Parliament Question: Demand and Supply of Power in Uttar Pradesh

Issued by Ministry of Power · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: This document presents the Indian government's response regarding the power demand and supply situation in Uttar Pradesh. It addresses the gap between power demand and supply, steps taken to bridge this gap, long-term infrastructure and policy initiatives for continuous power supply, and the actual power supply scenario in each district. The information provided covers the period up to June 2025, with some targets extending to 2034-35. Key Points: Power Supply Position in Uttar Pradesh: * The gap between energy requirement and supply in Uttar Pradesh has decreased from 0.8 MU in 2022-23 to almost NIL up to June 2025-26. * Annexure I and II provide detailed power supply positions for the last three years and current year up to June 2025, and month-wise data from April to June 2025, respectively. Government Measures for Uninterrupted Power Supply: * Generation Planning: The National Electricity Plan (NEP) projects an installed generation capacity of 874 GW by 2031-32, including conventional and renewable sources. * Resource Adequacy Plans (RAPs): States have prepared dynamic 10-year rolling RAPs in consultation with the Central Electricity Authority (CEA) including power generation and procurement planning. * Capacity Addition Programme: * Thermal Capacity: Additional 97,000 MW of coal and lignite-based thermal capacity is planned to meet the projected requirement of 3,07,000 MW by 2034-35. 11,680 MW commissioned since April 2023, 38,935 MW under construction, and contracts awarded for 15,440 MW. List of under construction projects in Uttar Pradesh is in Annexure III. * Hydro Electric Projects: 13,463.5 MW under construction and 9802 MW planned for completion by 2031-32. * Nuclear Capacity: 6,600 MW under construction (target completion by 2029-30) and 7,000 MW in planning/approval stages. * Renewable Capacity: 1,58,450 MW under construction and 62,000 MW in planning (target completion by 2029-30). * Energy Storage: 8250 MW/49500 MWh Pumped Storage Projects (PSPs) are under construction, with additional PSPs and Battery Energy Storage Systems (BESS) in bidding/planning. * Transmission Planning: Addition of 1,91,474 ckm of transmission lines and 1,274 GVA of transformation capacity is planned by 2031-32, including 17,915.6 ckm lines and 95.5 GVA capacity in Uttar Pradesh. * Distribution System Planning: Infrastructure projects worth Rs. 1.85 lakh Cr. executed under DDUGJY, IPDS and SAUBHAGYA. Under RDSS, projects worth Rs. 2.82 lakh Cr. sanctioned, including Rs 40,739 crore for Uttar Pradesh. Average supply in rural and urban areas has improved to 22.6 hrs and 23.4 hrs, respectively, in FY 2025. * Renewable Energy Promotion: * Bidding trajectory for 50 GW/annum of RE power procurement bids by REIAs from FY 2023-24 to FY 2027-28. * 100% FDI permitted under the automatic route. * ISTS charges waived for interstate sale of solar and wind power (commissioned by June 30, 2025), Green Hydrogen (till December 2030) and offshore wind (till December 2032). * Renewable Purchase Obligation (RPO) and Renewable Consumption Obligation (RCO) notified till 2029-30. * Standard Bidding Guidelines for tariff-based competitive bidding for power procurement from grid-connected RE projects. * Various schemes launched: PMKUSUM, PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency Solar PV Modules, New Solar Power Scheme for Tribal and PVTG Habitations/Villages under PM JANMAN and DA JGUA, National Green Hydrogen Mission, VGF Scheme for Offshore Wind Energy Projects * Implementation of Solar Parks and Ultra Mega Solar Power projects to provide land and transmission to RE developers. * Funding for new transmission lines and substations under the Green Energy Corridor Scheme. * Strategy for Establishments of Offshore Wind Energy Projects has been issued. * Transmission plan prepared till 2032. * Green Term Ahead Market (GTAM) launched. * Production Linked Incentive (PLI) scheme for High Efficiency Solar PV Modules. Power Supply and Distribution: * Supply and distribution of electricity are under the purview of the respective State Government/Power Utility. * Distribution licensees shall supply 24x7 power to all consumers, as per the Electricity Rights of Consumers Rules, 2020. The Commission may specify lower hours for some categories like agriculture. * Details of average daily hours of supply in rural and urban areas for Uttar Pradesh, including Moradabad district, are in Annexure IV. Impact Analysis: Government of India and Ministry of Power: * Impact: Responsible for overall power planning, policy formulation, and implementation of various schemes to enhance power generation, transmission, and distribution. * Action Required: Continue monitoring the progress of capacity addition, transmission infrastructure development, and implementation of renewable energy initiatives. State Government of Uttar Pradesh/Power Utility: * Impact: Responsible for ensuring 24x7 power supply to all consumers within the state, managing distribution infrastructure, and complying with the Electricity Rights of Consumers Rules, 2020. * Action Required: Ensure efficient distribution of power, address any supply gaps, and improve supply hours in rural areas to meet the 24x7 power supply mandate. Monitor and act in accordance with the average supply hours in Annexure IV. Central Electricity Authority (CEA): * Impact: Involved in the preparation of Resource Adequacy Plans (RAPs) in consultation with states and providing technical support for power sector development. * Action Required: Collaborate with states to formulate and update RAPs, ensuring they align with the National Electricity Plan (NEP) and address future power demand. Renewable Energy Implementing Agencies (REIAs): * Impact: Responsible for issuing RE power procurement bids as per the bidding trajectory set by the Ministry of New and Renewable Energy (MNRE). * Action Required: Adhere to the bidding trajectory for RE power procurement and promote the development of renewable energy projects in the country. Power Consumers (especially in Uttar Pradesh): * Impact: Affected by the availability and reliability of power supply in their respective areas. * Action Required: Be aware of the Electricity Rights of Consumers Rules, 2020, and report any issues related to power supply to the distribution licensee.

Key Entities Referenced

Uttar Pradesh: A state in India, focus of the power demand and supply analysis. Ministry of Power: The Union Government ministry responsible for power sector development. National Electricity Plan NEP: A plan that includes installed generation capacity in 2031-32 CEA: Central Electricity Authority; works in consultation with states to prepare Resource Adequacy Plans. Resource Adequacy Plans RAPs: Dynamic 10-year rolling plans prepared by states in consultation with CEA for power generation and procurement planning. Deen Dayal Upadhyaya Gram Jyoti Yojana DDUGJY: A government scheme to improve power supply in rural areas. Revamped Distribution Sector Scheme RDSS: A scheme to improve power supply in urban and rural areas. Moradabad district: A specific district in Uttar Pradesh for which power demand and supply data is analyzed.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA UNSTARRED QUESTION NO.4732 ANSWERED ON 21.08.2025 DEMAND AND SUPPLY OF POWER IN UTTAR PRADESH †4732. MRS RUCHI VIRA: Will the Minister of POWER be pleased to state: (a) whether the Government is aware of the growing gap between demand and supply of power in Uttar Pradesh especially during the peak season; (b) if so, the current figures of its demand and supply in the State; (c) the steps taken or proposed to be taken by the State Government and the Union Government to bridge this gap; (d) whether any long-term infrastructure is being/has been established or policy initiatives are being/have been undertaken to ensure continuous and uninterrupted power supply in rural and urban areas and if so, the timeline fixed and targets set for implementing such initiatives; and (e) the actual demand and supply of power and average daily power cut (cut time) in each district of Uttar Pradesh especially in Moradabad district? A N S W E R THE MINISTER OF STATE IN THE MINISTRY OF POWER (SHRI SHRIPAD NAIK) (a) & (b) : Power Supply Position of Uttar Pradesh during the last three years and current year 2025-26 (upto June, 2025) is given at Annexure-I. Further, month-wise Power Supply Position of the State during April to June of current year 2025 is given at Annexure-II. These details indicate that the Energy Supplied in the States has been almost commensurate to the Energy Requirement. The gap between the demand and availability of electricity in Uttar Pradesh has declined from 0.8% during 2022-23 to almost NIL in the current year 2025-26 (upto June, 2025). (c) & (d) : Government of India has taken following measures to ensure continuous and uninterrupted power supply in the country including Uttar Pradesh: 1. Generation Planning: (i) As per National Electricity Plan (NEP), installed generation capacity in 2031-32 is likely to be 874 GW. This includes capacity from conventional sources- Coal, Lignite etc., renewable sources- Solar, Wind and Hydro. ………2.- 2 - (ii) With a view to ensure generation capacity remains ahead of projected peak demand, all the States, in consultation with CEA, have prepared their “Resource Adequacy Plans (RAPs)”, which are dynamic 10 year rolling plans and includes power generation as well as power procurement planning. (iii) All the States were advised to initiate process for creating/ contracting generation capacities; from all generation sources, as per their Resource Adequacy Plans. (iv) In order to augment the power generation capacity, the Government of India has initiated following capacity addition programme: (A) The projected thermal (coal and lignite) capacity requirement by the year 2034–35 is estimated at approximately 3,07,000 MW as against the 2,11,855 MW installed capacity as on 31.03.2023. To meet this requirement, Ministry of Power has envisaged to set up an additional minimum 97,000 MW coal and lignite based thermal capacity. Several initiatives have already been undertaken. Thermal capacities of around 11,680 MW have already been commissioned since April 2023 till June 2025. In addition, 38,935 MW (including 5,695 MW of stressed thermal power projects) of thermal capacity is currently under construction. Further, contracts for 15,440 MW thermal capacity have been awarded and is due for construction. To meet the projected demand in the country, 35,460 MW of coal and lignite based candidate capacity has been identified, which is at various stages of planning. List of under construction central sector thermal power projects in Uttar Pradesh is given at Annexure-III. (B) 13,463.5 MW of Hydro Electric Projects are under construction. Further, 9802 MW of Hydro Electric Projects are under various stage of planning and targeted to be completed by 2031-32. (C) 6,600 MW of Nuclear Capacity is under construction and targeted to be completed by 2029-30. 7,000 MW of Nuclear Capacity is under various stages of planning and approval. (D) 1,58,450 MW Renewable Capacity including 74,150 MW of Solar, 30,080 MW of Wind and 53,750 MW Hybrid power is under construction while 62,000 MW of Renewable Capacity including 46,010 MW of Solar and 15,990 MW Hybrid Power is at various stages of planning and targeted to be completed by 2029-30. …….3.- 3 - (E) In energy storage systems, 8250 MW/49500MWh Pumped Storage Projects (PSPs) are under construction. Further, a total of 5780 MW/34680 MWh capacity of Pumped Storage Projects (PSPs) are concurred and yet to be taken up for construction. Out of these, 3500 MW/21000 MWh capacity of Pumped Storage Projects (PSPs) are under bidding and 15,829 MW/51,106 MWh Battery Energy Storage System (BESS) are currently under various stages of construction/bidding. 2. Transmission Planning: Inter and Intra-State Transmission System has been planned and implementation of the same is taken up in matching time frame of generation capacity addition. As per the National Electricity Plan, about 1,91,474 ckm of transmission lines and 1,274 GVA of transformation capacity is planned to be added (at 220 kV and above voltage level) during the ten year period from 2022-23 to 2031-32, which includes about 17,915.6 ckm of transmission lines and 95.5 GVA of transformation capacity in the State of Uttar Pradesh. 3. Distribution System Planning: Government of India has supported the States/ UTs to help them improve supply of power in urban and in rural areas earlier through schemes like Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY), Integrated Power Development Scheme (IPDS), Pradhan Mantri Sahaj Bijli Har Ghar Yojana (SAUBHAGYA) where in distribution infrastructure projects worth Rs. 1.85 lakh Cr. were executed. Presently under Revamped Distribution Sector Scheme (RDSS) infrastructure works worth Rs. 2.82 lakh Cr. have been sanctioned, including projects worth Rs 40,739 crore for the state of Uttar Pradesh. With collective efforts of Centre and States/UTs, the average hours of supply in rural and urban areas have improved to 22.6 hrs and 23.4 hrs, respectively, in FY 2025. 4. Promotion of Renewable Energy Generation: (i) Ministry of New & Renewable Energy (MNRE) has issued Bidding Trajectory for issuance of RE power procurement bids of 50 GW/annum by Renewable Energy Implementing Agencies (REIAs) from FY 2023-24 to FY 2027-28. (ii) Foreign Direct Investment (FDI) has been permitted up to 100 percent under the automatic route. ………4.- 4 - (iii) Inter State Transmission System (ISTS) charges have been waived for inter-state sale of solar and wind power for projects to be commissioned by 30th June 2025, for Green Hydrogen Projects till December 2030 and for offshore wind projects till December 2032. (iv) To boost RE consumption, Renewable Purchase Obligation (RPO) followed by Renewable Consumption Obligation (RCO) trajectory has been notified till 2029-30. The RCO which is applicable to all designated consumers under the Energy Conservation Act 2001 will attract penalties on non-compliance. RCO also includes specified quantum of consumption from Decentralized Renewable Energy sources. (v) Standard Bidding Guidelines for tariff based competitive bidding process for procurement of Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm & Dispatchable RE (FDRE) projects have been issued. (vi) Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency Solar PV Modules, New Solar Power Scheme (for Tribal and PVTG Habitations/Villages) under Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) and Dharti Aabha Janjatiya Gram Utkarsh Abhiyan (DA JGUA), National Green Hydrogen Mission, Viability Gap Funding (VGF) Scheme for Offshore Wind Energy Projects have been launched. (vii) Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being implemented to provide land and transmission to RE developers for installation of RE projects at large scale. (viii) Laying of new transmission lines and creating new sub-station capacity has been funded under the Green Energy Corridor Scheme for evacuation of renewable power. (ix) “Strategy for Establishments of Offshore Wind Energy Projects” has been issued. (x) To augment transmission infrastructure needed for steep RE trajectory, transmission plan has been prepared till 2032. (xi) Green Term Ahead Market (GTAM) has been launched to facilitate sale of Renewable Energy Power through exchanges. …….5.- 5 - (xii) To achieve the objective of increased domestic production of Solar PV Modules, the Govt. of India is implementing the Production Linked Incentive (PLI) scheme for High Efficiency Solar PV Modules. This will enable manufacturing capacity of Giga Watt (GW) scale in High Efficiency Solar PV Module. (e) : Electricity being a concurrent subject, the supply and distribution of electricity to the various categories of consumers/areas/districts in a State/UT is within the purview of the respective State Government/Power Utility. Further, as per Rule (10) of the Electricity (Rights of Consumers) Rules, 2020, the distribution licensee shall supply 24x7 power to all consumers. However, the Commission may specify lower hours of supply for some categories of consumers like agriculture. The Rules are applicable for all States and for all areas including rural and urban areas. As reported by State, the details of average daily hours of supply in rural and urban areas for Uttar Pradesh, including for the district of Moradabad, is placed at Annexure-IV. ********ANNEXURE-I ANNEXURE REFERRED IN REPLY TO PARTS (a) & (b) OF UNSTARRED QUESTION NO. 4732 ANSWERED IN THE LOK SABHA ON 21.08.2025 ************* Power Supply Position of Uttar Pradesh during the last three years and current year 2025-26 (upto June, 2025): Energy Energy Energy Not Requirement Supplied Supplied Year (MU) (MU) (MU) % 2022-23 1,44,251 1,43,050 1,201 0.8 2023-24 1,48,791 1,48,287 504 0.3 2024-25 1,65,090 1,64,786 304 0.2 2025-26 46,028 46,022 6 0.0 (upto June,2025) **************ANNEXURE-II ANNEXURE REFERRED IN REPLY TO PARTS (a) & (b) OF UNSTARRED QUESTION NO. 4732 ANSWERED IN THE LOK SABHA ON 21.08.2025 ************* Month-wise Power Supply Position of the State of Uttar Pradesh during the current year 2025-26 (upto June, 2025): Energy Energy Energy Not Requirement Supplied Supplied Year (MU) (MU) (MU) % April, 2025 13,075 13,072 3 0.0 May, 2025 16,117 16,117 0 0.0 June, 2025 16,837 16,833 4 0.0 *****************ANNEXURE-III ANNEXURE REFERRED IN REPLY TO PARTS (c) & (d) OF UNSTARRED QUESTION NO. 4732 ANSWERED IN THE LOK SABHA ON 21.08.2025 ************* List of under construction central sector Thermal Power Projects in Uttar Pradesh: Sl. Project Name / Unit Capacity Anticipated No. Implementing Agency No. (MW) date of Commissioning 1 Khurja SCTPP (THDC) U-2 660 Aug-25 2 Ghatampur TPP (NUPPL) U-2 660 Sept-25 3 Ghatampur TPP (NUPPL) U-3 660 Dec-25 4 Singrauli STPP, St-III (NTPC) U-8 800 May-29 5 Singrauli STPP, St-III (NTPC) U-9 800 Feb-30 SCTPP: Supercritical Thermal Power Project THDC: Tehri Hydro Development Corporation NUPPL: Neyveli Uttar Pradesh Power Limited STPP: Super Thermal Power Project ************ANNEXURE-IV ANNEXURE REFERRED IN REPLY TO PART (e) OF UNSTARRED QUESTION NO. 4732 ANSWERED IN THE LOK SABHA ON 21.08.2025 ************* Average Supply hours for Rural Area, Nagar Pachayat, Tehsil HQ And District HQ from UPSLDC Level (May- 2025) S.No. District Rural Area Nagar Pachayat Tehsil HQ District HQ (Scheduled 18:00 (Scheduled 21:30 hrs) (Scheduled 21:30 (Scheduled 24:00 hrs) hrs) hrs) Actual Emergency Actual Emergency Actual Emergency Actual Emergency Supply Rostering Supply Rostering Supply Rostering Supply Rostering Hours Hours Hours Hours Hours Hours Hours Hours 1 Prayagraj 18.29 - 21.35 - 21.36 - 24.00 - 2 Ballia 18.29 - 21.35 - 21.36 - 24.00 - 3 Deoria 18.29 - 21.35 - 21.36 - 24.00 - 4 Varanasi 18.29 - 21.35 - 21.36 - 24.00 - 5 Kushinagar 18.29 - 21.35 - 21.36 - 24.00 - 6 Bhadohi 18.36 - 21.35 - 21.36 - 24.00 - 7 Ghazipur 18.36 - 21.35 - 21.36 - 24.00 - 8 Mau 18.36 - 21.35 - 21.36 - 24.00 - 9 Sant Kabir Nagar 18.36 - 21.35 - 21.36 - 24.00 - 10 Sonbhadr 18.36 - 21.35 - 21.36 - 24.00 - 11 Azamgarh 18.33 - 21.35 - 21.36 - 24.00 - 12 Kaushambi 18.33 - 21.35 - 21.36 - 24.00 - 13 Maharajganj 18.33 - 21.35 - 21.36 - 24.00 - 14 Siddharthnagar 18.33 - 21.35 - 21.36 - 24.00 - 15 Pratapgarh 18.33 - 21.35 - 21.36 - 24.00 - 16 Basti 18.38 - 21.35 - 21.36 - 24.00 - 17 Chandauli 18.38 - 21.35 - 21.36 - 24.00 - 18 Fatehpur 18.38 - 21.35 - 21.36 - 24.00 - 19 Gorakhpur 18.38 - 21.35 - 21.36 - 24.00 - 20 Mirzapur 18.38 - 21.35 - 21.36 - 24.00 - 21 Jaunpur 18.38 - 21.35 - 21.36 - 24.00 - 22 Ambedkarnagar 18.36 - 21.36 - 21.38 - 24.00 - 23 Gonda 18.36 - 21.36 - 21.38 - 24.00 - 24 Lakhimpur Kheri 18.36 - 21.36 - 21.38 - 24.00 - 25 Shahjhanpur 18.36 - 21.36 - 21.38 - 24.00 - 26 Sitapur 18.36 - 21.36 - 21.38 - 24.00 - 27 Bahraich 18.41 - 21.36 - 21.38 - 24.00 - 28 Barabanki 18.41 - 21.36 - 21.38 - 24.00 - 29 Badaun 18.41 - 21.36 - 21.38 - 24.00 - 30 Pilibhit 18.41 - 21.36 - 21.38 - 24.00 - 31 Unnao 18.41 - 21.36 - 21.38 - 24.00 - 32 Amethi 18.33 - 21.36 - 21.38 - 24.00 - 33 Hardoi 18.33 - 21.36 - 21.38 - 24.00 - 34 Raebareli 18.33 - 21.36 - 21.38 - 24.00 - 35 Sharawasti 18.33 - 21.36 - 21.38 - 24.00 - 36 Balrampur 18.38 - 21.36 - 21.38 - 24.00 - 37 Bareilly 18.38 - 21.36 - 21.38 - 24.00 - 38 Ayodhya 18.38 - 21.36 - 21.38 - 24.00 - 39 Lucknow 18.38 - 21.36 - 21.38 - 24.00 - 40 Sultanpur 18.38 - 21.36 - 21.38 - 24.00 - 41 Agra 18.36 - 21.34 - 21.36 - 24.00 - 42 Auraiya 18.36 - 21.34 - 21.36 - 24.00 - 43 Firozabad 18.36 - 21.34 - 21.36 - 24.00 - 44 Kanpur 18.36 - 21.34 - 21.36 - 24.00 - 45 Etawah 18.39 - 21.34 - 21.36 - 24.00 - 46 Hathras 18.39 - 21.34 - 21.36 - 24.00 - 47 Kasganj 18.39 - 21.34 - 21.36 - 24.00 - 48 Mathura 18.39 - 21.34 - 21.36 - 24.00 - 49 Aligarh 18.34 - 21.34 - 21.36 - 24.00 -50 Farrukhabad 18.34 - 21.34 - 21.36 - 24.00 - 51 Mainpuri 18.34 - 21.34 - 21.36 - 24.00 - 52 Etah 18.36 - 21.34 - 21.36 - 24.00 - 53 Kanpur Dehat 18.36 - 21.34 - 21.36 - 24.00 - 54 Kannauj 18.36 - 21.34 - 21.36 - 24.00 - 55 Amroha 18.39 - 21.36 - 21.38 - 24.00 - 56 Bijnor 18.39 - 21.36 - 21.38 - 24.00 - 57 Rampur 18.40 - 21.36 - 21.38 - 24.00 - 58 Sambhal 18.40 - 21.36 - 21.38 - 24.00 - 59 Moradabd 18.40 - 21.36 - 21.38 - 24.00 - 60 Saharanpur 18.39 - 21.36 - 21.38 - 24.00 - NCR Area (Scheduled 24:00 Hours) 61 Gautam Buddh 24.00 - 24.00 - 24.00 - 24.00 - Nagar 62 Hapur 24.00 - 24.00 - 24.00 - 24.00 - 63 Muzaffarnagar 24.00 - 24.00 - 24.00 - 24.00 - 64 Shamli 24.00 - 24.00 - 24.00 - 24.00 - 65 Baghpat 24.00 - 24.00 - 24.00 - 24.00 - 66 Bulandshahr 24.00 - 24.00 - 24.00 - 24.00 - 67 Gahaziabad 24.00 - 24.00 - 24.00 - 24.00 - 68 Meerut 24.00 - 24.00 - 24.00 - 24.00 - Bundelkhand Rural Area (Scheduled 20:00 Hours) 69 Hamirpur 20.10 - 21.34 - 21.36 - 24.00 - 70 Mahoba 20.10 - 21.34 - 21.36 - 24.00 - 71 Chitrakoot 20.10 - 21.34 - 21.36 - 24.00 - 72 Banda 20.14 - 21.34 - 21.36 - 24.00 - 73 Jhansi 20.14 - 21.34 - 21.36 - 24.00 - 74 Jalaun 20.14 - 21.34 - 21.36 - 24.00 - 75 Lalitpur 20.14 - 21.34 - 21.36 - 24.00 -Average Supply hours for Rural Area, Nagar Pachayat, Tehsil HQ And District HQ from UPSLDC Level (June-2025) S.No. District Rural Area Nagar Pachayat Tehsil HQ District HQ (Schduled 18:00 hrs) (Schduled 21:30 hrs) (Schduled 21:30 hrs) (Schduled 24:00 hrs) Actual Emergency Actual Emergency Actual Emergency Actual Emergency Supply Rostering Supply Rostering Supply Rostering Supply Rostering Hours Hours Hours Hours Hours Hours Hours Hours 1 Prayagraj 18.25 - 21.34 - 21.40 - 24.00 - 2 Ballia 18.25 - 21.34 - 21.40 - 24.00 - 3 Deoria 18.25 - 21.34 - 21.40 - 24.00 - 4 Varanasi 18.25 - 21.34 - 21.40 - 24.00 - 5 Kushinagar 18.25 - 21.34 - 21.40 - 24.00 - 6 Bhadohi 18.36 - 21.34 - 21.40 - 24.00 - 7 Ghazipur 18.36 - 21.34 - 21.40 - 24.00 - 8 Mau 18.36 - 21.34 - 21.40 - 24.00 - 9 Sant Kabir 18.36 - 21.34 - 21.40 - 24.00 - Nagar 10 Sonbhadr 18.36 - 21.34 - 21.40 - 24.00 - 11 Azamgarh 18.34 - 21.34 - 21.40 - 24.00 - 12 Kaushambi 18.34 - 21.34 - 21.40 - 24.00 - 13 Maharajganj 18.34 - 21.34 - 21.40 - 24.00 - 14 Siddharthnagar 18.34 - 21.34 - 21.40 - 24.00 - 15 Pratapgarh 18.34 - 21.34 - 21.40 - 24.00 - 16 Basti 18.39 - 21.34 - 21.40 - 24.00 - 17 Chandauli 18.39 - 21.34 - 21.40 - 24.00 - 18 Fatehpur 18.39 - 21.34 - 21.40 - 24.00 - 19 Gorakhpur 18.39 - 21.34 - 21.40 - 24.00 - 20 Mirzapur 18.39 - 21.34 - 21.40 - 24.00 - 21 Jaunpur 18.39 - 21.34 - 21.40 - 24.00 - 22 Ambedkarnagar 18.33 - 21.35 - 21.41 - 24.00 - 23 Gonda 18.33 - 21.35 - 21.41 - 24.00 - 24 Lakhimpur 18.33 - 21.35 - 21.41 - 24.00 - Kheri 25 Shahjhanpur 18.33 - 21.35 - 21.41 - 24.00 - 26 Sitapur 18.33 - 21.35 - 21.41 - 24.00 - 27 Bahraich 18.38 - 21.35 - 21.41 - 24.00 - 28 Barabanki 18.38 - 21.35 - 21.41 - 24.00 - 29 Badaun 18.38 - 21.35 - 21.41 - 24.00 - 30 Pilibhit 18.38 - 21.35 - 21.41 - 24.00 - 31 Unnao 18.38 - 21.35 - 21.41 - 24.00 - 32 Amethi 18.28 - 21.35 - 21.41 - 24.00 - 33 Hardoi 18.28 - 21.35 - 21.41 - 24.00 - 34 Raebareli 18.28 - 21.35 - 21.41 - 24.00 - 35 Sharawasti 18.28 - 21.35 - 21.41 - 24.00 - 36 Balrampur 18.35 - 21.35 - 21.41 - 24.00 - 37 Bareilly 18.35 - 21.35 - 21.41 - 24.00 - 38 Ayodhya 18.35 - 21.35 - 21.41 - 24.00 - 39 Lucknow 18.35 - 21.35 - 21.41 - 24.00 - 40 Sultanpur 18.35 - 21.35 - 21.41 - 24.00 - 41 Agra 18.28 - 21.36 - 21.38 - 24.00 - 42 Auraiya 18.28 - 21.36 - 21.38 - 24.00 - 43 Firozabad 18.28 - 21.36 - 21.38 - 24.00 - 44 Kanpur 18.28 - 21.36 - 21.38 - 24.00 - 45 Etawah 18.35 - 21.36 - 21.38 - 24.00 - 46 Hathras 18.35 - 21.36 - 21.38 - 24.00 - 47 Kasganj 18.35 - 21.36 - 21.38 - 24.00 - 48 Mathura 18.35 - 21.36 - 21.38 - 24.00 - 49 Aligarh 18.29 - 21.36 - 21.38 - 24.00 - 50 Farrukhabad 18.29 - 21.36 - 21.38 - 24.00 - 51 Mainpuri 18.29 - 21.36 - 21.38 - 24.00 - 52 Etah 18.32 - 21.36 - 21.38 - 24.00 - 53 Kanpur Dehat 18.32 - 21.36 - 21.38 - 24.00 - 54 Kannauj 18.32 - 21.36 - 21.38 - 24.00 - 55 Amroha 18.29 - 21.40 - 21.41 - 24.00 - 56 Bijnor 18.29 - 21.40 - 21.41 - 24.00 - 57 Rampur 18.36 - 21.40 - 21.41 - 24.00 - 58 Sambhal 18.36 - 21.40 - 21.41 - 24.00 - 59 Moradabd 18.36 - 21.40 - 21.41 - 24.00 - 60 Saharanpur 18.29 - 21.40 - 21.41 - 24.00 -NCR Area (Scheduled 24:00 Hours) 61 Gautam Buddh 24.00 - 24.00 - 24.00 - 24.00 - Nagar 62 Hapur 24.00 - 24.00 - 24.00 - 24.00 - 63 Muzaffarnagar 24.00 - 24.00 - 24.00 - 24.00 - 64 Shamli 24.00 - 24.00 - 24.00 - 24.00 - 65 Baghpat 24.00 - 24.00 - 24.00 - 24.00 - 66 Bulandshahr 24.00 - 24.00 - 24.00 - 24.00 - 67 Gahaziabad 24.00 - 24.00 - 24.00 - 24.00 - 68 Meerut 24.00 - 24.00 - 24.00 - 24.00 - Bundelkhand Rural Area (Scheduled 20:00 Hours) 69 Hamirpur 20.13 - 21.36 - 21.38 - 24.00 - 70 Mahoba 20.13 - 21.36 - 21.38 - 24.00 - 71 Chitrakoot 20.13 - 21.36 - 21.38 - 24.00 - 72 Banda 20.13 - 21.36 - 21.38 - 24.00 - 73 Jhansi 20.13 - 21.36 - 21.38 - 24.00 - 74 Jalaun 20.13 - 21.36 - 21.38 - 24.00 - 75 Lalitpur 20.13 - 21.36 - 21.38 - 24.00 -Average Supply hours for Rural Area, Nagar Pachayat, Tehsil HQ And District HQ from UPSLDC Level (July-2025) Rural Area Nagar Pachayat Tehsil HQ District HQ (Schduled 18:00 hrs) (Schduled 21:30 hrs) (Schduled 21:30 hrs) (Schduled 24:00 hrs) Sl. District Actual Emergency Actual Emergency Actual Emergency Actual Emergency No. Supply Rostering Supply Rostering Supply Rostering Supply Rostering Hours Hours Hours Hours Hours Hours Hours Hours 1 Prayagraj 18.15 - 21.30 - 21.30 - 24.00 - 2 Ballia 18.15 - 21.30 - 21.30 - 24.00 - 3 Deoria 18.15 - 21.30 - 21.30 - 24.00 - 4 Varanasi 18.15 - 21.30 - 21.30 - 24.00 - 5 Kushinagar 18.15 - 21.30 - 21.30 - 24.00 - 6 Bhadohi 18.18 - 21.30 - 21.30 - 24.00 - 7 Ghazipur 18.18 - 21.30 - 21.30 - 24.00 - 8 Mau 18.18 - 21.30 - 21.30 - 24.00 - 9 Sant Kabir Nagar 18.18 - 21.30 - 21.30 - 24.00 - 10 Sonbhadr 18.18 - 21.30 - 21.30 - 24.00 - 11 Azamgarh 18.16 - 21.30 - 21.30 - 24.00 - 12 Kaushambi 18.16 - 21.30 - 21.30 - 24.00 - 13 Maharajganj 18.16 - 21.30 - 21.30 - 24.00 - 14 Siddharthnagar 18.16 - 21.30 - 21.30 - 24.00 - 15 Pratapgarh 18.16 - 21.30 - 21.30 - 24.00 - 16 Basti 18.18 - 21.30 - 21.30 - 24.00 - 17 Chandauli 18.18 - 21.30 - 21.30 - 24.00 - 18 Fatehpur 18.18 - 21.30 - 21.30 - 24.00 - 19 Gorakhpur 18.18 - 21.30 - 21.30 - 24.00 - 20 Mirzapur 18.18 - 21.30 - 21.30 - 24.00 - 21 Jaunpur 18.18 - 21.30 - 21.30 - 24.00 - 22 Ambedkarnagar 18.14 - 21.31 - 21.31 - 24.00 - 23 Gonda 18.14 - 21.31 - 21.31 - 24.00 - 24 Lakhimpur Kheri 18.14 - 21.31 - 21.31 - 24.00 - 25 Shahjhanpur 18.14 - 21.31 - 21.31 - 24.00 - 26 Sitapur 18.14 - 21.31 - 21.31 - 24.00 - 27 Bahraich 18.20 - 21.31 - 21.31 - 24.00 - 28 Barabanki 18.20 - 21.31 - 21.31 - 24.00 - 29 Badaun 18.20 - 21.31 - 21.31 - 24.00 - 30 Pilibhit 18.20 - 21.31 - 21.31 - 24.00 - 31 Unnao 18.20 - 21.31 - 21.31 - 24.00 - 32 Amethi 18.17 - 21.31 - 21.31 - 24.00 - 33 Hardoi 18.17 - 21.31 - 21.31 - 24.00 - 34 Raebareli 18.17 - 21.31 - 21.31 - 24.00 - 35 Sharawasti 18.17 - 21.31 - 21.31 - 24.00 - 36 Balrampur 18.16 - 21.31 - 21.31 - 24.00 - 37 Bareilly 18.16 - 21.31 - 21.31 - 24.00 - 38 Ayodhya 18.16 - 21.31 - 21.31 - 24.00 - 39 Lucknow 18.16 - 21.31 - 21.31 - 24.00 - 40 Sultanpur 18.16 - 21.31 - 21.31 - 24.00 - 41 Agra 18.16 - 21.30 - 21.30 - 24.00 - 42 Auraiya 18.16 - 21.30 - 21.30 - 24.00 - 43 Firozabad 18.16 - 21.30 - 21.30 - 24.00 - 44 Kanpur 18.16 - 21.30 - 21.30 - 24.00 - 45 Etawah 18.13 - 21.30 - 21.30 - 24.00 - 46 Hathras 18.13 - 21.30 - 21.30 - 24.00 - 47 Kasganj 18.13 - 21.30 - 21.30 - 24.00 - 48 Mathura 18.13 - 21.30 - 21.30 - 24.00 - 49 Aligarh 18.18 - 21.30 - 21.30 - 24.00 - 50 Farrukhabad 18.18 - 21.30 - 21.30 - 24.00 - 51 Mainpuri 18.18 - 21.30 - 21.30 - 24.00 - 52 Etah 18.20 - 21.30 - 21.30 - 24.00 - 53 Kanpur Dehat 18.20 - 21.30 - 21.30 - 24.00 - 54 Kannauj 18.20 - 21.30 - 21.30 - 24.00 - 55 Amroha 18.17 - 21.30 - 21.30 - 24.00 - 56 Bijnor 18.17 - 21.30 - 21.30 - 24.00 - 57 Rampur 18.22 - 21.30 - 21.30 - 24.00 - 58 Sambhal 18.22 - 21.30 - 21.30 - 24.00 - 59 Moradabd 18.22 - 21.30 - 21.30 - 24.00 - 60 Saharanpur 18.17 - 21.30 - 21.30 - 24.00 -NCR Area (Scheduled 24:00 Hours) Gautam Buddh 61 Nagar 24.00 - 24.00 - 24.00 - 24.00 - 62 Hapur 24.00 - 24.00 - 24.00 - 24.00 - 63 Muzaffarnagar 24.00 - 24.00 - 24.00 - 24.00 - 64 Shamli 24.00 - 24.00 - 24.00 - 24.00 - 65 Baghpat 24.00 - 24.00 - 24.00 - 24.00 - 66 Bulandshahr 24.00 - 24.00 - 24.00 - 24.00 - 67 Gahaziabad 24.00 - 24.00 - 24.00 - 24.00 - 68 Meerut 24.00 - 24.00 - 24.00 - 24.00 - Bundelkhand Rural Area (Scheduled 20:00 Hours) 69 Hamirpur 20.03 - 21.30 - 21.30 - 24.00 - 70 Mahoba 20.03 - 21.30 - 21.30 - 24.00 - 71 Chitrakoot 20.03 - 21.30 - 21.30 - 24.00 - 72 Banda 20.07 - 21.30 - 21.30 - 24.00 - 73 Jhansi 20.07 - 21.30 - 21.30 - 24.00 - 74 Jalaun 20.07 - 21.30 - 21.30 - 24.00 - 75 Lalitpur 20.07 - 21.30 - 21.30 - 24.00 - *****************