Parliament Question: Delay in Completion of Works by Class-I Contractors

Issued by Ministry of Housing and Urban Affairs · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: This document presents the response to Lok Sabha Unstarred Question No. 730 regarding delays in the completion of works by Class I contractors. The Ministry of Housing and Urban Affairs provides data from CPWD, NBCC, HSCC, and HITES on projects costing more than Rupees 50 crore completed since 2014. The response includes details on time and cost overruns, extensions granted, and contractors disqualified. The information was compiled as of July 24, 2025. Key Points / Main Content: CPWD: * 87 works costing more than Rupees 50 crore have been completed since 2014. * 71 contracts experienced delays; details of cost and time overruns are in Annexure A. * 46 Class I contractors were allowed to complete works with delays exceeding 20%; cost escalation details and reasons are in Annexure A. * 1 Class I contractor has been disqualified from bidding due to delays. * Annexure B provides details of time and cost overruns. * Annexure C details cost escalations and reasons. * Annexure D contains replies from different units under ADG, Patna. * Annexure E provides additional details on completed works, overruns, and contractor disqualifications. NBCC: * 92 works costing more than Rupees 50 crore have been completed since 2014. * 57 projects experienced time overruns, with 54 exceeding 20% of the original timeframe. * Cost escalation was paid for 7 projects as per contract terms. Details are in Enclosure IIA & IIB * 5 contractors have been disqualified from bidding due to delays. HSCC: * 52 works costing more than Rupees 50 crore have been completed since 2014. * 50 contracts experienced time overruns; details are in Enclosure IIIA. * 42 Class I contractors were allowed to complete works with delays exceeding 20%; details are in Enclosure IIIA. * No contractors have been disqualified from bidding due to delays. HITES: * 12 works costing more than Rupees 50 crore have been completed since 2014. * 12 contracts experienced time overruns; details are in Enclosure IVA. * 12 Class I contractors were allowed to complete works with delays exceeding 20%; details are in Enclosure IVA. * No contractors have been disqualified from bidding due to delays. Impact Analysis: Class I Contractors: Impact: Affected by potential disqualification from bidding on future projects due to delays. May experience cost escalations (or lack thereof) based on project performance and contract terms. Action Required: Review project timelines and financial performance. Implement measures to avoid delays and manage costs effectively to maintain eligibility for future bids. CPWD, NBCC, HSCC, HITES: Impact: Accountable for project oversight and contractor management. Subject to scrutiny regarding project delays and cost overruns. Action Required: Review project management processes. Implement measures to minimize delays and control costs, and ensure compliance with contract terms. Client Governments/Departments/Agencies: Impact: Affected by project delays and potential cost increases. May experience disruptions in planned services or infrastructure development. Action Required: Monitor project progress closely. Engage with CPWD, NBCC, HSCC, and HITES to address issues promptly and ensure timely project completion within budget.

Key Entities Referenced

Ministry of Housing and Urban Affairs: The Indian government ministry responsible for housing and urban development. CPWD: Central Public Works Department, an agency involved in construction and maintenance of public works. NBCC: National Buildings Construction Corporation, an agency involved in construction and infrastructure development projects. HSCC: Hospital Services Consultancy Corporation, an agency involved in healthcare infrastructure development. HITES: HLL Infra Tech Services Ltd, an agency involved in infrastructure development and procurement. IIT Kanpur: Indian Institute of Technology Kanpur, an engineering institute where construction projects were undertaken. IIT Madras, Chennai: Indian Institute of Technology Madras, located in Chennai, Tamil Nadu, an engineering institute where construction projects were undertaken. AIIMS, New Delhi: All India Institute of Medical Sciences, a medical research public higher education institute and hospital in New Delhi
Official Source Record View Original Source →
See Full Document Text
O.I.H. GOVERNMENT OF INDIA MINISTRY OF HOUSING AND URBAN AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 730 TO BE ANSWERED ON JULY 24, 2025 DELAY IN COMPLETION OF WORKS BY CLASS-I CONTRACTORS NO. 730. SHRI DHARMENDRA YADAV: Will the Minister of HOUSING AND URBAN AFFAIRS be pleased to state: (a) the total number of works costing more than Rupees 50 crore that have been completed through Class-I contractors and handed over by through agencies such as CPWD, NBCC, HSCC, HITES, etc. to the respective client Governments/Departments/Agencies since 2014; (b) the number of contracts where the works were not completed on time as per tender documents along with the details of cost and time overruns in such cases; (c) the number of Class-I contractors who were allowed to complete works with more than 20% delay beyond the original time-frame and the details/extent of cost escalation in such cases along with reasons for the same; and (d) the number of Class-I contractors who have been disqualified/barred from bidding on account of delay in completion of previous projects? ANSWER THE MINISTER OF STATE IN THE MINISTRY OF HOUSING AND URBAN AFFAIRS (SHRI TOKHAN SAHU) (a) to (d): Information in respect of CPWD, NBCC, HSCC and HITES are enclosed at Enclosures I, II, III and IV respectively. *****CPWD (Enclosure-I) Parliament Question Reply a. The total number of works costing more than Rupees 87 Nos. 50 crore that have been completed and handed over by Class-I Contractors through agencies such as CPWD to the respective client Governments/Departments/Agencies since 2014; b. The number of contracts where the works were not 71 Nos. completed on time as per tender documents along As per with the details of cost and time overruns in such Annexure cases; A attached. c. The number of Class-I Contractors who were allowed 46 Nos. to complete works with more than 20 % delay beyond As per the original time frame, and the extent of cost Annexure escalation permitted in such cases, along with A reasons; and attached. d. The number of Class-I Contractors who have been 1 No. disqualified/barred from bidding on account of delay in completion of previous projects?CPWD (Annexure - A) Sl. Name of Office Total number of The number of contracts where The number of Class – I Contractors The number of No. works costing more the works were not completed who were allowed to complete Class – I than Rupees 50 crore on time as per tender works with more than 20% delay contractors that have been documents along with the beyond the original time frame, and who have been completed and details of cost and time the extent of cost escalation disqualified/barr handed over by class overruns in such cases; permitted in such cases, along with ed from bidding – I Contractors reasons; and on account of through agencies delay in such as CPWD to the completion of respective clients previous Governments/Depart projects? ments/Agencies since 2014; 1. ADG(Bhopal)CE Raipur 5 1 C/o GPOA at Naya Raipur C. 1 C/o GPOA at Naya Raipur C. G. G. Cost escalation 0.71 crore Cost overrun Time 2 C/o Administrative building school overrun building, Boys hostel & Girls hostel Nil 25 including development works for months 2 C/o NIBSM of Baronda Raipur (CG) Administrative building school Cost escalation 2.96 Crore building, Boys hostel & Girls 3 C/o 100 Bedded ESIC Hospital at hostel including development Bhilai works for NIBSM of Baronda Cost escalation2.74 crore Raipur (CG) 4 C / o P e r m a n e n t c a m p u s of IIT Cost overrun Time Bhillai at Kutelabhata Durg, CG, overrun Phase-I (stage-I) Nil 13 Cost escalation 56 Crore months 3 C/o 100 5 C/o Super speciality hospital, Bedded ESIC Hospital at Bhilai J a g d a l p u r u n d e r P M S S Y ( P h a s e-IV) Cost overrun Time on Engineering procurement and overrun construction (EPC) basis. Nil 34 Cost escalation 0.07 crore months 4 C/o Permanent Reason for cost and time overruns - campus of IIT Bhillai at 10C/10CA, extra work. GST increase Kutelabhata Durg, CG, Phase-I is the reason for cost overruns and (stage-I) d e l a y due to disturbed site in Cost overrun Time Jagdalpur, 1st and 2nd wave of overrun COVID, land disputes etc. 56 Crore 20 months 5 C/o Super speciality hospital, Jagdalpur under PMSSY(Phase-IV) on Engineering procurement and construction (EPC) basis. Cost overrun Time overrun23 crores 44 monthsCE Bhopal 1 1 C/o Various Building under Reason for cost and time overruns - different schemes at HSER, 10C/10CA, extra work. GST increase Bhopal (MP)(Package-I) i s t h e r e a s o n f o r c o st overruns and Tend. Amt. 55.05 crore d e l a y d ue to non-availability / delay Completion Cost - 100.08 crore of receipt of drawings from the Time overrun - 18 months c o n s ultant hired by the client department. SE & PD RPC 2 1 EE & SM (C)I and EE&SM(E) 1 . 1 E E & S M (C)I and EE&SM(E) Raipur Cost overrun Nil S h i f t i n g o f e x i s t i ng services in the Time overrun 36 months l a y o u t which were not conveyed by 2 EE & SM (C)II and EE&SM(E) c l i e n t w h i l e t e n d e ring the work Cost overrun 0.40 crore 1 . 2 I m p a c t o n w ork due to 1st and Time overrun 21 months 2nd wave of COVID-19 & drastically impacted due to project located in containment zone. 2. EE & SM (C)II and EE&SM(E) Reasons for Cost Overruns Due to payment on account of change in GST slab from 12% to 18% Additional 6% GST has been paid to the Agency from 01.07.2022. Reason for time overrun - Due to COVID pandemic .SE & PD Indore 3 1 M/s Asian constn Co. Ajmer C h a n g e i n s c o p e a n d a d ditional Est. Cost - 51.78 crore s c o p e b y t h e c lient. upto date expn. - 65.82 crore Time overrun- 17 months 2 M/s. B L Infra Proj P Ltd. Est. Cost - 69.86 crore Actual expn. 129.16 crore Time overrun - 13 months 3 M/s. DEE VEE Proj Ltd. Tend Amt. 255.96 crore Actual expn. 343.25 crore Time overrun- 14 months SE & PD Bhopal 1 1 C/o CAPT at Kanhasaiya Delay due to drawings and decision village, Bhopal (Package-4b) p e n d i n g , s h o r t a g e o f f u n d etc. Time overrun - 453 days 2 ADG(Border) Nil Nil Nil Nil3 ADG(Guwahati) 1 Cost overrun Time overrun Nil Nil Nil 256 days 4 ADG(Hyderabad) 11 2 3 Nil 5 ADG(Jammu) nil nil nil Nil6 ADG(Kochi) 6 6 (annex B) 6 (annex B) (annex B) 7 SDG(Chennai) 8 10(annex C) 6(annex C) Nil 8 ADG(Delhi) 5 1No. - Time overrun 2yr 01 No. - Escalation paid as per Nil 4months 18 days C l a u s e o f a greement amounting to 1No. - Time overrun 3 Rs. 6,56,65,221/- and EOT was months Cost overrun - 78 sanctioned without levy of crore compensation. 02 Nos. - Escalation paid as per Clause of agreement amounting of Rs. 7,76,42,588/- and EOT was sanctioned without levy of compensation. 01 No. - Cost escalation 26%(Approx.) due to Covid-19.9 SDG(PRND) 1 Tend. Amount 66.48 crore 0 1 n o . Of contractor was allowed to Nil Final cost 80.99 crore complete such work with a cost Time overrun - 1 year 7 months excalation of Rs 14.50 crore. The 29 days delay was due to various hindrances at site.10 ADG Lucknow 14 10 Nos. 10 Nil 1. Construction of Office Building for Central Excise & Custom, DRI. CBN, NACEN etc. including water supply, sanitary installation, internal electrical installation, Fire Fighting System. Fire Alarm, Sub-Station, DG Sets, Lifts, HVAC & UPS at Vibhuti Khand, Gomti Nagar, Lucknow. No Cost Over run Time over run 3 Year 7 Months 2. C/o Office Building & Guest House for AG, UP, Gomti Nagar, Lucknow. No Cost Over run Time over run 3 Year 3 Months 3. C/o Engineering core lab building Basement plus ground plus five storey including plumbing, sewerage system, internal and external Electrical works, Fire-fighting, Fire alarm, CCTV, system, Access Control System, PA system, Building Management System, Lift. HVAC all complete at IIT Campus, Kanpur. No Cost Over run Time over run 1 Year 10 MonthsADG Lucknow 4. C/o Retrofitting of Aerospace Engineering department building into multi-storeyed building basement plus ground plus six storey including plumbing, sewerage system, internal and external Electrical works, Fire fighting, Fire alarm, CCTV, system, access Control System, PA system, Building management System, Lift, HVAC all complete at IIT Campus, Kanpur. No Cost Over run Time over run 2 Year 8 Months 5. Construction of Science & Technology building (G+5) for IIT Kanpur including internal water supply, sanitary installation, internal electrical installation, HVAC, IMBS, Lifts, Fire fighting, Fire Alarm System, Public Address System, pathways and all other related work to make the building function on Engineering procurement and construction (EPC) basis at IIT Campus, Kanpur. No Cost Over run Time over run 1 Year 5 MonthsADG Lucknow 6. Construction of Research Lab Complex Building, basement plus Ground plus Four Storey with mezzanine floor including plumbing, Fire alarm, sewerage system, Building external Electronic works, Fire fighting, Fire alarm, PA system, Building Management system, Lift, HVAC, external development, pathways all complete and all other related work to make the building function on Engineering Procurement and construction EPC basis at IIT Campus, Kanpur. No Cost Over run Time over run 1 Year 9 Months 7. Construction of General Pool office accommodation i/c water supply sanitary installation internal electrical installation lift, electrical sub-station installation, DG sets, fire- fighting system and mechanical ventilation at Fazalganj, Kanpur. No Cost Over run Time over run 2 Year 8 MonthsADG Lucknow 8. Construction of GST building (2 Basement + G+7 Floor) composite structure on EPC basis at Kamla Nehru Nagar (Near HapurChungi), Ghaziabad (UP) Tendered Cost - 74.64 crore Gross Work done - 96.37 crore Time over run 1 Years 2 Months 9. Re-surfacing of runway at Air Force Station Hindan (SH: Surfacing and widening of runway, taxi track, dispatch etc. and conversion of ORA/SGA into rigid pavements rigid turn pads) Tender Cost- 1,16.50 crore Gross Work done - 133.28 crore Time over run 2 Months 10 Provision of Security Wall at Air Force Station, Hindan (SH: Civil work) Tender Cost- Rs. 76.27 crore Gross Work done - 95.36crore Time over run 2 Years 6 Months11 ADG (Bangalore) 0 Nil Nil Nil 12 ADG(Proj Delhi) 2 Nil Nil Nil 13 ADG(Patna) 11 Nos (annexure D) 11 Nos (Annexure D) 11 Nos (Annexure D) Nil 14 SDG (Kolkata)CE (Kolkata) 3 1. C/o Building for ICDWQ at No of Contractor allowed - 3 Not Aplicable Joka Cost Esclation - 0 Cost overrun Time overrun 87.92 cr 22 months 2. C/o I.T Park for STPI at Plot No.5/1 Block DP Cost overrun Time overrun 69.64 cr 2yrs 10 months 3. C/o Office building for CFSL at Rajarhat Cost overrun Time overrun 72.04 cr. 5yrs 2 months CA (Kolkata) Nil CE (Berhampur) 1 No of works not completed. 1 No of Contractor allowed - 1 Not Aplicable Cost overrun Time Cost Esclation - 75,22,764 overrun Nil 392 days CE Nil Not Aplicable (Bhubaneswar) CE (IIT 1 No of works not completed. 1 No of Contractor allowed - 1 Not Aplicable Kharagpur) Cost overrun Time Cost Esclation - 0 overrun Nil 699 days SE Siliguri 2 NilSE (IIIT Kalyani) Nil No of works not completed. 1 No of Contractor allowed - 1 No of Cost overrun Time Cost Esclation - 0 contractor overrun barred - 1 Nil 52 months SE (Durgapur) Nil SE (IIMC Joka) Nil SE (Rourkela) 1 Nil Not Pertains SE (Barasat) 2 1. C/o office cum residential No of Contractor allowed - 1 Not Aplicable and hostel complex for the Cost Esclation - 0 Dept. of NIPER at Panihati, Kolkata Cost overrun Time overrun Nil 07 Months SE 0 1. C/o New Admin. Building No of Contractor allowed - 2 Not Aplicable (AIIMS Cost overrun Time Cost Esclation - 0 Bhubaneswar) overrun Nil 49 Months 2. C/o Critical Care Hospital Cost overrun Time overrun Nil 12 MonthsSE (Rajarthat) 1 1. C/o Corporate Bhawan, New No of Contractor allowed - 1 Not Aplicable Town, Kolkata Cost Esclation - 0 Cost overrun Time overrun Nil 3 Years & 4 Months SE (RTI) Nil 15 ADG(Chandigarh 6 Nos (annexure E) 6 Nos (Annexure E) 6 Nos (Annexure E) Nil )CPWD (Annexure-B) Sl.No Agreement Completion Cost Over Time as Time for Time Reason for delay Amount Cost (Cr) run (Cr) per Actual over run (Cr) Contract Completion (Months) condition (Months) (Months) 1 Rs. 77.78 Rs. 87.68 9.90 15 51 36 1) Restricted working space and However, shortage of space for material No cost storage. over run. 2) Work affected during Covid 19 Completion lockdown. was within the AA&ES sanction 2 Rs. 73.52 Rs. 67.01 Nil 24 41 17 1) Delay in removal of old centring shuttering done by earlier agency engaged by IISER. 2) Delay in handing over of entrance room multipurpose hall & central court in indoor stadium done by earlier agency engaged by IISER. 3) Due to floods in August 2018. 3 Rs. 135.01 Rs. 118.95 Nil 24 38 14 1) Additional requirement fromclient regarding E&M works. 2) Due to floods in August 2018. 4 Rs. 76.04 Rs. 69.53 Nil 24 42 18 1) Due to floods in August 2018, August 2019. 2) Revision in foundation drawings, lift well details and retaining walls etc. 5 Rs. 106.15 Rs. 56.74 Nil 18 60 42 1) Major reasons are revision in Structural drawings due to changes asked by the client and shortage of funds. 2) Due to floods in August 2018, August 2019. 3) Covid Pandemic 2020, 2021 and litigation. 6 Rs. 68.53 Rs. 84.57 Rs. 16.04 18 43 25 1. Non availability of funds 2. Delay in providing drawings by consultant appointed by Client.CPWD (Annexure-C) Sl No Name of Work Cost over run Time Over Run 1 Construction of 96B Type 4 Cr 1.32 times faculty apartments (3 block each 32 flats G+8 floor) at IIT Madras at Chennai 2 Construction of Boys 10 Cr 1.82 times Hostel by replacing existing Mandakini Hostel at IIT Madras, Chennai-36. Sub work 1: Building Portion including Water Supply, Sanitary Installations, Drainage, Dismantling of existing structured Development works 3 Construction of New 34 Cr 2.03 times Academic Complex-II at IIT Madras, Chennai-36 4 Construction of Hostel NA 2.14 times blocks G plus 4, Academic Research Block G plus 2 with Food Court, Utility and Common Services at Thaiyur B Village for IIT Madras Discovery Campus. (Determined under Clause- 3) 5 Construction of 152 NIL 724 days Quarters (60 Nos. Type II, 30 Nos. Type III, 30 Nos. Type IV, 20 Nos. Type V and 12 Nos. Type VI), M.S. Residence, Dean Residence, Servant Quarters, 240 Nos. BoysHostel, 240 Nos. Girls Hostel, 150 Nos. Nurses Hostel, Service Buildings and development works like filling, roads, storm water drains, drainage, bore wells, underground sump, sewage treatment plant, open parking, water treatment plant, etc. for Residential and Academic Campus for JIPMER, Karaikal. 6 Construction of Composite Work in 25 Months upto Block Building and 2 Nos. Progress July 25 Semi-Permanent Buildings including associated development works and bulk services at NIT Puducherry Campus, Karaikal. 7 Construction of Medical NIL 416 days College Building and associated development works and bulk services at Academic Campus for JIPMER, Karaikal 8 Construction of 456 Boys work in 16 months upto Hostel Block No. 2 (G+4) progress July 25 Storeys, Vertical Extension of existing Girls Hostel for 2 (Two) Floors, Common Amenities Centre (Single Storey building) at NITpy campus, Karaikal. 9 Construction of 152 Nos. Rs.230.89 1048 days Type- II, 304 Nos. Type-III Crores and 76 Nos. Type- IV for Central Revenue Quarters at Ranganathan Garden,Anna Nagar West, Chennai. 10 Construction of 726 Nos. Rs.282.07 409 days Residential Quarters (288 Crores Nos. Type- II, 288 Nos. Type-III with stilts parking and 150 Nos. Type-IV) for Customs/Central Excise Department at Central Revenue Colony Land at Ranganathan Garden, Anna Nagar West, Chennai.Sl No Name of Work Cost Escalation Reason 1 Construction of 96B Type Nil Delay due to faculty apartments (3 reasons beyond block each 32 flats G+8 the control of floor) at IIT Madras at the contractor Chennai 2 Construction of Boys 9 Lakhs Delay due to Hostel by replacing reasons beyond existing Mandakini Hostel the control of at IIT Madras, Chennai-36. the contractor Sub work 1: Building Portion including Water Supply, Sanitary Installations, Drainage, Dismantling of existing structure and Development works 3 Construction of New 90 Lakhs Delay due to Academic Complex-II at reasons beyond IIT Madras, Chennai-36 the control of the contractor 4 - 4.5% permitted Due to Force Majeure COVID and abnormal bad weather conditions 5 Construction of 152 Nos. Rs.30,18,23,565 1) Covid 19 Type- II, 304 Nos. Type-III Lock down and 76 Nos. Type- IV for period. Central Revenue Quarters 2) Want of fund. at Ranganathan Garden, Anna Nagar West, Chennai. 6 Construction of 726 Nos. Rs.10,41,40,007 1) Covid 19 Residential Quarters (288 Lock down Nos. Type- II, 288 Nos. period. Type-III with stilt parking 2) Want of fund. and 150 Nos. Type-IV) for Customs/Central Excise Department at Central Revenue Colony at Ranganathan Garden, Anna Nagar West, Chennai.CPWD (Annexure - D) Reply received from different Unit under O/o ADG, Patna Sl. Question CE(Patna) CE ( AIMS & SE SE ( SE cum CE & ED Dhanbad SE Bhagalpur No (Ranchi) IIT Patna) (Bodhgaya) Muzaffa PD ( rpur) Jamshed pur) (A) The total number of Nil Nil 02 02 Nil 02 3 Nos. 02 works costing more than Rupees 50 crore that have been completed and handed over by Class-1 contractors through CPWD to the respective client Governments / Departments Agencies since 2014: (B) The number of Not Not T.O.R (a) - 02 Not T.O.R (a) 3 Nos. 02 contracts where the Applicable Applicab 2.26 Applica - 1.25 1 . T .O.R. 3.92 T.O.R (a) - 2.95 works were not le C.O.R - 0 ble T.O.R (b) C.O.R. Rs. 43.88 T.O.R (b) - 1.78 completed on time T.O.R (b) - - 1.8 Cr. as per tender 2.47 2. T.O.R. 1.9 documents along C.O.R-0 C.O.R. Rs. 23.41 with the details of Cr. cost and time 3. .T.O.R. 2.72 overrums in such C.O.R. Rs. 22.60 cases: Cr.(C The number of Class- Not Not There is 02 Cost Not 1. Cost 3 Nos. 02 ) I contractors who Applicable Applicab no cost Escalatio Applica escalati 1. C/o 1000 Room 01. Nil Boys Hostel were allowed to le escalation permitted ble on was 02. 1.75 Crore C.O.R. Rs. 43.88 Cr. complete works with for both as per NIT paid as Reason: more than 20% delay the works conditions per the a) Existing services beyond the original as both provisio line. time frame, and the have been ns of the b) Change in layout extent of cost completed agreeme from sanctioned escalation permitted within AA nt. No G+10 floor to G+15 in such cases along & ES escalati floor due to site with reasons; and on has constraints. c) Fund constraint been during 2016 to granted 2019. on d) COVID-19 account pandemic of time e) Delay go ahead overrun. decision for 8th to 2. Cost 10th floor of escalati kitchen block. on was f) Relocation of UG sump etc. nil as 2. C/o 600 Room escalati Girls Hostel on C.O.R. Rs. 23.41 Cr. clause Reason: was not a) Existing services applicab & structure. le) b) Fund constraint during 2016 to 2019. c) Restriction imposed for lifting of sand by NGT. 3. C/o Type-V & VIQtrs. C.O.R. Rs. 22.60 Cr. Reason: a) Existing services & structure. b) Fund constraint during 2016 to 2019. c) COVID-19 pandemic.(D) The number of class- Doesn't pertain to this office. I Contractors who have been disqualified / barred from bidding on account of delay in completion of previous project ?CPWD (Annexure-E) S.No. Question Reply (a) The total number of works costing more than Rs. 50 crore that have been 6 Nos. completed and handed over by Class-I Contractors through CPWD to the respective client Governments/ Departments/ Agencies since 2014; (b) The number of S. Name of work Cost Time overrun contracts where the No. overrun works were not (in Cr.) completed on time 1. C/o 240 bedded hospital 23.70 25 months as per tender building at Hamirpur documents 2. C/o office building for Nil 31 months alongwith the RBI at IT park, details of cost and Dehradun time overrun in such 3. Construction of faculty Nil 26 Months cases; housing (Phase I, 60 flats &Phase II, 120 flats) at IIT Roorkee, Roorkee, Uttarakhand 4. Construction of 800 Nil 37 Months capacity students Hostel at IIT Roorkee, Roorkee, Uttarakhand. 5. Construction of 572seater Nil 14 Days student EWS hostel (Phase-1 works on EPC basis at Vigyan Kunj, IIT Roorkee, Roorkee, Uttarakhand. 6. C/o 72 Nos. T-V & 27 Nos. T- Nil 27 months VI qtrs. at AIIMS Rishikesh. (c) The number of Unit No. of Cost Reason Class-1 contractors Class-I overrun who were allowed contra (in Cr.) to complete works ctor with more than 20% CE cum ED, 1 No. 23.70delay beyond the Chandigarh original time frame, CE-Dehradun 1 No. Nil and the extent of SE cum PD, 2 Nos. Nil cost escalation Roorkee Permitted as per the permitted in such SE cum PD, 1 No. Nil provision of agreement. cases, alongwith Uttarakhand reasons; and Total 5 Nos. (d) The number of Class-1 contractors who have been 1 No. disqualified / barred from bidding on account of delay in completion of previous projects?NBCC (Enclosure-II) Sl. Question Reply (in Nos.) No. The total number of works costing more than Rupees 50 Crore that have been completed and handed over by Class-I (a) 92 Contractor through NBCC to the respective client/Governments/Departments/Agencies Since 2014. The number of contracts where the works There was time overrun were not completed on time as per tender for 57 Projects. (b) documents along with the details of cost Out of 57 Projects, 54 and time overruns in such cases. Projects’ time overrun was more than 20% of original time frame. The number of Class-I Contractors who Out of 54 Projects, for 7 were allowed to complete works with more Nos. Contract cost than 20% delay beyond the original time escalation was paid as (c) frame, and the extent of cost escalation per the Contract permitted in such cases, along with (Enclosure-II-A) reasons; and For remaining 3, details of time/cost overrun are as per Enclosure-II-B The number of Class-I Contractors who have been disqualified/barred from bidding (d) 5 on account of delay in completion of previous projects? Further, it is to mention that, there is no any contractor class bifurcation in bidding process at NBCC (I) Ltd., all the tenders are called through open e-tender process.NBCC (Enclosure-II-A) Sl. No. Name of Time Over Run / Cost Over Run Project 1 East Kidwai 03 nos. of contractor are allowed to complete Nagar, New the work beyond the time frame due to various Delhi hindrance at site like Relocation of Labour Hutment and shifting of existing services etc. Escalation is paid only as per applicable whole sale Price index for labour and material rate. Time Extent approx. 18 months. 2 ESIC MGM Rs. 12.33 Cr Escalation released by client on Hospital Parel, account of delay in deviation approval and delay Mumbai in decision from the client. Time Extent: approx.36 Months . 3 ESIC Trauma Rs. 4.5 Cr (Escalation paid to Contractor. ), Delay centre, in handing over of encumbrance free site, Delay Lucknow in approval of deviation & decision from client. Time Extent: approx. 24 Months. 4 ESIC dental Rs. 10.13 Cr (Escalation released to contractor), college & Delay in handing over of encumbrance free site, Renovation of Delay in approval of deviation & decision from ESIC hospital, client. Time Extent: approx. 12 Months. Pandu Nagar, Kanpur : 5 ESIC Mandi, Rs.66 Cr (Cost Escalation), Delay in handing Himachal over of encumbrance free site, Delay in approval Pradesh of deviation & decision from client. Time Extent: approx. 15 Months. Total Nos 07 NosNBCC (Enclosure-II-B) Sl. No. Name of Project Time Over Run / Cost Over Run 1 CISF, Ranchi. Time overrun - 24 Months, Cost Overrun - Nil. Reason of Time overrun - Delay on the part of Contractor. 2 CISF, Mahipalpur. Time overrun - 3 Months, Cost overrun - Nil. Reason of Time overrun - Delay on the part of Contractor. 3 Medical College Time overrun - 14 Months, Dungarpur, Cost overrun - Nil. Rajasthan. Reason of Time overrun - Delay in vacant old quarters and handing over of encroachment free site, Shifting of overhead HT line, Delay in release of funds from Medical Education Dept.HSCC (Enclosure-III) Sl. Question Reply (in Nos.) No. The total number of works costing more than Rupees 50 Crore that have been completed and handed over by Class-I Contractor through HSCC (a) 52 to the respective client/Governments/Departments/Agencies Since 2014. The number of contracts where the works were 50 not completed on time as per tender documents (b) along with the details of cost and time overruns (Enclosure–III-A) in such cases. The number of Class-I Contractors who were allowed to complete works with more than 20% 42 (c) delay beyond the original time frame, and the (Enclosure-III-A) extent of cost escalation permitted in such cases, along with reasons; and The number of Class-I Contractors who have (d) been disqualified/barred from bidding on account Nil of delay in completion of previous projects?HSCC (Enclosure–III-A) (d) CONTRACTOR (a) ( b ) ( c ) D I S Q A L I F I E D / WORKS COMPLETED BY WORKS NOT COMPLETED BY WORKS COMPLETED B A R R ED S.No. CONTRACTOR S . N o . C O N T R A C T O R O N T I M E ( 2 0 % d e l a y b e y o n d o r i g i n a l (on account (50 cr. or more since (with details like Project Cost, time), if esacalation, of delay in 2014) Time overrun) mentioned reasons completion of previous project) 1 Construction of OPD 1 Construction of OPD Block & Rs. 126403865, Escalation NIL Block & Other Associated Other Associated Services and Amount was paid upto actual Services and their their Maintenance during Defect date of completion whereas Maintenance during Liability Period in AIIMS indices were freezed as per Defect Liability Period in Campus, Ansari Nagar, New stipulated date of completion AIIMS Campus, Ansari Delhi for AIIMS, New Delhi REASONS: Extension of Time Nagar, New Delhi for was granted without levy of AIIMS, New Delhi Liquidity Damages. (Reason not attributable to contractor and HSCC) 2 Construction of Geriatrics 2 Construction of Geriatrics Block final bill not submitted Block Including Including Associated Works, Associated Works, Operation & Maintenance during Operation & Maintenance defect liability period in AIIMS during defect liability Campus, Masjid Moth, Newperiod in AIIMS Campus, Delhi Masjid Moth, New Delhi 3 Construction of Mother & 3 Construction of Mother & Child Rs. 203762349, Escalation Child Block Including Block Including Associated Amount was paid upto actual Associated Works, Works, Operation & date of completion whereas Operation & Maintenance Maintenance during defect indices were freezed as per during defect liability liability period at Masjid Moth stipulated date of completion period at Masjid Moth Area, Ansari Nagar, New Delhi REASONS: Extension of Time Area, Ansari Nagar, New for AIIMS, New Delhi was granted without levy of Delhi for AIIMS, New Liquidity Damages. (Reason Delhi not attributable to contractor and HSCC) 4 Construction of Burn & 4 Construction of Burn & Plastic Rs. 173215726, Escalation Plastic Surgery Block & Surgery Block & Other Amount was paid upto actual Other Associated Associated Services and their date of completion whereas Services and their Maintenance during Defect indices were freezed as per Maintenance during Liability Period at J.P.N. APEX stipulated date of completion Defect Liability Period at Trauma Centre AIIMS, New REASONS: Extension of Time J.P.N. APEX Trauma Delhi was granted without levy of Centre AIIMS, New Delhi Liquidity Damages. (Reason not attriibutable to contractor and HSCC)5 Construction of Hospital, 5 Construction of Hospital, OPD & Rs 649368228, Escalation OPD & Other Associated Other Associated Services and Amount was paid upto actual Services and their their Maintenance during Defect date of completion whereas Maintenance during Liability Period for National indices were freezed as per Defect Liability Period for Cancer Institute at Badsha, stipulated date of completion National Cancer Institute Jhajjar, Haryana REASONS: Extension of Time at Badsha, Jhajjar, was granted without levy of Haryana Liquidity Damages. (Reason not attributable to contractor and HSCC) 6 Construction of 6 Construction of Residential Rs. 293550535, Escalation Residential Complex for Complex for National Cancer Amount was paid upto actual National Cancer Institute Institute (NCI) including date of completion whereas (NCI) including Associated Services and indices were freezed as per Associated Services and Operation & Maintenance during stipulated date of Operation & Maintenance Defect Liability Period at completionREASONS: during Defect Liability Badsha, Jhajjar, Haryana Extension of Time was Period at Badsha, Jhajjar, granted without levy of Haryana Liquidity Damages. (Reason not attributable to contractor and HSCC)7 Construction of New Paid 7 Construction of New Paid Ward Rs. 93658486, Escalation Ward including including Associated Works, Amount was paid upto actual Associated Works, Operation & Maintenance during date of completion whereas Operation & Maintenance defect liability period in AIIMS indices were freezed as per during defect liability Campus, Ansari Nagar, New stipulated date of completion period in AIIMS Campus, Delhi for AIIMS, New Delhi REASONS: Extension of Time Ansari Nagar, New Delhi (Balance Work) was granted without levy of for AIIMS, New Delhi Liquidity Damages (Reason (Balance Work) not attributable to contractor and HSCC) 8 Construction of Hostel 8 Construction of Hostel Block for Rs. 260365035, Escalation Block for Resident Resident Doctor’s including Amount was paid upto actual Doctor’s including associated works, Operation & date of completion whereas associated works, Maintenance during defect indices were freezed as per Operation & Maintenance liability period for PGIMER, Dr. stipulated date of completion during defect liability RML Hospital, New Delhi REASONS: Extension of Time period for PGIMER, Dr. was granted without levy of RML Hospital, New Delhi Liquidity Damages (Reason not attributable to contractor and HSCC) 9 Construction of Hospital, 9 Construction of Hospital, OPD & Rs. 6837990, Escalation OPD & Other Associates Other Associates Works for Amount was paid upto actual Works for Kalpana Kalpana Chawla Govt. Medical date of completion whereas Chawla Govt. Medical College (KCGMC), Karnal, indices were freezed as perCollege (KCGMC), Karnal, Haryana (Package-II) stipulated date of completion Haryana (Package-II) REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attriibutable to contractor and HSCC) 10 Construction of Housing 10 Construction of Housing Block Rs. -580167, Escalation Block for Proposed for Proposed Kalpana Chawla Amount was paid upto actual Kalpana Chawla Govt. Govt. Medical College (KCGMC), date of completion whereas Medical College Karnal, Haryana indices were freezed as per (KCGMC), Karnal, stipulated date of completion Haryana REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 11 Construction of Hospital 11 Construction of Hospital & Rs. 169892348, Escalation & Medical College for All Medical College for All India Amount was paid upto actual India Institute of Medical Institute of Medical Sciences date of completion whereas Sciences (AIIMS) at (AIIMS) at Raebareli, Uttar indices were freezed as per Raebareli, Uttar Pradesh Pradesh (U.P.). stipulated date of completion (U.P.). REASONS: Extension of Time was granted without levy of Liquidity Damages (Reasonnot attributable to contractor and HSCC) 12 Construction of Housing 12 Construction of Housing Rs. 169892348, Escalation Complex including Complex including external Amount was paid upto actual external development & development & services for date of completion whereas services for AIIMS (Under AIIMS (Under PMSSY) at indices were freezed as per PMSSY) at Raebareli Raebareli (U.P.). stipulated date of completion (U.P.). REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 13 Construction of 13 Construction of ADVANCED Rs. 111579143, Escalation ADVANCED NEUROSCIENCES CENTRE and Amount was paid upto actual NEUROSCIENCES their Maintenance during Defect date of completion whereas CENTRE and their Liability Period at PGIMER, indices were freezed as per Maintenance during Chandigarh on Comprehensive stipulated date of completion Defect Liability Period at Design, Engineering, REASONS: Extension of Time PGIMER, Chandigarh on Procurement and Construction was granted without levy of Comprehensive Design, EPC basis Liquidity Damages (Reason Engineering, Procurement not attributable to contractor and Construction EPCbasis and HSCC) 14 Construction of Sub- 14 Construction of Sub-Specialty Nil Specialty Hospital block Hospital block for NIMHANS. for NIMHANS. Bangalore” Bangalore” 15 Construction for left out 15 Construction for left out building Nil building works including works including finishing, finishing, airconditioning, airconditioning, electrical electrical works, roads, works, roads, footpaths, footpaths, sewerage, OT, sewerage, OT, auditorium, IT, auditorium, IT, gases gases manifold, electrical, manifold, electrical, substations and all otherelated substations and all services for Oncology and otherelated services for Academic Block under Oncology and Academic comprehensive Redevelopment Block under Plan for Lady Hardinge Medical comprehensive College and Associated Redevelopment Plan for Hospitals New Delhi and their Lady Hardinge Medical Operation and Maintenance College and Associated during the Defect Liability Hospitals New Delhi and Period. their Operation andMaintenance during the Defect Liability Period. 16 Construction for left out 16 Construction for left out building Nil building works including works including finishing, air- finishing, air-conditioning, conditioning, electrical works, electrical works, roads, roads, footpaths, sewerage, footpaths, sewerage, OT0, electrical substations and OT0, electrical all other related services for substations and all other OPD, IPD and Accident and related services for OPD, Emergency A and E Block under IPD and Accident and comprehensive Redevelopment Emergency A and E Block Plan for Lady Hardinge Medical under comprehensive College and Associated Redevelopment Plan for Hospitals, New Delhi and their Lady Hardinge Medical Operation and Maintenance College and Associated during the Defect Liability Hospitals, New Delhi and Period their Operation and Maintenance during the Defect Liability Period17 Construction of Super 16 Construction of Super Rs. 89204215, Escalation specialty hospital and specialty hospital and other Amount was paid upto actual other facilities for Dr. B. facilities for Dr. B. C. Roy date of completion whereas C. Roy Institute of Institute of Medical Sciences indices were freezed as per Medical Sciences and and Research at IIT-Kharagpur, stipulated date of completion Research at IIT- West Bengal REASONS: Extension of Time Kharagpur, West Bengal was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 18 Construction of Academic 18 Construction of Academic Rs. 44755559, Escalation Block, Boys and Girls Block, Boys and Girls Hostel, Amount was paid upto actual Hostel, Staff Quarters, Staff Quarters, Resident Hostel date of completion whereas Resident Hostel Block, Block, UGT, STP, Indoor Sports indices were freezed as per UGT, STP, Indoor Sports Block, Guest House, ESS and stipulated date of completion Block, Guest House, ESS other services etc. with 03 REASONS: Extension of Time and other services etc. years Defect liability period and was granted without levy of with 03 years Defect Operation and maintenance for Liquidity Damages (Reason liability period and 05 years after completion of not attributable to contractor Operation and works for Establishment of New and HSCC) maintenance for 05 years Medical College at after completion of works Hanumangarh, Rajasthan for Establishment of New Medical College atHanumangarh, Rajasthan 19 Construction of Phase-I 19 Construction of Phase-I works Rs. 929466, Escalation works comprising comprising research lab with Amount was paid upto actual research lab with R&D R&D office, hostel block date of completion whereas office, hostel block including guest house, type III indices were freezed as per including guest house, residential quarter, security stipulated date of completion type III residential lodge, Animal farms & Animal REASONS: Extension of Time quarter, security lodge, House, STP including was granted without levy of Animal farms & Animal Associated works for NIAB at Liquidity Damages (Reason House, STP including Hyderabad not attributable to contractor Associated works for and HSCC) NIAB at Hyderabad 20 Construction of Academic 20 Construction of Academic Rs. 49593698, Escalation Hostel Blocks and Hostel Blocks and auditorium at Amount was paid upto actual auditorium at Rajkumari Rajkumari Amrit Kaur College of date of completion whereas Amrit Kaur College of Nursing, New Delhi and their indices were freezed as per Nursing, New Delhi and maintenance during defect stipulated date of completion their maintenance during liability period REASONS: Extension of Time defect liability period was granted without levy of Liquidity Damages (Reasonnot attributable to contractor and HSCC) 21 Construction of Satellite 21 Construction of Satellite Centre Rs199846181, Escalation Centre of PGIMER, of PGIMER, Chandigarh at Amount was paid upto actual Chandigarh at Sangrur Sangrur (Punjab) including date of completion whereas (Punjab) including Maintenance during Defect indices were freezed as per Maintenance during Liability Period stipulated date of Defect Liability Period completionREASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 22 AIIMS @ Nagpur 22 AIIMS @ Nagpur Residential Rs127638773, Escalation Residential Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractorand HSCC) 23 AIIMS @ Nagpur (Pakage 23 AIIMS @ Nagpur (Pakage II) Rs 113549605, Escalation II) Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 24 PMSSY - III - Guwahati 24 PMSSY - III - Shimla Rs. 111383264, Escalation Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractorand HSCC) 25 PMSSY - III - Dibrugarh 25 PMSSY - III - Moti Lal Nehru Rs. 106892194, Escalation (ssb Dibrugarh (assam Medical College, Allahbad, U.P. Amount was paid upto actual medical college)) date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 26 PMSSY - III - Shimla 26 SSB , Safdarjung Hospital Rs62527770, Escalation Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attriibutable to contractorand HSCC) 27 PMSSY - III - Moti Lal 27 Emergency Block, Safdarjung Rs60740552, Escalation Nehru Medical College, Hospital Amount was paid upto actual Allahbad, U.P. date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 28 SSB , Safdarjung Hospital 28 AIIMS @ Kalyani Pakage I OPD Rs140567595, Escalation AND RESIDENTAL Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completionREASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractorand HSCC) 29 Emergency Block, 29 AIIMS @ Kalyani Pakage II Rs69940095, Escalation Safdarjung Hospital HOSPITAL AND ACADEMIC Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 30 AIIMS @ Kalyani Pakage I 30 SSB Burla, PMSSY PH-III Rs190695367, Escalation OPD AND RESIDENTAL Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC)31 AIIMS @ Kalyani Pakage II 31 PMSSY - III - Udaipur Rs79311927, Escalation HOSPITAL AND Amount was paid upto actual ACADEMIC date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 32 SSB Burla, PMSSY PH-III 32 Medical College at Pali, Rs119318855, Escalation Rajasthan Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC)33 PMSSY - III - Udaipur 33 PMSSY - III - Goverment Medical Rs60937818, Escalation College - Kota Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 34 Medical College at Pali, 34 ESIC - Siliguri Nil Rajasthan 35 PMSSY - III - Goverment 35 AIIMS @ Guntur (Pakage I)-OPD Rs65035498, Escalation Medical College - Kota & Residential Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC)36 ESIC - Siliguri 36 AIIMS @ Guntur (Pakage II)- Nil Hospital & Academic Block 37 AIIMS @ Guntur (Pakage 37 PMSSY - III - Goa Rs102721429, Escalation I)-OPD & Residential Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completionREASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 38 AIIMS @ Guntur (Pakage 38 PMSSY - III - Goverment Medical Rs18479596, Escalation II)-Hospital & Academic College- Aurangabad Amount was paid upto actual Block date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC)39 PMSSY - III - Goa 39 PMSSY - III - Goverment Medical Rs163332243, Escalation College- Latur Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 40 PMSSY - III - Goverment 40 Construction Balance work of Rs. 84268018, Escalation Medical College- hostel and residential quarters Amount was paid upto actual Aurangabad FOR INCREASE OF UG seats date of completion whereas RIMS, Imphal indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 41 PMSSY - III - Goverment 41 PMSSY - III - Goverment Medical Rs. 21136211, Escalation Medical College- Latur College, Rewa Amount was paid upto actual date of completion whereas indices were freezed as perstipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 42 Package - I -Hospital 42 PMSSY - III - NSB Medical NIl LGBRIMH, Tezpur, Assam College, Jabalpur 43 Package - II - Residential 43 PMSSY - III - Gajra Medical NIl LGBRIMH, Tezpur, Assam College, Gwalior 44 Const. Add. Facility 44 PMSSY - III - Patiala, Punjab Nil RIPANS - Aizwal, Mizoram 45 PMSSY - III - Goverment 45 PMSSY - III - Goverment Medical Rs64017134, Escalation Medical College, Rewa College, Jhansi, U.P. Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC)46 PMSSY - III - NSB Medical 46 CNCI, Kolkata Rs54229774, Escalation College, Jabalpur Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 47 PMSSY - III - Gajra 47 PMSSY - III - MKCG Medical Rs73438228, Escalation Medical College, Gwalior Colloege, Berahampur Amount was paid upto actual date of completion whereas indices were freezed as per stipulated date of completionREASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC)48 PMSSY - III - Patiala, 48 PMSSY - III - North Bengal Rs57538284, Escalation Punjab Medical College - Siliguri, West Amount was paid upto actual Bengal date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 49 PMSSY - III - Goverment 49 PMSSY - III - MKCG Medical Rs66534415, Escalation Medical College, Jhansi, Colloege, Berahampur Amount was paid upto actual U.P. date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 50 CNCI, Kolkata 50 PMSSY - III - North Bengal Rs331526041, Escalation Medical College - Siliguri, West Amount was paid upto actual Bengal date of completion whereas indices were freezed as perstipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages 51 PMSSY - III - MKCG Rs79123506, Escalation Medical Colloege, Amount was paid upto actual Berahampur date of completion whereas indices were freezed as per stipulated date of completion REASONS: Extension of Time was granted without levy of Liquidity Damages (Reason not attributable to contractor and HSCC) 52 PMSSY - III - North Bengal NIL Medical College - Siliguri, West BengalHITES (Enclosure-IV) WORK COMPLETED BY CLASS -I CONTRACTORS Sl. Description No. of Projects No 1 The total number of works costing more 12 Nos. than Rupees 50 crore that have been completed and handed over by Class-I Contractors through HITES to the respective client Government/Department/Agencies since 2014; 2 The number of contracts where the 12 Nos. (Enclosure-IV-A works were not completed on time as attached) per tender documents along with the details of cost and time overruns in such cases; 3 The number of Class-I Contractors who 12 Nos. (Enclosure-IV-A were allowed to complete works with attached) more than 20% delay beyond the original time frame, and the extent of cost escalation permitted in such cases, along with reasons. 4 The number of Class- I Contractor who Nil have been disqualified/barred from bidding on account of delay in completion of previous project.HITES (Enclosure-IV-A) Constructi on of 100 Justified delay not Bedded M/s Asian Applicable 10- 10- 23- attributed to the General DGHS 17.3 Construct as per 1 49.93 67.32 02- 02- 03- 311% contractor. work Hospital at MoHFW 9 ion tender 2019 2020 2023 completed within RHTC Company conditions the budgeted cost Najafgarh, Delhi Constructi Levy of on of 200 Compensation Bedded Applicable 02- 01- 31- amount of Rs. 1.96 Mother and M/s KMV as per 2 NHM 77.35 75.14 Nil 09- 03- 01- 129% Cr. imposed to Child Projects tender 2016 2018 2020 contractor. Work Hospital at conditions completed within Chitrakoot the budgeted cost. (U.P) Justified delay not 25- 24- 30- attributed to the AIIMS 582.8 25.4 M/s NCC Not 3 MoHFW 557.48 08- 08- 04- 84% contractor. work Bathinda 9 1 Ltd applicable 2018 2020 2022 completed within the budgeted costConstructi on of Upgradatio M/s n of Sivanssh Justified delay not Ganesh Applicable Infrastru 02- 01- 31- attributed to the ShankarVid as per 4 MoHFW 101.37 95.11 Nil cture 12- 04- 01- 138% contractor. work yarthi tender Develop 2018 2020 2022 completed within Memorial conditions ment the budgeted cost Medical Pvt. Ltd. College, Kanpur (U.P) Justified delay not Surgical 10CA is attributed to the M/s Block- 03- 02- 31- applicable contractor. work Govt. of 129.6 15.1 Jatan 5 GMC 114.43 02- 08- 01- 100% as per completed within Kerala 1 8 construc Kottayam , 2020 2022 2025 tender the budgeted cost tions Kerala conditions & final bill under process Justified delay not 23- 22- 20- attributed to the GMC Konni Govt. of M/s NCC Not 6 167.33 129 Nil 12- 06- 12- 434% contractor. work Phase - I Kerala Ltd applicable 2013 2015 2021 completed within the budgeted cost10CA & Justified delay not GMC 10CC are M/s KMV 15- 14- 13- attributed to the Thanjavur applicable 7 MoHFW 79.8 84.31 4.51 Projects 06- 12- 12- 67% contractor. work PMSSY_III , as per Ltd 2016 2017 2018 completed within Tamil Nadu tender the budgeted cost conditions 10CA & Justified delay not GMC 10CC are M/s KMV 22- 21- 31- attributed to the Tirunelveli applicable 8 MoHFW 79.64 85.98 6.34 Projects 06- 12- 12- 69% contractor. work PMSSY_III as per Ltd 2016 2017 2018 completed within Tamil Nadu tender the budgeted cost conditions 10CA & Justified delay not RIMS 10CC are M/s KMV 16- 15- 16- attributed to the Adilabad, applicable 9 MoHFW 77.58 76.92 Nil Projects 07- 01- 03- 277% contractor. work PMSSY_III as per Ltd 2016 2018 2022 completed within Telangana tender the budgeted cost conditions 10CA & Justified delay not KMC 10CC are M/s KMV 16- 15- 08- attributed to the Warangal, applicable 10 MoHFW 78.65 78.82 0.17 Projects 07- 01- 06- 226% contractor. work PMSSY_III as per Ltd 2016 2018 2021 completed within Telangana tender the budgeted cost conditionsM/s Justified delay not Cherian 10CA & attributed to the SSB, GMC Varkey 10CC are 12- 11- 31- contractor. work Kozhikode, Construc applicable 11 MoHFW 71.14 80.24 9.1 07- 04- 12- 156% completed within PMSSY_III, tion as per 2017 2019 2021 the budgeted cost Kerala Compan tender & final bill under y Pvt. conditions process Ltd. M/s Justified delay not Upgradatio Cherian 10CA & attributed to the n of T.D Varkey 10CC are 12- 11- 31- contractor. work MC, Construc applicable 12 MoHFW 74.15 81.98 7.83 07- 04- 01- 161% completed within Alappuzha, tion as per 2017 2019 2022 the budgeted cost PMSSY_III, Compan tender & final bill under Kerala y Pvt. conditions process Ltd.