See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 505
TO BE ANSWERED ON 22.07.2026
CONSTRUCTION OF ROBS/RUBS AT JHUNJHUNU LOK SABHA
CONSTITUENCY
†505. SHRI RAHUL KASWAN:
SHRI BRIJENDRA SINGH OLA:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has undertaken any national assessment of
the remaining railway level crossings in the country from the
perspective of safety, if so, the details thereof particularly in Jhunjhunu
Lok Sabha Constituency of Rajasthan;
(b) the details of Railway Overbridges (ROBs) and Railway Underbridges
(RUBs) that have been sanctioned/under construction/completed during
the last three years particularly in the said Lok Sabha Constituency of
Rajasthan, year and State/UT-wise;
(c) whether the Government has developed any standardised system for
prioritising locations with a high potential for accidents and heavy
traffic congestion in the said State and if so, the details thereof; and
(d) whether any new mechanism has been developed to strengthen
coordination between the Railways and the State Government and if so,
the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d): Sanctioning of works of Road over Bridge (ROB)/Road under
Bridge (RUB) in lieu of Level crossings (LCs) is a continuous and dynamic
process of Indian Railway. Such works are prioritised and taken up on the
basis of their impact on safety in train operations, mobility of trains &
impact for road users and feasibility etc.
§ Page 1 of 4No. of ROBs/ RUBs constructed on Indian Railways during the period
2004-14 viz-a-viz 2014-26 (Upto May’26) is as under:
Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-26 (Upto May’26) 14,451 Nos. (1,612 Nos.
in the State of Rajasthan)
As on 01.04.2026, Indian Railways has 15,689 Nos. of Manned Level
Crossings (MLCs) on Broad Gauge (BG). Of these, 764 Nos. MLCs are
situated in the State of Rajasthan, including 16 Nos. MLCs falling within the
Jhunjhunu Lok Sabha Constituency.
As on 01.06.2026, 4,993 Nos. ROB/ RUB works are sanctioned at a cost
of approx.₹ 1,17,492 Cr on Indian Railways including 618 Nos. ROB/ RUB
works at a cost of approx. ₹ 6,137 Cr in the state of Rajasthan.
In Jhunjhunu Lok Sabha Constituency, 02 Nos. ROBs/RUBs are
completed in the last three years. Further, 12 Nos. ROB/RUB works are
sanctioned at a cost of approx. ₹ 112 Cr in which are at various stages of
planning and execution. The details are as follows:
S.N. LC Details ROB/ Cost of Remarks
RUB work (₹
in Cr
approx.)
1 LC-270 at Km RUB 2 Site feasibility
306/0-1 on Sikar- examination taken up
Loharu section for preparation of GAD.
Page 2 of 42 LC-294 at Km RUB 2 Site feasibility
337/7-8 on Sikar- examination taken up
Loharu section for preparation of GAD.
3 LC-303 at Km RUB 2 Site feasibility
344/6-7 on Sikar- examination taken up
Loharu section for preparation of GAD.
4 LC-231 at RUB 2 Site feasibility
Km270/6-7 on examination taken up
Sikar-Loharu for preparation of GAD.
section
5 LC-237 at Km RUB 2 Site feasibility
276/2-3 on Sikar- examination taken up
Loharu section for preparation of GAD.
6 LC-240 at Km RUB 2 Site feasibility
278/7-8 on Sikar- examination taken up
Loharu section for preparation of GAD.
7 LC-241 at Km RUB 2 Site feasibility
279/9-280/0 on examination taken up
Sikar-Loharu for preparation of GAD.
section
8 LC-268 at Km RUB 2 Site feasibility
304/1-2 on Sikar- examination taken up
Loharu section for preparation of GAD.
9 LC-288 at RUB 2 Site feasibility
Km325/4-5 on examination taken up
Sikar-Loharu for preparation of GAD.
section
Page 3 of 410 LC-292 at Km RUB 2 Site feasibility
331/9-332/0 on examination taken up
Sikar-Loharu for preparation of GAD.
section
11 LC-265 at Km ROB 49 Construction work has
301/1-2 on Sikar- been taken up.
Loharu section
12 LC-269 at Km ROB 43 GAD work has been
304/5-6 on Sikar- taken up.
Loharu section
ROB/RUB works are prioritised for sanction on the basis of the Train
vehicle units (TVU) of each LC, effect of LC on train operations, technical
feasibility and the importance of the LC in local context. These works are
taken up in phases depending on their priority, feasibility and availability of
funds.
Completion & commissioning of ROB/RUB works depends on various
factors like cooperation of State Governments in giving consent for
closure of LC, fixing of approach alignment, approval of General
Arrangement Drawing (GAD), land acquisition, removal of encroachment,
shifting of infringing utilities, statutory clearances from various
authorities, law and order situation in the area of project / work sites,
duration of working season in a year for the particular project / area due to
climatic conditions etc. All these factors affect the completion time of the
projects / works.
*****