See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
RAJYA SABHA
UNSTARRED QUESTION NO - 4241
ANSWERED ON - 01/04/2026
DEVELOPMENT OF MULTI-MODAL LOGISTICS PARKS (MMLPs) UNDER THE
BHARATMALA PARIYOJANA
4241 # SHRI DEEPAK PRAKASH:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS be pleased to state:-
(a) the number of Multi-Modal Logistics parks (MMLPs) proposed under Bharatmala
Pariyojana and the details of the number of projects out of these projects that are currently
under development or operational in Jharkhand;
(b) the locations of the MMLPs identified for development on a priority basis and the
current status of implementation of project at these sites;
(c) the linkages with highways, ports and inland waterways; and
(d) the expected capacity of these parks in terms of cargo handling, the details of the role
thereof in reducing transportation costs and improving logistics efficiency?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) 4 nos. of Multi-Modal Logistics Park (MMLP) Projects have been taken up for
development on Public Private Partnership (PPP) mode at Chennai, Indore, Bengaluru and
Nagpur under Bharatmala Pariyojana. The Bharatmala Pariyojana has been discontinued
since November, 2023. The work of MMLP at Chennai, Indore and Bengaluru are under
implementation. The MMLP Nagpur work was terminated on account of concessionaire's
default and the same has been re-awarded on 18.03.2026.
(b) Government in Ministry of Road Transport & Highways has prioritized 15 No. of
locations for development of MMLPs out of which 6 Projects are under implementation ,
preparation of Detailed Project Report (DPR) is in progress in 8 projects while DPR is
proposed for one project. The location-wise details are annexed.(c) Multi-Modal Logistics Parks (MMLPs) are designed to be developed as integrated
logistics hubs with connectivity through road and rail primarily, but may also include
waterways, wherever feasible, to ensure seamless and efficient freight movement through
appropriate mode to other parts of the country.
(d) The capacity of a Multi Modal Logistics Park (MMLP) is determined based on
market studies during the Detailed Project Report (DPR) and project implementation
stage. Development of MMLPs is planned in phases based on land availability, ensuring
scalability while balancing throughput and storage requirements. The capacity expressed in
Million Metric Tons Per Annum (MMTPA), is optimized with due consideration to
connectivity with key corridors such as access-controlled highways/expressways and the
Dedicated Freight Corridor, as well as overall financial viability. The capacity of awarded
MMLP projects, in terms of total cargo volumes to be handled across all modes in the
horizon year, is annexed.
At present all awarded MMLP projects are at the implementation stage and their role in
reducing transportation costs and improving logistics efficiency could be assessed once these
are completed and operationalized.ANNEXURE
ANNEXURE REFERRED IN REPLY TO PARA (b) & (d) OF THE RAJYA SABHA
UNSTARRED QUESTION NO. 4241 FOR ANSWER ON 01.04.2026 ASKED BY SHRI
DEEPAK PRAKASH REGARDING "DEVELOPMENT OF MULTI-MODAL LOGISTICS
PARKS (MMLPS) UNDER THE BHARATMALA PARIYOJANA".
Sr.No. MMLP Cargo Capacity Status
location estimated by
Authority in
MMTPA
1 Chennai 7.17 Under implementation
2 Indore 12.79 Under implementation
3 Bengaluru 29.46 Under implementation
4 Nagpur 9.47 Original work terminated; work reawarded on
18.03.2026.
5 Jogighopa -- Area development work done on Engineering
Procurement Mode(EPC) mode; Bid for partial
construction, Operation & Maintenance to be
invited
6 Jalna -- Rail terminal with rail connectivity pre-existed on
site obtained from Jawaharlal Nehru Port
Authority (JNPA) for development of Dry Port;
other facilities developed on EPC mode by
NHLML; Bid for Operation & Maintenance
awarded in March, 2025
7 Nashik -- DPR completed; project at Appraisal stage
8 Patna -- DPR completed; project at Appraisal stage
9 Anantapur -- DPR completed; project at Appraisal stage
10 Hyderabad -- DPR completed; project at Appraisal stage
11 Varanasi -- DPR completed; project at Appraisal stage
12 Pune -- DPR in progress
13 Coimbatore -- DPR in progress
14 Silchar -- DPR in progress
15 Visakhapatnam -- DPR to be prepared.
* MMTPA-Million Metric Tons per Annum
*****