GOVERNMENT OF INDIA
MINISTRY OF POWER
RAJYA SABHA
UNSTARRED QUESTION NO.4155
ANSWERED ON 30.03.2026
DEVELOPMENT OF BATTERY ENERGY STORAGE SYSTEMS
4155 SHRI SANA SATHISH BABU:
Will the Minister of POWER be pleased to state:
(a) whether Government has taken any initiatives to support the development and deployment
of Battery Energy Storage Systems (BESS), if so, the details thereof;
(b) the contribution of such systems to energy security, grid stability and renewable energy
integration;
(c) details of the total capacity of existing BESS, State-wise;
(d) the adequacy of current planning, grid connection and market arrangements in encouraging
investment in battery storage; and
(e) the future policy measures to accelerate the rollout of Battery Energy Storage nationwide?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a), (b), (d) & (e): The Government of India has set a target of achieving 500 GW of installed
electricity generation capacity from non-fossil fuel-based sources by 2030, with a major share
expected from solar and wind energy, which are inherently intermittent and variable in nature.
To facilitate the integration of such variable and intermittent Renewable Energy (RE)
sources, deployment of Energy Storage Systems (ESS) is essential for storing surplus energy during
periods of high RE generation to ensure 24x7 electricity supply. ESS can also provide critical
ancillary services, including frequency regulation, voltage control, and black start capability. As per
the National Electricity Plan (2023) published by the Central Electricity Authority (CEA), a
requirement of 208 GWh of Battery Energy Storage Systems (BESS) has been projected by 2030 to
enable seamless integration of the increasing share of renewable energy in the grid.
To support this energy transition, the Government of India has undertaken a series of
coordinated policy, regulatory, demand-side, and supply-side measures to promote the development
and deployment of energy storage technologies, including BESS. The details of these measures are
provided in the Annexure-I.
(c): As per the data available with the Ministry, the State/UT wise existing BESS capacity (for
projects above 1 MWh) is provided in Annexure-II. Further, 35.8 GWh of BESS capacity is under
construction.
***************ANNEXURE-I
ANNEXURE REFERRED IN REPLY TO PARTS (a), (b), (d) & (e) OF UNSTARRED
QUESTION NO. 4155 ANSWERED IN THE RAJYA SABHA ON 30.03.2026
*************
I. Policy and Regulatory Measures
1. The Electricity Rules were amended in December 2022 to explicitly recognise Energy
Storage Systems (ESS) as an integral part of the power system, enabling their participation
across generation, transmission and distribution functions.
2. In October 2022, ESS were included in the Harmonised Master List of Infrastructure of the
Ministry of Finance, facilitating access to long-tenure and lower-cost financing.
3. In June 2023, the Government issued Guidelines for Preparation of Resource Adequacy
Plans by State utilities, under which energy storage has been incorporated as a key planning
resource for meeting peak demand and ensuring system reliability.
4. A National Framework for Promotion of Energy Storage Systems was issued in September
2023, providing a comprehensive roadmap for deployment, market integration and
regulatory facilitation of storage technologies.
5. To enhance safety and reliability of BESS installations and standardise design and
construction practices, Draft CEA (Measures Relating to Safety and Electric Supply) (First
Amendment) Regulations, 2025 and Draft Technical Standards for Construction of BESS
Regulations, 2025 have been issued.
II. Demand-Side Enablers and Market Development Measures
6. Waiver of Inter-State Transmission System (ISTS) charges has been provided for co-located
BESS projects commissioned up to June 2028, to improve project viability.
7. In January 2022, CERC allowed storage-based resources to provide ancillary services,
including secondary and tertiary reserves, enabling ESS to support real-time grid balancing
alongside conventional generators.
8. Tariff-Based Competitive Bidding (TBCB) Guidelines for procurement of BESS by
distribution licensees were notified in March 2022, creating a transparent mechanism for
large-scale storage procurement.
9. Under the Electricity (Rights of Consumers) Rules, 2020, amended in December 2022,
consumers using diesel generator sets have been mandated to shift to cleaner backup
solutions, including energy storage, within timelines specified by State Commissions.
10. Electricity supplied from BESS has been allowed to participate in the High-Price Day-Ahead
Market, launched in March 2023, enabling storage to respond to peak price signals similar
to gas-based generation.
11. The Government is implementing two Viability Gap Funding (VGF) schemes to support
development of approximately 43 GWh of Battery Energy Storage Systems, launched in
March 2024 and June 2025, to accelerate early-stage deployment.III. Supply-Side and Manufacturing-Focused Measures
12. The Ministry of Heavy Industries is implementing a Production-Linked Incentive (PLI)
Scheme with an outlay of ₹18,100 crore for establishing 50 GWh of Advanced Chemistry
Cell manufacturing capacity, of which 10 GWh is earmarked for grid-scale storage.
13. CERC has allowed separate grid connectivity during non-solar hours, enabling additional
renewable capacity at existing substations and facilitating storage-based shifting of power to
evening and night hours.
14. Through amendment of the Electricity Rules in September 2025, energy storage systems
have been permitted to be developed, owned, leased or operated by consumers, expanding
the range of ownership and business models.
15. In February 2025, CEA issued an advisory on co-location of ESS with solar power projects,
recommending storage capacity of at least 10% of installed solar capacity for a minimum
duration of two hours, to improve dispatchability of solar power.
***********ANNEXURE-II
ANNEXURE REFERRED IN REPLY TO PART (c) OF UNSTARRED QUESTION NO. 4155
ANSWERED IN THE RAJYA SABHA ON 30.03.2026
*************
Details of Battery Energy Storage Systems State/UT wise (>1 MWh capacity)
State/UT Capacity (in MWh)
Andaman & Nicobar 08
Bihar 282
Chhattisgarh 120
Delhi 50
Gujarat 77
Karnataka 150
Lakshadweep 01
Rajasthan 100
Uttar Pradesh 03
West Bengal 06
Total 798
************