Executive Summary:
The Ministry of Railways addresses the development of Akbarpur Railway Station under the Amrit Bharat Station Scheme, as part of a broader initiative to enhance passenger facilities across Indian Railways. Akbarpur station, located in Uttar Pradesh, has undergone and is undergoing various improvements including infrastructure upgrades and Divyangjan facilities. The scheme aims for long-term station redevelopment through master planning and phased implementation, with 157 stations in Uttar Pradesh identified for this purpose.
Key Points / Main Content:
Amrit Bharat Station Scheme:
* Akbarpur Railway Station in Ambedkar Nagar Lok Sabha constituency, Uttar Pradesh, is being developed under this scheme.
* The scheme focuses on long-term station redevelopment through master plans and phased implementation.
* Aims to improve station access, integrate stations with the city, upgrade buildings, and enhance passenger amenities.
* Includes provisions for wider Foot Over Bridges, lifts, escalators, platform improvements, and Divyangjan facilities.
* Promotes sustainable and environment-friendly solutions, and the potential creation of city centers at stations.
* 157 stations in Uttar Pradesh are included in the scheme.
Completed and Ongoing Works at Akbarpur Station:
* Completed: New station building, development of porches and parking, improved circulating area and platform surface, 6m Foot Over Bridge, augmented platform shelters, and toilet blocks.
* Ongoing: Signage, Divyangjan facilities (dedicated parking, low height ticket booth, tactile pathway), lighting, and platform fans.
* An approach road connecting the station to the main road already exists.
Implementation Status and Funding:
* Phase I works completed at 20 stations in Uttar Pradesh.
* Works are progressing at stations including Modinagar, Sitapur Junction, Lucknow Charbagh, Prayagraj Junction and Ghaziabad.
* Upgradation of stations is ongoing, prioritizing higher category stations.
* Significant investments have been made in customer amenities.
* Allocation of ₹4,358 crore for the financial year 2025-26 for five railway zones covering Uttar Pradesh, with ₹1,213 crore spent up to July 2025.
Challenges and Timeframe:
* Development is complex, requiring statutory clearances and managing brownfield challenges.
* Factors such as utility shifting and train operations affect completion time.
* No specific time frame for completion can be indicated.
Impact Analysis:
Passengers:
* Impact: Enhanced facilities, improved accessibility, and better overall experience at railway stations.
* Action Required: Utilize and provide feedback on new amenities and infrastructure.
Divyangjan (Persons with Disabilities):
* Impact: Improved accessibility through dedicated parking, tactile pathways, and low-height ticket booths.
* Action Required: Utilize dedicated facilities and report any issues for further improvement.
Ministry of Railways:
* Impact: Responsible for planning, funding, and overseeing the implementation of the Amrit Bharat Station Scheme.
* Action Required: Continue to allocate funds, monitor project progress, and address implementation challenges.
Zonal Railways:
* Impact: Responsible for executing the Amrit Bharat Station Scheme within their respective jurisdictions.
* Action Required: Execute works as per plan, manage funds effectively, and coordinate with various stakeholders.
Contractors and Vendors:
* Impact: Involved in construction, renovation, and provision of services for station development.
* Action Required: Adhere to project timelines, quality standards, and safety regulations.
Local Businesses:
* Impact: Potential opportunities for setting up kiosks and providing local products through schemes like "One Station One Product".
* Action Required: Participate in relevant schemes and provide quality products/services.
Key Entities Referenced
Akbarpur Railway Station: A railway station located in Uttar Pradesh, identified for development under the Amrit Bharat Station Scheme.
Ambedkar Nagar Lok Sabha constituency: A Lok Sabha constituency in Uttar Pradesh where the Akbarpur Railway Station is located.
Uttar Pradesh: A state in India where the Akbarpur Railway Station and other stations mentioned in the document are located.
Amrit Bharat Station Scheme: A scheme launched by Indian Railways for the redevelopment of railway stations with a long-term approach, including preparation of master plans and their implementation in phases.
Indian Railways: The national railway system of India, responsible for the development, upgradation, and modernization of railway stations.
SHRI ASHWINI VAISHNAW: Minister of Railways, Information Broadcasting and Electronics Information Technology.
Plan Head 53 Customer Amenities: A budgetary allocation within Indian Railways specifically for customer amenities.
Northern Railway: One of the five railway zones covering the state of Uttar Pradesh.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 4581
TO BE ANSWERED ON 20.08.2025
DEVELOPMENT OF AKBARPUR RAILWAY STATION
†4581. SHRI LALJI VERMA:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government proposes to develop Akbarpur Railway
Station in Ambedkar Nagar Lok Sabha constituency of Uttar Pradesh to
enhance passengers facilities and if so, the details thereof; and
(b) whether the Government proposes to connect the said station to the
main road through platform-3 and if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) and (b) Akbarpur station of Ambedkar Nagar Lok Sabha Constituency,
located in the state of Uttar Pradesh, has been identified for
development under Amrit Bharat Station Scheme. Works have been
completed which include:
New station building,
Development of porches,
Improvement of circulating area, Development of parking area,
6m Foot Over Bridge,
Improvement of platform surface,
Augmentation of platform shelters,
Toilet blocks
Water booths for passengers etc.
The works of signages, Divyangjan facilities including dedicated parking,
low height ticket booth, tactile pathway, lighting and platform fans have
been taken up.
Approach road connecting station to main road at Akbarpur station
already exists.
To enhance customer experience and provide better amenities,
Indian Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master
planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement,
water booths
Provision of wider Foot Over Bridge/air concoursecommensurate with passenger traffic
Provision of lift/escalators/ramp
Improvement/Provision of platform surface and cover over
platforms
Provision of kiosks for local products through schemes like
‘One Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at
each station
The scheme also envisages sustainable and environment friendly
solutions, provision of ballastless tracks etc. as per necessity,
phasing and feasibility and creation of city centre at the station in
the long term.
Under this scheme, 157 stations including Akbarpur station,located in
the state of Uttar Pradesh have been identified. List of stations
identified under this scheme in the state of Uttar Pradesh is as under:
No. of
State Amrit Names of Amrit Stations
Stations
Uttar 157 Achnera, Agra Cantt., Agra Fort, Aishbagh Jn,
Pradesh Akbarpur Jn, Aligarh, Amethi, Amroha, Anand
Nagar Jn., Aonla, Ayodhya Dham Junction,Azamgarh, Babatpur, Bachhrawan, Badaun,
Badshahnagar, Badshahpur, Baheri, Bahraich,
Balamau Jn., Ballia, Balrampur, Banaras, Banda,
Barabanki Jn, Bareilly, Bareilly City, Barhni, Basti,
Belthara Road, Bhadohi, Bharatkund, Bhatni,
Bhuteshwar, Bijnor, Bulandsahar,
ChandauliMajhwar, Chandausi, Chilbila,
Chitrakutdhamkarwi, Chopan, Chunar Jn.,
Daliganj, Darshannagar, Deoria Sadar, Dhampur,
Dildarnagar, Etawah Jn., Farrukhabad, Fatehabad,
Fatehpur, Fatehpur Sikri, Firozabad, Gajraula,
Garhmuktesar, Gauriganj, Ghatampur, Ghaziabad,
Ghazipur City, Gola Gokarnath, Gomtinagar,
Gonda, Gorakhpur, Govardhan, Govindpuri,
Gursahaiganj, Haidergarh, Hapur, Hardoi, Hathras
City, Idgah Agra Jn, Izzatnagar, Janghai Jn,
Jaunpur City, Jaunpur Jn, Kannauj, Kanpur
Anwarganj, Kanpur Bridge Left Bank, Kanpur
Central, Kaptanganj Jn, Kasganj Jn, Kashi,
Khalilabad, Khorason road, Khurja Jn., Kosi Kalan,
Kunda Harnamganj, Lakhimpur, Lalganj, Lalitpur
Jn, Lambhua, Lohta, Lucknow (Charbagh) NR,
Lucknow city, Lucknow Jn. (NER), Maa Belha Devi
Pratapgarh Junction, Maghar, Maharaja Bijli Pasi,
Mahoba Jn, Mailani Jn, Mainpuri Jn, Malhaur,
Manak Nagar, Manikpur Jn, Mariahu, Mathura Jn,
Mau Jn, Meerut City Jn, Mirzapur, Modinagar,Mohanlalganj, Moradabad Jn, Muzaffarnagar,
Nagina, Najibabad Jn, Orai, Panki Dham,
Phaphamau Jn, Phulpur, Pilibhit Jn, Pokhrayan,
Prayag Jn, Prayagraj Jn, Pt. Deen Dayal Upadhyay
Jn , Rae Bareli Jn, Raja Ki Mandi, Ramghat Halt,
Rampur Jn, Renukoot, Saharanpur Jn., Salempur,
Seohara, Shahganj Jn, Shahjahanpur, Shamli,
Shikohabad Jn., Shivpur, Siddharth nagar, Sitapur
Jn., Sonbhadra, Sri Krishna Nagar, Sultanpur Jn,
Suraimanpur, Swaminarayan Chappia, Takia,
Tulsipur, Tundla Jn., Ujhani, Unchahar, Unnao Jn,
Utraitia Jn, Varanasi Cantt., Varanasi City,
Vindhyachal, Virangana Lakshmibai Jhansi,
Vyasnagar, Zafarabad
Development works at railway stations under Amrit Bharat Station
Scheme in the state of Uttar Pradesh have been taken up at a good
pace. Till now, phase-I works of 20 stations (Ayodhya Dham, Balrampur,
Bareilly City, Bijnor, Fatehabad, Gola Gokarnath, Gomtinagar,
Govardhan, Govindpuri, Hathras City, Idgah Agra Jn, Izzatnagar, Mailani,
Pokhrayan, Ramghat Halt, Saharanpur Jn., Siddharth nagar,
Suraimanpur, Swaminarayan Chappia, Ujhani) in the state of Uttar
Pradesh have been completed under this scheme.
The works at other stations have also been taken up at good pace and
progress of some of above stations is as given below: Modinagar station: The work of improvement to station building
elevation, improvement to waiting area and toilets, 12 m wide Foot
Over Bridge, new platform shelters, have been completed and work
of minor finishing items of building, platform surfacing, signage,
improvement to circulating area and parking have been taken up.
Sitapur Junction station: The work of construction of old station
building façade, platform flooring, platform shelter, circulating area
boundary wall have been completed and works of construction of
new station building foundation, pay & use toilet renovation,
circulating area road, parking etc. have been taken up.
Lucknow (Charbagh) station: The structural works of the second
entry station building, TTE Running Hostel, Store Depot have been
completed and masonry work including other finishing works,
concourse, Foot Over Bridge, second entry circulating area, main
entry external development and platform no. 10/11 works have been
taken up.
Prayagraj Junction station: Structural work of second entry side, Rail
Mail Service & arrival, parcel & arrival buildings and basement plaza
at second entry, Electrical substation have been completed and
finishing work of these structures have been taken up. Extension
work of Foot Over Bridge no. 2 has been completed. Work of roof
plaza and relocated structures have been taken up.
Ghaziabad station: Structural work of station building at main entry
side and second entry side, foundation work of Foot Over Bridge, roofplaza, electrical substation at main entry side and second entry side,
Magistrate building, Government Railway Police and Railway
Protection Force buildings have been taken up.
Upgradation / Modernisation of stations on Indian Railways is a
continuous and ongoing process and works in this regard are undertaken
as per requirement, inter-se priority, availability of funds. The priority for
development / redevelopment / upgradation / modernisation of stations is
accorded to higher category of station over lower category of station
while sanctioning and executing the works.
Funds allotment:
Indian Railways is committed to provide enhanced and modern
amenities to passengers. During recent years, large investments have
been made by Ministry of Railways for upgradation of customer
amenities as compared earlier period. Expenditure under Plan Head–53
‘Customer Amenities’ during 2004-14, 2014-25 and 2025-26 is as under:
Expenditure under Plan Head–53 ‘Customer
Period
Amenities’
2004-14 ₹ 6,733 crores
2014-25 ₹ 35,591 crores
2025-26
₹ 3,701 crores
(up to July, 2025)
Further, development / upgradation / modernization of stations including
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure underPlan Head-53 are maintained Zonal Railway-wise and not work-wise or
station-wise or state-wise. The state of Uttar Pradesh is covered under
the jurisdiction of five railway zones, namely East Central Railway,
Northern Railway, North Central Railway, North Eastern Railway and
Western Central Railway. For these zones, an allocation of ₹ 4,358 crore
has been made for the financial year 2025–26, out of which an
expenditure (up to July, 2025) of ₹ 1,213 crore has been incurred so far.
Development / Redevelopment / Upgradation / Modernisation of Railway
Stations is complex in nature involving safety of passengers & trains and
requires various statutory clearances such as fire clearance, heritage,
tree cutting, airport clearance etc. The progress also gets affected due
to brown field related challengessuch as shifting of utilities (involving
water/sewage lines, optical fibre cables, gas pipe lines, power/signal
cables etc.), infringements, operation of trains without hindering
passenger movement, speed restrictions due to works carried out in
close proximityof tracks and high voltage power lines, etc. and these
factors affect the completion time. Therefore, no time frame can be
indicated at this stage.
*****