GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
STARRED QUESTION NO. 272
ANSWERED ON 6TH AUGUST, 2026
CONSTRUCTION OF NATIONAL HIGHWAYS IN RAJASTHAN
*272. SMT. MANJU SHARMA:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) the total number of National Highways in Rajasthan along with
their present status of operationality;
(b) whether the Government has given in-principle approval for the
construction of five new National Highways in Rajasthan during the
last five years and if so, the details thereof;
(c) the details of the number of highways proposed along with their
length;
(d) the progress made in this regard and the time by which the said
works are likely to be commenced; and
(e) the details of the estimated expenditure likely to be incurred on
the said projects and the time by which these are likely to be
completed?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) to (e) A Statement is laid on the Table of the House.STATEMENT REFERRED TO IN REPLY TO PARA (a) to (e) OF LOK
SABHA STARRED QUESTION NO. 272 ANSWERED ON 06TH
AUGUST, 2026 ASKED BY SMT. MANJU SHARMA REGARDING
“CONSTRUCTION OF NATIONAL HIGHWAYS IN RAJASTHAN.
(a) 68 National Highways having a length of about 10886 km
passes through the State of Rajasthan. The lane configuration is as
below:
Lane Configuration Total (in km)
8 Lane 374
6 Lane 1549
4 Lane 2652
2 Lane / 2 Lane with Paved shoulder 6036
< 2 Lane 275
10886
(b) to (e) No State Highway has been given in-principle approval for
upgradation as National Highway in the last five years. The details
of works sanctioned during last 5 years since 2021-22 are annexed.ANNEXURE REFERRED TO IN REPLY TO PARA (b) to (e) OF LOK
SABHA STARRED QUESTION NO. 272 ANSWERED ON 06TH AUGUST,
2026 ASKED BY SMT. MANJU SHARMA REGARDING
“CONSTRUCTION OF NATIONAL HIGHWAYS IN RAJASTHAN.
Details of work sanctioned during last 5 years since 2021-22.
Sr. NH Name of the Length Sanction Expendit Physical Likely Status
No. No. project (km) ed Cost ure (in Progress Completion
(in Rs. Rs. Cr.) Date
Cr.)
1. 911 Construction/ 102.076 672.35 555.63 100% Completed Completed
upgradation and under
of 2LPS of Operation
Srianganagar &
- Maintenanc
Raisinghnagar e (O&M)
section of 911
(Design Ch. -
0.500 to
101.00)
(length
102.076 Km.)
under NH(O)
(Pkg-I) on
HAM
2. NE- Construction 66.916 2170.39 1283.58 100% Completed Completed
4C of 4-lane and under
Green Field O&M
Expressway
Spur from
Delhi-
Vadodara
Greenfield
expressway
near Bandikui
to Jaipur in
Bharatmala
Pariyojana
Phase-I on
HAM
3. 125A 4-Lanning of 30.093 736.75 463.96 100% Completed Work
Karwar (Km completed.
281.980 of NH Completion62 Nagaur Certificate
road) to (CC) to be
Dangiyavas issued
(Package-II)
(design length
30.093 km) of
Jodhpur Ring
Road on EPC
4. 48 Construction 7.478 325.12 141.33 89.50% 30.11.2026 Work in
of Additional progress.
Structure Likely to be
work on Six- completed
lane Gurgaon– by
Kotputli– 30.11.2026
Jaipur section
of NH-48
5. 68 Construction 6.203 353.30 190.04 89.37% 22.11.2026 Work in
of Elevated progress.
Structure at Likely to be
Raniwara completed
Circle by
Sanchore 22.11.2026
town of
Gandhav-
Sanchore
section of NH-
68 under
NH(O) on EPC
6. NH- Mayjilar- 134.865 1237.71 70.00 21.22% 18.12.2027 Work in
70 & Jaisalmer progress
11 with
Jaisalmer
Bypass Link
Road section
of NH-11 (Km
0 to 98.350)
Part of BM-7
& Sundra–
Myajilar–
Ambsingh ki
Dhani Road
part of
Munabao-
Tanot projectNH-70
7. YTD Construction 7.633 1243.19 0 0% - Agreement
of Four Lane signed on
Elevated Road 25.02.2026
in Jodhpur Appointed
city portion date yet to
from be issued
Mahamandir
(Ch. 0+000) to
Akhaliya
Chouraha (Ch.
7+633) on
HAM under
NH(O)
8. 48 Upgradation 89.785 738.67 0 0% - Agreement
of 6-lane signed on
Jaipur 13.05.2026
Kishangarh Appointed
section of NH- date yet to
48 from Km. be issued
274+100 to
363+885
involving
construction
of Flyovers
and service
Road on EPC
9. 48 Construction 3.24 363.89 0 0% 08.01.2029 Work in
of Elevated progress
Corridor at
Kherwara
Town on
Udaipur
Ratanpur
Shamlaji
Section of
NH-48 in
Udaipur Distt
on EPC
10. 719 Development 88.400 4612.65 0 0% - Agreement
D of a 6-lane Km signed on
access- (26.65 30.04.2025
controlled Km in Appointed
Greenfield Rajasth date yet toHighway from an) be issued
Design Km
0+00 near
Village Deori
(Agra District,
Uttar
Pradesh) to
Design Km
88+400 near
Village
Susera
(Gwalior
District,
Madhya
Pradesh),
traversing the
States of
Uttar
Pradesh,
Rajasthan and
Madhya
Pradesh
(Under RO-
Bhopal)
11. 148B Construction 40.08 769.96 327.68 42.75% 15.09.2026 Work in
of Six lane progress
access-
controlled
Highway from
Km. 0+00 to
KM. 40+080
(Paniyala to
Mator
Section) of
Paniyala-
Alwar-
Baradameo
ICR in the
state of
Rajasthan
under
Bharatmala
Pariyojana on
EPC Mode(Package-I)
(Under RO-
Delhi with
PIU-Sohna)
12. 148B Construction 46.433 1034.43 328.21 37.27% 17.11.2026 Work in
of Six lane progress
access-
controlled
Highway from
Km. 40+080
to KM. 86+513
(Mator to
Baradameo
Section) of
Paniyala-
Alwar-
Baradameo
ICR in the
state of
Rajasthan
under
Bharatmala
Pariyojana on
EPC Mode
(Package-II)
(Under RO-
Delhi with
PIU-Sohna)
Strenghtening
/
Reconstructio
n from km 0 /0
to 1/200,
1/800 to
42/400, 43/900
Complete
1 75 to 44/100,
76.68 84.39 77.79 100% 31-Mar-24 d & under
3 2 47/400 to
O&M
59/100, 64/450
to 72/080,
72/680 to
78/750, 79/050
to 88/330 of
NH-752 in the
state ofRajasthan on
EPC mode.
Construction
of Balance
work of
proposed 2
Lane ROB and
its
approaches in
lieu of
existing Level Complete
1 70
Crossing No. 0.70 36.03 28.88 100% 30-Nov-25 d & under
4 9E
A-142 at km. O&M
1.0 on NH-
709 Extn.
Near Sadalpur
railway
station in
District Churu
in the State of
Rajasthan.
Strengthening
for Suratgarh-
Sriganganaga
r section of
NH No. 62
Complete
1 (Old NH No.
62 77.90 56.20 56.13 100% 15-Oct-25 d & under
5 l5) from Km.
O&M
173/000 to
250/900 in the
state of
Rajasthan on
EPC mode.
Construction
of Pratapgarh
City Bypass
two lane with
paved Complete
1 11 11.16
shoulder 98.90 85.31 100% 15-Feb-26 d & under
6 3 5
configuration O&M
from existing
km 74.00 to
km 81.600
(DesignChainage Km
0+00 to km
11+165) on
NH18-113 on
EPC Mode in
the State of
Rajasthan.
Construction
of 4 lane
divided
carriageway
from km 0.000
(Km. 144.200
of NH-15
(New NH-68))
to km 21.042 Complete
1 21.04
68 (Km. 160.700 451.66 380.47 100% 07-Jun-25 d & under
7 2
of NH-15 O&M
(New NH-68))
Barmer
Bypass of NH-
15 (New NH-
68) on EPC
mode on in
the State of
Rajasthan.
Construction
of Two Lane
with Paved
Shoulder for
Rajgarh
Bypass from
Design
Chainage Km
Complete
1 70 0.000 to Km
12.68 107.63 86.07 100% 25-Aug-24 d & under
8 9E 5.400 & Pilani
O&M
Bypass from
Design
Chainage Km
35.840 to Km
43.120 on NH-
709 Extn on
EPC Mode in
the State ofRajasthan.
Up-gradation
to 2 lane with
Paved
shoulder from
Charbhuja at
Design km
0.00 (existing
Complete
1 16 km 150.00) to
88.80 838.43 651.09 100% 11-Apr-25 d & under
9 2E Neechli Oden
O&M
(Nathdwara)
at Design ch.
Km 88.800
(existing km
55.950) of NH-
162E on EPC
mode.
Upgradation
to Two Lane
Paved
Shoulder in
km 33/0 to
126/520 of
NH-23 (Old
Complete
2 NH-11B)
23 93.52 150.11 111.65 100% 31-Jan-26 d & under
0 Kothun-
O&M
Lalsot-Karoli-
Dholpur road
in the state of
Rajasthan
under EPC
mode (Length-
93.52 Km).
Construction
of two lane
paved
shoulder from
Shahpura Complete
2 24 36.81
existing km. 174.34 139.11 100% 21-Jul-25 d & under
1 8A 0
0.00 (Design O&M
Ch. 0+00) to
Thanagazi
existing
Km.37+352(Design Ch.
36+810) of
NH-248A on
EPC mode in
the State of
Rajasthan.
Upgradation
&
Rehabilitation
to Two Lane
with Paved
Shoulder of
Barmer-
Gagariya
Complete
2 25 section from 68.93
304.87 213.91 100% 19-Feb-24 d & under
2 E Km 0.972 to 8
O&M
Km 69.910 of
NH-25 Ext.
(Design
Length 68.938
Km) in the
State of
Rajasthan on
EPC Mode.
Upgradation
to Two lane
with Paved
Shoulder from
existing
chainage km
207.700
(Design Ch.
208+550) to
Complete
2 92 km 216.440 15.44
187.65 144.47 100% 19-Jun-25 d & under
3 7A (Design Ch. 0
O&M
216+890)
[Sagwara
Bypass] &
from existing
km 227.470
(Design Ch.
227+900) to
Km 244.060
(Design Ch.235+00)
[Garhi-
Partapur
Bypass]
section of NH-
927A in the
State of
Rajasthan on
EPC Mode.
Construction
of Two lane
with Paved
Shoulder for
Fatehpur
Bypass
(Design Km
0.000 to Km
7.400) ,
Mandawa
Bypass Complete
2 26.84
11 (Design Km 186.29 166.61 100% 30-Sep-25 d & under
4 0
20.925 to Km O&M
27.300) &
Jhunjhunu
Bypass
(Design Km
41.625 to Km
54.689) of NH-
11 on EPC
Mode in the
State of
Rajasthan .
Upgradation
&
Rehabilitation
to Two lane
with Paved
Complete
2 25 Shoulder of
56.45 235.15 171.67 100% 19-Feb-25 d & under
5 Ext Ghagariya-
O&M
Munabao
section from
Km 69.910 to
Km 126.355
of NH-25 Ext(design length
56.445 Km) in
the State of
Rajasthan on
EPC Mode.
Widening and
reconstructio
n of streches
Complete
2 75 in Kawai,
4.725 16.04 9.98 100% 10-Jul-26 d & under
6 2 Chipabarod &
O&M
Aklera Towns
(OTI) on NH
752.
Widening of
Pachpadra-
Bagundi
section to 4-
Lane from km Complete
2 22.10 31-July-
25 73.600 to km 194.88 165.17 100% d & under
7 0 26
95.700 of NH- O&M
25 on EPC
mode in the
state of
Rajasthan.
Construction
of 2 lane with
paved
shoulder for
the work of
"Development
of remaining
sections of
NH-325
2 32 (Balotra to 41.45 31-Oct -
411.40 296.18 92% ongoing
8 5 sanderao via 5 26
Jalore) to 2
lane with
paved
shoulder
configuration
by
Construction
of Byasses for
townportions:(1)
Asotra-
Brahmdham
bypass
2)Siwana
Bypass (3)
Mokalsar
Bypass (4)
Major
realignment
at Kathadi (5)
Major
realignment
at Bishangarh
(6) Jalore
Bypass (7)
Ahore Town
portion (8)
Dujana
Bypass in the
state of
Rajasthan" on
EPC Mode
Upgradation
to two lane
with Paved
Shoulder of
Hanumangarh
to Kenchiyan
from km 0/00
(existing
chainage km
2 23.200) to km 49.70
54 321.16 185.26 70% 03-Oct-26 ongoing
9 49.605 0
(existing
chainage
74.645) of NH-
54 on EPC
Mode in the
State of
Rajasthan
(Length
49.605)
3 52 Construction 12.91 317.74 154.86 50% 30-Nov-26 ongoing0 of 2 lane with 5
paved
shoulder
Northern
Bypass
Phase-II of
Kota city from
Design
chainage
Km.0/0 (Km.
178+300 of
SH-33) to Km
12/915 (Km.
236+800 of
NH-52) on
EPC Mode in
the State of
Rajasthan .
Up-gradation
to 2 lane with
paved
shoulder from
Neechli Oden
(Nathdwara)
at Design Km
88.800
(existing km
3 16
55.95) to 53.23 606.61 238.33 64% 03-Oct-26 ongoing
1 2E
Bhatewar at
Design Km
142.028
(existing km
0.00) of NH-
162E in the
State of
Rajasthan on
EPC mode.
Upgradation
to 2-Lane with
Paved
3 24 31-Dec-
Shoulder from 25.66 154.89 22.24 23% ongoing
2 8A 26
Design Km
36+300 to
DesignChainage
47+918 and
from Design
Ch 69+900 to
Design Ch
83+940 of
NH-248A
(Natni Ka
Bara) in the
State of
Rajasthan on
EPC Mode.
Upgradation
four-lane
carriageway
from km.
3/100 to 7/050
on NH-448
3 44
(Ajmer- 3.95 82.72 7.53 4% 24-Mar-27 ongoing
3 8
Nasirabad
section) in the
State of
Rajasthan on
EPC Mode-
Reg.
Construction
of 2-Lane with
Paved
Shoulder
configuration
of bypass to
Mandal Town
(District-
Bhilwara)
3 15
with 4.379 64.44 9.91 4% 31-Mar-27 ongoing
4 8
connecting
NH-158 (Ch.
109.90 to Ch.
114.279) to
NH-48 in the
state of
Rajasthan
(Mandal
bypass).Construction
of 4-Lane
bypass to Ras
3 15 Town on NH-
4.525 78.06 17.05 35% 31-Mar-27 ongoing
5 8 158 in the
State of
Rajasthan on
EPC mode.
Construction
of grade
separated
structure VUP
on Ajmer
Nagaur
section of NH-
89 (New NH-
58) at km
3
58 3/630 (kayad), 7.825 102.59 1.42 18% 31-Mar-27 ongoing
6
km 6/020
(sikar
Junction) and
at km 18/500
(Dev Nagar) in
the state of
Rajasthan on
EPC mode. (3
VUP)
Construction
of 4-lane
major bridge
on Ghaghar
river including
approaches at
3 km. 176/090
62 0.5 17.54 3.9 35% 31-Mar-27 ongoing
7 of Suratgarh -
Sri
Ganganagar
section of NH-
62 in the state
of Rajasthan
on EPC Mode
Construction
3 03-Dec-
58 of flyover/VUP 2 83.28 13.81 30% ongoing
8 26
on AjmerNagaur
Section of
NH-89 (New
NH-58) (i)
Tehla at km
38/240 (ii)
Construction
of
Flyover/VUP
at Kuchera
Bypass at km
116/450 and
Development
of Junction on
NH-89 from
0/00 to
148/250 in the
state of
Rajasthan. (2
VUP)
Balance
works of
“Rehabilitatio
n and Up-
gradation to
4-Lane
configuration
of Ras-
Beawar
Section (Km
3 15 27-Dec-
00.000 to km 30.05 278.1 98.66 53% ongoing
9 8 26
30.050) of NH-
158 in the
State of
Rajasthan
under Green
National
Highway
Corridor
Project
(GNHCP).
Construction
4 16
of Balance 0 54.47 27.99 69% 23-Oct-26 Ongoing
0 2E
work of ROB(Bow String
type) in
railway
portion at km
30.00 on NH-
l62E (Pali-
Nadol
Section)
[Crossing the
Falna- Marwar
Railway
Section at LC
No. C-67 near
Sornesar.]
Balance work
of
Construction
of two lane
with paved
shoulder
configuration
of kawai
4 75 bypass of NH-
8.7 75.46 12.43 27% 10-Jan-27 Ongoing
1 2 752 from km
41/560 to
50/650
(Design Ch
0/000 to
8/700) on EPC
mode in the
State of
Rajasthan.
Widening of
existing
2L+PS road to
4 Lane with
paved
4 55 shoulder from 23-May-
6.45 111.03 24.4 7% Ongoing
2 2E Km 69/750 to 27
Km 75/750
(Kustla –
Sawai
madhopur
section) ofNH-552 Extn.
on EPC mode.
4 11 Ghatol bypass
7.7 170.49 34.27 17% 24-Sep-27 Ongoing
3 3 on NH-113
Construction
of VUP at
4 start point
62 4.6 50.23 4.8 15% 10-Mar-27 Ongoing
4 and Balance
work of Rohat
Bypass
Widening/
Stregthening/
reconstructio
n/ overlay
work on
Wajwana-
Banswara
4 92 Section at
20.3 29.59 7.12 36% 19-Feb-27 Ongoing
5 7A design ch.
242/00 to
264/370 (on
selected
stretches) on
NH-927A in
the State of
Rajasthan.
Strengthening
from Km
39/00 to km
41/00 (Lalsot
Town
Portion), km
66/200 to km
66/840, km
4 87/340 to km
23 6.2 6.27 0 1% 05-Jan-27 Ongoing
6 88/300 (ROB
Approaches)
and joint
filling of CC
reaches of 2.6
km of Lalsot-
Karauli
section of NH-
23 in theStateof
Rajasthan
under Annual
Plan 2025-26
Bypass of
Awarded
4 Gangapur city 19.15
23 452.36 6.99 0 NA not
7 bypass on NH- 9
appointed
23
Bypass of
Awarded
4 Karauli 14.33
23 511.01 0.25 0 NA not
8 section on 1
appointed
NH-23
Construction
of Nagaur
bypass
(Balance
length) from
existing
km161+00
(Amarpura on
NH-58) to km
173+100
(Gogelao on
NH-62) and
4 widening to 104.4 1393.3 LOA yet to
62 0 0 NA
9 Four lane with 97 4 be issued
paved
shoulders
from Nagaur
to Netra (from
design km
180+150 to
design
chairragc km
269+314) in
the State of
Rajasthan on
HAM Mode.
Widening to
two lane with
5 45 paved LOA yet to
29.77 716.74 10.22 0 NA
0 8 shoulder of be issued
Raipur-
Jassakherasection from
km 0.00 to
29.770 of NH-
458 in the
State of
Rajasthan.
Balance work
of widening to
four lane with
paved
shoulder from
km 166.00 to
5 LOA yet to
62 172.200 on 6.2 29.77 0 0 NA
1 be issued
old NH-89 (left
out one time
improvement)
at Nagaur city
in the State of
Rajasthan.
4L Suratgarh-
5 1022.5 Under
62 Sriganganaga 75.5 0.17 0 NA
2 7 Bidding
r Section
4L of
Jhunjhunu-
5 2202.6 Under
11 Chirawa 77 0 0 NA
3 7 Bidding
section of NH-
11
4L+PS
Rajgarh-
5 92 51.09 Under
Mahua- 862.22 0.15 0 NA
4 1 6 Bidding
Mandawar of
NH-921
Singhana-
Khetri- Nagar-
Jasrapur-
Nagli- Saledi
5 31 Under
Singh- 24.68 260.87 0 0 NA
5 1 Bidding
Bhatiwar-
Chhawsari-
Titanwar of
NH-311
Construction
5 24 Under
of ROB at Km 1.7 101.55 0.09 0 NA
6 8A Bidding
112 onShahpura
Ramgarh road
of NH-248A
(LC no.- 95)
Upgradation
to Four-Lane
of Left-Out
Stretches of
NH-709 from
km 0/700to
5 70 Km 3/650 Under
2.95 18.06 0 0 NA
7 9E (Rajgarh- Bidding
Pilani Section
up to Haryana
Border) in the
Stateof
Rajasthan on
EPC Mode.
Landslide
affected
length on
5 58 Kundal-Jhadol Under
1.42 72.55 0 0 NA
8 E section (KM Bidding
12.800 to KM
14.220) on
NH-58E
4 Lane
5 Nagaur- 108.2 1359.3 Under
62 0 0 NA
9 Bikaner 5 3 Bidding
section NH-62
Bids yet
6 Mukundra 10.09
52 550.84 0 0 NA to be
0 Bypass NH-52 2
invited
*****