**Executive Summary**
This document is a response to Lok Sabha Unstarred Question No. 957 regarding the desiltation and sediment management proposal prepared by the Bhakra Beas Management Board (BBMB) for the State Government of Himachal Pradesh. The proposal was forwarded to the Government of Himachal Pradesh on 29.10.2025 for approval, with BBMB publishing an Expression of Interest (EOI) on 02.01.2026 for extraction and auction of the silt. The proposal is based on a revenue model with no financial outgo for BBMB.
**Key Points / Main Content**
* **Desiltation Proposal Details**
* BBMB has prepared a proposal for desilting the Bhakra Reservoir at Luhnoo Ground, District Bilaspur, Himachal Pradesh.
* The proposal aims to address sediment accumulation, promote sustainable reservoir management, and explore beneficial utilisation of desilted material.
* The project covers the reach from Mandi Bharari Bridge to Luhnoo Ground.
* Desilting is planned up to 2 metres during the 8-9 month period when the reservoir water level recedes.
* The proposal is based on a revenue model with no financial outgo for BBMB.
* **Proposal Approval and Follow-up**
* The desiltation proposal was forwarded to the Government of Himachal Pradesh on 29.10.2025 for approval.
* On 23.12.2025, Himachal Pradesh informed BBMB that Rule 33 of the Himachal Pradesh Minor Minerals Rules, 2015 permits desilting and lifting/transportation of minerals after royalty payment.
* On 31.12.2025 Himachal Pradesh intimated BBMB regarding the royalty, cess, and taxes for minerals extracted during desilting.
* BBMB published an Expression of Interest (EOI) for extraction and auction of the silt on 02.01.2026.
* **Utilisation of Desilted Material**
* The desilted material (sand, silt, and clay) is proposed to be commercially utilised by the successful bidder.
* Unusable material will be disposed of at designated sites in compliance with environmental norms.
* The successful bidder will pay royalty, cess, and taxes to the State Government, generating revenue and improving reservoir capacity.
* **International Collaboration and Funding**
* BBMB is receiving financial support under the Dam Rehabilitation and Improvement Project (DRIP) Phase II and III.
* This project is being implemented with funding and technical support from the World Bank.
* The project aims at sedimentation management, sediment control strategies, and restoration of live storage capacity around the Bhakra and Pong reservoir areas.
**Impact Analysis**
**Himachal Pradesh Government**
* **Impact:** Receives the desiltation proposal for approval and is responsible for setting royalty, cess and tax rates. Receives revenue from the successful bidder's operations and sees improvements in reservoir capacity.
* **Action Required:** Review and approve the desiltation proposal, continue to collect royalty, cess, and taxes from the successful bidder.
**Bhakra Beas Management Board (BBMB)**
* **Impact:** Responsible for executing the desiltation project, improving reservoir capacity, and facilitating the extraction and auction of silt. Obtains funding support from the Dam Rehabilitation and Improvement Project (DRIP)
* **Action Required:** Oversee the desiltation process, manage the EOI process, and coordinate with the Himachal Pradesh Government and the successful bidder.
**Successful Bidder**
* **Impact:** Obtains the right to commercially utilise the desilted material in the Bhakra Reservoir. Required to pay applicable royalty, cess, and taxes to the State Government.
* **Action Required:** Extract and commercially utilise the desilted material, dispose of unusable material according to environmental norms, and pay all applicable taxes and royalties.
Key Entities Referenced
Bhakra Beas Management Board (BBMB): The entity that prepared the desiltation and sediment management proposal for the Bhakra Reservoir and forwarded it to the Government of Himachal Pradesh.
Himachal Pradesh Minor Minerals (Concession) and Minerals (Prevention of Illegal Mining, Transportation and Storage) Rules, 2015: Rules that permit the desilting of reservoirs and lifting/transportation of minerals in Himachal Pradesh.
Himachal Pradesh: The state where the desiltation project is proposed and to whose government the proposal was forwarded.
Dam Rehabilitation and Improvement Project (DRIP) Phase II and III: A flagship project of Ministry of Jal Shakti, being implemented with funding and technical support from the World Bank that provides financial support to BBMB.
Ministry of Power: The ministry to which the question regarding the desiltation and sediment management proposal was addressed.
GOVERNMENT OF INDIA
MINISTRY OF POWER
LOK SABHA
UNSTARRED QUESTION NO.957
ANSWERED ON 05.02.2026
DESILTATION AND SEDIMENT MANAGEMENT PROPOSAL PREPARED BY BBMB
957. SHRI ANURAG SINGH THAKUR:
Will the Minister of POWER
be pleased to state:
(a) the details of the desiltation and sediment management proposal prepared by
the Bhakra Beas Management Board (BBMB) to State Government of Himachal
Pradesh, along with its objectives, estimated cost, timelines and reservoirs covered;
(b) the date on which the said desiltation/dredging proposal was forwarded to the
State Government of Himachal Pradesh for consultation or approval and whether any
reminders or follow-up communications have since been issued and if so, the details
thereof;
(c) the proposed plan for utilisation, disposal or commercial use of the desilted
material, including sand, silt and other sediments and whether any revenue or
ecological benefits are envisaged and if so, the details thereof; and
(d) whether BBMB proposes to engage any foreign agencies, international
collaborations, or advanced technical know-how for execution of the project in a cost-
effective, environmentally sustainable and time-bound manner and if so, the details
thereof?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a): Bhakra Beas Management Board (BBMB) has prepared a proposal for desilting of
Bhakra Reservoir at Luhnoo Ground in District Bilaspur, Himachal Pradesh. The
proposal aims to address sediment accumulation and loss of reservoir capacity,
promote sustainable reservoir management, and explore the beneficial utilisation of
desilted material. The project covers the reach from Mandi Bharari Bridge to Luhnoo
Ground, which has been identified as suitable for desiltation due to ease of access
and favourable sediment characteristics. The proposal envisages desilting up to a
depth of 2 metres during the available 8–9 months period in a year, when the reservoir
water level recedes and the area becomes exposed. The proposal is based on a
revenue model with no financial outgo for BBMB.
(b): The desiltation proposal was forwarded by BBMB to the Government of Himachal
Pradesh on 29.10.2025 for approval. On 23.12.2025, the Government of Himachal
Pradesh informed BBMB that Rule 33 of the Himachal Pradesh Minor Minerals
(Concession) and Minerals (Prevention of Illegal Mining, Transportation and Storage)
Rules, 2015 permits desilting of reservoirs and lifting/ transportation of mineralsgenerated after payment of royalty. Further, the Government of Himachal Pradesh on
31.12.2025 intimated BBMB the royalty, cess and taxes for the minerals to be
extracted during desilting of Bhakra Reservoir. Thereafter, BBMB on 02.01.2026 has
published an Expression of Interest (EOI) for extraction and auction of the silt.
(c): The desilted material, comprising sand, silt, and clay, is proposed to be
commercially utilised by the successful bidder. Any unusable material will be disposed
of at designated disposal sites in compliance with environmental norms. Under this
revenue model, the successful bidder will pay applicable royalty, cess, and taxes to
the State Government, thereby, generating revenue besides yielding benefits through
improved reservoir capacity and sustainable sediment management.
(d): BBMB is receiving financial support under Dam Rehabilitation and Improvement
Project (DRIP) Phase II and III, a flagship project of Ministry of Jal Shakti, Government
of India, being implemented with funding and technical support from the World Bank.
The project aims for sedimentation management, formulation of sediment control
strategies, treatment of sediment-generation hotspots and landslide-prone vulnerable
reaches around the Bhakra and Pong reservoir areas and restoration of their live
storage capacity.
*****************