Date: 2026-02-10 Category: RAJYASABHA_QNA State: Union Government Country: India

Parliament Question: Completion, delays and implementation gaps of Sagarmala project

Issued by Ministry of Ports, Shipping and Waterways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF PORTS, SHIPPING AND WATERWAYS RAJYA SABHA UNSTARRED QUESTION NO. 1269 ANSWERED ON 10.2.2026 COMPLETION, DELAYS AND IMPLEMENTATION GAPS OF SAGARMALA PROJECT 1269. SHRI DIGVIJAYA SINGH: SMT. PHULO DEVI NETAM: Will the Minister of PORTS, SHIPPING AND WATERWAYS be pleased to state: (a) the year-wise data since Sagarmala’s launch on projects added, projects dropped or put on hold and projects re-scoped due to delays or infeasibility; (b) the project-wise list of the 131 projects which are in development stage, including original approval date, latest revised completion date and present stage of execution; (c) the details of original project cost and the latest estimated cost for the 131 projects still at the development stage; and (d) how many projects have been delayed by more than three years solely due to land acquisition issues and the cumulative cost escalation attributable to these delays? ANSWER MINISTER OF PORTS, SHIPPING AND WATERWAYS (SHRI SARBANANDA SONOWAL) (a) to (c): Since the inception of the Sagarmala scheme in March 2015, 186 projects have been sanctioned for financial assistanceby Ministry of Ports, Shipping and Waterways. However, sanctions of 58 projects have been withdrawn from time to time in terms of Sagarmala funding guidelines to maintain fiscaldiscipline. No project has been re-scoped due to delay or non- feasibility. Year wise details of projects sanctioned and sanction withdrawn for funding under Sagarmala scheme is available at annexure-1. At present 128 projects are funded Sagarmala scheme. Out of these, 78 projectshave been completed and 50 projects areunder implementation. The details of these 128 projects including sanction date, completion date, present status and project cost is available at annexure- 2. (d) No project under Sagarmala scheme have delayed by more than three years onaccount of land acquisition and cost escalation.Annexure- 1 The year wise details of projects sanctioned and sanction withdrawn for funding under Sagarmala scheme: Financial Year 61-5102 71-6102 81-7102 91-8102 02-9102 12-0202 22-1202 32-2202 42-3202 52-4202 62-5202 latoT Projects 9 34 20 23 6 17 29 30 4 2 12 186 sanctioned Sanction 0 0 0 0 0 0 0 0 0 55 3 58 withdrawnAnnexure- 2 The details of 128 projects funded under Sagarmala scheme: Sanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) Providing separate Andaman approach way for cargo 1 and Nicobar 15/01/2021 31/12/2023 Completed 10.91 movement in Havelock Island jetty at Havelock Construction of coastal Andhra 2 01/04/2014 30/09/2017 Completed 43.00 Berth at VPT Pradesh Construction of grade separator from H-7 area to Port connectivity Andhra 3 27/02/2017 06/10/2020 Completed 46.34 Road by passing Pradesh Convent Junction - Visakhapatnam Port 2 to 4 laning of port Andhra 4 road connectivity to NH 30/12/2015 30/09/2017 Completed 77.00 Pradesh – 5 -Phase II DDUGKY Phase I Andhra 5 28/07/2016 30/09/2018 Completed 0.28 Andhra Pradesh Pradesh Centre of Excellence in Maritime and Andhra 6 30/10/2017 30/12/2018 Completed 574.00 Shipbuilding - CEMS - Pradesh AP - 18 out of 24 Labs Construction of fishing Andhra 7 harbour at Juvvaladinne 18/03/2020 30/01/2025 Completed 288.00 Pradesh in Nellore District Improvement of Kakinada Anchorage Andhra 8 02/06/2021 28/02/2024 Completed 73.34 Ports infrastructure in Pradesh East Godavari district Recycling/Reuse of Sewage Treated Water from Sewarage Infrastructure 9 Goa 13/03/2024 15/06/2025 Completed 3.18 Development Corporation of goa Ltd (SIDCGL) located at KatemBaina Road circulation plan for ease of movement of 10 Goa 20/09/2018 11/03/2019 Completed 19.35 break bulk cargo at Mormugao Full rake wagon 11 Goa 26/09/2016 06/01/2019 Completed 17.65 handling line withSanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) paving 30m wide at Mormugao Removal of 2 No.s Mooring of Spiral in the 12 Goa 25/02/2019 23/09/2019 Completed 13.87 area of Cruise Berth - Mormugao 2nd Full rake handling 13 line RD 8A with 30m Goa 27/09/2019 21/10/2021 Completed 6.59 paving Construction of an Up- 14 Ramp at MPT Railway Goa 11/11/2020 30/11/2024 Completed 21.99 yard Baina. Construction of 12m wide concrete road 15 connecting berth 5 6 7 8 Goa 09/02/2021 03/06/2023 Completed 9.51 & 9 to new entry / exit road Balance Portion 4 Lane road connectivity to 16 Goa 16/03/2024 30/01/2026 Completed 719.00 NH17 - for Mormugao Port Installation of 3 MWp Solar Power Plant with 17 Goa 19/06/2025 21/05/2025 Completed 11.91 Virtual Net Metering on Turnkey Basis Coastal jetty at 18 Gujarat 27/02/2017 30/04/2025 Completed 108.00 Navlakhi for cement Capital Dredging work of Ro-Pax Ferry 19 services between Gogha Gujarat 21/09/2016 30/10/2018 Completed 208.85 and Dahej in Gulf of Cambay. Construction of RoRO/ 20 Ro-Pax Facility at Gujarat 15/03/2021 30/12/2022 Completed 98.42 Hazira Upgradation of Dredging of Ghogha Channel, Turning Circle 21 Gujarat 30/03/2022 30/11/2023 Completed 62.49 and Approach Channel to achieve depth of 7 meter". Third stage expansion including modernisation 22 Karnataka 25/01/2017 30/12/2023 Completed 50.00 of the existing fishing harbour of Malpe inSanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) Udupi District in Karnatak Modernisation of the existing fishing harbour 23 Karnataka 29/12/2016 30/09/2018 Completed 19.00 at Amadalli in Uttara Kannada DDUGKY Phase I 24 Karnataka 05/08/2016 30/09/2018 Completed 1.53 Karnataka Installation of Fire 25 Fighting Equipment at Karnataka 03/03/2022 30/07/2025 Completed 18.21 Karwar Port Refurbishment and Capacity enhancement 26 of Coastal liquid Kerala 24/04/2015 13/01/2018 Completed 19.27 terminal -COT and NTB at CoPT Construction of 27 Multipurpose Coastal Kerala 21/11/2017 27/10/2020 Completed 18.50 Berth at Kollam Construction of Fishing 28 Harbour at Thalai in Kerala 29/12/2016 19/05/2018 Completed 35.00 Kannur District Construction of Mini Fishing 29 Kerala 25/01/2017 30/12/2018 Completed 30.00 HarbourChettuva in Thrissur District Reconstruction of South Coal Berth at Cochin 30 Kerala 13/12/2019 17/08/2022 Completed 19.30 Port for handling chemicals Development of RORO facilities for handling 31 Kerala 22/04/2022 30/06/2024 Completed 12.46 propylene and other cargo at Cochin Port Passenger Jetty at 32 Janjira Fort, Raigad Maharashtra 14/10/2022 30/01/2026 Completed 121.23 District Construction of break 33 Maharashtra 04/03/2016 15/07/2018 Completed 72.14 water at Mandwa Ro Ro service at Mandwa -Phase 2 of 34 Maharashtra 26/09/2016 15/07/2018 Completed 63.00 Mandwa port development Construction of Ro-Ro 35 Maharashtra 14/12/2016 09/02/2024 Completed 6.73 jetties at VasaiSanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) Construction of approach jetty and sloping berth jetty and 36 Maharashtra 14/12/2016 01/12/2020 Completed 7.25 approach road to facilitate Ro Ro jetty at Bhayander Construction of Ro Ro 37 Maharashtra 27/12/2016 30/10/2021 Completed 6.75 jetty atNarangi (Virar) Construction of jetties 38 Maharashtra 22/12/2016 22/02/2024 Completed 7.40 at Ghodbunder Construction of Ro Ro Jetty at Malvan 39 Passenger Jetty at Maharashtra 27/12/2016 15/10/2021 Completed 10.63 Sindhudurg Port in Maharashtra Dredging in the Navigational Channel 40 Maharashtra 20/11/2017 15/07/2018 Completed 16.54 for Ro-Ro Pax Services at Mandwa Stage II expansion of 41 Mirkawada Fishing Maharashtra 29/12/2016 31/03/2020 Completed 75.00 Harbour in Ratnagiri DDUGKY Phase I 42 Maharashtra 28/07/2016 30/06/2019 Completed 5.50 Maharashtra Centre of Excellence in Maritime and 43 Shipbuilding -CEMS - Maharashtra 30/10/2017 28/02/2019 Completed 191.00 Maharashtra-6 out of 24 Labs Construction of passenger boat landing 44 Maharashtra 17/08/2020 17/04/2017 Completed 7.68 jetty at KanhojiAngre Island Construction of Coastal 45 Maharashtra 22/09/2017 31/03/2021 Completed 143.00 Berth at JNPT Construction of Fishing 46 Harbor at Karanja, Maharashtra 13/08/2018 15/09/2023 Completed 149.80 Raigad district Construction of 47 Maharashtra 23/07/2018 30/09/2021 Completed 6.50 Tourism jetty at Belapur Construction of tourism 48 Jetty at Veldur, Distt.- Maharashtra 18/07/2018 31.06.24 Completed 7.06 Ratnagiri Construction of Ro-Ro 49 Maharashtra 23/07/2018 31/07/2024 Completed 7.37 Jetty atSanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) AmbadaveShigwan in Raigad District ‘Construction of Approach road to 50 Maharashtra 26/03/2019 30/01/2020 Completed 15.00 Kharwadeshwari Jetty in District Palghar Construction of Third 51 Chemical Berth at Maharashtra 27/01/2022 27/09/2024 Completed 161.00 Pirpau, MbPT SCADA and PLC automation system at 52 Maharashtra 04/05/2022 31/07/2024 Completed 22.77 Marine Oil Terminal at Mumbai Port DDUGKY Phase I 53 Odisha 01/08/2016 31/10/2019 Completed 3.72 Odisha Capital Dredging for 54 Puducherry 30/03/2018 31/12/2022 Completed 27.65 Puducherry Port Development and Operation of a full- fledged Truck Parking 55 Terminal adjacent to Tamil Nadu 24/03/2016 06/12/2017 Completed 23.69 NH7A opposite to Fisheries college at V. O .Chidambaranar Coastal berth with dredged depth of 10.0m 56 to handle vessels up to Tamil Nadu 23/06/2015 19/12/2017 Completed 36.00 15000 DWT -length 150m at VoCPT Coastal Cargo Berth at 57 Tamil Nadu 2015-16 21/11/2019 Completed 80.00 ChPT Construction of Breakwater both in North and South side of entrance channel- 58 Berth-1- Berth-2 and Tamil Nadu 27/02/2017 30/09/2023 Completed 135.00 Capital Dredging at Cuddalore Port -From entrance channel till cargo berths Development of paved storage yard at Chennai 59 Tamil Nadu 16/02/2018 16/06/2023 Completed 51.46 Port for handling export cargo 60 Construction of Bunker Tamil Nadu 23/02/2018 31/01/2023 Completed 44.00Sanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) berth at Chennai Port Construction of a fishing harbour at 61 Tamil Nadu 26/12/2016 31/08/2019 Completed 148.00 Poompuhar in Nagapattinam District Expansion of fishing harbour at 62 Tamil Nadu 25/01/2017 30/09/2016 Completed 74.00 Chinnamuttomin Kanyakumari District DDUGKY Phase I 63 Tamil Nadu 09/08/2016 30/09/2018 Completed 2.94 Tamil Nadu Construction of widening the Korampallam Surplus course bridge and rail 64 Tamil Nadu 07/10/2020 20/02/2021 Completed 41.55 over bridge -RoB including widening of road from western boundary to TTPS Dredging the dock basin for coastal cargo berth 65 at VOCPT -Dredging in Tamil Nadu 21/11/2017 21/04/2018 Completed 98.00 front of dedicated coastal berth National Technology Centre for Ports, 66 Waterways and Coasts Tamil Nadu 30/06/2018 30/09/2022 Completed 77.03 (NTCPWC) at IIT Madras. Fishing harbor at Mookaiyur in 67 Tamil Nadu 19/07/2018 30/08/2019 Completed 113.90 Ramanathapuram district Construction of fish landing centre at 68 Kunthukal in Tamil Nadu 27/02/2019 14/09/2020 Completed 74.00 Ramanathapuram District of Tamil Nadu. Modern elevated steel bridge for safe 69 trasportof tourists from Tamil Nadu 17/12/2020 31/01/2025 Completed 37.00 Vivekananda Rock to Thiruvalluvur statue Development of Buffer 70 Tamil Nadu 13/03/2024 10/02/2025 Completed 49.06 Parking yard forSanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) Trailers / Trucks at the backup areas of Berth No. 24B(BD-II) in Chennai Port Authority RoB cum Flyover at West 71 Ranichak level crossing 24/11/2015 28/12/2020 Completed 127.80 Bengal at KoPT Improvement of road connectivity to facilitate West 72 27/09/2016 18/04/2023 Completed 13.52 trade and port users at Bengal KoPT Upgradation of the track 10-12-14-16-18-19-20- West 73 27/09/2016 30/06/2018 Completed 47.00 21- 22 and 23 at EJC Bengal yard of KoPT Upgrade of existing rail West 74 network at Kolkata 05/10/2016 10/01/2018 Completed 9.00 Bengal Dock System 2nd Railway Line from Durgachak take off West 75 01/02/2016 03/08/2021 Completed 117.00 point to ‘A’ cabin at Bengal Durgachak at HDC Improvement of road connectivity to facilitate West 76 24/09/2018 18/03/2023 Completed 87.91 trade and port users at Bengal KoPT, Phase-2 Design, Engineering & Construction for Rehabilitation of No.7, NSD Old Berth West 77 12/07/2022 01/09/2024 Completed 80.74 including Development Bengal of Backyard at N.S. Dock of KDS - SMP, Kolkata’ Anti-erosion work on the left bank of river Hooghly/ Bhagirathi West 78 23/03/2023 28/02/2025 Completed 14.99 Block & P.S. Kalyani, Bengal Nadia district, Kolkata (WB) DDUGKY Phase II Andaman Under 79 Andaman & Nicobar and Nicobar 24/08/2021 31/03/2026 Implementat 7.09 Islands Island ion Development of Sea Andaman Under 80 14/01/2021 30/04/2026 24.98 Port Terminal at and Nicobar ImplementatSanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) Havelock SwarajDweep Island ion Modernisation of Under Andhra 81 Visakhapatnam Fishing 30/03/2022 30/11/2026 Implementat 178.51 Pradesh Harbour ion Under DDUGKY Phase II Andhra 82 12/03/2019 31/03/2026 Implementat 5.98 Andhra Pradesh Pradesh ion Augmentation of Under Firefighting facilities at 83 Goa 05/06/2025 31/03/2026 Implementat 17.76 Berth no. 8 of MgPA on ion Turnkey basis International & Domestic Cruise Under 84 Terminal and Ferry Goa 15/07/2020 31/03/2026 Implementat 87.44 Terminal at Mormugao ion Port, Goa Construction of Ro-Ro/ Under 85 Ro-Pax facility at Gujarat 03/11/2021 31/12/2026 Implementat 90.49 Muldwarka ion Under DDUGKY Phase II 86 Gujarat 04/07/2019 31/03/2026 Implementat 10.85 Gujarat ion National Maritime Under 87 Heritage Complex, Gujarat 25/02/2019 31/03/2026 Implementat 573.12 Lothal ion Construction of fishing Under 88 harbor at Mangrol Gujarat 16/10/2017 31/03/2026 Implementat 158.00 (Phase-III), Junagarh ion Occupational Safety and Under 89 Health Training in Gujarat 20/09/2016 31/03/2026 Implementat 30.00 Alang ion Under DDUGKY Phase II 90 Karnataka 29/02/2024 31/03/2026 Implementat 2.18 Karnataka ion Under Development of Fishing 91 Karnataka 28/02/2018 31/12/2026 Implementat 196.51 Harbour at Kulai ion Development of existing fish landing Under 92 center at Karnataka 13/08/2018 31/03/2026 Implementat 138.60 HejamadiKodiin Udupi ion district of Karnataka Construction of coastal Under 93 Karnataka 14/09/2017 31/03/2026 65.00 cargo berth at Old ImplementatSanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) Mangaluru Port ion Under DDUGKY Phase II 94 Kerala 12/03/2019 31/03/2026 Implementat 25.46 Kerala ion Modernization and up- Under 95 gradation of Cochin Kerala 11/03/2022 30/09/2026 Implementat 169.17 Fishing Harbour ion Under DDUGKY Phase II 96 Maharashtra 21/10/2019 31/03/2026 Implementat 15.11 Maharashtra ion Modernization of Under existing Fishing Harbor 97 Maharashtra 02/04/2016 30/05/2026 Implementat 92.52 at Sassoon Dock, ion Mumbai Development of Fishing Under 98 Harbour at Mallet Maharashtra 20/01/2022 31/03/2026 Implementat 96.60 Bunder, Mazgaon ion Under Development of Ro-Ro 99 Maharashtra 03/08/2020 30/06/2026 Implementat 21.66 Service at Rewas ion Construction of Ro-Pax Under 100 jetty and Terminal at Maharashtra 06/08/2021 30/04/2026 Implementat 82.92 Mora, Distt. Raigad ion Construction of fishing Under harbour at Anandwadi 101 Maharashtra 28/03/2018 30/05/2026 Implementat 88.44 (Deogad) in Sindhudurg ion District Construction of Approach Jetty and Under sloping berth jetty and 102 Maharashtra 14/12/2016 31/03/2026 Implementat 6.59 Approach Road to ion facilitate Ro-Ro Jetty at Manori, Maharashtra Construction of jetty at Under 103 Arnala fort- Tal Vasai- Maharashtra 25/09/2020 31/03/2026 Implementat 9.94 Dist. Thane ion Up- gradation/modernization Under 104 of International Cruise Maharashtra 27/01/2017 31/03/2026 Implementat 363.30 Terminal at Indira ion Dock, Mumbai Under Tourism Jetty at Kashid 105 Maharashtra 30/03/2018 31/03/2026 Implementat 99.82 in Raigad District ionSanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) Under DDUGKY Phase II 106 Odisha 11/02/2025 31/03/2026 Implementat 22.83 Odisha ion Ro-pax Jetty and allied infrastructure Under connecting Kaninali in 107 Odisha 05/04/2021 10/03/2026 Implementat 136.98 Bhadrak District ion &Talchua in Kendrapada District". Modernization and Under 108 upgradation of Paradip Odisha 03/01/2022 19/07/2026 Implementat 99.75 Fishing Harbour ion Construction of fishing harbor at Chandipur Under 109 (Balaramagadi) in Odisha 06/08/2018 31/03/2026 Implementat 49.94 Balasore district, ion Odisha. Ro-pax Jetty and allied infrastructure Under connecting Balugaon in 110 Odisha 21/09/2020 31/03/2026 Implementat 37.02 Khurda District ion &KrishnaprasadGada in Puri District Under DDUGKY Phase II 111 Puducherry 14/02/2022 31/03/2026 Implementat 2.22 Puducherry ion Upgradation of Nagapattinam Port Infrastructure for the Under passenger ferry service 112 Tamil Nadu 21/08/2024 10/05/2026 Implementat 10.47 from Nagapattinam ion (India) to Kankesanthurai (Sri Lanka) Creation of Berthing Under facilities for the tourist 113 Tamil Nadu 07/03/2023 20/03/2026 Implementat 7.58 vessels at Agni ion Theertham, Tamil Nadu Creation of additional berthing facilities for Under 114 the tourist vessels at Tamil Nadu 08/02/2023 20/03/2026 Implementat 3.66 VilloondiTheertham, ion Tamil Nadu DDUGKY Phase II Under 115 Tamil Nadu 27/03/2019 31/03/2026 10.67 Tamil Nadu ImplementatSanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) ion Modernization and up- Under 116 gradation of Chennai Tamil Nadu 22/02/2022 30/06/2026 Implementat 97.95 Fishing Harbour ion Development of Under 117 Passenger jetty at Tamil Nadu 23/03/2018 27/02/2026 Implementat 20.00 Kanyakumari ion Setting up of Centre for Inland and Coastal Under Maritime Technology West 118 07/03/2019 30/03/2026 Implementat 69.20 (CICMT) at Indian Bengal ion Institute of Technology, Kharagpur Development of River Cruise terminal and Under river tourism facility West 119 11/08/2025 30/02/2027 Implementat 75.82 along with riverfront Bengal ion beautification works at KDS, SMP, Kolkata’ Augmentation of Under Firefighting facilities at 120 Maharashtra 30/09/2025 31/01/2026 Implementat 52.69 Pir Pau Terminal of ion Mumbai Port Construction of Under 121 Approach road to Maharashtra 17/10/2025 30/01/2026 Implementat 29.41 Narangi Jetty ion Construction of four EXIM Godowns and Under 122 concrete roads around Tamil Nadu 25/11/2025 31/05/2026 Implementat 54.34 EXIM Godowns at ion Chennai Port Development of paved storage yard at Under 123 marshalling yard and JD Tamil Nadu 25/11/2025 31/05/2026 Implementat 45.90 (east) back up area for ion handling EXIM cargoes Under Smart Lighting on 124 Kerala 25/11/2025 30/04/2026 Implementat 2.01 Willingdon Island ion 2.3 MWp roof mounted Under grid connected solar West 125 24/11/2025 31/03/2026 Implementat 30.70 power plant at Bengal ion Khidderpre Dock-IISanction Completion Project Project cost SI. No. Project Name State/UT Date date Status (in ₹ crore) Extension and Improvement of Loading Platform of full rake No.8 and Under modification to railway 126 Goa 02/12/2025 31/07/2026 Implementat 12.58 infrastructure for ion Handling two rakes simultaneously at Line No. 08 and 8A at Mormugao Port Revamping/upgradation Under of 6 roads in port West 127 11/12/2025 31/03/2026 Implementat 19.35 operational areas of Bengal ion KDS under SMPA Creation of additional birthing and Land side Under 128 facilities at Chellanam Kerala 19/12/2025 31/03/2027 Implementat 7.65 Fishing Harbor in ion Kerala Total 8,936 *****