00 17,256.44 2,630.00 17,006.56 154 BARKHERA TPS 90.00 347.29 90.00 387.62 155 DADRI (NCTPP) 1,820.00 9,982.72 1,820.00 9,901.80 156 GHATAMPUR TPP - - 660.00 1,053.22 157 HARDUAGANJ TPS 1,265.00 6,428.87 1,265.00 5,430.45 158 JAWAHARPUR STPP 660.00 - 1,320.00 2,405.03 159 KHAMBARKHERA TPS 90.00 339.87 90.00 389.34160 KHURJA TPP - - 660.00 870.80 161 KUNDARKI TPS 90.00 326.46 90.00 374.97 162 LALITPUR TPS 1,980.00 12,352.91 1,980.00 12,551.42 163 MAQSOODPUR TPS 90.00 349.51 90.00 404.43 164 MEJA STPP 1,320.00 8,275.82 1,320.00 8,598.70 165 OBRA TPS 1,660.00 4,810.77 1,660.00 7,975.65 166 PANKI TPS EXT - - 660.00 - 167 PARICHHA TPS 920.00 5,208.04 920.00 5,439.03 168 PRAYAGRAJ TPP 1,980.00 12,699.02 1,980.00 12,987.15 169 RIHAND STPS 3,000.00 23,399.81 3,000.00 23,426.61 170 ROSA TPP Ph-I 1,200.00 7,609.70 1,200.00 7,402.50 171 SINGRAULI STPS 2,000.00 15,756.09 2,000.00 15,657.40 172 TANDA TPS 1,760.00 10,397.00 1,760.00 10,728.24 173 UNCHAHAR TPS 1,550.00 8,464.35 1,550.00 9,815.70 174 UTRAULA TPS 90.00 338.98 90.00 370.60 175 West Bengal BAKRESWAR TPS 1,050.00 8,155.93 1,050.00 8,583.13 176 BANDEL TPS 270.00 1,774.69 270.00 2,158.88 177 BUDGE BUDGE TPS 750.00 5,734.98 750.00 5,489.13 178 D.P.L. TPS 550.00 2,375.21 550.00 3,887.17 179 DISHERGARH TPP 12.00 46.52 12.00 41.19 180 DURGAPUR STEEL TPS 1,000.00 7,079.73 1,000.00 7,058.57 181 FARAKKA STPS 2,100.00 13,784.22 2,100.00 14,023.79 182 HALDIA TPP 600.00 4,563.95 600.00 4,790.42 183 HIRANMAYE TPP 300.00 1,861.44 300.00 1,933.85 184 KOLAGHAT TPS 840.00 5,393.77 840.00 5,606.49 185 MEJIA TPS 2,340.00 15,670.77 2,340.00 15,711.73 186 RAGHUNATHPUR TPP 1,200.00 6,954.97 1,200.00 6,576.47 187 SAGARDIGHI TPS 1,600.00 11,527.89 1,600.00 12,734.18 188 SANTALDIH TPS 500.00 3,949.21 500.00 4,133.69 189 SOUTHERN REPL. TPS 135.00 640.68 135.00 439.48 190 TITAGARH TPS 240.00 - 240.00 - Coal Based Sub Total 2,10,969.51 12,60,902.62 2,15,193.01 12,98,872.29 B. Lignite Based Power Stations 1 AKRIMOTA LIG TPS 250.00 451.98 250.00 88.13 2 BHAVNAGAR CFBC TPP 500.00 1,874.93 500.00 1,521.86 Gujarat 3 KUTCH LIG. TPS 150.00 404.40 150.00 470.98 4 SURAT LIG. TPS 500.00 3,085.12 500.00 3,164.78 5 BARSINGSAR LIGNITE 250.00 1,692.16 250.00 1,759.56 6 Rajasthan GIRAL TPS 250.00 0.00 250.00 0.00 7 JALIPA KAPURDI TPP 1,080.00 7,084.30 1,080.00 6,760.62 8 NEYVELI ( EXT) TPS 420.00 2,871.16 420.00 3,006.93 9 NEYVELI NEW TPP 1,000.00 7,073.21 1,000.00 6,729.57 10 Tamil Nadu NEYVELI TPS-II 1,470.00 5,756.11 1,470.00 6,760.01 11 NEYVELI TPS-II EXP 500.00 2,154.85 500.00 1,074.46 12 NEYVELI TPS(Z) 250.00 1,501.57 250.00 1,657.87 Lignite Based Sub Total 6,620.00 33,949.79 6,620.00 32,994.77 Grand Total 2,17,589.51 12,94,852.41 2,21,813.01 13,31,867.06The details of State-Wise & Coal & Lignite Based Power Station-Wise Generation Data for FY 2021-22 & 2022- 23 Sl Capacity Generation Capacity Generation State Station Name No (MW) (MUs) (MW) (MUs) 2021-22 2022-23 A. Coal Based Power Stations DAMODARAM 1,600.00 5,672.41 2,400.00 5,883.05 1 SANJEEVAIAH TPS 2 Dr. N.TATA RAO TPS 1,760.00 11,591.18 1,760.00 11,121.58 3 PAINAMPURAM TPP 1,320.00 9,331.61 1,320.00 8,897.49 4 RAYALASEEMA TPS 1,650.00 6,828.52 1,650.00 9,313.14 Andhra 5 SGPL TPP 1,320.00 7,629.01 1,320.00 8,101.71 Pradesh 6 SIMHADRI 2,000.00 11,570.21 2,000.00 12,641.29 7 SIMHAPURI TPS 600.00 0.00 600.00 135.53 THAMMINAPATNAM 300.00 422.41 300.00 0.00 8 TPS 9 VIZAG TPP 1,040.00 281.39 1,040.00 4,838.14 10 Assam BONGAIGAON TPP 750.00 4,201.45 750.00 5,026.24 11 BARAUNI TPS 710.00 2,410.67 710.00 3,622.80 12 BARH STPS 1,980.00 8,821.55 1,980.00 13,138.38 13 KAHALGAON TPS 2,340.00 16,026.71 2,340.00 15,595.60 Bihar 14 MUZAFFARPUR TPS 390.00 2,849.53 390.00 2,991.96 15 NABINAGAR STPP 1,980.00 8,138.21 1,980.00 12,924.67 16 NABINAGAR TPP 1,000.00 5,693.73 1,000.00 6,926.80 17 AKALTARA TPS 1,800.00 9,005.13 1,800.00 10,630.91 ADANI POWER LIMITED 600.00 3,704.70 600.00 3,968.28 18 RAIGARH TPP 19 BALCO TPS 600.00 3,438.03 600.00 2,541.09 20 BANDAKHAR TPP 300.00 2,162.84 300.00 1,513.15 21 BARADARHA TPS 1,200.00 8,633.69 1,200.00 7,632.45 22 BHILAI TPS 500.00 3,517.73 500.00 3,791.95 23 BINJKOTE TPP 600.00 1,664.15 600.00 1,452.13 24 CHAKABURA TPP 30.00 104.40 30.00 195.15 25 DSPM TPS 500.00 3,908.44 500.00 3,648.13 26 KASAIPALLI TPP 270.00 1,391.81 270.00 1,139.39 27 KATGHORA TPP 35.00 0.00 35.00 0.00 28 KORBA STPS 2,600.00 21,245.37 2,600.00 20,759.68 29 KORBA-WEST TPS 1,340.00 8,778.11 1,340.00 9,686.01 Chhattisgarh 30 LARA TPP 1,600.00 11,365.81 1,600.00 11,685.41 31 MARWA TPS 1,000.00 4,827.36 1,000.00 4,375.48 32 NAWAPARA TPP 600.00 693.79 600.00 2,588.65 33 OP JINDAL TPS 1,000.00 5,225.88 1,000.00 5,990.97 34 PATHADI TPP 600.00 4,024.01 600.00 3,235.81 ADANI POWER LIMITED 1,370.00 8,834.61 1,370.00 7,084.49 35 RAIPUR TPP 36 RATIJA TPS 100.00 663.75 100.00 537.07 37 SALORA TPP 135.00 0.00 135.00 0.00 38 SIPAT STPS 2,980.00 21,220.75 2,980.00 21,168.02 39 SVPL TPP 63.00 0.00 63.00 0.00 40 SWASTIK KORBA TPP 25.00 0.00 25.00 0.00 41 TAMNAR TPP 2,400.00 9,587.90 2,400.00 12,977.06 42 UCHPINDA TPP 1,440.00 6,872.61 1,440.00 5,997.92 43 GANDHI NAGAR TPS 630.00 3,313.29 630.00 3,694.55 ADANI POWER LIMITED 1,980.00 2,982.15 1,980.00 3,784.88 44 MUNDRA TPP - III ADANI POWER LIMITED 2,640.00 8,980.02 2,640.00 5,690.16 45 MUNDRA TPP - I & II 46 MUNDRA UMTPP 4,000.00 9,088.34 4,000.00 11,730.07 Gujarat SABARMATI (D-F 362.00 2,437.82 362.00 2,798.01 47 STATIONS) 48 SALAYA TPP 1,200.00 0.00 1,200.00 2,056.52 49 SIKKA REP. TPS 500.00 962.12 500.00 1,563.82 50 UKAI TPS 1,110.00 5,027.92 1,110.00 5,431.52 51 WANAKBORI TPS 2,270.00 11,092.74 2,270.00 10,847.0552 INDIRA GANDHI STPP 1,500.00 7,051.21 1,500.00 8,268.17 53 MAHATMA GANDHI TPS 1,320.00 7,756.83 1,320.00 8,145.93 54 Haryana PANIPAT TPS 710.00 2,754.95 710.00 4,859.39 55 RAJIV GANDHI TPS 1,200.00 2,674.31 1,200.00 6,636.56 56 YAMUNA NAGAR TPS 600.00 2,610.13 600.00 4,226.63 57 BOKARO TPS `A` EXP 500.00 2,996.83 500.00 3,796.11 CHANDRAPURA(DVC) 500.00 3,815.98 500.00 3,478.12 58 TPS 59 JOJOBERA TPS 240.00 1,615.14 240.00 1,788.09 60 KODARMA TPP 1,000.00 6,930.26 1,000.00 7,269.56 Jharkhand MAHADEV PRASAD 540.00 3,724.14 540.00 3,497.06 61 STPP 62 MAITHON RB TPP 1,050.00 7,489.25 1,050.00 7,558.98 NORTH KARANPURA - - 660.00 499.32 TPP 63 TENUGHAT TPS 420.00 1,767.12 420.00 2,585.54 64 BELLARY TPS 1,700.00 6,616.60 1,700.00 7,096.67 65 KUDGI STPP 2,400.00 6,709.08 2,400.00 11,330.75 66 RAICHUR TPS 1,720.00 6,700.99 1,720.00 6,582.65 TORANGALLU 260.00 1,428.38 260.00 1,835.47 67 TPS(SBU-I) Karnataka TORANGALLU 600.00 1,957.41 600.00 2,018.43 68 TPS(SBU-II) ADANI POWER LIMITED 1,200.00 1,712.43 1,200.00 1,410.93 69 UDUPI TPP 70 YERMARUS TPP 1,600.00 5,380.37 1,600.00 4,739.40 71 AMARKANTAK EXT TPS 210.00 1,507.83 210.00 1,433.97 72 ANUPPUR TPP 1,200.00 7,715.95 1,200.00 7,518.22 73 BINA TPS 500.00 2,508.67 500.00 2,979.74 74 GADARWARA TPP 1,600.00 7,965.67 1,600.00 9,390.94 75 KHARGONE STPP 1,320.00 6,343.97 1,320.00 5,630.45 76 MAHAN TPP 1,200.00 3,431.14 1,200.00 3,782.92 77 Madhya NIGRI TPP 1,320.00 8,381.90 1,320.00 8,036.35 78 Pradesh NIWARI TPP 90.00 167.99 90.00 318.71 79 SANJAY GANDHI TPS 1,340.00 6,631.59 1,340.00 8,782.77 80 SASAN UMTPP 3,960.00 32,673.14 3,960.00 29,763.91 81 SATPURA TPS 1,330.00 3,449.85 1,330.00 3,968.04 82 SEIONI TPP 600.00 3,708.01 600.00 3,727.99 83 SHREE SINGAJI TPP 2,520.00 9,418.46 2,520.00 13,167.30 84 VINDHYACHAL STPS 4,760.00 35,730.28 4,760.00 37,337.16 85 AMRAVATI TPS 1,350.00 8,880.99 1,350.00 9,127.46 86 BELA TPS 270.00 0.00 270.00 759.21 87 BHUSAWAL TPS 1,210.00 6,158.13 1,210.00 6,835.02 88 BUTIBORI TPP 600.00 0.00 600.00 0.00 CHANDRAPUR(MAHARA 2,920.00 14,991.95 2,920.00 15,067.28 89 SHTRA) STPS 90 DAHANU TPS 500.00 3,337.86 500.00 3,498.90 91 DHARIWAL TPP 600.00 3,990.83 600.00 4,229.47 92 GEPL TPP Ph-I 120.00 0.00 120.00 0.00 93 GMR WARORA TPS 600.00 3,478.26 600.00 4,318.74 94 JSW RATNAGIRI TPP 300.00 3,417.94 300.00 676.13 95 Maharashtra KHAPARKHEDA TPS 1,340.00 7,140.51 1,340.00 7,775.49 96 KORADI TPS 2,190.00 11,746.63 2,190.00 12,399.53 97 MAUDA TPS 2,320.00 12,205.51 2,320.00 14,714.12 98 MIHAN TPS 246.00 0.00 246.00 0.00 99 NASIK (P) TPS 1,350.00 0.00 1,350.00 0.00 100 NASIK TPS 630.00 2,014.02 630.00 2,666.36 101 PARAS TPS 500.00 2,634.60 500.00 3,069.69 102 PARLI TPS 750.00 2,950.05 750.00 3,927.99 103 SHIRPUR TPP 150.00 0.00 150.00 0.00 104 SOLAPUR STPS 1,320.00 5,081.29 1,320.00 5,879.54 ADANI POWER LIMITED 3,300.00 21,647.19 3,300.00 22,600.44 105 TIRODA TPP106 TROMBAY TPS 750.00 4,550.60 750.00 4,147.53 107 WARDHA WARORA TPP 540.00 2,259.56 540.00 2,784.57 108 DARLIPALI STPS 1,600.00 9,129.42 1,600.00 11,317.57 109 DERANG TPP 1,200.00 8,559.39 1,200.00 7,862.69 110 IB VALLEY TPS 1,740.00 10,199.41 1,740.00 11,724.28 111 KAMALANGA TPS 1,050.00 7,530.42 1,050.00 7,080.76 Odisha 112 TALCHER STPS 3,000.00 22,123.45 3,000.00 23,223.19 UTKAL TPP (IND 350.00 0.00 350.00 0.00 113 BARATH) 114 VEDANTA TPP 600.00 2,276.82 600.00 3,323.09 115 GH TPS (LEH.MOH.) 920.00 2,007.29 920.00 3,917.16 116 GOINDWAL SAHIB TPP 540.00 1,884.24 540.00 2,141.36 117 Punjab RAJPURA TPP 1,400.00 9,654.01 1,400.00 10,379.53 118 ROPAR TPS 840.00 1,734.71 840.00 3,532.26 119 TALWANDI SABO TPP 1,980.00 8,895.57 1,980.00 11,535.85 120 CHHABRA-II TPP 1,320.00 5,633.26 1,320.00 7,268.77 121 CHHABRA-I PH-1 TPP 500.00 2,547.02 500.00 3,192.78 122 CHHABRA-I PH-2 TPP 500.00 2,075.69 500.00 2,338.09 123 KALISINDH TPS 1,200.00 7,144.53 1,200.00 6,109.58 Rajasthan ADANI POWER LIMITED 1,320.00 8,345.81 1,320.00 8,920.29 124 KAWAI TPP 125 KOTA TPS 1,240.00 6,904.60 1,240.00 7,979.25 126 SURATGARH STPS 1,320.00 4,474.19 1,320.00 4,683.88 127 SURATGARH TPS 1,500.00 3,721.27 1,500.00 6,474.04 128 ITPCL TPP 1,200.00 3,093.68 1,200.00 2,302.51 129 METTUR TPS 840.00 4,795.92 840.00 5,395.76 130 METTUR TPS - II 600.00 2,763.78 600.00 3,000.69 131 MUTHIARA TPP 1,200.00 1,221.72 1,200.00 2,349.99 132 NORTH CHENNAI TPS 1,830.00 7,868.89 1,830.00 8,574.92 Tamil Nadu 133 NTPL TUTICORIN TPP 1,000.00 4,182.47 1,000.00 5,930.01 134 TUTICORIN (P) TPP 300.00 0.00 300.00 0.00 135 TUTICORIN TPP ST-IV 525.00 0.00 525.00 922.46 136 TUTICORIN TPS 1,050.00 4,962.60 1,050.00 5,717.92 137 VALLUR TPP 1,500.00 7,913.49 1,500.00 9,566.74 138 BHADRADRI TPP 1,080.00 5,098.49 1,080.00 6,136.87 139 KAKATIYA TPS 1,100.00 7,141.46 1,100.00 7,570.14 KOTHAGUDEM TPS 1,000.00 6,376.97 1,000.00 7,184.59 140 (NEW) Telangana KOTHAGUDEM TPS 800.00 5,856.82 800.00 4,211.26 141 (STAGE-7) 142 RAMAGUNDEM-B TPS 62.50 273.39 62.50 271.26 143 RAMAGUNDEM STPS 2,600.00 17,450.00 2,600.00 16,059.37 144 SINGARENI TPP 1,200.00 9,352.93 1,200.00 9,304.71 145 ANPARA C TPS 1,200.00 8,270.56 1,200.00 8,129.22 146 ANPARA TPS 2,630.00 17,428.19 2,630.00 18,347.23 147 BARKHERA TPS 90.00 200.16 90.00 290.68 148 DADRI (NCTPP) 1,820.00 5,723.77 1,820.00 10,703.99 149 HARDUAGANJ TPS 1,265.00 1,528.65 1,265.00 5,660.07 150 KHAMBARKHERA TPS 90.00 199.94 90.00 262.15 151 KUNDARKI TPS 90.00 280.07 90.00 319.34 152 LALITPUR TPS 1,980.00 9,551.59 1,980.00 11,334.39 153 MAQSOODPUR TPS 90.00 198.40 90.00 291.60 Uttar 154 MEJA STPP 1,320.00 7,572.83 1,320.00 7,366.82 Pradesh 155 OBRA TPS 1,094.00 4,644.41 1,000.00 5,591.02 156 PARICHHA TPS 1,140.00 3,708.94 1,140.00 5,198.64 157 PRAYAGRAJ TPP 1,980.00 11,656.38 1,980.00 12,509.99 158 RIHAND STPS 3,000.00 22,406.34 3,000.00 23,368.30 159 ROSA TPP Ph-I 1,200.00 5,773.63 1,200.00 7,511.05 160 SINGRAULI STPS 2,000.00 14,453.81 2,000.00 15,332.74 161 TANDA TPS 1,760.00 8,616.41 1,760.00 10,039.63 162 UNCHAHAR TPS 1,550.00 8,242.66 1,550.00 8,615.27 163 UTRAULA TPS 90.00 242.19 90.00 282.86164 BAKRESWAR TPS 1,050.00 8,288.17 1,050.00 8,497.25 165 BANDEL TPS 330.00 1,730.12 270.00 1,855.19 166 BUDGE BUDGE TPS 750.00 5,562.04 750.00 5,330.70 167 DISHERGARH TPP 12.00 0.00 12.00 43.50 168 D.P.L. TPS 550.00 2,567.62 550.00 2,707.16 169 DURGAPUR STEEL TPS 1,000.00 6,138.47 1,000.00 7,096.23 170 DURGAPUR TPS 210.00 215.11 - - 171 FARAKKA STPS 2,100.00 12,421.57 2,100.00 12,402.37 West 172 HALDIA TPP 600.00 4,276.69 600.00 4,219.33 Bengal 173 HIRANMAYE TPP 300.00 1,110.66 300.00 1,878.54 174 KOLAGHAT TPS 1,260.00 4,271.63 840.00 4,970.39 175 MEJIA TPS 2,340.00 14,599.25 2,340.00 15,668.23 176 RAGHUNATHPUR TPP 1,200.00 6,081.72 1,200.00 5,641.39 177 SAGARDIGHI TPS 1,600.00 11,885.63 1,600.00 12,529.57 178 SANTALDIH TPS 500.00 3,904.06 500.00 4,001.79 179 SOUTHERN REPL. TPS 135.00 164.03 135.00 635.69 180 TITAGARH TPS 240.00 0.00 240.00 0.00 Coal Based Sub Total 2,04,559.50 10,41,487.43 2,05,235.50 11,45,907.58 B. Lignite Based Power Stations 1 AKRIMOTA LIG TPS 250.00 589.71 250.00 821.94 2 BHAVNAGAR CFBC TPP 500.00 1656.68 500.00 1340.41 Gujarat 3 KUTCH LIG. TPS 150.00 508.76 150.00 659.73 4 SURAT LIG. TPS 500.00 2928.87 500.00 2904.27 5 BARSINGSAR LIGNITE 250.00 1627.84 250.00 1716.03 6 Rajasthan GIRAL TPS 250.00 0.00 250.00 0.00 7 JALIPA KAPURDI TPP 1080.00 7134.19 1080.00 7285.68 8 NEYVELI ( EXT) TPS 420.00 3266.37 420.00 3114.00 9 NEYVELI NEW TPP 1000.00 6177.93 1000.00 7156.19 10 Tamil Nadu NEYVELI TPS-II 1470.00 9623.91 1470.00 8000.26 11 NEYVELI TPS-II EXP 500.00 2041.50 500.00 1972.52 12 NEYVELI TPS(Z) 250.00 1538.28 250.00 1217.31 Lignite Based Sub Total 6620.00 37094.04 6620.00 36188.34 Grand Total 2,11,179.50 10,78,581.47 2,11,855.50 11,82,095.92The details of State-Wise & Coal & Lignite Based Power Station-Wise Generation Data for FY 2019-20 and FY 2020-21. Capacity Generation Capacity Generation Sl No State Station Name (MW) (MUs) (MW) (MUs) FY 2019-20 FY 2020-21 A. Coal Based Power Stations DAMODARAM SANJEEVAIAH 1,600.00 7,127.55 1,600.00 7,228.27 1 TPS 2 Dr. N.TATA RAO TPS 1,760.00 11,061.93 1,760.00 8,330.96 3 PAINAMPURAM TPP 1,320.00 10,302.97 1,320.00 8,992.83 4 Andhra RAYALASEEMA TPS 1,650.00 6,408.90 1,650.00 2,373.87 5 Pradesh SGPL TPP 1,320.00 8,403.69 1,320.00 9,270.13 6 SIMHADRI 2,000.00 10,649.71 2,000.00 8,679.00 7 SIMHAPURI TPS 600.00 0.00 600.00 0.00 8 THAMMINAPATNAM TPS 300.00 0.00 300.00 126.83 9 VIZAG TPP 1,040.00 2,961.32 1,040.00 1,143.82 10 Assam BONGAIGAON TPP 750.00 3,929.96 750.00 2,976.74 11 BARAUNI TPS 710.00 228.69 710.00 1,362.95 12 BARH II 1,320.00 8,219.09 1,320.00 7,803.80 13 KAHALGAON TPS 2,340.00 16,504.46 2,340.00 13,231.15 Bihar 14 MUZAFFARPUR TPS 610.00 2,904.66 610.00 2,468.93 15 NABINAGAR STPP 660.00 2,616.70 1,320.00 4,734.79 16 NABINAGAR TPP 750.00 4,887.16 750.00 4,264.52 17 AKALTARA TPS 1,800.00 10,309.80 1,800.00 10,475.04 ADANI POWER LIMITED 600.00 483.99 600.00 2,877.03 18 RAIGARH TPP 19 BALCO TPS 600.00 3,497.96 600.00 3,781.65 20 BANDAKHAR TPP 300.00 2,062.18 300.00 2,090.95 21 BARADARHA TPS 1,200.00 6,439.02 1,200.00 8,073.35 22 BHILAI TPS 500.00 2,745.97 500.00 3,209.98 23 BINJKOTE TPP 600.00 2,683.49 600.00 1,866.84 24 CHAKABURA TPP 30.00 235.35 30.00 204.38 25 DSPM TPS 500.00 3,847.87 500.00 3,336.85 26 KASAIPALLI TPP 270.00 1,695.85 270.00 1,404.55 27 KATGHORA TPP 35.00 0.00 35.00 0.00 28 KORBA-III 240.00 1,308.74 - - 29 KORBA STPS 2,600.00 19,793.34 2,600.00 21,332.59 30 Chhattisgarh KORBA-WEST TPS 1,340.00 8,699.78 1,340.00 9,379.24 31 LARA TPP 800.00 2,752.24 1,600.00 6,096.63 32 MARWA TPS 1,000.00 4,356.14 1,000.00 4,542.20 33 NAWAPARA TPP 600.00 1,926.84 600.00 1,963.01 34 OP JINDAL TPS 1,000.00 2,341.80 1,000.00 4,397.99 35 PATHADI TPP 600.00 3,480.50 600.00 4,568.84 ADANI POWER LIMITED 1,370.00 5,831.21 1,370.00 6,540.99 36 RAIPUR TPP 37 RATIJA TPS 100.00 714.20 100.00 483.68 38 SALORA TPP 135.00 0.00 135.00 0.00 39 SIPAT STPS 2,980.00 22,530.32 2,980.00 23,524.78 40 SVPL TPP 63.00 313.10 63.00 0.00 41 SWASTIK KORBA TPP 25.00 0.00 25.00 0.00 42 TAMNAR TPP 2,400.00 7,119.61 2,400.00 8,667.68 43 UCHPINDA TPP 1,440.00 2,822.97 1,440.00 4,820.53 44 GANDHI NAGAR TPS 630.00 1,709.10 630.00 1,464.48 45 MUNDRA TPS 4,620.00 29,825.01 4,620.00 25,664.98 46 MUNDRA UMTPP 4,000.00 26,495.39 4,000.00 26,208.53 47 SABARMATI (D-F STATIONS) 362.00 2,317.99 362.00 1,403.80 Gujarat 48 SALAYA TPP 1,200.00 4,589.86 1,200.00 4,048.87 49 SIKKA REP. TPS 500.00 2,711.25 500.00 1,836.22 50 UKAI TPS 1,110.00 5,781.18 1,110.00 4,601.92 51 WANAKBORI TPS 2,270.00 5,581.26 2,270.00 6,408.75 52 INDIRA GANDHI STPP 1,500.00 3,842.82 1,500.00 3,654.73 53 MAHATMA GANDHI TPS 1,320.00 5,888.87 1,320.00 4,873.03 Haryana 54 PANIPAT TPS 920.00 1,972.80 710.00 1,218.49 55 RAJIV GANDHI TPS 1,200.00 2,316.12 1,200.00 1,636.9156 YAMUNA NAGAR TPS 600.00 2,741.24 600.00 2,611.42 57 BOKARO `B` TPS 210.00 94.03 210.00 18.59 58 BOKARO TPS `A` EXP 500.00 2,689.99 500.00 3,271.47 59 CHANDRAPURA(DVC) TPS 630.00 3,425.71 500.00 3,268.59 60 JOJOBERA TPS 240.00 1,464.39 240.00 1,417.27 Jharkhand 61 KODARMA TPP 1,000.00 6,459.72 1,000.00 7,508.95 62 MAHADEV PRASAD STPP 540.00 3,029.42 540.00 3,113.78 63 MAITHON RB TPP 1,050.00 6,488.20 1,050.00 6,383.36 64 TENUGHAT TPS 420.00 2,420.62 420.00 2,237.96 65 BELLARY TPS 1,700.00 4,050.40 1,700.00 3,094.68 66 KUDGI STPP 2,400.00 4,604.36 2,400.00 4,711.33 67 RAICHUR TPS 1,720.00 8,532.64 1,720.00 3,927.85 68 TORANGALLU TPS(SBU-I) 260.00 1,130.77 260.00 1,007.73 Karnataka 69 TORANGALLU TPS(SBU-II) 600.00 1,863.53 600.00 1,389.74 ADANI POWER LIMITED 1,200.00 3,277.94 1,200.00 2,350.12 70 UDUPI TPP 71 YERMARUS TPP 1,600.00 376.78 1,600.00 3,379.79 72 AMARKANTAK EXT TPS 210.00 1,691.61 210.00 1,632.45 73 ANUPPUR TPP 1,200.00 6,267.72 1,200.00 6,654.31 74 BINA TPS 500.00 2,513.68 500.00 1,686.39 75 GADARWARA TPP 800.00 1,076.12 1,600.00 4,497.00 76 KHARGONE STPP 1,320.00 959.11 1,320.00 4,340.13 77 MAHAN TPP 1,200.00 3,281.04 1,200.00 2,889.61 78 Madhya NIGRI TPP 1,320.00 6,356.69 1,320.00 8,106.40 79 Pradesh NIWARI TPP 90.00 243.25 90.00 170.23 80 SANJAY GANDHI TPS 1,340.00 6,604.20 1,340.00 8,616.32 81 SASAN UMTPP 3,960.00 33,340.92 3,960.00 33,387.69 82 SATPURA TPS 1,330.00 5,276.35 1,330.00 4,505.80 83 SEIONI TPP 600.00 2,901.09 600.00 3,677.23 84 SHREE SINGAJI TPP 2,520.00 8,647.04 2,520.00 5,928.37 85 VINDHYACHAL STPS 4,760.00 35,659.46 4,760.00 36,997.85 86 AMRAVATI TPS 1,350.00 3,196.28 1,350.00 2,835.89 87 BELA TPS 270.00 0.00 270.00 0.00 88 BHUSAWAL TPS 1,210.00 5,317.27 1,210.00 4,801.30 89 BUTIBORI TPP 600.00 0.00 600.00 0.00 CHANDRAPUR(MAHARASHT 2,920.00 16,028.86 2,920.00 16,097.12 90 RA) STPS 91 DAHANU TPS 500.00 3,347.43 500.00 3,206.13 92 DHARIWAL TPP 600.00 3,378.10 600.00 4,228.79 93 GEPL TPP Ph-I 120.00 0.00 120.00 0.00 94 GMR WARORA TPS 600.00 4,138.84 600.00 3,934.82 95 JSW RATNAGIRI TPP 1,200.00 7,868.77 1,200.00 6,199.03 96 KHAPARKHEDA TPS 1,340.00 7,260.45 1,340.00 7,930.84 97 Maharashtra KORADI TPS 2,400.00 9,466.38 2,400.00 8,430.42 98 MAUDA TPS 2,320.00 10,403.74 2,320.00 6,694.84 99 MIHAN TPS 246.00 0.00 246.00 0.00 100 NASIK (P) TPS 1,350.00 0.00 1,350.00 0.00 101 NASIK TPS 630.00 2,359.70 630.00 737.11 102 PARAS TPS 500.00 2,773.98 500.00 3,368.79 103 PARLI TPS 750.00 2,434.21 750.00 2,408.06 104 SHIRPUR TPP 150.00 0.00 150.00 0.00 105 SOLAPUR STPS 1,320.00 817.22 1,320.00 3,586.06 ADANI POWER LIMITED 3,300.00 23,254.40 3,300.00 18,049.49 106 TIRODA TPP 107 TROMBAY TPS 750.00 4,758.17 750.00 3,586.29 108 WARDHA WARORA TPP 540.00 198.36 540.00 2,078.85 109 DARLIPALI STPS 800.00 421.11 800.00 4,775.89 110 DERANG TPP 1,200.00 5,199.79 1,200.00 5,936.33 111 IB VALLEY TPS 1,740.00 6,495.79 1,740.00 8,643.13 Odisha 112 KAMALANGA TPS 1,050.00 5,865.43 1,050.00 7,101.19 113 STERLITE TPP 1,200.00 585.71 1,200.00 3,033.78 114 TALCHER (OLD) TPS 460.00 3,378.28 460.00 3,405.51115 TALCHER STPS 3,000.00 19,261.20 3,000.00 21,897.14 116 UTKAL TPP (IND BARATH) 350.00 0.00 350.00 0.00 117 GH TPS (LEH.MOH.) 920.00 915.99 920.00 905.76 118 GOINDWAL SAHIB TPP 540.00 1,312.74 540.00 1,282.71 119 Punjab RAJPURA TPP 1,400.00 8,757.21 1,400.00 7,951.49 120 ROPAR TPS 840.00 1,051.62 840.00 883.52 121 TALWANDI SABO TPP 1,980.00 8,864.11 1,980.00 6,971.31 122 CHHABRA TPP 2,320.00 13,515.68 2,320.00 14,421.24 123 KALISINDH TPS 1,200.00 5,728.09 1,200.00 6,089.98 ADANI POWER LIMITED 1,320.00 8,000.29 1,320.00 8,590.50 Rajasthan 124 KAWAI TPP 125 KOTA TPS 1,240.00 6,513.16 1,240.00 5,192.46 126 SURATGARH TPS 2,160.00 4,690.34 2,160.00 2,443.87 127 ITPCL TPP 1,200.00 7,235.28 1,200.00 4,819.06 128 METTUR TPS 840.00 4,619.22 840.00 3,544.11 129 METTUR TPS - II 600.00 2,596.36 600.00 1,418.37 130 MUTHIARA TPP 1,200.00 3,559.82 1,200.00 2,297.10 131 Tamil Nadu NORTH CHENNAI TPS 1,830.00 9,047.66 1,830.00 6,458.77 132 TUTICORIN (JV) TPP 1,000.00 4,844.41 1,000.00 5,290.62 133 TUTICORIN (P) TPP 300.00 0.00 300.00 0.00 134 TUTICORIN TPS 1,050.00 5,303.36 1,050.00 4,132.38 135 VALLUR TPP 1,500.00 5,674.72 1,500.00 4,369.00 BHADRADRI TPP - - 810.00 1,670.75 136 KAKATIYA TPS 1,100.00 7,554.74 1,100.00 6,322.47 137 KOTHAGUDEM TPS 420.00 2,295.57 - - 138 KOTHAGUDEM TPS (NEW) 1,000.00 7,167.84 1,000.00 6,316.18 Telangana KOTHAGUDEM TPS (STAGE- 800.00 3,578.51 800.00 6,109.56 139 7) 140 RAMAGUNDEM-B TPS 62.50 398.09 62.50 285.95 141 RAMAGUNDEM STPS 2,600.00 17,126.05 2,600.00 16,711.55 142 SINGARENI TPP 1,200.00 9,226.98 1,200.00 7,344.30 143 ANPARA C TPS 1,200.00 7,539.56 1,200.00 8,666.50 144 ANPARA TPS 2,630.00 17,047.66 2,630.00 15,279.04 145 BARKHERA TPS 90.00 90.84 90.00 184.19 146 DADRI (NCTPP) 1,820.00 6,546.43 1,820.00 3,957.75 147 HARDUAGANJ TPS 605.00 3,274.14 605.00 2,142.65 148 KHAMBARKHERA TPS 90.00 79.81 90.00 188.10 149 KUNDARKI TPS 90.00 125.18 90.00 246.58 150 LALITPUR TPS 1,980.00 7,174.91 1,980.00 7,289.49 151 MAQSOODPUR TPS 90.00 102.56 90.00 190.83 Uttar 152 MEJA STPP 660.00 1,050.67 1,320.00 4,054.65 Pradesh 153 OBRA TPS 1,094.00 3,695.92 1,094.00 4,698.93 154 PARICHHA TPS 1,140.00 3,835.22 1,140.00 3,677.32 155 PRAYAGRAJ TPP 1,980.00 9,120.88 1,980.00 10,751.13 156 RIHAND STPS 3,000.00 23,359.27 3,000.00 23,398.68 157 ROSA TPP Ph-I 1,200.00 6,039.70 1,200.00 6,751.18 158 SINGRAULI STPS 2,000.00 15,331.89 2,000.00 14,959.51 159 TANDA TPS 1,100.00 3,958.39 1,760.00 5,738.68 160 UNCHAHAR TPS 1,550.00 8,526.46 1,550.00 7,156.40 161 UTRAULA TPS 90.00 119.42 90.00 261.35 162 BAKRESWAR TPS 1,050.00 7,002.77 1,050.00 7,896.57 163 BANDEL TPS 330.00 860.04 330.00 1,170.80 164 BUDGE BUDGE TPS 750.00 5,798.13 750.00 5,422.69 165 D.P.L. TPS 550.00 2,233.33 550.00 2,787.96 166 DURGAPUR STEEL TPS 1,000.00 6,319.02 1,000.00 5,780.98 167 DURGAPUR TPS 210.00 437.85 210.00 135.82 West Bengal 168 FARAKKA STPS 2,100.00 13,132.63 2,100.00 11,928.60 169 HALDIA TPP 600.00 4,430.09 600.00 4,224.94 170 HIRANMAYE TPP 300.00 10.02 300.00 433.86 171 KOLAGHAT TPS 1,260.00 2,871.42 1,260.00 1,769.36 172 MEJIA TPS 2,340.00 12,540.81 2,340.00 12,828.81 173 RAGHUNATHPUR TPP 1,200.00 5,030.71 1,200.00 5,225.69174 SAGARDIGHI TPS 1,600.00 6,695.31 1,600.00 9,596.12 175 SANTALDIH TPS 500.00 3,693.99 500.00 3,442.98 176 SOUTHERN REPL. TPS 135.00 339.27 135.00 89.89 177 TITAGARH TPS 240.00 0.00 240.00 0.00 Coal Based Sub Total 1,99,272.50 9,61,218.23 2,02,662.50 9,50,937.55 B. Lignite Based Power Stations 1 AKRIMOTA LIG TPS 250.00 740.25 250.00 435.05 2 BHAVNAGAR CFBC TPP 500.00 596.27 500.00 1,201.05 Gujarat 3 KUTCH LIG. TPS 290.00 883.25 150.00 809.43 4 SURAT LIG. TPS 500.00 3,359.81 500.00 2,975.71 5 BARSINGSAR LIGNITE 250.00 1,528.01 250.00 1,451.70 6 Rajasthan GIRAL TPS 250.00 0.00 250.00 0.00 7 JALIPA KAPURDI TPP 1,080.00 5,875.54 1,080.00 7,026.83 8 NEYVELI ( EXT) TPS 420.00 3,328.54 420.00 2,786.96 9 NEYVELI NEW TPP 500.00 547.87 1,000.00 3,349.84 10 NEYVELI TPS-I 500.00 2,711.74 0.00* 531.64 Tamil Nadu 11 NEYVELI TPS-II 1,470.00 10,356.22 1,470.00 6,955.54 12 NEYVELI TPS-II EXP 500.00 1,613.71 500.00 2,095.81 13 NEYVELI TPS(Z) 250.00 1,437.55 250.00 886.12 Lignite Based Sub Total 6,760.00 32,978.76 6,620.00 30,505.68 Grand Total 2,06,032.50 9,94,196.99 2,09,282.50 9,81,443.23 (*) All the units of NEYVELI TPS-I were retired by 30.09.2020. Hence the monitored capacity on 31.03.2021 is 0 MWThe details of State-Wise & Coal & Lignite Based Power Station-Wise Generation Data for FY 2017- 2018 & FY 2018-19 Sl Capacity Generation Capacity Generation State Station Name No (MW) (MUs) (MW) (MUs) 2017-18 2018-19 A. Coal Based Power Stations 1 SIMHADRI 2,000.00 11,773.71 2,000.00 12,449.08 DAMODARAM 1,600.00 6,957.21 2 SANJEEVAIAH TPS 1,600.00 4,939.92 3 Dr. N.TATA RAO TPS 1,760.00 10,821.55 1,760.00 10,885.93 4 Andhra RAYALASEEMA TPS 1,650.00 6,924.70 1,650.00 6,637.55 5 Pradesh PAINAMPURAM TPP 1,320.00 9,833.58 1,320.00 8,369.17 6 SGPL TPP 1,320.00 8,970.59 1,320.00 9,736.08 7 SIMHAPURI TPS 600.00 25.02 600.00 99.46 8 THAMMINAPATNAM TPS 300.00 587.30 300.00 36.59 9 VIZAG TPP 1,040.00 3,326.14 1,040.00 949.10 10 Assam BONGAIGAON TPP 500.00 1,732.17 750.00 2,824.21 11 BARH II 1,320.00 9,272.35 710.00 44.85 12 KAHALGAON TPS 2,340.00 16,316.65 1,320.00 9,845.23 13 Bihar MUZAFFARPUR TPS 610.00 1,750.61 2,340.00 16,485.91 14 NABINAGAR TPP 500.00 1,060.94 610.00 3,039.78 15 BARAUNI TPS 810.00 39.48 750.00 2,754.75 16 BHILAI TPS 500.00 3,877.77 500.00 3,426.23 17 KORBA STPS 2,600.00 20,477.94 2,600.00 20,083.42 18 LARA TPP 800.00 0.00 800.00 262.91 19 SIPAT STPS 2,980.00 23,009.82 2,980.00 23,907.12 20 DSPM TPS 500.00 4,042.97 500.00 3,828.15 21 KORBA-II 200.00 545.24 200.00 226.10 22 KORBA-III 240.00 1,242.20 240.00 1,317.27 23 KORBA-WEST TPS 1,340.00 9,283.64 1,340.00 9,472.41 24 MARWA TPS 1,000.00 5,720.00 1,000.00 6,415.52 25 AKALTARA TPS 1,800.00 5,806.98 1,800.00 7,912.22 ADANI POWER LIMITED 600.00 0.00 26 RAIGARH TPP 600.00 572.13 27 BALCO TPS 600.00 2,313.07 600.00 2,768.07 28 BANDAKHAR TPP 300.00 2,223.84 300.00 2,137.60 29 BARADARHA TPS 1,200.00 6,536.81 1,200.00 6,729.62 Chhattisgarh 30 BINJKOTE TPP 600.00 673.97 600.00 1,464.92 31 CHAKABURA TPP 30.00 268.75 30.00 241.55 32 KASAIPALLI TPP 270.00 1,905.36 270.00 1,900.36 33 KATGHORA TPP 35.00 0.00 35.00 0.00 34 NAWAPARA TPP 600.00 2,741.13 600.00 3,095.17 35 OP JINDAL TPS 1,000.00 4,221.47 1,000.00 3,349.21 36 PATHADI TPP 600.00 4,139.42 600.00 4,293.08 ADANI POWER LIMITED 1,370.00 2,830.89 37 RAIPUR TPP 1,370.00 1,367.92 38 RATIJA TPS 100.00 743.06 100.00 799.10 39 SALORA TPP 135.00 0.00 135.00 0.00 40 SVPL TPP 63.00 27.13 63.00 12.44 41 SWASTIK KORBA TPP 25.00 0.00 25.00 0.00 42 TAMNAR TPP 2,400.00 6,684.29 2,400.00 7,044.63 43 UCHPINDA TPP 1,080.00 1,438.78 1,440.00 1,953.26 44 BADARPUR TPS 705.00 1,556.97 - - 45 Delhi I.P. T.P.S. 247.50 0.00 - - 46 RAJGHAT TPS 135.00 0.00 135.00 0.00 47 GANDHI NAGAR TPS 870.00 3,741.98 630.00 3,703.99 48 SIKKA REP. TPS 740.00 2,677.54 500.00 2,725.93 49 Gujarat UKAI TPS 1,350.00 6,768.96 1,110.00 6,936.96 50 WANAKBORI TPS 1,470.00 7,704.68 1,470.00 8,343.14 51 MUNDRA TPS 4,620.00 21,907.95 4,620.00 23,912.3852 MUNDRA UMTPP 4,000.00 26,514.87 4,000.00 26,839.30 SABARMATI (C 60.00 0.00 53 STATION) 60.00 0.01 SABARMATI (D-F 362.00 2,785.64 54 STATIONS) 362.00 2,638.77 55 SALAYA TPP 1,200.00 2,682.42 1,200.00 0.00 56 INDIRA GANDHI STPP 1,500.00 7,734.53 1,500.00 7,387.28 57 FARIDABAD TPS. 170.00 0.00 - - 58 PANIPAT TPS 1,360.00 2,579.45 920.00 3,378.89 Haryana 59 RAJIV GANDHI TPS 1,200.00 4,681.01 1,200.00 3,852.19 60 YAMUNA NAGAR TPS 600.00 3,448.13 600.00 3,321.63 61 MAHATMA GANDHI TPS 1,320.00 7,325.47 1,320.00 6,898.35 62 BOKARO TPS `A` EXP 500.00 2,924.25 210.00 688.44 63 BOKARO `B` TPS 210.00 573.94 500.00 2,920.75 CHANDRAPURA(DVC) 1,120.00 3,560.59 64 TPS 1,120.00 4,075.82 65 KODARMA TPP 1,000.00 5,911.30 1,000.00 6,278.75 Jharkhand 66 PATRATU TPS 770.00 0.00 770.00 0.00 67 TENUGHAT TPS 420.00 1,933.31 420.00 1,689.05 68 JOJOBERA TPS 240.00 1,618.38 240.00 1,519.04 69 MAHADEV PRASAD STPP 540.00 2,909.92 540.00 2,876.22 70 MAITHON RB TPP 1,050.00 7,345.34 1,050.00 7,267.81 71 KUDGI STPP 2,400.00 3,945.19 2,400.00 7,566.33 72 BELLARY TPS 1,700.00 4,021.14 1,700.00 4,059.06 73 RAICHUR TPS 1,720.00 10,834.52 1,720.00 8,917.98 74 YERMARUS TPP 1,600.00 997.45 1,600.00 790.93 TORANGALLU TPS(SBU- 260.00 Karnataka 1,319.47 75 I) 260.00 1,675.06 TORANGALLU TPS(SBU- 600.00 2,484.62 76 II) 600.00 2,338.10 ADANI POWER LIMITED 1,200.00 5,214.35 77 UDUPI TPP 1,200.00 6,181.32 78 VINDHYACHAL STPS 4,760.00 37,495.73 800.00 0.00 79 AMAR KANTAK 40.00 0.00 4,760.00 37,539.00 80 AMARKANTAK EXT TPS 450.00 1,728.15 40.00 0.00 81 SANJAY GANDHI TPS 1,340.00 7,543.08 450.00 1,636.16 82 SATPURA TPS 1,642.50 5,020.85 1,340.00 8,680.63 83 SHREE SINGAJI TPP 1,200.00 3,954.09 1,642.50 7,472.97 Madhya 84 ANUPPUR TPP 1,200.00 6,225.05 2,520.00 7,753.38 Pradesh 85 BINA TPS 500.00 2,465.28 1,200.00 6,689.60 86 MAHAN TPP 600.00 2,918.23 500.00 2,503.79 87 NIGRI TPP 1,320.00 7,688.93 1,200.00 3,220.09 88 NIWARI TPP 45.00 87.88 1,320.00 7,330.28 89 SASAN UMTPP 3,960.00 31,792.52 45.00 77.38 90 SEIONI TPP 600.00 1,666.87 3,960.00 32,877.27 91 MAUDA TPS 2,320.00 7,971.14 600.00 2,500.55 92 SOLAPUR STPS 660.00 1,397.56 2,320.00 11,878.13 93 BHUSAWAL TPS 1,470.00 6,623.87 1,320.00 1,783.67 CHANDRAPUR(MAHARA 1,470.00 6,595.75 94 SHTRA) STPS 3,340.00 14,798.22 95 KHAPARKHEDA TPS 1,340.00 6,179.19 3,340.00 15,850.79 96 KORADI TPS 3,020.00 9,387.08 1,340.00 7,471.18 97 NASIK TPS 880.00 2,887.88 3,020.00 8,429.52 98 PARAS TPS 555.00 3,116.32 880.00 2,316.16 Maharashtra 99 PARLI TPS 1,420.00 3,067.31 555.00 2,628.25 100 AMRAVATI TPS 1,350.00 4,771.38 1,420.00 2,842.07 101 BELA TPS 270.00 80.51 1,350.00 4,074.09 102 BUTIBORI TPP 600.00 3,306.31 270.00 149.37 103 DAHANU TPS 500.00 3,534.27 600.00 2,212.73 104 DHARIWAL TPP 600.00 2,393.27 500.00 3,617.02 105 GEPL TPP Ph-I 120.00 0.00 600.00 3,228.90 106 GMR WARORA TPS 600.00 3,746.10 120.00 0.00 107 JSW RATNAGIRI TPP 1,200.00 6,731.26 600.00 3,895.25108 MIHAN TPS 246.00 0.00 1,200.00 8,019.75 109 NASIK (P) TPS 1,350.00 1.69 246.00 0.00 110 SHIRPUR TPP 150.00 4.74 1,350.00 0.00 ADANI POWER LIMITED 150.00 0.00 111 TIRODA TPP 3,300.00 17,596.24 112 TROMBAY TPS 1,400.00 4,940.50 3,300.00 21,665.55 113 WARDHA WARORA TPP 540.00 1,129.70 1,400.00 5,018.74 114 TALCHER (OLD) TPS 460.00 3,780.71 540.00 1,052.44 115 TALCHER STPS 3,000.00 22,976.99 460.00 3,606.84 116 IB VALLEY TPS 420.00 2,840.33 3,000.00 21,242.30 117 DERANG TPP 1,200.00 3,657.42 420.00 3,085.46 Odisha 118 KAMALANGA TPS 1,050.00 5,583.99 1,200.00 4,213.60 119 STERLITE TPP 1,200.00 1,074.47 1,050.00 6,690.02 UTKAL TPP(IND 1,200.00 828.09 120 BARATH) 350.00 0.00 121 GH TPS (LEH.MOH.) 920.00 2,944.50 350.00 0.00 122 GND TPS(BHATINDA) 440.00 301.33 920.00 2,485.15 123 ROPAR TPS 1,260.00 2,274.36 840.00 1,669.99 Punjab 124 GOINDWAL SAHIB TPP 540.00 1,541.00 540.00 2,445.49 125 RAJPURA TPP 1,400.00 9,110.04 1,400.00 9,123.71 126 TALWANDI SABO TPP 1,980.00 8,556.82 1,980.00 10,639.92 127 CHHABRA TPP 1,660.00 7,630.44 2,320.00 10,379.13 128 KALISINDH TPS 1,200.00 6,691.18 1,200.00 5,550.40 129 KOTA TPS 1,240.00 7,213.05 1,240.00 7,921.01 Rajasthan 130 SURATGARH TPS 1,500.00 4,964.36 1,500.00 7,168.92 ADANI POWER LIMITED 1,320.00 7,599.26 131 KAWAI TPP 1,320.00 5,067.15 132 TUTICORIN (JV) TPP 1,000.00 5,412.83 1,000.00 5,486.62 133 VALLUR TPP 1,500.00 7,167.72 1,500.00 7,706.87 134 ENNORE TPS 450.00 0.00 450.00 0.00 135 METTUR TPS 1,440.00 7,558.60 840.00 5,807.22 136 Tamil Nadu NORTH CHENNAI TPS 1,830.00 10,062.78 600.00 3,153.10 137 TUTICORIN TPS 1,050.00 5,247.18 1,830.00 10,711.12 138 ITPCL TPP 1,200.00 5,724.29 1,050.00 6,306.31 139 MUTHIARA TPP 1,200.00 3,906.24 1,200.00 5,544.59 140 TUTICORIN (P) TPP 300.00 0.00 1,200.00 3,221.74 141 RAMAGUNDEM STPS 2,600.00 18,867.65 300.00 0.00 142 KAKATIYA TPS 1,100.00 7,392.30 2,600.00 18,547.91 143 KOTHAGUDEM TPS 720.00 3,871.07 1,100.00 7,727.37 Telangana KOTHAGUDEM TPS 720.00 3,611.15 144 (NEW) 1,000.00 7,131.20 145 RAMAGUNDEM-B TPS 62.50 474.84 1,800.00 9,210.48 146 SINGARENI TPP 1,200.00 9,575.16 62.50 423.03 147 DADRI (NCTPP) 1,820.00 9,933.39 1,200.00 8,698.48 148 MEJA STPP 660.00 8.22 1,820.00 10,533.54 149 RIHAND STPS 3,000.00 23,530.54 660.00 69.61 150 SINGRAULI STPS 2,000.00 14,781.83 3,000.00 22,686.80 151 TANDA TPS 440.00 3,277.98 2,000.00 14,798.21 152 UNCHAHAR TPS 1,550.00 7,092.48 440.00 2,371.80 153 ANPARA TPS 2,630.00 16,618.51 1,550.00 7,241.00 154 HARDUAGANJ TPS 720.00 3,850.52 2,630.00 20,140.46 155 OBRA TPS 1,372.00 4,313.90 660.00 3,141.52 156 PANKI TPS 210.00 338.69 1,094.00 3,648.03 Uttar Pradesh 157 PARICHHA TPS 1,140.00 6,427.09 1,140.00 4,978.88 158 ANPARA C TPS 1,200.00 8,397.10 1,200.00 8,236.75 159 BARKHERA TPS 90.00 190.36 90.00 148.70 160 KHAMBARKHERA TPS 90.00 181.51 90.00 141.20 161 KUNDARKI TPS 90.00 192.12 90.00 203.67 162 LALITPUR TPS 1,980.00 8,565.92 1,980.00 5,449.92 163 MAQSOODPUR TPS 90.00 167.48 90.00 141.28 164 PRAYAGRAJ TPP 1,980.00 5,635.06 1,980.00 7,759.32 165 ROSA TPP Ph-I 1,200.00 7,718.80 1,200.00 4,340.90 166 UTRAULA TPS 90.00 192.93 90.00 196.09167 DURGAPUR STEEL TPS 1,000.00 6,503.85 1,000.00 6,293.54 168 DURGAPUR TPS 350.00 947.10 350.00 981.28 169 FARAKKA STPS 2,100.00 13,356.91 2,100.00 14,846.44 170 MEJIA TPS 2,340.00 12,478.48 2,340.00 12,744.35 171 RAGHUNATHPUR TPP 1,200.00 2,279.47 1,200.00 3,208.40 172 BAKRESWAR TPS 1,050.00 7,486.77 1,050.00 7,182.26 173 BANDEL TPS 450.00 1,926.03 450.00 1,315.39 174 D.P.L. TPS 940.00 2,524.46 940.00 2,442.23 175 KOLAGHAT TPS 1,260.00 4,749.84 1,260.00 4,422.88 West Bengal 176 SAGARDIGHI TPS 1,600.00 6,341.75 1,600.00 6,051.94 177 SANTALDIH TPS 980.00 2,941.59 980.00 3,552.62 178 BUDGE BUDGE TPS 750.00 6,033.39 750.00 6,011.69 179 CHINAKURI TPS 30.00 0.00 30.00 0.00 180 HALDIA TPP 600.00 4,525.89 600.00 4,614.74 181 HIRANMAYE TPP 300.00 27.48 300.00 80.71 182 NEW COSSIPORE TPS 160.00 0.00 160.00 0.00 183 SOUTHERN REPL. TPS 135.00 303.76 135.00 283.78 184 TITAGARH TPS 240.00 0.00 240.00 0.00 Coal Based Sub Total 1,98,395.50 9,51,754.51 2,00,305.00 9,87,681.83 B. Lignite Based Power Stations 1 AKRIMOTA LIG TPS 250.00 1,357.12 250.00 1,188.45 2 BHAVNAGAR CFBC TPP 500.00 480.15 500.00 588.95 Gujarat 3 KUTCH LIG. TPS 290.00 1,297.78 290.00 1,205.39 4 SURAT LIG. TPS 500.00 3,271.72 500.00 3,521.75 5 BARSINGSAR LIGNITE 250.00 1,648.81 250.00 1,357.10 6 Rajasthan GIRAL TPS 250.00 0.00 250.00 0.00 7 JALIPA KAPURDI TPP 1,080.00 6,855.95 1,080.00 6,700.10 8 NEYVELI ( EXT) TPS 420.00 3,247.15 420.00 2,949.65 9 NEYVELI NEW TPS 0.00 0.00 0.00 0.00 10 NEYVELI TPS-I 600.00 3,379.73 500.00 3,105.90 Tamil Nadu 11 NEYVELI TPS-II 1,470.00 10,262.56 1,470.00 10,744.54 12 NEYVELI TPS-II EXP 500.00 2,009.90 500.00 1,931.31 13 NEYVELI TPS(Z) 250.00 1,025.27 250.00 1,290.36 Lignite Based Sub Total 6,360.00 34,836.14 6,260.00 34,583.50 Grand Total 2,04,755.50 9,86,590.65 2,06,565.00 10,22,265.33The details of State-Wise & Coal & Lignite Based Power Station-Wise Generation Data for FY 2015- 16 & FY 2016-17 Sl Capacity Generation Capacity Generation State Station Name No (MW) (MUs) (MW) (MUs) FY 2015-16 FY 2016-17 A. Coal Based Power Stations DAMODARAM 1 SANJEEVAIAH TPS 1,600.00 5,013.38 1,600.00 8,804.65 2 Dr. N.TATA RAO TPS 1,760.00 12,072.53 1,760.00 11,652.38 3 PAINAMPURAM TPP 1,320.00 6,889.03 1,320.00 9,059.40 4 Andhra RAYALASEEMA TPS 1,050.00 7,292.52 1,050.00 6,711.64 5 Pradesh SGPL TPP - - 1,320.00 1,658.60 6 SIMHADRI 2,000.00 14,469.64 2,000.00 14,173.49 7 SIMHAPURI TPS 600.00 4,122.85 600.00 1,617.72 8 THAMMINAPATNAM TPS 300.00 1,699.09 300.00 1,373.63 9 VIZAG TPP 1,040.00 464.71 1,040.00 3,282.53 10 Assam BONGAIGAON TPP 250.00 117.12 500.00 1,680.27 11 BARAUNI TPS 210.00 0.00 310.00 131.42 12 BARH STPS St-II 1,320.00 4,769.88 1,320.00 7,642.01 13 Bihar KAHALGAON TPS 2,340.00 15,275.13 2,340.00 15,947.93 14 MUZAFFARPUR TPS 415.00 781.87 610.00 793.49 15 NABINAGAR TPP 250.00 0.13 500.00 0.00 16 AKALTARA TPS 1,200.00 6,367.66 1,200.00 6,732.49 ADANI POWER LIMITED 17 RAIGARH TPP 600.00 1,054.81 600.00 2,819.44 18 BALCO TPS 600.00 1,580.97 600.00 3,193.38 19 BANDAKHAR TPP 300.00 216.22 300.00 1,405.40 20 BARADARHA TPS 1,200.00 2,477.12 1,200.00 7,188.39 21 BHILAI TPS 500.00 3,549.63 500.00 3,651.19 22 BINJKOTE TPP - - 300.00 0.00 23 CHAKABURA TPP 30.00 259.93 30.00 242.94 24 DSPM TPS 500.00 3,985.52 500.00 3,982.40 25 KASAIPALLI TPP 270.00 1,906.35 270.00 2,012.43 26 KATGHORA TPP 35.00 0.00 35.00 0.00 27 KORBA STPS 200.00 794.47 2,600.00 20,364.88 28 KORBA-II 240.00 1,444.23 200.00 893.64 29 Chhattisgarh KORBA-III 2,600.00 20,429.17 240.00 1,396.99 30 KORBA-WEST TPS 1,340.00 9,045.59 1,340.00 9,235.86 31 MARWA TPS 500.00 10.69 1,000.00 2,554.67 32 NAWAPARA TPP - - 600.00 714.27 33 OP JINDAL TPS 1,000.00 5,146.22 1,000.00 4,482.79 34 PATHADI TPP 600.00 2,984.65 600.00 4,448.61 ADANI POWER LIMITED 35 RAIPUR TPP 1,370.00 790.23 1,370.00 763.34 36 RATIJA TPS 50.00 272.67 100.00 432.03 37 SALORA TPP - - 135.00 0.00 38 SIPAT STPS 2,980.00 22,286.31 2,980.00 23,778.93 39 SVPL TPP 63.00 59.03 63.00 303.06 40 SWASTIK KORBA TPP 25.00 0.00 25.00 0.00 41 TAMNAR TPP 2,400.00 4,405.48 2,400.00 4,797.70 42 UCHPINDA TPP 720.00 123.04 720.00 137.59 43 BADARPUR TPS 705.00 2,241.44 705.00 1,704.85 44 Delhi I.P. T.P.S. - - 247.50 0.00 45 RAJGHAT TPS 135.00 46.60 135.00 0.00 46 GANDHI NAGAR TPS 870.00 2,731.94 870.00 2,172.33 ADANI POWER LIMITED 47 MUNDRA TPP - III 1,980.00 14,247.89 1,980.00 12,985.04 ADANI POWER LIMITED 48 Gujarat MUNDRA TPP - I & II 2,640.00 18,745.07 2,640.00 17,313.39 49 MUNDRA UMTPP 4,000.00 25,679.75 4,000.00 27,460.24 50 SABARMATI (C STATION) 60.00 51.81 60.00 0.00 SABARMATI (D-F 51 STATIONS) 362.00 2,389.46 362.00 2,759.1052 SALAYA TPP 1,200.00 4,985.84 1,200.00 5,213.21 53 SIKKA REP. TPS 740.00 1,203.75 740.00 2,148.22 54 UKAI TPS 1,350.00 5,555.01 1,350.00 5,296.15 55 WANAKBORI TPS 1,470.00 5,663.95 1,470.00 3,929.62 56 FARIDABAD TPS. - - 170.00 0.00 57 INDIRA GANDHI STPP 1,500.00 5,798.20 1,500.00 5,473.77 58 MAHATMA GANDHI TPS 1,320.00 4,952.22 1,320.00 2,895.70 Haryana 59 PANIPAT TPS 920.00 1,704.89 1,360.00 2,205.93 60 RAJIV GANDHI TPS 1,200.00 4,634.49 1,200.00 3,856.75 61 YAMUNA NAGAR TPS 600.00 4,056.70 600.00 3,424.24 62 BOKARO TPS `A` EXP 500.00 0.30 500.00 208.00 63 BOKARO `B` TPS 630.00 1,859.93 630.00 1,456.68 64 CHANDRAPURA(DVC) TPS 890.00 5,078.72 1,250.00 5,642.70 65 JOJOBERA TPS 360.00 2,519.59 240.00 2,274.02 66 Jharkhand KODARMA TPP 1,000.00 3,326.82 1,000.00 3,801.77 67 MAHADEV PRASAD STPP 540.00 2,925.90 540.00 3,257.47 68 MAITHON RB TPP 1,050.00 7,206.18 1,050.00 7,356.63 69 PATRATU TPS 770.00 594.02 770.00 385.88 70 TENUGHAT TPS 420.00 2,636.74 420.00 1,423.30 71 BELLARY TPS 1,700.00 6,133.82 1,700.00 6,402.37 72 KUDGI STPP - - 1,600.00 25.49 73 RAICHUR TPS 1,720.00 11,423.63 1,720.00 11,495.67 74 TORANGALLU TPS(SBU-I) 260.00 2,184.71 260.00 1,714.95 Karnataka 75 TORANGALLU TPS(SBU-II) 600.00 4,571.51 600.00 2,700.39 ADANI POWER LIMITED 76 UDUPI TPP 1,200.00 8,086.45 1,200.00 7,875.42 77 YERMARUS TPP 800.00 1.05 1,600.00 246.54 78 AMAR KANTAK - - 40.00 0.00 79 AMARKANTAK EXT TPS 210.00 1,785.72 450.00 1,481.04 80 ANUPPUR TPP 1,200.00 2,890.72 1,200.00 3,760.16 81 BINA TPS 500.00 1,307.77 500.00 812.85 82 MAHAN TPP 600.00 0.00 600.00 2,629.20 83 NIGRI TPP 1,320.00 5,346.18 1,320.00 7,266.96 Madhya 84 NIWARI TPP 45.00 141.96 45.00 237.26 Pradesh 85 SANJAY GANDHI TPS 1,340.00 7,052.76 1,340.00 6,843.25 86 SASAN UMTPP 3,960.00 31,262.34 3,960.00 29,414.72 87 SATPURA TPS 1,330.00 5,508.86 1,642.50 3,644.90 88 SEIONI TPP 600.00 3.96 600.00 311.25 89 SHREE SINGAJI TPP 1,200.00 4,250.48 1,200.00 2,474.65 90 VINDHYACHAL STPS 4,760.00 31,319.93 4,760.00 32,206.94 ADANI POWER LIMITED 91 TIRODA TPP 3,300.00 20,079.70 3,300.00 17,642.56 92 AMRAVATI TPS 1,350.00 6,179.55 1,350.00 1,874.70 93 BELA TPS 270.00 0.00 270.00 0.00 94 BHUSAWAL TPS 1,420.00 8,086.67 1,470.00 6,120.56 95 BUTIBORI TPP 600.00 4,030.17 600.00 3,742.52 CHANDRAPUR(MAHARAS 96 HTRA) STPS 3,340.00 12,361.37 3,340.00 14,941.77 97 DAHANU TPS 500.00 3,824.84 500.00 3,742.55 98 DHARIWAL TPP 600.00 369.16 600.00 1,541.71 99 EMCO WARORA TPS - - 600.00 3,703.42 100 Maharashtra GEPL TPP Ph-I 120.00 0.00 120.00 0.00 101 GMR WARORA TPS 600.00 4,006.78 - - 102 JSW RATNAGIRI TPP 1,200.00 8,395.10 1,200.00 6,681.86 103 KHAPARKHEDA TPS 1,340.00 8,157.50 1,340.00 7,714.77 104 KORADI TPS 1,940.00 3,041.69 3,020.00 5,853.85 105 MAUDA TPS 1,660.00 1,875.66 2,320.00 4,305.65 106 MIHAN TPS 246.00 0.00 246.00 0.00 107 NASIK (P) TPS 270.00 0.00 810.00 0.72 108 NASIK TPS 630.00 4,327.81 880.00 3,328.71 109 PARAS TPS 500.00 3,512.44 555.00 2,988.82 110 PARLI TPS 1,380.00 1,320.21 1,420.00 1,627.09 111 SOLAPUR STPS - - 660.00 0.00112 TROMBAY TPS 1,400.00 5,428.92 1,400.00 4,980.93 113 WARDHA WARORA TPP 540.00 1,857.44 540.00 1,394.90 114 DERANG TPP 1,200.00 6,243.60 1,200.00 6,515.30 115 IB VALLEY TPS 420.00 3,117.33 420.00 3,235.67 116 KAMALANGA TPS 1,050.00 6,235.01 1,050.00 5,932.79 117 STERLITE TPP - - 600.00 7,801.53 Odisha 118 TALCHER (OLD) TPS 460.00 3,730.75 460.00 3,759.53 119 TALCHER STPS 3,000.00 23,966.53 3,000.00 22,847.48 120 UTKAL TPP(IND BARATH) 350.00 21.58 350.00 0.00 121 VEDANTA TPP 2,400.00 8,077.03 - - 122 GH TPS (LEH.MOH.) 920.00 3,138.22 920.00 2,736.39 123 GND TPS(BHATINDA) 440.00 918.30 440.00 698.58 124 GOINDWAL SAHIB TPP 540.00 54.39 540.00 223.91 Punjab 125 RAJPURA TPP 1,400.00 7,703.31 1,400.00 9,441.76 126 ROPAR TPS 1,260.00 3,959.03 1,260.00 2,776.36 127 TALWANDI SABO TPP 1,980.00 3,241.80 1,980.00 7,078.84 128 CHHABRA TPP 1,000.00 4,472.07 1,660.00 6,826.93 129 KALISINDH TPS 1,200.00 5,982.76 1,200.00 5,944.12 ADANI POWER LIMITED 130 Rajasthan KAWAI TPP 1,320.00 8,684.82 1,320.00 8,289.27 131 KOTA TPS 1,240.00 7,789.95 1,240.00 7,486.79 132 SURATGARH TPS 1,500.00 5,953.32 1,500.00 4,474.99 133 ENNORE TPS 450.00 442.31 450.00 191.99 134 ITPCL TPP 600.00 1,131.38 1,200.00 4,975.70 135 METTUR TPS 1,440.00 9,903.94 1,440.00 9,177.43 136 MUTHIARA TPP 1,200.00 2,788.76 1,200.00 3,749.10 137 Tamil Nadu NORTH CHENNAI TPS 1,830.00 10,947.51 1,830.00 10,092.30 138 TUTICORIN (JV) TPP 1,000.00 3,558.11 1,000.00 6,252.04 139 TUTICORIN (P) TPP 300.00 800.40 300.00 23.62 140 TUTICORIN TPS 1,050.00 7,082.47 1,050.00 5,547.59 141 VALLUR TPP 1,500.00 7,716.79 1,500.00 9,210.86 142 KAKATIYA TPS 1,100.00 3,632.00 1,100.00 6,578.52 143 KOTHAGUDEM TPS 720.00 4,433.29 720.00 3,964.11 144 KOTHAGUDEM TPS (NEW) 1,000.00 6,636.28 1,000.00 6,586.16 Telangana 145 RAMAGUNDEM-B TPS 62.50 399.40 62.50 453.70 146 RAMAGUNDEM STPS 2,600.00 20,250.59 2,600.00 19,597.52 147 SINGARENI TPP 600.00 1.17 1,200.00 4,099.33 148 ANPARA C TPS 1,200.00 8,638.30 1,200.00 8,451.36 149 ANPARA TPS 2,630.00 12,168.82 2,630.00 15,219.41 150 BARKHERA TPS 90.00 340.33 90.00 391.92 151 DADRI (NCTPP) 1,820.00 10,047.65 1,820.00 8,765.46 152 HARDUAGANJ TPS 665.00 3,786.35 720.00 3,825.11 153 KHAMBARKHERA TPS 90.00 320.78 90.00 375.30 154 KUNDARKI TPS 90.00 374.44 90.00 460.80 155 LALITPUR TPS 1,320.00 27.76 1,980.00 3,953.51 156 MAQSOODPUR TPS 90.00 312.59 90.00 417.24 157 Uttar Pradesh OBRA TPS 1,278.00 3,959.86 1,372.00 3,842.06 158 PANKI TPS 210.00 535.99 210.00 762.60 159 PARICHHA TPS 1,140.00 6,767.63 1,140.00 6,139.11 160 PRAYAGRAJ TPP 660.00 234.78 1,320.00 4,468.48 161 RIHAND STPS 3,000.00 21,054.66 3,000.00 21,959.62 162 ROSA TPP Ph-I 1,200.00 7,059.64 1,200.00 7,913.90 163 SINGRAULI STPS 2,000.00 16,270.51 2,000.00 15,219.06 164 TANDA TPS 440.00 3,125.98 440.00 3,241.42 165 UNCHAHAR TPS 1,050.00 7,013.10 1,550.00 6,993.65 166 UTRAULA TPS 90.00 411.37 90.00 415.02 167 BAKRESWAR TPS 1,050.00 6,669.45 1,050.00 7,050.54 168 BANDEL TPS 450.00 1,108.02 450.00 1,885.02 169 BUDGE BUDGE TPS 750.00 5,793.34 750.00 5,410.75 170 CHINAKURI TPS 30.00 0.00 30.00 0.00 171 West Bengal D.P.L. TPS 880.00 1,983.35 940.00 2,143.41 172 DURGAPUR STEEL TPS 1,000.00 4,440.54 1,000.00 6,655.77 173 DURGAPUR TPS 340.00 904.28 350.00 592.72 174 FARAKKA STPS 2,100.00 12,360.43 2,100.00 13,743.98 175 HALDIA TPP 600.00 3,633.26 600.00 4,015.49176 KOLAGHAT TPS 1,260.00 5,766.12 1,260.00 6,038.00 177 MEJIA TPS 2,340.00 11,985.29 2,340.00 12,936.78 178 NEW COSSIPORE TPS 160.00 0.00 179 RAGHUNATHPUR TPP 1,200.00 257.54 1,200.00 2,016.51 180 SAGARDIGHI TPS 1,100.00 2,715.22 1,600.00 4,877.43 181 SANTALDIH TPS 980.00 3,697.01 980.00 3,667.33 182 SOUTHERN REPL. TPS 135.00 531.26 135.00 410.68 183 TITAGARH TPS 240.00 663.83 240.00 232.81 Coal Based Sub Total 1,78,326.50 8,62,015.25 1,92,075.50 9,10,135.81 B. Lignite Based Power Stations 1 AKRIMOTA LIG TPS 250.00 1,427.42 250.00 1,392.90 2 BHAVNAGAR CFBC TPP 0.00 0.00 500.00 55.47 Gujarat 3 KUTCH LIG. TPS 290.00 1,621.38 290.00 1,483.92 4 SURAT LIG. TPS 500.00 3,077.99 500.00 3,178.22 5 BARSINGSAR LIGNITE 250.00 1,285.56 250.00 1,463.25 6 Rajasthan GIRAL TPS 250.00 275.15 250.00 0.00 7 JALIPA KAPURDI TPP 1,080.00 7,215.82 1,080.00 6,622.49 8 NEYVELI ( EXT) TPS 420.00 3,269.52 420.00 3,328.33 9 NEYVELI NEW TPP 0.00 0.00 0.00 0.00 10 NEYVELI TPS(Z) 250.00 1,476.81 250.00 1,078.69 Tamil Nadu 11 NEYVELI TPS-I 600.00 3,161.04 600.00 3,696.52 12 NEYVELI TPS-II 1,470.00 10,582.62 1,470.00 11,052.08 13 NEYVELI TPS-II EXP 500.00 851.13 500.00 1,373.25 Lignite Based Sub Total 5,860.00 34,244.44 6,360.00 34,725.12 Grand Total 1,84,186.50 8,96,259.69 1,98,435.50 9,44,860.93 ************ANNEXURE-II ANNEXURE REFERRED IN REPLY TO PARTS (b), (c) & (e) OF UNSTARRED QUESTION NO. 2103 ANSWERED IN THE LOK SABHA ON 12.02.2026 ************* Power Plants with Online Continuous Emission and Effluent Monitoring System (OCEMS) Sl. No. Power Plant Name State City 1 KTA POWERS PVT LTD Rajasthan JHUNJHUNU 2 JASRASAR GREEN POWER ENERGY PRIVATE LIMITED Rajasthan NOKHA Khurja Super Thermal Power Project, THDC INDIA 3 LIMITED UP Khurja 4 SARDARSHASHAR AGRI ENERGY PVT. LTD. Rajasthan SARDARSHASHAR 5 TNA RENEWABLE ENERGY PRIVATE LIMITED Rajasthan Bhadra 6 KPC Gas Power corporation Limited (KPC-GPCL) Karnataka Bidadi 7 North Chennai Thermal Power Station - I Tamil Nadu Chennai Maharashtra State Power Generation Co. Limited, Gas 8 Turbine Power Station, MSPGCL, Uran. Maharashtra Uran 9 Rosa Power Supply Co. Ltd._Stage-2 UP Shahjahanpur SERAIKELLA 10 Adhunik Power and Natural Resources Ltd. Jharkhand KHARSAWAN 11 Nabha Power Ltd, Punjab Rajpura 12 Pragati Power Station Delhi New Delhi 13 Bokaro Power Supply Co. Pvt Ltd Jharkhand Bokaro 14 ZAUROMIRA ENERGY LTD TIRUNALVELI Tamil Nadu TIRUNALVELI 15 Maithon Power Ltd Jharkhand Dhanbad 16 GLOBAL POWER TECH EQUIPMENTS LTD. Tamil Nadu TIRUVANNAMALAI 17 IND-BARATH POWER GENCOM LTD Tamil Nadu NAGAPATTINAM 18 J.KPower LTD (J.K CEMENT) - CHITTORGARH Rajasthan CHITTORGARH 19 NEYVELI LIGNITE CORPORATION LTD., TPS-2 Tamil Nadu KUNANKURUCHI 20 RAGHU RAMA RENEWABLE ENERGY LTD. Tamil Nadu RAMANATHAPURAM Adani Power Limited [Formerly known as Adani Electricity Mumbai Limited, Adani Dahanu Thermal Power Station (ADTPS)/ ( M/s. Reliance Infrastructure 21 Limited, Dahanu Thermal Power Station)] Maharashtra PALGHAR 22 SAI REGENCY POWER CORPORATION PVT LTD Tamil Nadu RAMANATHAPURAM 23 SAI WARDHA POWER LTD Maharashtra CHANDRAPUR 24 TERRA ENERGY LIMITED Tamil Nadu CUDDALORE 25 TAMILNADU NEWSPRINT AND PAPERS LTD Tamil Nadu KARUR 26 Jhajjar power Limited Haryana jhajjar 27 ACC Kymore 25 MW UNIT 1 Madhya Pradesh Kymore 28 CESC Ltd - Budge Budge Generating Station West Bengal Pujali M/s India Power Corporation Ltd (Formerly Dishergarh 29 Power Supply Co. Ltd.) West Bengal ASANSOL 30 Southern Generating Station West Bengal Kolkata 31 Titagarh Generating Station West Bengal Titagarh NAVA LIMITED (Formerly Known as Nava Bharat 32 Ventures Ltd.) Orissa MERAMANDALI 33 Suratgarh Super Thermal Power Station (RRVUNL) Rajasthan Suratgarh 34 SAI LILAGAR POWER LTD. Chhattisgarh BILASPUR 35 Sri Jyoti Renewable Energy Pvt Ltd Haryana Bhiwani 36 Sanjay Gandhi Thermal Power Station Madhya Pradesh Magdhar 37 Sasan Power Limited Madhya Pradesh Singrauli 38 Grasim Industries Ltd , Power Plant Division Renukoot UP Renukoot 39 ARKAY ENERGY LTD Tamil Nadu RAMNAD 40 COROMANDEL ELECTRIC COMPANY LTD Tamil Nadu RAMANATHAPURAM 41 Bajaj Energy Power Ltd_barkhera UP Pilibhit 42 Bajaj Energy Pvt Limited_Kundarki,Gonda UP Gonda 43 Bajaj Energy Power Ltd_Khambarkhera UP Khambarkhera 44 Bajaj Energy Power Ltd_,UTRAULA,Balrampur UP UTRAULA 45 Bajaj Energy Power Ltd_MAQSOODPUR UP MAQSOODPUR 46 Ultra tech Cement Ltd Vikram cement Madhya Pradesh Vikram Nagar 47 Vidharba Iindustries Power Ltd - Buttibori Maharashtra Nagpur 48 METTUR THERMAL POWER STATION Tamil Nadu METTUR49 M/s. North Chennai Thermal Power Station, Stage II, Tamil Nadu Tiruvallur 50 OPG POWER GENERATION Tamil Nadu THIRUVALLUR 51 PPNPOWER Tamil Nadu NAGAPATTINUM JSW Energy (Barmer) Limited formerly Known Raj 52 waste power Rajasthan Barmer 53 ROSA POWER SUPPLY CO LTD STAGE 1 UP Shahjahanpur 54 KSK Mahanadi Power Company Limited Chattisgarh Champa 55 SHRIRAM NON CONVENTIONAL ENERGY LTD Tamil Nadu THANJAVUR 56 SHRIRAM POWERGEN LTD Tamil Nadu DINDIGUL 57 SYNERGY SHAKTHI RENEWABLE ENERGY LTD Tamil Nadu POCHAMPALLI 58 Talwandi Sabo Power Ltd Punjab BHATINDA 59 TCP POWER PLANT GUMMIDIPOONDI Tamil Nadu THIRUVALLUR 60 Tuticorin Thermal Power Station Tamil Nadu THOOTHUKUDI 61 JINDAL POWER LTD - RAIGARH Chattisgarh RAIGARH 62 Durgapur Steel Thermal Power station West Bengal Burdwan 63 TheRaymondLtd Madhya Pradesh Chhindwara 64 Hanuman Agro Industries Limited Chattisgarh Nawapara-rajim 65 SRF Limited Rajasthan Bhiwadi 66 Tripura gas based Power Plant, NEEPCO Ltd Tripura Monarchak Agartala Gas Turbine Combine Cycle Power Plant, 67 NEEPCO Ltd Tripura Agartala 68 Gulbarga Power PVT LTD Karnataka Gulbarga 69 Amarkanatak Thermal Power Station,Chachai MP Madhya Pradesh CHACHAI 70 Bharathi Cement Corporation Pvt.Ltd Andhra Pradesh Kadapa 71 Banswara Syntex Limited Rajasthan Banswara 72 CHHABRA THERMAL POWER PLANT Rajasthan Chhabra 73 D.B. Power Limited Chattisgarh Badadarha 74 GMR EMCO ENERGY LMITED Maharashtra Warora 75 Gemco Energy Limited Haryana Bhiwani 76 Guru Hargobind Thermal Plant Punjab Bathinda 77 GRASIM ENERGY CENTER 2 Madhya Pradesh UJJAIN 78 Torrent Power Ltd SUGEN Mega Power Plant Gujarat Surat 79 Torrent Power Limited DGEN Mega Power Project Gujarat Bharuch 80 National Capital Power Project - Dadri UP Dadri 81 ACC Limited-Wadi Cement Works CPP Karnataka Kalaburagi 82 Jabalpur MSW Pvt. Ltd. Madhya Pradesh Jabalpur Jaypee Nigrie Super Thermal Power Plant 2 x 660 MW 83 (A unit of Jaiprakash Power Ventures Limited ) Madhya Pradesh Singrauli 84 JSW Energy Ltd 860 MW Power Plant Karnataka Bellary 85 Kothagudem Thermal power Station old station Telangana Palvancha Star Cement Meghalaya Limited (43 MW TPP) 86 (Formerly known as Meghalaya Power Ltd.) Meghalaya Jowai 87 MEJIA THERMAL POWER STATION West Bengal BANKURA 88 Pragati - III Combined Cycle Power Project, Bawana Delhi New Delhi 89 Reliance Infrastructure Limited,SAMALKOT Andhra Pradesh SAMALKOT 90 Rajasthan Textile & Weaving Mills Rajasthan Bhawani Mandi 91 Andhra Pradesh Gas Power Corporation Ltd Andhra Pradesh West Godavari 92 NITIN SPINNERS - THERMAL POWER PLANT Rajasthan HAMIRGARH 93 Kothagudem Thermal Power Station Telangana Paloncha 94 Topworth Urja & Metals Limited Maharashtra Nagpur 95 Vardhman Fabrics Madhya Pradesh Budhni 96 Vidarbha Industries Power Ltd Maharashtra NAGPUR 97 Eastern India Powertech Ltd - Giddi Jharkhand Giddi-C 98 Vardhman Yarns-Power Division Madhya Pradesh Mandideep Gujarat State Eletctricity Corporation Ltd Formally 99 GEB, (Wanakbori Thermal Power Station) Gujarat Galteshwar 100 Usha Martin Ltd, Thermal Power Plant Jharkhand Ranchi 101 Kakatiya Thermal Power Project - Stage-II Telangana Warangal 102 TAQA Neyveli Power Company Pvt Ltd Tamil Nadu Cuddalore 103 ARS Energy Pvt Ltd Tamil Nadu Tiruvallur 104 Himatsingka Captive Power Plant Karnataka Hassan 105 Kalisindh Thermal Power Plant Rajasthan Jhalawar106 Durgapur Thermal Power Station West Bengal Durgapur 107 Maithan Alloys Ltd Meghalaya Shillong 108 Sukhbir Agro Energy Ltd. UP Ghazipur 109 Chandrapur Super Thermal Power Station Unit Maharashtra CHANDRAPUR 110 GMR WARORA ENERGY LIMITED Maharashtra Chandrapur 111 Shyam Century Ferrous Ltd Meghalaya Shillong 112 Vandana Vidyuth Ltd Chattisgarh Bilaspur INDSIL ENERGY AND ELECTROCHEMICALS PRIVATE 113 LTD Chattisgarh RAIPUR 114 NTPC Limited Faridabad Haryana Faridabad 115 NTPC Limited Kawas Gas Power Plant Gujarat Surat 116 NTPC Ltd Barh (Stage - I , Unit - I) Bihar Patna 117 NTPC Limited Anta Gas Power Station Rajasthan Anta 118 NTPC Tanda Thermal Power Project UP Ambedkarnagar 119 NTPC Limited Rihand Superthermal Power UP RIHANDNAGAR 120 NTPC Limited Kahalgaon Super Thermal Power Station Bihar Bhagalpur 121 NTPC Limited Farakka Super Thermal Power Station West Bengal Murshidabad 122 Dongamahua Captive Power Plant JSPL Chattisgarh Raigarh 123 Grasim Energy Center-4_40 MW Madhya Pradesh UJJAIN 124 NTPC Limited Singrauli Super Thermal Power Station UP SONEBHADRA 125 NTPC Limited Korba Super Thermal Power Station Chattisgarh KORBA 126 Kesoram Cements Captive Power Plant Telangana Basantnagar 127 Koderma Thermal Power Plant_Banjhedih Jharkhand KODERMA 128 THE DURGAPUR PROJECTS LIMITED West Bengal DURGAPUR MEIL Anpara Energy Limited (FORMERLY KNOWN AS 129 LANCO ANPARA POWER LIMITED) UP ANPARA 130 Nava Bharat Energy India Ltd Telangana Paloncha 131 BHUSAWAL THERMAL POWER STATION_Unit 2&3 Maharashtra BHUSAWAL 132 BHUSAWAL THERMAL POWER STATION_Unit 4& 5 Maharashtra BHUSAWAL 133 Panipat Thermal Power Station Haryana Panipat 134 Bhushan Energy Limited Orissa ANGUL Assam Gas Based Power Plant (North Eastern Electric 135 Power Corporation Ltd) Assam Bokuloni 136 VASAVADATTA CEMENT POWER PLANT Karnataka SEDAM NTPC Limited Ramagundam Super Thermal Power 137 Station Telangana Jyotinagar NTPC Limited Ltd, Vindhyachal Super Thermal Power 138 Project Madhya Pradesh Vindhyanagar 139 NTPC Limited Auraiya Gas Power Station UP Auraiya 140 NTPC Limited Badarpur Thermal Power Station Delhi New Delhi 141 NTPC Limited Talcher Super Thermal Power Station Orissa Angul 142 NTPC Limited Mouda Super Thermal Power Station Maharashtra Nagpur 143 NTPC Limited Simhadri Super Thermal Power Station Andhra Pradesh Visakhapatnam 144 NTPC Limited Sipat Super Thermal Power Chattisgarh Bilaspur 145 NTPC Limited Talcher Thermal Power Station Orissa Angul 146 NTPC Limited Jhanor - Gandhar Gas Power Project Gujarat Gandhar 147 NTPC - Rajiv Gandhi Combined Cycle Power Plant Kerala Kayamkulam NTPC Limited Feroz Gandhi Unchahar Thermal Power 148 Station UP Raebareli Kuttalam Gas Turbine Power Station, Tamilnadu 149 Generation and Distribution Corporation Limited Tamil Nadu Nagapattinam 150 Dhariwal Infrastructure Limited, Maharashtra Chandrapur 151 Valuthur Gas Turbine Power Station Tamil Nadu Ramanathapuram M/s Nuvoco Vistas Corporation Limited (NVCL)( 152 Formally known as Nirma Limited) Rajasthan Beawar KUTTALAM GAS TURBINE POWER STATION, TAMILNADU GENERATION AND DISTRIBUTION 153 CORPORATION LIMITED Tamil Nadu KUTTALAM 154 NEYVELI LIGNITE CORPORATION LIMITED Tamil Nadu CUDDALORE 155 PIONEER POWER LIMITED Tamil Nadu RAMANATHAPURAM Harduaganj Tapiya Vidyut Pariyojna, (2X250 156 Megawatt Vistar Pariyojna) UP Aligarh157 Panki Thermal Power Station UP Kanpur East Delhi Waste Processing Company Private Limited (formerly East Delhi Waste Power Corporation Private 158 Limited) Delhi Delhi TAMILNADU NEWSPRINT AND PAPERS LIMITED UNIT II 159 (CAPTIVE CO GENERATION PLANT) Tamil Nadu Manapparai 160 COASTAL ENERGEN PVT LTD Tamil Nadu TUTICORIN 161 JK Lakshmi Cement -Sirohi Power Plant Rajasthan Tehsil Pindwara 162 GMR Kamalanga Energy Ltd Orissa Kamalanga 163 Shree Raipur Cement Plant (A unit of Shree cement Ltd.) Chattisgarh Raipur NTPC SAIL POWER COMPANY LIMITED(A JOINT VENTURE OF NATIONAL THERMAL POWER CORPORATION & STEEL 164 AUTHORITY OF INDIA LIMITED), Captive Power Plant-2 Chattisgarh Bhilai 165 NTPC-SAIL Power Company Limited (P) Limited.(CPP-II) Orissa Rourkela 166 Haldia Energy Limited West Bengal East Medinipur 167 Ind-Barath Energies (Thoothukudi) Limited Tamil Nadu Thoothukudi 168 Ind Barath Thermal Power Plant Tamil Nadu Thoothukudi 169 MADRAS ATOMIC POWER STATION Tamil Nadu Kancheepuram KHEDAR,BARWAL 170 RAJIV GANDHI THERMAL POWER PLANT Haryana A 171 Hira Power and Steels Limited Unit-II Chattisgarh Raipur 172 Shri Bajarang Power & Ispat Limited-TMT Division Chattisgarh Raipur Ramagundam Thermal Station(T.S. Power Generation 173 Corporation Ltd) Telangana Ramagundam Andhra 174 Rayalaseema Thermal Power Plant Pradesh Kadapa 175 SURYADEV ALLOYS AND POWER PVT LTD Tamil Nadu THIRUVALLUR 176 Indian Metals & Ferro Alloys ltd (80MW) Orissa Choudwar 177 NARORA ATOMIC POWER STATION NPCIL UP Narora 178 Finolex Industries Limited Maharashtra Ratnagiri DAMODAR VALLEY CORPORATION, CHANDRAPURA 179 THERMAL POWER STATION Jharkhand Chandrapura 180 Kutch Lignite Thermal Power Station Gujarat Khanot 181 Ukai Thermal Power Station Gujarat Tapi 182 Uttran Gas Based Power Station Gujarat Surat 183 Dhuvaran Gas Power Station Gujarat Anand 184 Sikka Thermal Power Station Gujarat Sikka 185 Indraprastha Power Generation Co. Ltd Delhi Delhi 186 Gujarat State Electricity Corporation Ltd Gujarat Gandhinagar 187 Sagardighi Thermal power Project West -Bengal PDCL West Bengal Sagardighi Maharashtra State Power Generation Company Ltd-Nashik 188 Thermal Power Station Maharashtra Nashik 189 INDUSTRIAL ENERGY LIMITED - PH-6 Jharkhand Jamshedpur 190 HINDALCO INDUSTRIES LTD.RENUSAGAR POWER DIVISION UP RENUSAGAR 191 MARUTI CLEAN COAL AND POWER Ltd. Chattisgarh Bandhakar 192 SPECTRUM COAL & POWER LTD. Chattisgarh Ratija 193 SUDHA BIO POWER PVT LTD Chattisgarh Mohtarai ACB(INDIA)LIMITED (KNOWN AS ARYAN COAL 194 BENEFIACTION PVT LTD ) 30 MW Chattisgarh Kasaipali Andhra 195 Dr.Narla Tatarao Thermal Power Station Pradesh Ibrahimpatnam 196 Prakash industries Ltd Chhattisgarh Champa 197 MMS Steel & Power Private Limited Tamil Nadu Nagapattinam 198 RAMGARH GAS THERMAL POWER PLANT Rajasthan Jaisalmer 199 The Ramco Cements Limited Tamil Nadu Ariyalur 200 Rajasthan Rajya Vidyut Utpadan Nigam Ltd Rajasthan Dholpur 201 Thirumakotai (k) Gas Turbine Power Station Tamil Nadu Thiruvarur PUNJAB STATE POWER CORPORATION LIMITED/GURU 202 GOVIND SINGH SUPER THERMAL PLANT Punjab Roopnagar 203 SARDA ENERGY & MINERALS LTD (POWER) Chhattisgarh RAIPUR 204 Gujarat Industries Power Company Limited Gujarat Vadodara 205 INDRA POWERGEN PVT. LTD Chhattisgarh SURAJPUR 206 INLAND POWER LIMITED Jharkhand RANCHI207 KALINDI POWER AND STEEL LTD. Chhattisgarh MAHASAMUND 208 N.R. ISPAT & POWER LTD Chhattisgarh Chhattisgarh 209 NEERAJ POWER P LTD. Chhattisgarh Simga 210 Lanco Amarkantak Power Ltd. Chhattisgarh Korba 211 SHANTI G D ISPAT & POWER PVT. LTD. Chhattisgarh CHAMPA 212 Shyam Warehousing and Power Plant Chhattisgarh Janjgir–Champa 213 MAHAVIR ENERGY AND COAL BENFICATION LTD Chhattisgarh RAIGARH 214 ONGC TRIPURA POWER COMPANY LIMITED Tripura Palatana 215 BHUBANESHWAR POWER PRIVATE LIMITED Orissa CUTTACK 216 Kota Super Thermal Power Station (KSTPS) Rajasthan Kota 217 NLC Tamilnadu Power Limited Tamil Nadu Thoothukudi 218 Adani Power Rajasthan Limited Rajasthan Baran M/s AMNS Khopoli Limited (Formerly known as M/s Uttam 219 Galva Steel Limited) Maharashtra Naringi Khopoli 220 IL&FS TamilNadu Power Company ltd Tamil Nadu Bhuvanagiri Taluk 221 Bakreswar Thermal Power Project West Bengal Sadaipur 222 BANDEL THERMAL POWER STATION West Bengal TRIBENI 223 SKS POWER GENERATION LTD Chhattisgarh KHARSIA 224 ACB (INDIA)LIMITED 2*135 MW Chhattisgarh Chakabura 225 Adani power limited (formerly Raipur Energy Limited) Chhattisgarh Raikheda 226 Eco Tech Papers Assam Guwahati Atal Bihari Vajpayee Thermal Power Station (Formerly 227 Chhatisgarh State Power Generation Company Limited) Chhattisgarh Marwa Andhra 228 Simhapuri Energy limited Pradesh Thamminapatnam 229 NTPC TAMILNADU ENERGY COMPANY LTD. Tamil Nadu TIRUVALLUR 230 AURO ENERGY Tamil Nadu THANJAVUR 231 Shriram Fertilisers & Chemicals(Power Plant) Rajasthan Kota 232 WEST BOKARO COLLIERY POWER PLANT Jharkhand Ramgarh Mahan Energen Limited(Formerly Known as Essar Power MP Madhya 233 Limited) Pradesh Bandhaura Andhra 234 SBQ Steels LTD_Captive Power Plants Pradesh Ankulapaturu CLP India Pvt. Ltd. (Formerly Known as Gujarat Paguthan 235 Energy Corporation Pvt.Ltd) Gujarat Bharuch 236 Jindal India Thermal Power Ltd Orissa Angul 237 Parichha Thermal Power Project UP Jhansi 238 Sitapuram Power Limited Telangana Suryapet 239 Malu Paper Mill Ltd.(News print/Writing printing Div. Unit-III) Maharashtra Nagpur 240 HALDIA ENERGY LIMITED West Bengal HALDIA 241 Chattisgarh State Electricity Board Chattisgarh Korba Madhya 242 Satpura Thermal Power Station, M P power Generation Co Ltd Pradesh betul 243 OPG Energy Pvt Ltd. Tamil Nadu Nagapattinam Chattisgarh State Electricity Board, Korba Thermal Power 244 Station (East), Korba Chattisgarh Korba 245 BOKARO THERMAL POWER STATION Jharkhand BOKARO 246 VS LIGNITE POWER PVT LTD Rajasthan BIKANER 247 SOUTHERN ENERGY DEVELOPMENT CORPORATION LTD Tamil Nadu TIRUVALLUR 248 VEDANTA LTD THERMAL POWER DIVISION Tamil Nadu THOOTHUKUDI 249 TATA CHEMICAL LTD MITHAPUR Gujarat MITHAPUR 250 SHREE AMBIKA SUGARS LTD. (POWER DIVISION) Tamil Nadu CUDDALORE 251 Brahmapuram Diesel Power Plant Kerala Ernakulam GUJARAT INDUSTRIES POWER COMPANY LIMITED (Surat 252 Lignite Power Plant) Gujarat Vadodara 253 GVK Power (Goindwal Sahib) Limited Punjab Tarn Taran 254 TRN Energy Private Limited(1x300MW) Chattisgarh Raigarh 255 Lalitpur Power Generation Company Limited UP Lalitpur Thiruvidaimaruthur 256 Lanco Tanjore Power Company Limited Tamil Nadu Taluk 257 RattanIndia Power Ltd, Amravati Maharashtra Amravati 258 IGSTPP ARAVALI POWER COMPANY PRIVATE LIMITED Haryana JhajjarSESHASAYEE PAPER AND BOARDS LTD., UNIT : TIRUNELVELI 259 (CO-GEN PLANT) Tamil Nadu TIRUNELVELI 260 DIVINE VIDYUT LIMITED Jharkhand Palgam 261 Emami Cement Ltd,Baloda bazar. Chattisgarh Baloda Bazar 262 Indo Rama Synthetics Ltd. Maharashtra Butibori Madhya 263 Jaypee Bina Thermal Power Plant Pradesh Bina 264 Kalpataru Power Transmission Limited Rajasthan TONK 265 Khaperkheda Thermal Power Station Unit I to IV Maharashtra Saoner 266 Khaperkheda Thermal Power Station, Unit 5 Maharashtra Khaperkheda 267 Kolaghat Thermal Power Station,WBPDCL West Bengal Midnapore 268 Koradi Thermal Power Station Maharashtra Nagpur 269 MSPGCL-Paras Thermal Power Station Maharashtra PARAS 270 Vedanta Limited (Thermal Power Plant) Orissa Jharsuguda Sembcorp Energy India Limited (Project 2) (formerly known as Andhra 271 Sembcorp Gayatri Power Limited) Pradesh Muthukur 272 TORRENT POWER LTD Gujarat AHMEDABAD 273 Urjankur Shree Datta Power Company Ltd. Maharashtra Kolhapur 274 Urjankur Shree Tatyasaheb Kore Warna Power Company Ltd Maharashtra Panhala 275 Tata Power Company Limited Jharkhand Jamshedpur 276 Kaveri Gas Power Ltd Tamil Nadu MAYILADUTHURAI Chhattisgarh State Power Generation Company Limited-Korba (East) Dr Shyama Prasad Mukharjee Thermal Power Station 277 Korba(East),Dist Korba Chattisgarh Korba Andhra 278 Empee Power Company (India) Ltd Pradesh Nayudupeta Andhra 279 Meenakshi Energy Limited Pradesh Nellore The Tata Power Company Limited (Formarly known as 280 Coastal Gujarat Power Limited) Gujarat Mundra 281 Deen Bandhu Chhotu Ram Thermal Power Project Haryana YamunaNagar 282 Mangalam Cement Ltd_power plant Rajasthan Kota Animesh Ispat Pvt. Ltd.,Formerly Known as South Asian 283 Industries Limited Chattisgarh Baloda Bazar 284 Vandana Global Ltd., (CPP) Chattisgarh Raigarh NLC INDIA LTD. (FORMELY NEYVELI LIGNITE CORPORATION 285 LTD.) Rajasthan BIKANER 286 Obra Thermal Power Station UP Sonebhadra 287 Anpara Thermal Power Plant UP Anpara 288 Saheli Exports Pvt. Ltd. Tamil Nadu Kuttalam 289 NTPC Limited Kudgi Super Thermal power Project Karnataka Bijapur 290 NTPC Limited Solapur Super Thermal Power Maharashtra Solapur Madhya 291 RAMNIK POWER & ALLOYS PVT. LTD. Pradesh BALAGHAT 292 GRASIM INDUSTRIES LTD. Gujarat BHARUCH 293 Jagdamba Power & Alloys Ltd Chattisgarh Siltara Maharashtra State Power Generation Company (Mahagenco)- 294 Thermal Power Station,Parli Unit 6 , 7. Maharashtra PARLI 295 Tenughat Thermal Power Station Jharkhand Bokaro Bhadreshwar Vidyut Private limited, Formerly known as OPGS 296 POWER GUJARAT PRIVATE LIMITED Gujarat BHADRESHWAR Maharashtra State Power Generation Company (Mahagenco)- 297 Thermal Power Station,Parli Unit 8 Maharashtra PARLI 298 Santaldih Thermal Power Station (WBPDCL) West Bengal Purulia SRI DAMODARAM SANJEEVAIAH THERMAL POWER STATION POWER STATION (ANDHRA PRADESH POWER DEVELOPMENT Andhra 299 COMPANY LIMITED) Pradesh Nelatur Village 300 Essar Power Gujarat Limited Gujarat Mota Mandha AMNS Power Hazira Ltd Formerly (ESSAR POWER HAZIRA 301 LTD. (EPHL) Gujarat Hazira Madhya 302 ACC Limited, Kymore, 25MW CPP (Unit2) Pradesh Kymore 303 NLC Limited TPS-II Expansion Tamil Nadu Neyveli304 Thermal Power Plant of Ambuja Cement Ltd Gujarat Kodinar 305 Arcelor Mittal Nippon Steel India Limited (CPP) Orissa Paradeep 306 Raichur Thermal Power Station Karnataka Raichur Kozhikode Diesel Power Project Kerala State Electricity 307 Board Limited Kerala Kozhikode Andhra 308 Hinduja National Power Corporation Limited Pradesh Visakhapatnam 309 Bongaigaon Thermal Power Project (NTPC) Assam Kokrajhar SHREE SINGAJI THERMAL POWER PROJECT, Stage -I- Madhya 310 MPPGCL Pradesh Dongaliya 311 Kanti Bijlee Utpadan Nigam Limited Bihar Muzaffarpur 312 WELSPUN CAPTIVE POWER GENERATION LTD Gujarat ANJAR RAGHUNATHPUR THERMAL POWER STATION- 313 DAMODARVALLEYCO West Bengal RAGHUNATHPUR 314 WELSPUN CORP LTD-Old Welspun Gujarat stahl rohernL Gujarat ANJAR 315 KALPATARU POWER TRANSMISSION LTD-BIOMASS Rajasthan Padampur 316 PRAYAGRAJ POWER GENERATION COMPANY LIMITED UP Prayagraj SEMBCORP ENERGY INDIA LIMITED-old name Thermal Andhra 317 Powertech Corporation India Ltd Pradesh Nelaturu 318 Tata Power Compnay Limited Maharashtra Mahul Road 319 Suryaa Chambal Power Ltd Rajasthan Ladpura 320 Yermarus Thermal Power Station Karnataka Bijapur 321 Barauni Thermal Power Station Bihar Begusarai Madhya 322 Jhabua Power Limited Pradesh Ghansore 323 NLC India Limited,Thermal Power Station_II Tamil Nadu Cuddalore 324 National Aluminium Company_NALCO(CPP) Orissa Angul 325 Sanjog Sugars & Eco Power Private Limited Rajasthan Sangaria 326 Hiranmaye Energy Ltd West Bengal Kasberia 327 A2Z INFRA ENGINEERING LIMITED Punjab NAKODAR 328 Balkrishna Industries Limited Gujarat Kutch 329 Mahendra Power Private Limited Chattisgarh Champa 330 Star Wire(india) vidyut Pvt Ltd Haryana Mahendargarh Madhya 331 MB Power (Madhya Pradesh) Limited Pradesh Jaithari 332 Singareni Collieries Company Ltd. Telangana MANCHERIAL 333 The India Cements Limited-Wadapally(55 MW CPP) Telangana Nalgonda 334 RattanIndia Nashik Power Limited Maharashtra NASHIK 335 Abhinav Steel and Power ltd. UP Jaunpur 336 Bhartiya Rail Bijli Company Limited, BRBCL Bihar Aurangabad 337 MADHYA BHARAT PAPERS LIMITED Chattisgarh Champa 338 M/s. R.K.M Powergen Pvt. Ltd. Chattisgarh Janjgir–Champa 339 ACC CEMENT LTD TIKARIA UP Amethi 340 ALTEN POWER PVT LTD Tamil Nadu Sivagangai 341 M/s. Chemplast Limited,Coal Power Plan Tamil Nadu Mettur 342 Simbhaoli Power Pvt.Ltd.(Power Div.) UP Simbhaoli Jubilant Ingrevia Ltd. - Power Plant (Formerly: Jubilant Life 343 Sciences Limited_Power Plant) UP Bhartiagram Andhra 344 The Andhra Sugars Limited (Power Division) Pradesh Saggonda Adani Power Limited, Udupi (formerly Udupi Power 345 Corporation Limited, Adani Power, Udipi) Karnataka UDUPI 346 Chhattisgarh Steel and Power Limited Chattisgarh Amjhar NTPC SAIL POWER COMPANY LIMITED(A JOINT VENTURE OF NATIONAL THERMAL POWER CORPORATION & STEEL 347 AUTHORITY OF INDIA LIMITED) - Expansion PP3 Chattisgarh Bhilai 348 NTPC-SAIL Power Company Limited.CPP_II West Bengal Durgapur 349 The Chengalrayan Co-generation Power Plant (18MW) Tamil Nadu Ulundurpettai Vellore Co-operative Sugar Mills Limited(Co- Gen Plant- 350 15MW) Tamil Nadu Katpadi 351 Mettur Thermal Power Station-II Tamil Nadu Mettur 352 Rashmi Metaliks Limited (Power Division) West Bengal KhargapurAndhra 353 Sarda Metals & Alloys Ltd Pradesh VIZIANAGARAM 354 BSES Kerala Power Ltd Kerala Pathalam Andhra 355 Spectrum Power Generation Limited Pradesh Kakinada M/s Barauni Thermal Power Station (BTPS), (A unit of NTPC) (former Name BSPGCL-Bihar State Power Generation 356 Company Limited -BTPS_Unit 8-9) Bihar Patna 357 HINDALCO IndustriesLtd. Orissa Sambalpur 358 Meja Urja Nigam Private Limited UP Allahabad Kothagudem Thermal Power Station, Stage-VI (500MW),KTPS, 359 VI th Stage, Telangana Khammam 360 Kothagudem Thermal Power Station, Stage-VII (800MW) Telangana Khammam 361 Kothari Sugars and Chemicals limited Tamil Nadu Sathamangalam Billakuppam 362 Cauvery Power Generation Chennai Pvt Ltd. Tamil Nadu village 363 Bhavnagar Energy Co. Ltd. Gujarat Bhavnagar 364 The India Cements Limited -Captive Power Plant Tamil Nadu Tirunelveli 365 Hindustan Zinc Ltd, ZAWAR CPP Rajasthan Udaipur ArcelorMittal Nippon Steel India Private Limited- Power Division (525MW) [Formerly known as ArcelorMittal Nippon 366 Steel India Limited-Power Division (525MW)] Gujarat Surat 367 Shalivahana Green Energy Ltd (6 MW Biomass power plant) Telangana Mancherial Guru Nanak Dev thermal Plant, Punjab State Power 368 Corporation Limited, Bathinda Punjab Bhatinda 369 Balrampur Chini Mills Ltd (Power Division Balrampur) UP Balrampur UltraTech Cement Ltd. Unit: Sidhi Cement Works(2x60 MW Madhya 370 TPP) Pradesh Sidhi 371 RSWM LIMITED Rajasthan Banswara 372 Jindal Pipes Limited UP Hapur Andhra 373 Shri Girija Alloy & Power (I) Private Limited Pradesh Peddapuram 374 Ultratech Cement Limited (Unit : Birla White) Rajasthan Bhopalgarh 375 PERAMBALUR CO-GENERATION POWER PLANT(18MW) Tamil Nadu Eraiyur 376 Puducherry Power Corporation Limited Puducherry TR Pattinam Madhya 377 Gadarwara Super Thermal Power Station Pradesh Gadarwara 378 Nuvoco Vistas Corporation Limited Rajasthan Chittorgarh 379 VAYUNANDANA POWER LIMITED Maharashtra GADCHIROLI 380 S.M.Enviornmental Technologies Pvt Ltd. Rajasthan Baran ORIENT GREEN POWER COMPANY (RAJASTHAN) PRIVATE 381 LIMITED Rajasthan BARAN 382 ORISSA METALIKS PRIVATE LIMITED (POWER DIVISON) West Bengal MIDNAPORE 383 JAI BALAJI INDUSTRIES LIMITED 2 Chattisgarh RASMADA 384 NTPC Limited, Lara Super Thermal Power Project Chattisgarh Raigarh 385 Nabi nagar Super Thermal Power Project Bihar Aurangabad INDRAJIT POWER Pvt Ltd.(Phas I &II),(Formerly Known as 386 M/s. Indrajit Infrastructure Pvt. Ltd.) Maharashtra Wardha 387 ACC Limited Jamul Cement Works Chattisgarh Bhilai 388 Darlipali Super Thermal Power Project (NTPC Ltd.) Orissa Sundargarh 389 Ratnagiri Gas & Power Pvt. Ltd. Maharashtra Ratnagiri 390 ACC Limited, Captive Power Plant,Madukkarai Tamil Nadu Coimbatore 391 Lakwa Thermal Power Station Assam Sonari 392 Transtech Green Power Pvt. Ltd. Rajasthan sanchore SURATGARH SUPERCRITICAL THERMAL POWERPLANT2x660MW_RAJASTHAN 393 RAJYAVIDYUTUTPADANNL Rajasthan SURATGARH Adani power limited (Formerly Known as M/s Raigarh Energy 394 Generation Limited) Chattisgarh Raigarh Shree Singaji Thermal Power Project, Dongalia, Stage- Madhya 395 II(2X660 MW) Pradesh KHANDWA 396 Triveni Engineering & Industries Limited UP Khatauli 397 TAMILNADU NEWSPRINT AND PAPERS LTD (BOILER PLANT) Tamil Nadu KALLAKURICHI398 JSW STEEL LIMITED., CPP-II, SALEM WORKS Tamil Nadu Mettur 399 Neyveli New Thermal Power Station Tamil Nadu Cuddalore 400 Penna Cement Industries Ltd - Power Plant Telangana Wadapalli 401 Rana Power Limited UP MORADABAD 402 NTPC Khargone Super Thermal Power Project Madhya Pradesh Khargone Sai Lilagar Power Generation Limited (Formerly known M/s Janjgir–Champ 403 Arasmetta Captive Power Company Private Limited) Chhattisgarh a 404 Birla Corporation Limited - 27 MW Power Plant Rajasthan Chittorgarh 405 GMDC Gujarat Kutch 406 Jindal Urban Waste Management (Guntur) Limited Andhra Pradesh Guntur 407 Indian Metals & Ferro Alloys Ltd (120MW) Orissa Choudwar 408 Ambuja Cement Limited_Rawan Chhattisgarh Rawan 409 BLA Power Pvt.Ltd Madhya Pradesh GADARWARA 410 Odisha Power Generation Corporation (2X660 MW ITPS) Orissa Jharsuguda 411 M/s Sunil Sponge Private Limited Chhattisgarh Raipur 412 Jindal Power Limited(Formerly Simhapuri Energy Limited) Andhra Pradesh Tirupati 413 MONGIA POWER PRIVATE LIMITED Jharkhand GIRIDIH 414 1X660MW HARDUAGANJ THERMAL POWER PLANT EXTN. II UP KASIMPUR 415 Lanco Kondapalli Power Plant Andhra Pradesh Ibrahimpatnam MVK Industries Private Limited (Formerly known as - M/s 416 KVK Bio Energy Private Limited) Chhattisgarh Janjgir 417 Sukhbir Agro Energy Ltd Haryana Kaithal Nayara Energy Limited (Captive Power Plant) (OLD NAME:- 418 Vadinar Power Company Limited) Gujarat Vadinar 419 Gujarat State Energy Generation Limited Gujarat Surat 420 North Karanpura Super Thermal Power Project Jharkhand Tandwa 421 Indeen Bio Power Limited Rajasthan Tonk 422 Adani Power Limited Gujarat Mundra 423 Adani Power Limited Maharashtra Gondia Post jaigad - Taluka & Dist- 424 JSW Energy Limited Maharashtra Ratnagiri 425 Sri Andal Paper Mills Private Limited Power Division Tamil Nadu Sathyamangalam 426 SEPC Power Private Limited Tamil Nadu THOOTHUKUDI 427 Adani Power (Jharkhand) Limited Jharkhand Godda 428 Telangana Super Thermal Power Project (NTPC Ltd) Telangana Ramagundam KPC Gas Power Corporation Ltd, 1X370 MW Yelahanka 429 Combined Cycle Power Plant Karnataka Bangalore North Moshi Pimpri 430 Antony lara renewable energy Pvt. limited Maharashtra Chinchwad JAYASHANKAR 431 Kakatiya Thermal Power Project, stage - I Telangana BHUPLALAPALLY Gadivemula 432 JSW Energy Limited, (Captive Power Plant), Andhra Pradesh Mondal 433 TRIVENI ENGINEERING AND INDUSTRIES LTD UP Deoband 434 jagannath power and infra pvt ltd Orissa dhenkanal 435 The hind Samachar limited Haryana Kurukshetra 436 SHRI BAJRANG CHEMICAL DISTILLERY LLP Chhattisgarh Arang 437 Fatehabad Bio Energy LLP Haryana Bhuna 438 Jind Bio Energy LLP Haryana Pillukhera 439 Greenergy Bio Refineries Private Limited Karnataka Ranebennur PRAGATI POWER STATION 330 MW COMBINED CYCLE GAS 440 TURBINE Delhi DELHI 441 MAADURGA THERMAL POWER COMPANY LIMITED Orissa BOINCHUA 442 Namrup Thermal Power Station Assam Dibrugarh 443 CHATTARGARH RENEWABLE ENERGY PVT. LTD. Rajasthan Bikaner 444 SHIKHAR COMMODITIES Chhattisgarh BILASPUR 445 Rajasthan Atomic Power Station (Unit-3 & 4) Rajasthan Rawatbhata 446 Rajasthan Atomic Power Station (Unit-2) Rajasthan BENGU 447 Jindal Urban Waste Management (Ahmedabad) Limited Gujarat Ahmedabad 448 Jabalpur MSW Pvt. Limited Madhya Pradesh Jabalpur ************