Home India Ministry of Road Transport and Highways Parliament Question: Construction of Under/Over-Bridges on N...
Date: 2026-07-23 Category: LOKSABHA_QNA State: Union Government Country: India

Parliament Question: Construction of Under/Over-Bridges on NH-48

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 727 ANSWERED ON 23RD JULY, 2026 CONSTRUCTION OF UNDER/OVER-BRIDGES ON NH-48 727. SHRI RAJKUMAR ROAT: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) the details of the budget utilized for the expansion of National Highway (NH)-48 and the number of under-bridges/over-bridges constructed thereon and locations where accidents have occurred due to the absence of such under-bridges/over-bridges during the last three years, district and year-wise; (b) whether the local villagers had written letters dated 10.12.2018 and 07.12.2021 to the Project Director, National Highways Authority of India (NHAI), NH-48, Udaipur for the construction of an under-bridge/over-bridge on NH-48 at Lehna in Bichhiwara, Dungarpur and if so, the details of the action taken in this regard; (c) whether accidents are increasing there due to the closure of the previously built crossing bridge during the expansion of NH-48, which forces the local villagers and the students of Raumawi Asiyawas and Malmatha to cross NH-48, if so, the details thereof; and (d) whether the Government proposes to construct an under-bridge on NH-48 situated at village Lehna, Bichhiwara in Dungarpur keeping in view the public interest and the safety of the students and if so, the time by which it would be completed and if not, the reasons therefor? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI)(a) The details of the works including grade-separated structures, taken up on NH-48 in the State of Rajasthan during the last three years, along with the expenditure incurred, are given in the enclosed at Annexure-A. The list of identified Black-Spots on this stretch, and the status of their rectification is enclosed at Annexure-B. (b) A representation from local villagers was received regarding construction of an underpass on NH-48 at village Lehna. A minor bridge at chainage 428+052, near the school building, has been retained as per the provisions of the Concession Agreement and the openings of this bridge structure are being used for crossing the highway. (c) No crossing structure existing prior to the expansion of NH-48 has been closed during the course of the widening work. Therefore, no accident has been reported on this ground. (d) Government has taken up the work of technical assessment and identification of improvement measures on the existing six-lane Udaipur - Ratanpur- Shamlaji section of NH-48, including the Lehna Ghati stretch. Improvement measures on National Highways are undertaken with the approval of the competent authority on the basis of the outcome of the Detailed Project Report (DPR)/Technical assessment, techno-economic feasibility and synergy with PM Gati Shakti National Master Plan.ANNEXURE-A ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 727 ANSWERED ON 23RD JULY, 2026 ASKED BY SHRI RAJKUMAR ROAT REGARDING CONSTRUCTION OF UNDER/OVER- BRIDGES ON NH-48. The details of works, including grade-separated structures, taken up on NH- 48 in the State of Rajasthan during the last three years: S. Name of Stretch NH Accident District Type of Cost Status No. No. Locations/ Structures Rs. Spots (Rs. in Cr) 1 6-lane Gulabpura 48 185+920 Chittorgarh 360 m 43.42 Work in Chittorgarh (Gangrar) Elevated Progress & Flyover targeted for completion by Sept-2026 2 146+580 Bhilwara VUP 58.65 Work (S.Tech. commenced Chouraha) from 3 170+000 Bhilwara VUP 08.06.2026. (Kanya Khedi) 4 156+132 Bhilwara VUP (Hazari Kheda) 5 6-lane Chittorgarh 48 269+00 Udaipur VUP 19.18 Work in Udaipur (Vana) Progress & targeted for completion by Oct-2026 6 288+400 Udaipur VUP 28.21 Work (Bhutpura) commenced 7 6-lane Udaipur 48 0+000 Udaipur Ramp from Bypass (Debari) 09.03.2026. 8 6-lane Udaipur 48 395+900 to Udaipur 3.240 km 209.91 Work Shamlaji 399+140 Elevated commenced (Kherwara) Road from 09.07.2026. 9 6-lane Kishangarh- 48 Srinagar Ajmer Flyover/ 46.32 Work in Gulabpura Village at Ch. LVUP Progress & 20+870 & targeted for Dilwari Village completion by at Ch. 33+70 09.01.2027 10 Rectification of black Heerapura Ch. Jaipur Flyover Completed spots locations on 275.891 11 Jaipur – Kishangarh 48 Bhankrota Ch. Jaipur Flyover 108.80 Completed section of NH-48, 278.278 12 NHAI has taken up Narsinghpura Jaipur Flyover Completedconstruction of 06 Ch. 282.640 13 nos. Mahlan Ch. Jaipur Flyover Completed 301.090 14 Mokhampura Jaipur Flyover Completed Ch. 312.347 15 Padasoli Ch. Jaipur Flyover Completed 339.879 16 Additional 04 flyovers DahmiKalan Jaipur Flyover Completed constructed on Ch. 292.450 17 Jaipur-Kishangarh Gadota Ch. Jaipur Flyover Completed 307.500 48 99.88 18 Sawarda Ch. Jaipur Flyover Completed 320.100 19 Bandersindhri Ajmer Flyover Completed Ch. 350.640 20 Additional Structures Bawal Chowk Rewari Flyover Under on 6-lane Gurgaon – Ch. 96.148 Construction 21 Jaipur Dehmi mode Kotputli- Flyover Completed Ch. 129.047 Behror 22 Jaguwas Kotputli- Flyover 48 chowk Ch. Behror 113.35 Completed 134.66 23 Putli cut Ch. Kotputli- Flyover Completed 158.92 Behror 24 Shahpura Ch. Jaipur Flyover Completed 202.452ANNEXURE-B ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 727 ANSWERED ON 23RD JULY, 2026 ASKED BY SHRI RAJKUMAR ROAT REGARDING CONSTRUCTION OF UNDER/OVER- BRIDGES ON NH-48. Details of blackspots and status of their rectification on NH-48: Status Sl. NH (Rectified/ Blacksp Measures No PIU Stretch No District Blackspot Location Under ot ID taken . . Constructio n/ DPR) VUP Constructio Kishnagar n h- NH RJ-(02)- VUP 1 Ajmer Beawar 27 mil chauraha completed Gulabpura -48 066-BS constructed LTM done. Section Blackspot Rectified PUP RJ-(02)- Constructio Kishnagar 044-BS, n h- NH Sthana chauraha/ RJ-04- PUP 2 Ajmer Beawar completed Gulabpura -48 pirbaba ka sthan 91-BS, constructed LTM done. Section RJ-07- Blackspot 180 Rectified Flyover Constructio Kishnagar n h- NH RJ-(02)- Flyover 3 Ajmer Beawar 26 mil chauraha completed Gulabpura -48 324-BS constructed LTM done. Section Blackspot Rectified Flyover Constructio Kishnagar n h- NH RJ-(02)- Flyover 4 Ajmer Bhilwara 29 mil chauraya completed Gulabpura -48 272-BS constructed LTM done. Section Blackspot Rectified Kishnagar RJ-(02)- LTM NH Kheda chauraya/ Flyover 5 Ajmer h- Ajmer 173-BS, (Flyover) is -48 Verma Petrol Pump constructed Gulabpura RJ-03- UnderSection 129-BS, Constructio RJ-07- n 167 PUP Constructio Kishnagar RJ-(02)- n h- NH 172-BS, PUP 6 Ajmer Ajmer Kishna ki jhopra completed Gulabpura -48 RJ-07- constructed LTM done. Section 181 Blackspot Rectified Service RJ-(02)- Road Kishnagar 171-BS, Constructio h- NH Sanjaynagar / baral RJ-04- Service Road n 7 Ajmer Beawar Gulabpura -48 chouraha 92-BS, constructed completed Section RJ-07- LTM done. 179 Blackspot Rectified Kishnagar LTM (LVUP) h- NH RJ-03- LVUP is Under 8 Ajmer Ajmer Dilwadi Gulabpura -48 130-BS constructed Constructio Section n VUP Constructio Kishnagar n h- NH RJ-04- VUP 9 Ajmer Ajmer VISHARAM BADI completed Gulabpura -48 87-BS constructed LTM done. Section Blackspot Rectified Flyover Constructio Kishnagar n h- NH RJ-04- Flyover 10 Ajmer Ajmer BANDAWARA completed Gulabpura -48 86-BS constructed LTM done. Section Blackspot Rectified PUP Constructio Kishnagar n h- NH RJ-04- PUP 11 Ajmer Ajmer LAVERA CHORAYA completed Gulabpura -48 90-BS constructed LTM done. Section Blackspot Rectified 12 Ajmer Kishnagar NH Ajmer Kheri Puliya RJ-07- Service Road Serviceh- -48 168 constructed Road Gulabpura Constructio Section n completed LTM done. Blackspot Rectified Service Road Kishnagar Constructio h- NH Kumawt Petrol RJ-07- Service Road n 13 Ajmer Ajmer Gulabpura -48 Pump 169 constructed completed Section LTM done. Blackspot Rectified Service Road Kishnagar Constructio h- NH RJ-07- Service Road n 14 Ajmer Ajmer Singhawal Choraha Gulabpura -48 170 constructed completed Section LTM done. Blackspot Rectified RJ-(02)- 061 Long Term RJ-(04)- 360m Gulabpura Measures Udaipu NH Chittorgar 129 Elevated 15 Chittorgar Gangrar chauraya under r -48 h RJ-(05)- Flyover under h Section constructio 136 construction n RJ-(07)- 258 Gulabpura Sarhad Narpat ki VUP with Udaipu NH Chittorgar RJ-(03)- LTM Taken. 16 Chittorgar Khedi, Highway Service Road r -48 h 209 Rectified h Section Puliya Completed Gulabpura Udaipu NH ChittorgarBarada Puliya k aas RJ-(04)- Service Road LTM Taken. 17 Chittorgar r -48 h pass ka Kshetra 132 Completed Rectified h Section RJ-(04)- Gulabpura Udaipu NH Chittorgar 131 Service Road LTM Taken. 18 Chittorgar Rithola Choraya r -48 h RJ-(07)- Completed Rectified h Section 257 Gulabpura RJ-06-59 Light Vehicle Udaipu NH Chittorgar LTM Taken. 19 Chittorgar Rolaheda Puliya RJ-(07)- underpass(PU r -48 h Rectified h Section 259 P) withService Road Completed Gulabpura Baira Udaipu NH RJ-(02)- PUP LTM Taken. 20 Chittorgar Bhilwara Chauraya/Jaswantp r -48 245 Constructed Rectified h Section ura Chauraya Gulabpura Udaipu NH RJ-(02)- PUP LTM Taken. 21 Chittorgar Bhilwara Bardod chauraya r -48 177 Constructed Rectified h Section Gulabpura Udaipu NH Dhuwaliya chauraya/ RJ-(02)- PUP LTM Taken. 22 Chittorgar Bhilwara r -48 Sangmmil chauraya 176 Constructed Rectified h Section RJ-(02)- 037 Light Vehicle Gulabpura Udaipu NH RJ-(05)- underpass(PU LTM Taken. 23 Chittorgar Bhilwara Kanwaliyas r -48 88 P) Rectified h Section RJ-(07)- Constructed 267 Mandpiya station se RJ-(02)- Gulabpura Udaipu NH puja process 013 Flyover LTM Taken. 24 Chittorgar Bhilwara r -48 (Mandapiya tiraya RJ-(03)- Constructed Rectified h Section se guwardi nala) 131 Gulabpura Udaipu NH RJ-(02)- PUP LTM Taken. 25 Chittorgar Bhilwara Mangalpura r -48 325 Constructed Rectified h Section Gulabpura Udaipu NH RJ-(02)- PUP LTM Taken. 26 Chittorgar Bhilwara Rayla overbridge r -48 208 Constructed Rectified h Section Gulabpura Udaipu NH Rupaheli Bhatta RJ-(02)- PUP LTM Taken. 27 Chittorgar Bhilwara r -48 chauraya 207 Constructed Rectified h Section Gulabpura Udaipu NH RJ-(02)- VUP LTM Taken. 28 Chittorgar Bhilwara Sreri chauraya r -48 303 Constructed Rectified h Section Gulabpura Udaipu NH Futiya Chouraha RJ-(03)- Flyover LTM Taken. 29 Chittorgar Bhilwara r -48 Pansal 134 Constructed Rectified h Section Gulabpura Under Udaipu NH Hajari Khera RJ-(04)- VUP under 30 Chittorgar Bhilwara Rectificatio r -48 Choraya 96 Construction h Section n for LTM RJ-(04)- Gulabpura Udaipu NH 99 Flyover LTM Taken. 31 Chittorgar Bhilwara Bhdali Khera r -48 RJ-(07)- Constructed Rectified h Section 268 32 UdaipuGulabpura NH Bhilwara Shahpura Thiraya RJ-(04)- Flyover LTM Taken.r Chittorgar -48 100 Constructed Rectified h Section Gulabpura Udaipu NH RJ-(04)- STM Done. 33 Chittorgar Bhilwara Lambiyakla ----- r -48 101 Rectified h Section Gulabpura Udaipu NH Bhairunath RJ-(04)- STM Taken. 34 Chittorgar Bhilwara ----- r -48 Chouraha 130 Rectified h Section RJ-(05)- Gulabpura Under Udaipu NH 86 VUP under 35 Chittorgar Bhilwara Kanyakhedi Rectificatio r -48 RJ-(07)- Construction h Section n for LTM 274 Light Vehicle Gulabpura Udaipu NH RJ-(05)- underpass(PU LTM Taken. 36 Chittorgar Bhilwara Sangam mill r -48 87 P) Rectified h Section Constructed Gulabpura Udaipu NH Guwardi Nala to RJ-(07)- Service Road LTM Taken. 37 Chittorgar Bhilwara r -48 Mandpiya Tiraha 271 Constructed Rectified h Section Vehicle Gulabpura Udaipu NH RJ-(07)- Underpass LTM Taken. 38 Chittorgar Bhilwara Dhulkheda r -48 270 (VUP) Rectified h Section Constructed RJ-(02)- UdaipuChittorgar NH 100 Service Road LTM Taken. 39 Udaipur Ganoli r h Udaipur -48 RJ-(03)- Constructed Rectified 205 Vehicle UdaipuChittorgar NH RJ-(02)- Underpass LTM Taken. 40 Udaipur Bhatewer r h Udaipur -48 186 (VUP) Rectified Completed RJ-(02)- Light Vehicle UdaipuChittorgar NH 253 underpass(PU LTM Taken. 41 Udaipur Daroli r h Udaipur -48 RJ-(03)- P) Rectified 206 Constructed Vehicle RJ-052 UdaipuChittorgar NH Underpass LTM Taken. 42 Udaipur Pawor house Circle RJ-(02)- r h Udaipur -48 (VUP) Rectified 280 Completed Light Vehicle UdaipuChittorgar NH RJ-(02)- underpass(PU LTM Taken. 43 Udaipur Kir ki Choki r h Udaipur -48 308 P) Rectified Constructed 44 UdaipuChittorgar NH Udaipur Zinc Circle RJ-053 Light Vehicle LTM Taken.r h Udaipur -48 RJ-(02)- underpass(PU Rectified 070 P) RJ-(05)- Constructed 125 Light Vehicle UdaipuChittorgar NH RJ-(02)- underpass(PU LTM Taken. 45 Udaipur Menar r h Udaipur -48 099 P) Rectified Constructed Vehicle Under UdaipuChittorgar NH RJ-(02)- Underpass 46 Udaipur Bhutpura Rectificatio r h Udaipur -48 309 (VUP) under n for LTM construction RJ-(02)- Light Vehicle UdaipuChittorgar NH Chittorgar 218 underpass(PU LTM Taken. 47 Hoda Circle r h Udaipur -48 h RJ-(07)- P) Rectified 262 Constructed Vehicle UdaipuChittorgar NH Chittorgar RJ-(02)- Underpass LTM Taken. 48 Narayanpura r h Udaipur -48 h 252 (VUP) under Rectified construction Light Vehicle UdaipuChittorgar NH Chittorgar RJ-(02)- underpass(PU LTM Taken. 49 Panchdevla r h Udaipur -48 h 283 P) Rectified Constructed Vehicle UdaipuChittorgar NH Chittorgar RJ-(02)- Underpass LTM Taken. 50 Mangalwad Circle r h Udaipur -48 h 031 (VUP) Rectified Completed Light Vehicle RJ-011 UdaipuChittorgar NH Chittorgar underpass(PU LTM Taken. 51 Bansen RJ-(02)- r h Udaipur -48 h P) Rectified 310 Constructed UdaipuChittorgar NH ChittorgarBagund Gaon se RJ-(03)- Flyover LTM Taken. 52 r h Udaipur -48 h Bhadsoda 211 completed Rectified RJ-(02)- 07 Light Vehicle UdaipuUdaipur NH RJ-(05)- LTM Taken. 53 Udaipur Khandi obri underpass(PU r Shamlaji -48 131 Rectified P) Completed RJ-(07)- 249 Light Vehicle UdaipuUdaipur NH RJ-(02)- LTM Taken. 54 Udaipur Kaya Kharpina Mod underpass(PU r Shamlaji -48 23 Rectified P) Completed 55 UdaipuUdaipur NH Udaipur Kanpura Cut RJ-(02)- Light Vehicle LTM Taken.r Shamlaji -48 30 underpass(PU Rectified RJ-(03)- P) Completed 202 RJ-(02)- 51 UdaipuUdaipur NH RJ-(03)- Flyover LTM Taken. 56 Udaipur Bhudar Mod r Shamlaji -48 204 completed Rectified RJ-(05)- 129 Vehicle UdaipuUdaipur NH RJ-(02)- Underpass LTM Taken. 57 Udaipur Kanuwada r Shamlaji -48 72 (VUP) Rectified Completed RJ-(02)- 73 Over Pass UdaipuUdaipur NH RJ-(06)- LTM Taken. 58 Udaipur Banjariya (VOP) r Shamlaji -48 056 Rectified Completed RJ-(07)- 248 RJ-(02)- Light Vehicle UdaipuUdaipur NH 98 LTM Taken. 59 Udaipur Kagdar underpass(PU r Shamlaji -48 RJ-(05)- Rectified P) Completed 128 RJ-(02)- 124 Light Vehicle UdaipuUdaipur NH RJ-(03)- LTM Taken. 60 Udaipur BhaglaGhat underpass(PU r Shamlaji -48 203 Rectified P) Completed RJ-(07)- 306 Vehicle UdaipuUdaipur NH RJ-(02)- Underpass LTM Taken. 61 Udaipur Tidi Naal r Shamlaji -48 151 (VUP) Rectified Completed 3.240 Km Under UdaipuUdaipur NH RJ-(02)- Elevated 62 Udaipur Kherwara Bus Stand Constructio r Shamlaji -48 152 Flyover under n construction 3.240 Km Under UdaipuUdaipur NH RJ-(02)- Elevated 63 Udaipur Badla Constructio r Shamlaji -48 153 Flyover under n construction Vehicle UdaipuUdaipur NH RJ-(02)- LTM Taken. 64 Udaipur Gavri Tiraya Underpass r Shamlaji -48 185 Rectified (VUP)Completed Vehicle UdaipuUdaipur NH RJ-(02)- Underpass LTM Taken. 65 Udaipur Tidi Bus Stand r Shamlaji -48 281 (VUP) Rectified Completed Vehicle UdaipuUdaipur NH RJ-(04)- Underpass LTM Taken. 66 Udaipur Parai r Shamlaji -48 122 (VUP) Rectified Completed Light Vehicle UdaipuUdaipur NH Dungarpu RJ-(05)- LTM Taken. 67 Mithi bill billakh underpass(PU r Shamlaji -48 r 130 Rectified P) Completed RJ-(06)- UdaipuUdaipur NH Dungarpu 055 Service Road LTM Taken. 68 Dhaga Mil r Shamlaji -48 r RJ-(07)- Completed Rectified 247 RJ-(05)- Realingment UdaipuUdaipur NH Dungarpu 140 LTM Taken. 69 Aara Puliya done. r Shamlaji -48 r RJ-(07)- Rectified Completed 308 Vehicle UdaipuUdaipur NH Dungarpu RJ-(05)- Underpass LTM Taken. 70 Bokhla r Shamlaji -48 r 139 (VUP) Rectified Completed RJ-(03)- UdaipuUdaipur NH Dungarpu 217 71 Lehna Ghati Jhajuri ----- Under DPR r Shamlaji -48 r RJ-(07)- 307 UdaipuUdaipur NH Arvalli, GJ-(02)- Box Opening LTM Taken. 72 Rangpur r Shamlaji -48 Gujarat 61 for crossing. Rectified GJ-01- Vehicle UdaipuUdaipur NH Arvalli, 014 Underpass LTM Taken. 73 ShamlaJi r Shamlaji -48 Gujarat GJ-(02)- (VUP) Rectified 99 Completed Construction of Service UdaipuUdaipur NH Arvalli, GJ-05- LTM Done. 74 Venpur Road r Shamlaji -48 Gujarat 027 Rectified alongwith Six laning of MCW Jaipur- Under NH RJ-(05)- 75 Jaipur Kishangar Jaipur 200 feet chauraha Underpass constructio -48 12 h Section and Flyover n Jaipur- NH Hirapura power RJ-(05)- 76 Jaipur Jaipur Rectified Kishangar -48 house/Kamla Nehru 13 Flyoverh Section Pulia Chauraha Jaipur- NH RJ-(03)- 77 Jaipur Kishangar Jaipur Bhankrota Choraha Rectified -48 20 h Section Flyover Jaipur- Short Term NH Mhapura mor ajmer RJ-(03)- 78 Jaipur Kishangar Jaipur Measures Rectified -48 bhankrota 022 h Section Taken Nrisinghpura cut raj Jaipur- NH chidiya hotel ke RJ-(04)- 79 Jaipur Kishangar Jaipur Rectified -48 samne ajmer road 01 h Section bhakrota Flyover Jaipur- Short Term Under NH Bad ke balaji cut RJ-(03)- 80 Jaipur Kishangar Jaipur Measures constructio -48 ajmer road 25 h Section Taken n Jaipur- Short Term NH Thikariya Mod West 81 Jaipur Kishangar Jaipur RJ-025 Measures Rectified -48 Bagru h Section Taken Jaipur- Short Term NH RJ-(06)- 82 Jaipur Kishangar Jaipur Dewaliya Cut Measures Rectified -48 01 h Section Taken Jaipur- NH Dahmi balaji cut RJ-(03)- 83 Jaipur Kishangar Jaipur Rectified -48 Ajmer Road 023 h Section Flyover Jaipur- Under NH Chhitroli cut ajmer RJ-(03)- 84 Jaipur Kishangar Jaipur constructio -48 road 024 h Section Flyover n Jaipur- NH RJ-(03)- 85 Jaipur Kishangar Jaipur Mahlan Rectified -48 39 h Section Flyover Jaipur- Under NH RJ-(03)- 86 Jaipur Kishangar Jaipur Nasnoda constructio -48 38 h Section Flyover n Jaipur- NH RJ-(03)- 87 Jaipur Kishangar Jaipur Gadota Rectified -48 37 h Section Flyover Jaipur- NH RJ-(03)- 88 Jaipur Kishangar Jaipur Moukhampura Rectified -48 36 h Section Flyover Jaipur- Under NH RJ-(03)- 89 Jaipur Kishangar Jaipur Palu constructio -48 35 h Section Flyover n Jaipur- NH RJ-(05)- 90 Jaipur Kishangar Jaipur Sawarda kat Rectified -48 25 h Section FlyoverJaipur- Under NH RJ-(05)- 91 Jaipur Kishangar Jaipur Gidani constructio -48 24 h Section Flyover n Jaipur- Short Term NH RJ-(03)- 92 Jaipur Kishangar Jaipur Dudu Puliya Measures Rectified -48 34 h Section Taken Jaipur- Short Term NH RJ-(03)- 93 Jaipur Kishangar Jaipur Ram Nagar Measures Rectified -48 33 h Section Taken Jaipur- Under NH RJ-(02)- 94 Jaipur Kishangar Jaipur Gaiji constructio -48 162 h Section Flyover n Jaipur- NH 95 Jaipur Kishangar Jaipur Padasoli RJ-(02)-1 Rectified -48 h Section Flyover Jaipur- Under NH RJ-(03)- 96 Jaipur Kishangar Jaipur Dantri constructio -48 032 h Section Flyover n Jaipur- NH RJ-(03)- 97 Jaipur Kishangar Ajmer Bandersindri Rectified -48 107 h Section Flyover Jaipur- Under NH RJ-(03)- 98 Jaipur Kishangar Ajmer Patan Choraha constructio -48 108 h Section Flyover n Jaipur- Short Term NH RJ-(03)- 99 Jaipur Kishangar Ajmer Badgav Choraha Measures Rectified -48 111 h Section Taken Jaipur- Under 10 NH RJ-(03)- Jaipur Kishangar Ajmer Tolamal constructio 0 -48 112 h Section Flyover n Jaipur- Short Term 10 NH RJ-(07)- Jaipur Kishangar Jaipur DPS cut Measures Rectified 1 -48 016 h Section Taken Gurgaon- 10 Kotputli- NH Kotputli- RJ-(02)- Short Term Jaipur Googlekota cut Rectified 2 Jaipur -48 Behror 264 Measures section Taken Gurgaon- 10 Kotputli- NH Kotputli- shahjhanpur puliya RJ-(04)- Short Term Jaipur Rectified 3 Jaipur -48 Behror se ramada hotel 051 Measures section Taken Gurgaon- Short Term 10 NH Kotputli- Shahajanpur Fly RJ-(06)- Jaipur Kotputli- Measures Rectified 4 -48 Behror Over Se Check Post 20 Jaipur Takensection Gurgaon- 10 Kotputli- NH Kotputli- Sasedi cut to Rto RJ-(05)- Short Term Jaipur Rectified 5 Jaipur -48 Behror check post 58 Measures section Taken Gurgaon- 10 Kotputli- NH Kotputli- Toll plaza to RJ-(03)- Short Term Jaipur Rectified 6 Jaipur -48 Behror Foladpur puliya 85 Measures section Taken Gurgaon- 10 Kotputli- NH Kotputli- RJ-(02)- Short Term Jaipur Bhuliya puliya Rectified 7 Jaipur -48 Behror 138 Measures section Taken Gurgaon- 10 Kotputli- NH Kotputli- RJ-(04)- Short Term Jaipur Neemrana Puliya Rectified 8 Jaipur -48 Behror 49 Measures section Taken Gurgaon- 10 Kotputli- NH Kotputli- RJ-(04)- Short Term Jaipur Hero Chowk Rectified 9 Jaipur -48 Behror 50 Measures section Taken Gurgaon- 11 Kotputli- NH Kotputli- RJ-(04)- Short Term Jaipur Dudera Cut Rectified 0 Jaipur -48 Behror 48 Measures section Taken Gurgaon- 11 Kotputli- NH Kotputli- RJ-(04)- Jaipur Dehmi Cut Rectified 1 Jaipur -48 Behror 054 section VUP Gurgaon- 11 Kotputli- NH Kotputli- RJ-(04)- Jaipur Behrod pulia Rectified 2 Jaipur -48 Behror 55 section Flyover Gurgaon- 11 Kotputli- NH Kotputli- RJ-(04)- Short Term Jaipur Sherpur Cut Rectified 3 Jaipur -48 Behror 56 Measures section Taken Gurgaon- 11 Kotputli- NH Kotputli- RJ-(04)- Jaipur Jaguwas Rectified 4 Jaipur -48 Behror 53 section VUP Gurgaon- Short Term 11 NH Kotputli- RJ-(04)- Jaipur Kotputli- Gunti puliya Measures Rectified 5 -48 Behror 52 Jaipur Takensection Gurgaon- 11 Kotputli- NH Kotputli- Jainpurwas Cut RJ-(06)- Short Term Jaipur Rectified 6 Jaipur -48 Behror (Sotanala ) 03 Measures section Taken Gurgaon- Under 11 Kotputli- NH Kotputli- RJ-(05)- Jaipur Sotanala constructio 7 Jaipur -48 Behror 20 Widening of n section Major Bridge Gurgaon- 11 Kotputli- NH Kotputli- RJ-(03)- Short Term Jaipur Malpura Rectified 8 Jaipur -48 Behror 42 Measures section Taken Gurgaon- 11 Kotputli- NH Kotputli- RJ-(03)- Short Term Jaipur Paniyala cut Rectified 9 Jaipur -48 Behror 43 Measures section Taken Gurgaon- 12 Kotputli- NH Kotputli- RJ-(03)- Short Term Jaipur Kherki mukarr Rectified 0 Jaipur -48 Behror 44 Measures section Taken Gurgaon- 12 Kotputli- NH Kotputli- RJ-(05)- Short Term Jaipur MORDA Rectified 1 Jaipur -48 Behror 19 Measures section Taken Gurgaon- 12 Kotputli- NH Kotputli- RJ-(06)- Short Term Jaipur Sangtera Village Cut Rectified 2 Jaipur -48 Behror 04 Measures section Taken Gurgaon- Under 12 Kotputli- NH Kotputli- RJ-(03)- Jaipur Sangteda constructio 3 Jaipur -48 Behror 41 n section Flyover Gurgaon- 12 Kotputli- NH Kotputli- RJ-(03)- Short Term Jaipur Molaheda Rectified 4 Jaipur -48 Behror 45 Measures section Taken Gurgaon- 12 Kotputli- NH Kotputli- RJ-(03)- Short Term Jaipur Budhika Hotel Rectified 5 Jaipur -48 Behror 56 Measures section Taken Gurgaon- Short Term 12 NH Kotputli- RJ-(03)- Jaipur Kotputli- Diwan hotel Measures Rectified 6 -48 Behror 57 Jaipur Takensection Gurgaon- 12 Kotputli- NH Kotputli- RJ-(03)- Jaipur Putli Cut Rectified 7 Jaipur -48 Behror 55 section Fyover Gurgaon- 12 Kotputli- NH Kotputli- RJ-(06)- Short Term Jaipur Kanwarpura Rectified 8 Jaipur -48 Behror 05 Measures section Taken Gurgaon- 12 Kotputli- NH Kotputli- RJ-(03)- Short Term Jaipur Gordhanpura Rectified 9 Jaipur -48 Behror 46 Measures section Taken Gurgaon- 13 Kotputli- NH Kotputli- RJ-(04)- Short Term Jaipur Gordhanpura Puliya Rectified 0 Jaipur -48 Behror 10 Measures section Taken Gurgaon- 13 Kotputli- NH Kotputli- Bus Stand Pawta, Short Term Jaipur RJ-021 Rectified 1 Jaipur -48 Behror Rural Pragpura Measures section Taken Gurgaon- 13 Kotputli- NH Kotputli- RJ-(04)- Short Term Jaipur CHC Cut Paota Rectified 2 Jaipur -48 Behror 11 Measures section Taken Gurgaon- 13 Kotputli- NH Kotputli- RJ-(04)- Short Term Jaipur Lada Ka Bass Cut Rectified 3 Jaipur -48 Behror 12 Measures section Taken Gurgaon- 13 Kotputli- NH Kotputli- Bhabhru Rural Short Term Jaipur RJ-022 Rectified 4 Jaipur -48 Behror Shahpura Measures section Taken Gurgaon- Under 13 Kotputli- NH Kotputli- Bhabru puliya( RJ-(03)- Jaipur constructio 5 Jaipur -48 Behror Gaskan ki Dhani) 51 Widening of n section Major Bridge Gurgaon- 13 Kotputli- NH Kotputli- RJ-(05)- Short Term Jaipur Nijhar Mor Rectified 6 Jaipur -48 Behror 21 Measures section Taken Gurgaon- Short Term 13 NH RJ-(03)- Jaipur Kotputli- Jaipur Alwar Triyaha Measures Rectified 7 -48 50 Jaipur Takensection Gurgaon- 13 Kotputli- NH RJ-(03)- Jaipur Jaipur Jaipur Triyaha Rectified 8 Jaipur -48 49 section Flyover Gurgaon- Under 13 Kotputli- NH RJ-(06)- Jaipur Jaipur Jaipur Triyaha constructio 9 Jaipur -48 06 n section Flyover Gurgaon- 14 Kotputli- NH RJ-(06)- Short Term Jaipur Jaipur Rajpura Puliya Rectified 0 Jaipur -48 07 Measures section Taken Gurgaon- 14 Kotputli- NH RJ-(04)- Jaipur Jaipur Gasipura DPR 1 Jaipur -48 013 section Flyover Gurgaon- 14 Kotputli- NH Manoharpur Toll RJ-(03)- Short Term Jaipur Jaipur Rectified 2 Jaipur -48 Plaza 58 Measures section Taken Gurgaon- 14 Kotputli- NH RJ-(03)- Short Term Jaipur Jaipur NawalPura mode Rectified 3 Jaipur -48 59 Measures section Taken Gurgaon- 14 Kotputli- NH RJ-(03)- Jaipur Jaipur Lekher stand /cut DPR 4 Jaipur -48 52 section Flyover Gurgaon- 14 Kotputli- NH Beelpur sevad mata RJ-(03)- Short Term Jaipur Jaipur Rectified 5 Jaipur -48 mandir 54 Measures section Taken Gurgaon- 14 Kotputli- NH RJ-(06)- Short Term Jaipur Jaipur Ghathwada Puliya Rectified 6 Jaipur -48 76 Measures section Taken Gurgaon- 14 Kotputli- NH RJ-(05)- Short Term Jaipur Jaipur Ghathwada Rectified 7 Jaipur -48 23 Measures section Taken Gurgaon- Short Term 14 NH RJ-(03)- Jaipur Kotputli- Jaipur Bilochi Measures Rectified 8 -48 026 Jaipur Takensection Gurgaon- Milan Cinema se 14 Kotputli- NH RJ-03- Short Term Jaipur Jaipur bdharna puliya tak Rectified 9 Jaipur -48 019 Measures express highway section Taken Gurgaon- 15 Kotputli- NH Loha mandi cut RJ-(03)- Short Term Jaipur Jaipur Rectified 0 Jaipur -48 express highway 018 Measures section Taken Gurgaon- 15 Kotputli- NH Gandhipath Puliya RJ-(05)- Short Term Jaipur Jaipur Rectified 1 Jaipur -48 to Shelby Hospital 02 Measures section Taken Gurgaon- 15 Kotputli- NH RJ-(07)- Short Term Jaipur Jaipur kherwadi puliya Rectified 2 Jaipur -48 023 Measures section Taken LTM - Long Term Measure STM - Short Term Measure *****

Continue your research