See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 682
TO BE ANSWERED ON 22.07.2026
CONSTRUCTION OF ROB/RUB AT LEVEL CROSSING NO. 285
†682. SHRI BRIJENDRA SINGH OLA:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has conducted any study on the traffic jams
occuring at railway level crossings in Rajasthan particularly in the
Jhunjhunu Lok Sabha Constituency;
(b) if so, the railway level crossing identified by the Government in the said
constituency where there is a need to construct ROB/RUB;
(c) the time by which the ROB/RUB are likely to be constructed at railway
level crossing number 285 located in Bhamarwasi village of Jhunjhunu
district; and
(d) if not, the reasons therefor?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d): As on 01.04.2026, Indian Railways has 15,689 Nos. manned Level
Crossings (MLCs) on Broad Gauge (BG). Of these, 764 Nos. MLCs are
situated in the State of Rajasthan, including 16 Nos. MLCs falling within the
Jhunjhunu Lok Sabha Constituency.
Sanctioning of works of Road over Bridge (ROB)/Road under Bridge
(RUB) in lieu of Level crossings (LCs) is a continuous and dynamic process
of Indian Railway. Such works are prioritised and taken up on the basis of
their impact on safety in train operations, mobility of trains & impact for
road users and feasibility etc.
§ Page 1 of 2No. of ROBs/ RUBs constructed on Indian Railways during the period
2004-14 viz-a-viz 2014-26 (Upto May’26) is as under:
Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-26 (Upto May’26) 14,451 Nos. (1,612 Nos.
in the State of Rajasthan)
As on 01.06.2026, 4,993 Nos. ROBs/ RUBs works are sanctioned at a
cost of approx.₹ 1,17,492 Cr on Indian Railways including 618 Nos. ROBs/
RUBs works at a cost of approx. ₹ 6,137 Cr in the state of Rajasthan and 17
Nos. ROBs/ RUBs works at a cost of approx. ₹ 114 Cr in Jhunjhunu Lok
Sabha Constituency which are at various stages of planning and execution.
LC No. 285 at km 321/3-4 on Sikar-Loharu section was closed during
gauge conversion in the year 2015 by constructing RUBs on either side
considering the population centre of the village and to facilitate public
movement. (RUB No. 176A on Loharu side & RUB No 176B on Sikar side)
Completion & commissioning of ROB/RUB works depends on various
factors like cooperation of State Governments in giving consent for
closure of LC, fixing of approach alignment, approval of General
Arrangement Drawing (GAD), land acquisition, removal of encroachment,
shifting of infringing utilities, statutory clearances from various
authorities, law and order situation in the area of project / work sites,
duration of working season in a year for the particular project / area due to
climatic conditions etc. All these factors affect the completion time of the
projects / works.
*****
Page 2 of 2