GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 1935
ANSWERED ON 30TH JULY, 2026
DELAY IN COMPLETION OF PROJECTS ON NHs IN RAJASTHAN
1935. SHRI HANUMAN BENIWAL:
Will the MINISTER OF ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) whether the Government is aware of the fact that several projects
concerning the widening, four-laning, six-laning and construction of bypasses
on various National Highways in Rajasthan have not been completed within
the stipulated timeframe resulting in disruption in traffic flow and complaints
regarding increase in road accidents;
(b) if so, the details of the National Highway projects currently under
construction or delayed in Rajasthan, Project-wise including their names,
sanctioned cost, scheduled completion date, current progress and the
reasons for delay;
(c) whether the Government is formulating any special action plan to
expedite the time-bound completion of these pending projects and to
enhance the availability of trauma centres, ambulances, cranes, emergency
medical aid and firefighting facilities on National Highways in Rajasthan
particularly on the Nagaur-Jodhpur, Bikaner-Nagaur, Nagaur-Salasar and
Nagaur- Ajmer National Highways; and
(d) if so, the details thereof?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)(a) to (b) The details of all National Highway projects currently under
construction in Rajasthan are annexed.
(c) to (d) Progress of projects is continuously monitored through advanced
digital platforms such as Project Monitoring Information System (PMIS) and
Data Lake, Bhoomi Rashi portal (for Land Acquisition). In addition, periodic
reviews are held at various levels with all stakeholders including officers of
executing agencies to resolve pending contractual issues and ensure timely
implementation of projects.
Ajmer-Nagaur section & Nagaur-Salasar section of NH-58, Nagpur-Jodhpur
section and Nagaur-Bikaner section of NH-62 are currently under Operation &
Maintenance stage and 2 number of Cranes and 2 number of Ambulances are
deployed on each of these sections. Provision of healthcare institutions
including trauma centres and fire-fighting facilities falls within the
jurisdiction of the State Government.ANNEXURE
ANNEXURE REFERRED TO IN REPLY TO PART (a) to (b) OF LOK SABHA
UNSTARRED QUESTION NO. 1935 ANSWERED ON 30TH JULY, 2026 ASKED
BY SHRI HANUMAN BENIWAL REGARDING DELAY IN COMPLETION OF
PROJECTS ON NHs IN RAJASTHAN.
Details of all National Highway projects currently under construction in
Rajasthan
S. Project Name Lengt Total Schedule Revised Physic Reasons for
No. h (km) Projec d Comple Schedule al Prog Delay
t Cost tion Date d date of ress (
(Rs. C Completi %)
r) on
1. Upgradation to Two-l 49.6 334.64 03-10-2026 03-10-2026 70.00 No delay
ane with paved shoul
der of Hanumangarh
to Kenchiyan section
from Km 0.000 existi
ng chainage-Km 23.2
00 to Km 49.605 e
xisting chainage-Km
74.645 of NH-54 in t
he State of Rajasthan
on EPC mode.
2. Construction of 4-Lan 4.52 78.06 03-09-2026 31-03-2027 34.80 Due to delay i
e bypass to Ras Tow n LA.
n on NH-158 in the St
ate of Rajasthan on E
PC mode.
3. Construction of 2-Lan 4.37 64.44 03-09-2026 31-03-2027 3.75 Slow mobiliza
e with Paved Shoulde tion of Contra
r configuration of byp ctor, delay in
ass to Mandal Tow LA
n District- Bhilwar
a with connecting
NH-158 Ch. 109.90 t
o Ch. 114.279 to N
H-48 in the state of R
ajasthan Mandal by
pass .
4. Upgradation to 2-Lan 25.65 154.89 29-05-2026 31-12-2026 23.00 Project falls i
e with Paved Shoulde n NCR, Delay
r from Design Km 36+ ed due GRAP
300 to Design Chaina & Land Acqui
ge 47+918 and from sition
Design Ch 69+900 toS. Project Name Lengt Total Schedule Revised Physic Reasons for
No. h (km) Projec d Comple Schedule al Prog Delay
t Cost tion Date d date of ress (
(Rs. C Completi %)
r) on
Design Ch 83+940 of
NH-248A Natni Ka B
ara in the State of
Rajasthan on EPC Mo
de.
5. Up-gradation to 2 lan 53.23 606.61 04-10-2026 03-10-2026 60.39 No delay
e with paved shoulde
r from Neechli Ode
n Nathdwara at D
esign Km 88.800 exi
sting km 55.95 to B
hatewar at Design K
m 142.028 existing
km 0.00 of NH-162E
in the State of Rajast
han on EPC mode.
6. Construction of 2 lan 12.92 317.74 14-04-2025 30-11-2026 48.90 Delayed due t
e with Paved Shoulde o Land Acqui
r for Northern Bypass sition
Phase-II of Kota city i
n the State of Rajast
han.
7. Construction & Wide 0.82 43.03 17-11-2024 31-08-2026 84.00 Delayed due t
ning of ROB Existin o Railway app
g Railway Portion & roval & Land
approach at Km 76 Acquisition
of old NH-116 New
NH-552Ext. in Swai
madhopur City in the
State of Rajasthan on
EPC Mode
8. Construction of 2 lan 41.46 411.44 11-05-2024 31-10-2026 91.36 Delayed due t
e with paved shoulde o LA & Railw
r for the work of Dev ay approval f
elopment of remainin or 3 ROBs
g sections of NH-32
5 Balotra to sandera
o via Jalore to 2 lan
e with paved shoulde
r configuration by Co
nstruction of Byasse
s for town portions
: 1 Asotra- Brahmd
ham bypass 2 Siwa
na Bypass 3 MokaS. Project Name Lengt Total Schedule Revised Physic Reasons for
No. h (km) Projec d Comple Schedule al Prog Delay
t Cost tion Date d date of ress (
(Rs. C Completi %)
r) on
lsar Bypass 4 Maj
or realignment at Kat
hadi 5 Major realig
nment at Bishangar
h 6 Jalore Bypas
s 7 Ahore Town po
rtion 8 Dujana Byp
ass in the state of Ra
jasthan on EPC Mode
9. Construction of 4-lan 0.967 55.28 17-10-2023 30-08-2026 92.60 Approval of G
e ROB and its approa AD of RUB
ches in lieu of existin
g LC no. C-328A at k
m. 0/500 on NH-25E o
n Barmer – Jasai roa
d crossing Barmer M
unabao railway line i
n district Barmer of E
PC mode in the state
of Rajasthan.
10. Construction of 2 lan 5 50.70 09-02-2022 31-08-2026 97.00 Delayed due t
e with paved shoulde o non-supply/
r Aklera Bypass from slow supply o
Km. 90+840 on New f fly ash.
NH-752 old NH-9
0 to km 387+400 on
New NH-52 old NH-1
2 , Design Ch-0+00
0 to 5+000 , Total l
ength 5.000 km on
EPC Mode
11. Construction of two l 9.2 73.00 14-05-2021 30-11-2026 88.80 Delayed due t
ane with paved shoul o non-supply/
der configuration o slow supply o
f i Chippa barod f fly ash.
bypass of New NH-75
2 old NH-90 from
Km. 55+430 to km 64
+530 Design Ch-0+0
00 to 8+300
12. Construction of grad 7.82 102.59 20-10-2026 31-03-2027 18.00 Due to water
e separated structur logging
e VUP on Ajmer Naga
ur section of NH-89 (
New NH-58) at km 3/S. Project Name Lengt Total Schedule Revised Physic Reasons for
No. h (km) Projec d Comple Schedule al Prog Delay
t Cost tion Date d date of ress (
(Rs. C Completi %)
r) on
630 (kayad), km 6/02
0 (sikar Junction) an
d at km 18/500 (Dev
Nagar) in the state of
Rajasthan on EPC mo
de. (3 VUP)
13. Construction of 4-lan 0.5 17.54 20-10-2026 31-03-2027 35.00 Due to delay i
e major bridge on Gh n forest clear
aghar river including ance
approaches at km. 17
6/090 of Suratgarh -S
ri Ganganagar sectio
n of NH-62 in the stat
e of Rajasthan on EP
C Mode
14. Construction of Bala 0.18 54.47 01-11-2026 23-10-2026 67.87 No delay
nce work of ROB (Bo
w String type) in rail
way portion at km 30
.00 on NH- l62E (Pali-
Nadol Section) [Cros
sing the Falna- Marw
ar Railway Section at
LC No. C-67 near Sor
nesar.]
15. Balance work of “Reh 30 278.10 27-12-2026 27-12-2026 53.45 No delay
abilitation and Up-gra
dation to 4-Lane conf
iguration of Ras-Bea
war Section (Km 00.0
00 to km 30.050) of N
H-158 in the State of
Rajasthan under Gre
en National Highway
Corridor Project (GN
HCP).
16. Construction of two l 7.7 170.49 23-09-2027 23-09-2027 11.00 No delay
ane with paved shoul
der of Ghatol Bypass
from km 133.250 to k
m 140.950 of NH-56 (
old NH No. 113) on E
PC mode in the State
of Rajasthan.S. Project Name Lengt Total Schedule Revised Physic Reasons for
No. h (km) Projec d Comple Schedule al Prog Delay
t Cost tion Date d date of ress (
(Rs. C Completi %)
r) on
17. 2 No. of VUP's on Aj 2 83.28 03-12-2026 03-12-2026 30.00 No delay
mer Nagaur section o
n NH-58
18. Balance work of Ka 8.7 75.46 10-01-2027 10-01-2027 26.21 No delay
wai Bypass of NH-75
2.
19. Widening of existing 6.45 111.03 25-05-2027 25-05-2027 7.00 No delay
2L+PS road to 4 Lane
with paved shoulder f
rom Km 69/750 to Km
75/750 (Kustla –Sawa
i madhopur section)
of NH-552 Extn. on E
PC mode under Annu
al Plan 2024-25 in the
State of Rajasthan.
20. Construction of VUP 4.6 50.24 10-03-2027 10-03-2027 1.50 No delay
at start point of Roha
t Bypass (Ch. 0.000 t
o Ch. 0.800) including
completion of balanc
e works of Rohat Byp
ass (Ch. 0.800 to Ch.
4.600) on Jodhpur-Pa
li Section of NH-62 in
the State of Rajastha
n EPC Mode.
21. Widening/ Stregtheni 20.3 29.60 19-02-2027 19-02-2027 32.00 No delay
ng/ reconstruction/ o
verlay work on Wajw
ana- Banswara Secti
on at design ch. 242/
00 to 264/370 (on sel
ected stretches) on
NH-927A in the State
of Rajasthan.
22. Upgradation four-lan 3.95 82.73 24-03-2027 24-03-2027 3.00 No delay
e carriageway from k
m. 3/100 to 7/050 on
NH-448 (Ajmer-Nasira
bad section) in the St
ate of Rajasthan on E
PC Mode
23. Delhi-Vadodara Gree 26.45 1272.97 21.05.2023 30.09.2026 95.25% 1. Delay due t
nfield Alignment (NH- o Financial CrS. Project Name Lengt Total Schedule Revised Physic Reasons for
No. h (km) Projec d Comple Schedule al Prog Delay
t Cost tion Date d date of ress (
(Rs. C Completi %)
r) on
148N) (Pkg-10) (Ch. 2 unch on Contr
92.950 to Ch. 319.40 actor
0) [End of Interchang
e on NH-166 near vill 2. Delay due t
age Mui to Hardeoga o Raising/shif
nj village near Inderg ting of 765 kV
arh] Anta-Phagi C
kt-I & II
24. Delhi-Vadodara Gree 8.3 1854.68 04.01.2024 31.08.2026 97.30% Delayed due t
nfield Alignment (NH- o:
148N) (Pkg-15) (Ch. 4 1. Change in
19.000 to Ch.427.300 Strata of soil.
) [Junction with NH-1 2. Delay due t
2 near village Umme o work stopp
dpura to Major bridge ed by Forest
over Takli river near Dept. & chan
Nayagaon Jageer vill ge in design d
age] ue to forest/
wildlife condi
tions.
3. Due to addi
tional work of
Change of Sc
ope in compli
ance of condi
tion of Forest
Department
25. Additional Structures 11.865 325.12 25.06.2024 04.08.2026 88.90% Delay due to f
on 6-LGurgaon-Jaipur inancial crun
section of NH-48 bet ch of the cont
ween Km 42.70 to 27 ractor
3.0
26. Mayjilar – Jaisalmer 134.865 1237.71 18.12.2027 18.12.2027 18.56% No delay
with Jaisalmer Bypas
s Link Road Section
of NH-11 Part of BM-7
& Sundra – Myajilar –
Ambsingh ki Dhani R
oad part of Munabao
– Tanot project NH-7
0
27. Construction of Four 6.20 353.30 11.07.2026 22.11.2026 86.18% Delay due to
lane Elevated Structu additional Ch
re at Raniwada Circle ange of Scop
in Sanchore City on N e (COS)S. Project Name Lengt Total Schedule Revised Physic Reasons for
No. h (km) Projec d Comple Schedule al Prog Delay
t Cost tion Date d date of ress (
(Rs. C Completi %)
r) on
H-68
28. 4L of Karwar (Km. 28 30.093 736.75 28.08.2024 Completed 100% Project compl
1.980 of NH-62 Naga on 15.06.2 eted on 15.06
ur road) to Dangiyava 026 .2026.
s of Jodhpur Ring Ro CC under pro
ad (Pkg-II) cess
29. Deogarh (near Dhand 30.00 622.08 15.07.2023 Completed 99.20% Project compl
haniya)-Rajasthan/Gu on 12.06.2 eted on 12.06
jarat Border (Phase-I) 026 .2026.
(AJ/DRGB-Package-7) CC under pro
cess
30. Construction of Four 7.633 1108.45 - - 0% LOA issued o
Lane Elevated Road i n 12.01.2026,
n Jodhpur city portio appointed dat
n from Mahamandir t e pending
o Akhaliya Chouraha
In State of Rajashtan
EPC mode under NHA
I
31. Upgradation of 6-lane 89.79 910.91 - - 0% LOA issued o
Jaipur- Kishangarh s n 30.03.2026,
ection of NH-48 from appointed dat
km 274+100 to 363+8 e pending
85 involving construc
tion of flyovers and S
ervice road in Rajast
han On Engineering,
Procurement & Const
ruction (EPC) Mode
32. Construction of Eleva 3.24 363.89 - - 0% LOA issued o
ted Corridor at Kher n 30.03.2026,
wara Town on Udaip appointed dat
ur Ratanpur Shamlaji e pending
Section of NH-48 in U
daipur District in the
State of Rajasthan on
EPC mode
*****