See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF POWER
RAJYA SABHA
UNSTARRED QUESTION NO.4141
ANSWERED ON 30.03.2026
COLLAPSE OF POWER DISTRIBUTION INFRASTRUCTURE AND FAILURE OF
DISCOM REFORMS IN WB
4141 SHRI SAMIK BHATTACHARYA:
Will the Minister of POWER be pleased to state:
(a) the Aggregate Technical and Commercial (AT&C) losses of West Bengal State Electricity
Distribution Company Limited (WBSEDCL) compared to the national average during the last five
years;
(b) whether the State of West Bengal has submitted a viable distribution sector reform plan as
required under RDSS;
(c) whether outstanding dues from the State of West Bengal DISCOMs to central generating
stations and transmission utilities remain unpaid; and
(d) the steps taken by the Central Government to ensure that power supply to consumers in the
State of West Bengal is not disrupted due to financial mismanagement by the State-owned utility?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a) to (d): Electricity being a concurrent subject, supply and distribution of electricity to consumers
is within the purview of the respective State Government/Distribution Utility. Government of India
(GoI) supplements the efforts of the States/UTs through various measures to improve the
operational and financial performance of power distribution utilities.
Government of India launched the Revamped Distribution Sector Scheme (RDSS) in July
2021 with the objective of improving the quality and reliability of power supply to consumers
through a financially sustainable and operationally efficient distribution sector.
Under RDSS, works amounting to ₹7,116 crore for loss reduction and ₹12,623 crore for
smart metering have been sanctioned for the State, based on the proposal and action plan for the
distribution utilities, submitted by the State as per the scheme guidelines. The Action plan includes
predefined trajectories for achievement of various financial and operational parameters including
Aggregate Technical and Commercial (AT&C) losses and the gap between Average Cost of Supply
and Average Revenue Realized. The release of funds under the scheme is linked to
States/Distribution utilities taking necessary measures to improve their performance.
Further, under the scheme, sanctioned works include replacement of old conductors, and
upgradation/augmentation of Distribution Transformers (DTs), upgradation of substations,
installation of new DTs, creation of new substations, feeder segregation etc. The execution of these
works would help improve the quality of power supply.As a result of various reform measures undertaken, AT&C losses have improved from
21.34% in FY2021 to 17.17% in FY2025 in West Bengal. The Aggregate Technical & Commercial
(AT&C) losses of WBSEDCL during the last five years vis-a-vis the national average are as under:
AT&C Loss FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
National Average 21.9% 16.2% 15.3% 16.12% 15.04%
WBSEDCL 21.34% 16.67% 17.43% 17.13% 17.17%
As per the Praapti Portal, there are no pending outstanding dues payable to Central
Generating Stations and Transmission Utilities as on 18.03.2026.
************